Tender For Survey, Supply, Installation, Testing, And Commissioning (Sitc) Of On-Grid Solar Pv Power Plant On Rooftop / On Ground Or Suitable Location In The Premises Of Belpatti Pumping W/S Scheme (Stage-I, Ii, Iii, Iv & V) At Block-Gangolihat, Dist
Tender Overview
Project Description
Tender for Survey, Supply, Installation, Testing, And Commissioning (Sitc) Of On-Grid Solar Pv Power Plant On Rooftop / On Ground Or Suitable Location In The Premises Of Belpatti Pumping W/S Scheme (Stage-I, Ii, Iii, Iv & V) At Block-Gangolihat, Distt- Pithoragarh, Including All Associated Electrical, Civil, And Mechanical Works Under State Sector Programme.
BOQ
| Sl. No. | Item Description |
| 1 | SITC OF 18 KW SOLAR POWER PLANT (STAGE-I) |
| 2 | Solar PANEL :- SPV MODULES MONO PERC HALF CUT 540Wp / 545 Wp Modules |
| 3 | Inverter- Inverter: House MPPT, output should compatible with grid frequency. IGBT/MOSFET, Microprodessor, DSP, 415V, 3 Phase, 50Hz +3%, Ambient tem -20 dec to +50Deg, Humidity 95%, Protection IP-20 forindoor and IP-65 outdoor. |
| 4 | Structure- fixed type structure with all required material for execution, wind Speed 180 kmph. Including Civil Work – PCC under solar panel and Foundation M20. |
| 5 | ACDB & DCDB Standard MCCB |
| 6 | AC Cable Inverter to ACDB: (copper flexible)ACDB to LT Panel: 4 core Arm solid Al conductor, XLPE insulated. |
| 7 | DC Cable (1C 4sq. mm annealed tinned flexible copper conductor solar DC cable). |
| 8 | Earthing with Protection Including Earthing Electrode (Copper Bonded with Chemical) with Earthing Strip: 25mmx3mm GI Type and Lighting Arrestor. |
| 9 | Net & Solar Meter with Obtaining statutory approvals / clearances. |
| 10 | Mounting Adhesive ● Chemical Type Fasteners● Adhesive SS/ Hot Dip GI FOSROC/ FISHERS |
| 11 | Miscellaneous items Cable Lug ,MC4 Connector,Cable Tie,Glands Hardware etc |
| 12 | Installation & Commissioning of solar system |
| 13 | Transportation |
| 14 | SITC OF 15 KW SOLAR POWER PLANT (STAGE-II) |
| 15 | Solar PANEL :- SPV MODULES MONO PERC HALF CUT 540Wp / 545 Wp Modules, |
| 16 | Inverter- Inverter: House MPPT,,output should compatible with grid frequency. IGBT/MOSFET, Microprodessor, DSP, 415V, 3 Phase, 50Hz +3%, Ambient tem -20 dec to +50Deg, Humidity 95%, Protection IP-20 forindoor and IP-65 outdoor. |
| 17 | Structure- fixed type structure with all required material for execution, wind Speed 180 kmph. Including Civil Work – PCC under solar panel and Foundation M20 . |
| 18 | ACDB & DCDB Standard MCCB |
| 19 | AC Cable Inverter to ACDB: (copper flexible)ACDB to LT Panel: 4 core Arm solid Al conductor, XLPE insulated. |
| 20 | DC Cable (1C 4sq. mm annealed tinned flexible copper conductor solar DC cable) . |
| 21 | Earthing with Protection Including Earthing Electrode (Copper Bonded with Chemical) with Earthing Strip: 25mmx3mm GI Type and Lighting Arrestor |
| 22 | Net & Solar Meter with Obtaining statutory approvals / clearances |
| 23 | Mounting Adhesive ● Chemical Type Fasteners● Adhesive SS/ Hot Dip GI FOSROC/ FISHERS |
| 24 | Miscellaneous items Cable Lug ,MC4 Connector,Cable Tie,Glands Hardware etc |
| 25 | Installation & Commissioning of solar system |
| 26 | Transportation |
| 27 | SITC OF 10 KW SOLAR POWER PLANT (STAGE-III) |
| 28 | Solar PANEL :- SPV MODULES MONO PERC HALF CUT 540Wp / 545 Wp Modules, |
| 29 | Inverter- Inverter: House MPPT, output should compatible with grid frequency. IGBT/MOSFET, Microprodessor, DSP, 415V, 3 Phase, 50Hz +3%, Ambient tem -20 dec to +50 Deg, Humidity 95%, Protection IP-20 forindoor and IP-65 outdoor. |
| 30 | Structure- fixed type structure with all required material for execution, wind Speed 180 kmph. Including Civil Work – PCC under solar panel and Foundation M20. |
| 31 | ACDB & DCDB Standard MCCB |
| 32 | AC Cable Inverter to ACDB: (copper flexible)ACDB to LT Panel: 4 core Arm solid Al conductor, XLPE insulated. |
| 33 | DC Cable (1C 4sq. mm annealed tinned flexible copper conductor solar DC cable) . |
| 34 | Earthing with Protection Including Earthing Electrode (Copper Bonded with Chemical) with Earthing Strip: 25mmx3mm GI Type and Lighting Arrestor |
| 35 | Net & Solar Meter with Obtaining statutory approvals / clearances |
| 36 | Mounting Adhesive ● Chemical Type Fasteners● Adhesive SS/ Hot Dip GI FOSROC/ FISHERS |
| 37 | Miscellaneous items Cable Lug ,MC4 Connector,Cable Tie,Glands Hardware etc |
| 38 | Installation & Commissioning of solar system |
| 39 | Transportation |
| 40 | SITC OF 25 KW SOLAR POWER PLANT (STAGE-IV) |
| 41 | Solar PANEL :- SPV MODULES MONO PERC HALF CUT 540Wp / 545 Wp Modules, |
| 42 | Inverter- Inverter: House MPPT,,output should compatible with grid frequency. IGBT/MOSFET, Microprodessor, DSP, 415V, 3 Phase, 50Hz +3%, Ambient tem -20 dec to +50 Deg, Humidity 95%, Protection IP-20 forindoor and IP-65 outdoor. |
| 43 | Structure- fixed type structure with all required material for execution, wind Speed 180 kmph. Including Civil Work – PCC under solar panel and Foundation M20 . |
| 44 | ACDB & DCDB Standard MCCB |
| 45 | AC Cable Inverter to ACDB: (copper flexible)ACDB to LT Panel: 4 core Arm solid Al conductor, XLPE insulated. |
| 46 | DC Cable (1C 4sq. mm annealed tinned flexible copper conductor solar DC cable) . |
| 47 | Earthing with Protection Including Earthing Electrode (Copper Bonded with Chemical) with Earthing Strip: 25mmx3mm GI Type and Lighting Arrestor |
| 48 | Net & Solar Meter with Obtaining statutory approvals / clearances |
| 49 | Mounting Adhesive ● Chemical Type Fasteners● Adhesive SS/ Hot Dip GI FOSROC/ FISHERS |
| 50 | Miscellaneous items Cable Lug ,MC4 Connector,Cable Tie,Glands Hardware etc |
| 51 | Installation & Commissioning of solar system |
| 52 | Transportation |
| 53 | SITC OF 15 KW SOLAR POWER PLANT (STAGE-V) |
| 54 | Solar PANEL :- SPV MODULES MONO PERC HALF CUT 540Wp / 545 Wp Modules, |
| 55 | Inverter- Inverter: House MPPT, output should compatible with grid frequency. IGBT/MOSFET, Microprodessor, DSP, 415V, 3 Phase, 50Hz +3%, Ambient tem -20 dec to +50Deg, Humidity 95%, Protection IP-20 forindoor and IP-65 outdoor. |
| 56 | Structure- fixed type structure with all required material for execution, wind Speed 180 kmph. Including Civil Work – PCC under solar panel and Foundation M20 . |
| 57 | ACDB & DCDB Standard MCCB |
| 58 | AC Cable Inverter to ACDB: (copper flexible)ACDB to LT Panel: 4 core Arm solid Al conductor, XLPE insulated. |
| 59 | DC Cable (1C 4sq. mm annealed tinned flexible copper conductor solar DC cable) . |
| 60 | Earthing with Protection Including Earthing Electrode (Copper Bonded with Chemical) with Earthing Strip: 25mmx3mm GI Type and Lighting Arrestor |
| 61 | Net & Solar Meter with Obtaining statutory approvals / clearances |
| 62 | Mounting Adhesive ● Chemical Type Fasteners● Adhesive SS/ Hot Dip GI FOSROC/ FISHERS |
| 63 | Miscellaneous items Cable Lug ,MC4 Connector,Cable Tie,Glands Hardware etc |
| 64 | Installation & Commissioning of solar system |
| 65 | Transportation Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender