Tender For Laying Of Reinforced Cement Concrete Hume Pipe In Different Locations, Cleaning Of Existing R..C.C Hume Pipe Culvert And Box Culvert, Supplying And Laying Sandbags As And When Required At Mines & Cleaning Of Jungle At Workshop Complex And
Tender Overview
Project Description
Tender for Laying Of Reinforced Cement Concrete Hume Pipe In Different Locations, Cleaning Of Existing R..C.C Hume Pipe Culvert And Box Culvert, Supplying And Laying Sandbags As And When Required At Mines & Cleaning Of Jungle At Workshop Complex And Dg Room C Us Of Hingula Ocp Under Hingula Area..
BOQ
| Sl. No. | Item Description |
| 1 | Item Description/ Heading |
| 2 | (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines,grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications ) |
| 3 | Laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 1800 mm dia RCC pipes. (Laying by manual/ machenical means) |
| 4 | Laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 1200 mm dia RCC pipes. (Laying by manual/ machanical means) |
| 5 | Laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 900 mm dia RCC pipes. |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 7 | Regular cleaning of water logged areas along mines roads by making channels to side drains or by building out the water removal of chocked materials from drains as per instruction of EIC.( Scope of work 04 Nos unskilled manpower Per day ) |
| 8 | Supplying and laying sand bags using empty cement bags filled with locally avoilable sand 2/3rd of its capacity and binding alive labour with carriage to work site etc complete as per instruction of EIC. |
| 9 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 10 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 11 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender