Housing Urban and Rular Development Government Departments Closing in 8 days TDR #58118278

Tender For Widening And Strengthening Of Kochhit Dandeshwar Dham Mawai Gajanpur Chhatari Pure Buddhi Road In Amethi District Including 5 Year Maintenance

Issued by Government Departments · Sultanpur, Uttar Pradesh
Tender Value
17.23 Crore
Estimated cost
Bid Submission
04 Nov 2026
8 days left
EMD
34.46 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Sultanpur → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Widening And Strengthening Of Kochhit Dandeshwar Dham Mawai Gajanpur Chhatari Pure Buddhi Road In Amethi District Including 5 Year Maintenance

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 26-Oct-2026 Extend Date Date 04-Nov-2026

BOQ

Name of Work:- Widening and strengthening of Kochhit Dandeshwar Dham Mawai Gajanpur Chhatari Pure Buddhi Road in Amethi district including 5 year maintenance
Sl. No. Item Description
1Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
2Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
3Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Carted Earth For Pound Portion.
4Providing and laying granular sub-base (GSB) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in plant method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.As per Direction of E/I.
5Nodal Junction Point grade correction of emerging/branching roads.
6Providing, laying and spreading Material on a prepared sub grade, adding cement @ 4% by weight to the spread Material manually, mixing in place with rotavator, compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base.
7Nodal Junction Point grade correction of emerging/branching roads.
8Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. As per MORT&H reff.- 406
9Nodal Junction Point grade correction of emerging/branching roads.
10Providing and applying tack coat with Bitumen VG-10 using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned . as per MORT&H Sp. 503. As per Direction of E/I.
11Nodal Junction Point grade correction of emerging/branching roads.
12Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous [email protected] per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finesher with senser control to the required grade,level and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the disiered compaction as per MoRT&H specifications clause 509 complete in all respects . As per Direction of E/I.
13Nodal Junction Point grade correction of emerging/branching roads.
14Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
15Construction of earthen shoulders (Patries) with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 As per Direction of E/I.
16Nodal Junction Point grade correction of emerging/branching roads.
17Excavation in foundation in ordinary soil, loame, clay or sand including lift upto 1.50 in & lead upto 30 m Including filling watering & ramming of excavated earth into the trenches or upto the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30 m from the foundation trenches. For Drain
18Construction of Duct For Road Cross
19Cement concrete with 2 cm gauge stone gritt. Approved coarse sand and cement in the proportion of 6:3:1 insluding supply of all materials labour and T&P etc. required for poper completion of the work. For Drain
20Construction of Duct For Road Cross
21Providing plain/ Reinforced Cement Concrete in U-Tpye Drain as per Drawing and Technical Specifications For Drain
22Construction of Duct For Road Cross
23Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 For Drain
24Construction of Duct For Road Cross
25Dismentling brick work or stone work in lime or cement mortar and i/c stacking of materials as per direction of Engineer in Charge with in distance of 60 mtr.as per SOR--692
26Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
27Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification
28Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and Technical Specification
29D.P.C 25 mm thick work above plinth and top of Boundry wall i/c cost of all material t&P etc as per direction of E/I as per SI N0-600
30Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications
31Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
32One Prime coat and two coat of dry Distamper on new work i/c supply of all materials T&P etc. as per SOR SI No-(681+682)
33Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 For Construction of 1000 mm dia NP3 Hume pipe
34For Construction of 600 mm dia NP3 New Hume
35For Construction of 350 mm dia NP3 New Hume pipe
36Supply Of RCC Hume Pipes as Per Direction Of E/I. For Construction of 1000 mm dia NP3 Hume pipe
37For Construction of 600 mm dia NP3 New Hume
38For Construction of 350 mm dia NP3 New Hume pipe
39Laying & fixing of pipe with collers As per SOR Chapter-17. For Construction of 1000 mm dia NP3 Hume pipe
40For Construction of 600 mm dia NP3 New Hume
41For Construction of 350 mm dia NP3 New Hume pipe
42Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 For Construction of 1000 mm dia NP3 Hume pipe
43For Construction of 600 mm dia NP3 New Hume
44For Construction of 350 mm dia NP3 New Hume pipe
45Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. For Construction of 1000 mm dia NP3 Hume pipe
46For Construction of 600 mm dia NP3 New Hume
47For Construction of 350 mm dia NP3 New Hume pipe
48Struck pointing 1:2 in cement and fine sand mortar as per SI-13.32.1 For Construction of 1000 mm dia NP3 Hume pipe
49For Construction of 600 mm dia NP3 New Hume
50For Construction of 350 mm dia NP3 New Hume pipe
51Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 For Construction of 1000 mm dia NP3 Hume pipe
52For Construction of 600 mm dia NP3 New Hume
53For Construction of 350 mm dia NP3 New Hume pipe
54Dimolishing Brick Work in cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. For Construction of RCC culvert 1X3 M Span
55Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled material as directed by the Engineer-in-Charge within a distance of 60 metres (200 ft.) For Construction of RCC culvert 1X3 M Span
56Construction of Diversion Providing and laying rienforced cement concrete pipe 1000 dia NP3 for culvert on first class bedding in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. For Construction of RCC culvert 1X3 M Span
57Construction of subgrade and earthen shoulders with approved material obtained form borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. For Construction of RCC culvert 1X3 M Span
58Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. For Construction of RCC culvert 1X3 M Span
59Brick on edge pavement with bricks laid dry joints filled with local sand including preperation base of proper slope and its ramming spreading blinding layer of 1 cm depth of local sand over sub-base including T&P etc rwquired for proper completion of work.. For Construction of RCC culvert 1X3 M Span
60Construction of Box Cell Culvert Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. For Construction of RCC culvert 1X3 M Span
61Sand Filling in Foundation Trenches as per Drawing & Technical Specification. For Construction of RCC culvert 1X3 M Span
62Plain Cement Concrete Grade M15 in Open Fondation complete as per Drawing and Technical Specifications. For Construction of RCC culvert 1X3 M Span
63Reinforced Cement Concrete Grade M25 in Open Fondation complete as per Drawing and Technical Specifications. For Construction of RCC culvert 1X3 M Span
64Reinforced Cement Concrete Grade M30 for wall & slab etc. complete as per Drawing and Technical Specifications. For Construction of RCC culvert 1X3 M Span
65Reinforced Cement Concrete Grade M35 for wall & slab etc. complete as per Drawing and Technical Specifications. For Construction of RCC culvert 1X3 M Span
66Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in sub-structure complete as per Drawing and Technical Specifications. For Construction of RCC culvert 1X3 M Span
67Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AV pipe, extending through the full width of 1V:20H towards drawing face. Complete as per drawing and technical specification. For Construction of RCC culvert 1X3 M Span
68Drainage Spouts complete as per drawing and Technical specification. For Construction of RCC culvert 1X3 M Span
69Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. For Construction of RCC culvert 1X3 M Span
70Protection Work Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. For Construction of RCC culvert 1X3 M Span
71Plain Cement Concrete Grade M15 in Open Fondation complete as per Drawing and Technical Specifications. For Construction of RCC culvert 1X3 M Span
72Providing and laying of Filter media with granular material/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. For Construction of RCC culvert 1X3 M Span
73Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical Specification. For Construction of RCC culvert 1X3 M Span
74Providing and laying Flooring complete as per drawing and Technical Specification laid over Cement Concrete Bedding. For Construction of RCC culvert 1X3 M Span
75Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m.As per Direction of E/I. For Widening of RCC culvert 1X4 M Span
76Providing and laying in cement concrete 1:4:8 (1cement:4 fine sand:8graded stone ballast 40 mm nominal size) and curing complete including supply all materials, labour and T&P etc. required for proper completion of the work. As per SOR Chapter-5 (4.1.8) For Widening of RCC culvert 1X4 M Span
77Brick masonry work in 1:4 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications as per SOR Chapter-6 (6.1.1) For Widening of RCC culvert 1X4 M Span
78Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but including the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately).All works above plinth level upto floor V level.As per SOR Chapter-5 (5.33.2) For Widening of RCC culvert 1X4 M Span
79Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and Technical Specification For Widening of RCC culvert 1X4 M Span
80Plastering with cement mortar (1:4 ) on brick work in sub-structure.As per SOR Chapter-11 (13.4.1) For Widening of RCC culvert 1X4 M Span
81S/F KM Stone,Hecto-stone, etc complete work
82The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.00% of tenderd cost of Construction as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
83The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25% of tenderd cost of Construction as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
84The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50% of tenderd cost of Construction as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
85The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75% of tenderd cost of Construction as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
86The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00% of tenderd cost of Construction as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024 Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58118278
AUTHORITY Government Departments
TENDER VALUE 17.23 Crore
LAST DATE 04-11-2026
Authority
Authority Name Public Works Department
Work Description Tender for Widening And Strengthening Of Kochhit Dandeshwar Dham Mawai Gajanpur Chhatari Pure Buddhi Road In Amethi District Including 5 Year Maintenance
Basic Detail
Tender No 3592/ 1com. su.a cir / 2026-27 Dt 30.09.2026
Bidding Type Tender
Location
City Sultanpur
State Uttar Pradesh
Key Dates
Publish Date 26 Oct 2026
Submission Date 04 Nov 2026
Open Date 04 Nov 2026
Finance
Tender Value 17.23 Crore
Tender Fee 2714
EMD 34.46 Lakhs
Exemption Available
Document List
7b1df8ca-ce38-4150-8ab6-f5ef71f048b4.html
BOQ_2265435.xls
Tendernotice_1.pdf
Tendernotice_2.pdf
Tendernotice_3.pdf
Tendernotice_4.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 26, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 04, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 8 days
Nov 04, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Nov 04, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 8 days

Tender Documents

Download All (ZIP) ↓
html

7b1df8ca-ce38-4150-8ab6-f5ef71f048b4.html

xls

BOQ_2265435.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

pdf

Tendernotice_3.pdf

pdf

Tendernotice_4.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender