Defence Statutory Bodies & Commissions/Committees Closing in 18 days TDR #58115524

Tender For Special Repair/ Replacement Of Essential Electrical Infrastructure Alongwith Restoration Resolving Critical Grid Remediation Including Repair Strategic Network Mains And Fault Rectification With System Upgrades Having Network Wiring And In

Issued by Statutory Bodies & Commissions/Committees · Patiala, Punjab
Tender Value
1.40 Crore
Estimated cost
Bid Submission
14 Nov 2026
18 days left
EMD
2.15 Lakhs
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Patiala → Punjab
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Special Repair/ Replacement Of Essential Electrical Infrastructure Alongwith Restoration Resolving Critical Grid Remediation Including Repair Strategic Network Mains And Fault Rectification With System Upgrades Having Network Wiring And Insulation Backup Power And Generator Readiness Main And Connected Items Under Ge (N) Patiala

BOQ

Name of Work:- SPECIAL REPAIR/ REPLACEMENT OF ESSENTIAL ELECTRICAL INFRASTRUCTURE ALONGWITH RESTORATION RESOLVING CRITICAL GRID REMEDIATION INCLUDING REPAIR STRATEGIC NETWORK MAINS AND FAULT RECTIFICATION WITH SYSTEM UPGRADES HAVING NETWORK WIRING AND INSULATION BACKUP POWER AND GENERATOR READINESS MAIN AND CONNECTED ITEMS UNDER GE (N) PATIALA
Sl. No. Item Description
1Material and labour for complete dismantling of old Mechanical on load changeover supply system 3 phase type and replacement with Phase failure and under voltage monitoring of primary supply. Interlocked contactor switching. Microprocessor based Auto changeover system 3 phase 415 volts AC load of 400 Amp applications with unbalanced loads where single-phase loads are unevenly distributed with the following technical specifications are standard for industrial-grade units. AUTO Changeover switching. Manual override of supplies. Supply available indication. Supply in use indication. Adjustable time delay between switching. with new on load auto interlock changeover system equipped with two switchgear contactors not less than 70 Amps three pole and following parameters Limit the Inrush Current, Improve the THD/PF at Light Load or High Line, Improved Stability with a Type 2 Compensation Network--Phase Unbalance, Auto Phase Reversal tripping suitable for 3 phase load of Potential Transformer , Phase Missing Under Voltage and Over Voltage Monitor and Control, Neutral Open Protection. ALSO SPECIAL ZERO CROSSING SWITCHING OPERATION PROTECTION SYSTEM BUILT WITH SCROLLING DIGITAL DISPLAY OF LINE PHASE VOLTAGES AND LINE CURRENT INCLUDING FREQUENCY AND POWER FACTOR Phase Un balance (1 to 20%) (Adjustable) Power consumption 15VA / 3W Setting Accuracy voltage ± 4V, Minimum setting current 0.5A, Maximum setting current =5A (Above 5A - external CT setting max.1000/5 in steps of 5), Setting Accuracy Current ± 5% of full scale ±1digit, Trip time delay1 to 250secs settable for UB, OV, UV , Trip time accuracy± 1% of set delay ±2sec., Trip setting, Phase failure 3 sec Max. factory set., Phase Reversal Auto tripping, Phase Un balance1 to 20% (Adjustable), Under Voltage and over voltage 5V to 60V AC (Adjustable Individually ), Recovery Time2 sec Min Power On Delay10 sec Max., Service life(under no load) 10Lakh operations minimum , Electrical life, (under full load) 10 Lakh operations minimum PROTECTION SYSTEM SHOULD BE PROVIDED WITH EACH FAULT DIGITAL ,Compensation of each phase, Measure power factor , total watts, total VAr, total KWH, Total KVArh, Programmable THD protection, Programmable Discharge Time Core Technical Specifications Current Rating: 400A (Continuous duty per phase). Operating Voltage: 415V AC, 3-Phase + Neutral (4-wire system). Microprocessor Control:
2Uses a microcontroller (such as an ATMEGA or PIC series) to monitor voltage and current in real-time, providing high accuracy compared to traditional thermal-magnetic switches. Unbalance Support: Specifically engineered for unbalanced loads, meaning it can manage different current draws across the three phases without tripping prematurely, provided the individual phase limit is not exceeded. Switching Mechanism: Typically contactor-based with a mechanical and electrical interlock to prevent cross-connection between sources. In both Auto / Manual Mode Intelligent Reconnection: If a trip occurs due to temporary overload, the microprocessor can attempt a set number of auto-resets (typically 5 cycles) with increasing time delays complete all as directed by Engineer-in-charge. Make:- PARTNER/ HAVELLS /SIEMENS/SCHNIDER/BCH/L&T/Elmeasure. Note :- The Entire work at site is to be executed only by OEM approved by GE
3Material and labour for complete dismantling of old Mechanical on load changeover supply system 3 phase type and replacement with Phase failure and under voltage monitoring of primary supply. Interlocked contactor switching. Microprocessor based Auto changeover system 3 phase 415 volts AC load of 200 Amp applications with unbalanced loads where single-phase loads are unevenly distributed with the following technical specifications are standard for industrial-grade units. AUTO Changeover switching. Manual override of supplies. Supply available indication. Supply in use indication. Adjustable time delay between switching. with new on load auto interlock changeover system equipped with two switchgear contactors not less than 70 Amps three pole and following parameters Limit the Inrush Current, Improve the THD/PF at Light Load or High Line, Improved Stability with a Type 2 Compensation Network--Phase Unbalance, Auto Phase Reversal tripping suitable for 3 phase load of Potential Transformer , Phase Missing Under Voltage and Over Voltage Monitor and Control, Neutral Open Protection. ALSO SPECIAL ZERO CROSSING SWITCHING OPERATION PROTECTION SYSTEM BUILT WITH SCROLLING DIGITAL DISPLAY OF LINE PHASE VOLTAGES AND LINE CURRENT INCLUDING FREQUENCY AND POWER FACTOR Phase Un balance (1 to 20%) (Adjustable) Power consumption 15VA / 3W Setting Accuracy voltage ± 4V, Minimum setting current 0.5A, Maximum setting current =5A (Above 5A - external CT setting max.1000/5 in steps of 5), Setting Accuracy Current ± 5% of full scale ±1digit, Trip time delay1 to 250secs settable for UB, OV, UV , Trip time accuracy± 1% of set delay ±2sec., Trip setting, Phase failure 3 sec Max. factory set., Phase Reversal Auto tripping, Phase Un balance1 to 20% (Adjustable), Under Voltage and over voltage 5V to 60V AC (Adjustable Individually ),
4Recovery Time2 sec Min Power On Delay10 sec Max., Service life(under no load) 10Lakh operations minimum , Electrical life, (under full load) 10 Lakh operations minimum PROTECTION SYSTEM SHOULD BE PROVIDED WITH EACH FAULT DIGITAL ,Compensation of each phase, Measure power factor , total watts, total VAr, total KWH, Total KVArh, Programmable THD protection, Programmable Discharge Time Core Technical Specifications Current Rating: 200A (Continuous duty per phase). Operating Voltage: 415V AC, 3-Phase + Neutral (4-wire system). Microprocessor Control: Uses a microcontroller (such as an ATMEGA or PIC series) to monitor voltage and current in real-time, providing high accuracy compared to traditional thermal-magnetic switches. Unbalance Support: Specifically engineered for unbalanced loads, meaning it can manage different current draws across the three phases without tripping prematurely, provided the individual phase limit is not exceeded. Switching Mechanism: Typically contactor-based with a mechanical and electrical interlock to prevent cross-connection between sources. In both Auto / Manual Mode Intelligent Reconnection: If a trip occurs due to temporary overload, the microprocessor can attempt a set number of auto-resets (typically 5 cycles) with increasing time delays complete all as directed by Engineer-in-charge. Make:- PARTNER/HAVELLS /SIEMENS/SCHNIDER/BCH/L&T/Elmeasure. Note :- The Entire work at site is to be executed only by OEM approved by GE
5Material and labour for complete dismantling of old Mechanical on load changeover supply system 3 phase type and replacement with Phase failure and under voltage monitoring of primary supply. Interlocked contactor switching. Microprocessor based Auto changeover system 3 phase 415 volts AC load of 100 Amp applications with unbalanced loads where single-phase loads are unevenly distributed with the following technical specifications are standard for industrial-grade units. AUTO Changeover switching. Manual override of supplies. Supply available indication. Supply in use indication. Adjustable time delay between switching. with new on load auto interlock changeover system equipped with two switchgear contactors not less than 70 Amps three pole and following parameters Limit the Inrush Current, Improve the THD/PF at Light Load or High Line, Improved Stability with a Type 2 Compensation Network--Phase Unbalance, Auto Phase Reversal tripping suitable for 3 phase load of Potential Transformer , Phase Missing Under Voltage and Over Voltage Monitor and Control, Neutral Open Protection. ALSO SPECIAL ZERO CROSSING SWITCHING OPERATION PROTECTION SYSTEM BUILT WITH SCROLLING DIGITAL DISPLAY OF LINE PHASE VOLTAGES AND LINE CURRENT INCLUDING FREQUENCY AND POWER FACTOR Phase Un balance (1 to 20%) (Adjustable) Power consumption 15VA / 3W Setting Accuracy voltage ± 4V, Minimum setting current 0.5A, Maximum setting current =5A (Above 5A - external CT setting max.1000/5 in steps of 5), Setting Accuracy Current ± 5% of full scale ±1digit, Trip time delay1 to 250secs settable for UB, OV, UV , Trip time accuracy± 1% of set delay ±2sec., Trip setting, Phase failure 3 sec Max. factory set., Phase Reversal Auto tripping, Phase Un balance1 to 20% (Adjustable), Under Voltage and over voltage 5V to 60V AC (Adjustable Individually ),
6Recovery Time2 sec Min Power On Delay10 sec Max., Service life(under no load) 10Lakh operations minimum , Electrical life, (under full load) 10 Lakh operations minimum PROTECTION SYSTEM SHOULD BE PROVIDED WITH EACH FAULT DIGITAL ,Compensation of each phase, Measure power factor , total watts, total VAr, total KWH, Total KVArh, Programmable THD protection, Programmable Discharge Time Core Technical Specifications Current Rating: 100A (Continuous duty per phase). Operating Voltage: 415V AC, 3-Phase + Neutral (4-wire system). Microprocessor Control: Uses a microcontroller (such as an ATMEGA or PIC series) to monitor voltage and current in real-time, providing high accuracy compared to traditional thermal-magnetic switches. Unbalance Support: Specifically engineered for unbalanced loads, meaning it can manage different current draws across the three phases without tripping prematurely, provided the individual phase limit is not exceeded. Switching Mechanism: Typically contactor-based with a mechanical and electrical interlock to prevent cross-connection between sources. In both Auto / Manual Mode Intelligent Reconnection: If a trip occurs due to temporary overload, the microprocessor can attempt a set number of auto-resets (typically 5 cycles) with increasing time delays complete all as directed by Engineer-in-charge. Make:- PARTNER /HAVELLS /SIEMENS/SCHNIDER/BCH/L&T/Elmeasure Note :- The Entire work at site is to be executed only by OEM approved by GE
7Material and labour for complete dismantling of old Mechanical on load changeover supply system 3 phase type and replacement with Phase failure and under voltage monitoring of primary supply. Interlocked contactor switching. Microprocessor based Auto changeover system 3 phase 415 volts AC load of 63 Amp applications with unbalanced loads where single-phase loads are unevenly distributed with the following technical specifications are standard for industrial-grade units. AUTO Changeover switching. Manual override of supplies. Supply available indication. Supply in use indication. Adjustable time delay between switching. with new on load auto interlock changeover system equipped with two switchgear contactors not less than 70 Amps three pole and following parameters Limit the Inrush Current, Improve the THD/PF at Light Load or High Line, Improved Stability with a Type 2 Compensation Network--Phase Unbalance, Auto Phase Reversal tripping suitable for 3 phase load of Potential Transformer , Phase Missing Under Voltage and Over Voltage Monitor and Control, Neutral Open Protection. ALSO SPECIAL ZERO CROSSING SWITCHING OPERATION PROTECTION SYSTEM BUILT WITH SCROLLING DIGITAL DISPLAY OF LINE PHASE VOLTAGES AND LINE CURRENT INCLUDING FREQUENCY AND POWER FACTOR Phase Un balance (1 to 20%) (Adjustable) Power consumption 15VA / 3W Setting Accuracy voltage ± 4V, Minimum setting current 0.5A, Maximum setting current =5A (Above 5A - external CT setting max.1000/5 in steps of 5), Setting Accuracy Current ± 5% of full scale ±1digit, Trip time delay1 to 250secs settable for UB, OV, UV , Trip time accuracy± 1% of set delay ±2sec., Trip setting, Phase failure 3 sec Max. factory set., Phase Reversal Auto tripping, Phase Un balance1 to 20% (Adjustable), Under Voltage and over voltage 5V to 60V AC (Adjustable Individually ),
8Recovery Time2 sec Min Power On Delay10 sec Max., Service life(under no load) 10Lakh operations minimum , Electrical life, (under full load) 10 Lakh operations minimum PROTECTION SYSTEM SHOULD BE PROVIDED WITH EACH FAULT DIGITAL ,Compensation of each phase, Measure power factor , total watts, total VAr, total KWH, Total KVArh, Programmable THD protection, Programmable Discharge Time Core Technical Specifications Current Rating: 63A (Continuous duty per phase). Operating Voltage: 415V AC, 3-Phase + Neutral (4-wire system). Microprocessor Control: Uses a microcontroller (such as an ATMEGA or PIC series) to monitor voltage and current in real-time, providing high accuracy compared to traditional thermal-magnetic switches. Unbalance Support: Specifically engineered for unbalanced loads, meaning it can manage different current draws across the three phases without tripping prematurely, provided the individual phase limit is not exceeded. Switching Mechanism: Typically contactor-based with a mechanical and electrical interlock to prevent cross-connection between sources. In both Auto / Manual Mode Intelligent Reconnection: If a trip occurs due to temporary overload, the microprocessor can attempt a set number of auto-resets (typically 5 cycles) with increasing time delays complete all as directed by Engineer-in-charge. Make:- PARTNER /HAVELLS /SIEMENS/SCHNIDER/BCH/L&T/Elmeasure. Note :- The Entire work at site is to be executed only by OEM approved by GE
9Material and labour for dismantling of old unit and replacement with Microprocessor base automation switch Device application Change source of supply Poles description 2P Network type AC Network frequency 50/60 Hz Downside connection Screwed Mounting mode Fixed Upside connection Screwed load Contact position indicator rated short-circuit making capacity 15 kA switch-disconnect or alone 400 V AC at 50 Hz 75 kA with upstream protection circuit breaker 400 V AC at 50 Hz Suitability for isolation Complementary Load switch class PC Number of contact position 3 Signal contacts composition 1 NO + 2 NC 1 NC + 2 NO 2 NO Utilization category rated operational voltage 230 V AC 50/60 Hz Control type 4 push-buttons Operating mode Automatic Manual Display type LCD screen Mounting support Plate rated insulation voltage Switch: 800 V Controller: 500 V rated impulse withstand voltage Switch: 6 kV Controller: 6 kV [Ie] rated operational current 32 conventional free air thermal current 32 A at 60 °C Environment Standards IEC 60947-6-1 auto mode Inside the enclosure: IP20 manual mode Ambient air temperature for operation -25…70 °C Ambient air temperature for storage -40…85 °C equipped with Phase Missing Under Voltage and Over Voltage Monitor and Control, Neutral Open Protection. ALSO SPECIAL ZERO CROSSING SWITCHING OPERATION PROTECTION SYSTEM BUILT WITH SCROLLING DIGITAL DISPLAY OF LINE PHASE VOLTAGES AND LINE CURRENT INCLUDING FREQUENCY AND POWER FACTOR Phase Un balance (1 to 20%) (Adjustable) Power consumption 15VA / 3W Setting Accuracy voltage ± 4V, Minimum setting current 0.5A, Maximum setting current =5A (Above 5A - external CT setting max.1000/5 in steps of 5), Setting Accuracy Current ± 5% of full scale ±1digit, Trip time delay1 to 250secs settable for UB, OV, UV , Trip time accuracy± 1% of set delay ±2sec., Trip setting, Phase failure 3 sec Max. factory set., Phase Reversal Auto tripping, Phase Un balance1 to 20% (Adjustable), Under Voltage and over voltage 5V to 60V AC (Adjustable Individually ), Recovery Time2 sec Min Power On Delay10 sec Max., Service life(under no load) 10Lakh operations minimum , Electrical life, (under full load) 10 Lakh operations minimum PROTECTION SYSTEM SHOULD BE PROVIDED WITH EACH FAULT DIGITAL ,Compensation of each phase, Measure power factor , total watts, total VAr, total KWH, Total KVArh, Programmable THD protection, Programmable Discharge Time Core Technical Specifications Current Rating: 32 A (Continuous duty per phase). Operating Voltage: 230 AC, 1-Phase + Neutral (4-wire system). Microprocessor Control: Uses a microcontroller (such as an ATMEGA or PIC series) to monitor voltage and current in real-time, providing high accuracy compared to traditional thermal-magnetic switches. Unbalance Support: Specifically engineered for unbalanced loads, meaning it can manage different current draws across the three phases without tripping prematurely, provided the individual phase limit is not exceeded.
10Switching Mechanism: Typically contactor-based with a mechanical and electrical interlock to prevent cross-connection between sources. In both Auto / Manual Mode Intelligent Reconnection: If a trip occurs due to temporary overload, the microprocessor can attempt a set number of auto-resets (typically 5 cycles) with increasing time delays. MAKE PARTNER /SIEMENS/SCHNIDER/BCH/L&T/Elmeasure Note :- The Entire work at site is to be executed only by OEM approved by GE
11Dismantling of old Ammeter/Voltmeter of any type & Make with replacing new MFM MULTLTIFUNCTION METER supply voltage (85...253 V a.c.), (40...50...400 hz) , (90...300 V d.c.) or (20...40 V a.c.), (20...60 V d.c.) power consumption ≤ 6 VA power consumption in voltage circuit ≤ 0.2 VA in current circuit ≤ 0.1 VA input signal (0...0.1...1.2) In; (0.1…0.2...1.2) Un for current, voltage, Pfi, frequency (45...50...60...65 hz,) sinusoidal (Thd ≤ 8%) power factor (-1…0…1 )preheating time 5 min. ambient temperature ( -10…23…55°C,) class k55 acc. to EN61557-12 Humidity (0...40...65…95%) without condensation operating position any external magnetic field ≤ 40…400 A/m d.c. ≤ 3 A/m a.c. 50/60 hz short-term overload voltage input: 2 Un (5 sec.) current input 50 A (1 sec.) admissible crest factor current: 2 voltage: 2 additional error (in % of the intrinsic error) from ambient temperature change: < 50% / 10°C On-site programmable for Primary & Secondary values On-site user selectable system - 3Φ- 3/4W unbalance or 1Φ 2W network Individual Harmonics – up to 31st Level for Voltage & Current % THD Measurement User assignable screens User Assignable Registers for quick data access Polycarbonate Housing with UL94 V-0 grade Plug & Play Current Transformer option for easy wiring EMC : IEC 61326, Safety : IEC 61010, IP for water & dust : IEC 60529High / Low recording VLL, VLN, A, Hz, W, VA, PF, VAR value storage with time stamp. Accuracy class 1.0 as per IEC 62053-21, 0.5s option, Class 0.2s User programmable Password Protection. Measures THD and Individual harmonics up to 63rd order with a sampling rate of 512 samples / cycle. Captures and measures power quality events: K factor, Crest factor, Sag / Swell, Interruption and Unbalance in accordance. Display basic, power, energy, demand for both import and export parameters. Representation of waveforms for instantaneous V, I, Sag / Swell. voltage and current harmonics histogram. Records events such as Sag / Swell for voltage with the time stamp in 1s duration. CO2, ON Hr, Power Interruptions. Max demand 4 high / 4 low, Flash 6MB, 12am snapshot, 31st day snapshot. Simultaneous sampling of voltage and current, programmable PT & CT ratio. Demand update every second to forecast System Volts ,System Current,Volts L1 – N, Volts L2 – N 5. Volts L3 – N 6. Volts L1 – L2 7. Volts L2 – L3 8. Volts L3 – L1 9. Current L1 10. Current L2 11. Current L3 12. Neutral Current 13. Frequency 14. System Active Power (kW) 15. Active Power L1 (kW16. Active Power L2 (kW) 17. Active Power L3 (kW18. System Re-active Power (kVAr) 19. Re-active Power L1 (kVAr) 20. Re-active Power L2 (kVAr) 21. Re-active Power L3 (kVAr) 22. System Apparent Power (kVA23. Apparent Power L1 (kVA) 24. Apparent Power L2 (kVA) 25. Apparent Power L3 (kVA) 26. System Power Factor 27. Power Factor L1 28. Power Factor L2 29.
12Power Factor L3 30. Phase Angle L1 Phase Angle L2 32. Phase Angle L3 33. Import kWh (8 digit resolution)* 34. Export kWh (8 digit resolution)* 35. Ind. kVArh (8 digit resolution)* 36. Cap. kVArh (8 digit resolution)* 37. kVAh (8 digit resolution)* 38. Current Demand 39. KVA Demand 40. KW Import Demand 41. KW Export Demand 42 KVAr Ind. Demand 43 KVAr Cap. Demand 44. Max Current Demand 45. Max KVA Demand 46. Max KW Import Demand 47. Max KW Export Demand 48 Max KVAr Ind. Demand 49 Max KVAr Cap. Demand 50. Run Hour 51. On Hour 52 Number of Interruptions 53. Phase Reversal Indication accurately. Clearance and Creepage distance meets UL- 61010. Programmable starting current in % of 5A secondary. Default 10mA Programmable Auto scrolling time - 1 sec. to 10 sec. (Default 5 sec.). Programmable Energy display - Counter based or Resolution based. Energy resetting at 9999999 kVAh x MF. Front LED pulse 16000 imp/kWh. OLD register to store previously cleared Energy & Load hours. Ampere hour (Ah) & PF average parameter. Phase wise Voltage Sag & Swell Wave Forms. LCD 8 parameter display at a time, 8 Digits energy. Power save mode with Enable/Disable option. Available RS485 communication & optional Ethernet communication (factory configurable). Byte order option - Field Programmable Float / Little Endian / Big End. Optional Features Digital outputs - 4 potential free contacts with programmable time delay. Hysteresis of 1%. Trip time delay: 1 to 180 sec. Pulse output 300/TR/KWh. Analog Input up to 2. Accuracy of class 1% FS. Individual Harmonics up to 63rd order. Demand Controller with 4 Relay outputs. TOD option (Energy & Demand up to 8 slots ).
13Digital Input up to 4 RTC synchronisation through communication. Analog Output - Two independently programmable to 0-20 mA (or) 4-20 mA Up to 60A or 100A direct measurements usingS/I/T/C flush mounted installation of OC ?EF protection relay comply with the IEC/DIN regulations required for the specific protection application. Plug-in technology & easy operation, quick fault-analysis and optimal communication capabilities are based on the microprocessor technology with following characteristics: Integration of multiple protective functions into one compact housing, User-friendly setting procedure by means of DIP-switches, Compact construction type by SMD~technology & also Complete suitable for earth fault directional detection with Rated data: Nominal current IN : 1A/5A Nominal frequency fN : 50/60 Hz Power consumption : 97% Returning time : 30 ms Minimum operating time : 30 ms Output relay characteristics: Maximum breaking capacity : 250 V AC / 1500 VA / continuous current 6 A Design standard : VDE 0435, part 303, IEC 255.4, BS 142 Specified ambient service Temperature range: for storage : - 40°C to + 85°C for operating : - 20°C to + 70°C Environmental protection class F as per DIN 40040 and per DIN IEC 68 2-3 : relative humidity 95 % at 40°C for 56 days Insulation test voltage, inputs and outputs between themselves and to the relay frame as per VDE 0435, part 303 IEC 255-5 : 5 kV; 1.2/50 Hz; 1 min. (except supply voltage inputs) Impulse test voltage, inputs and outputs between themselves and to the relay frame as per VDE 0435, part 303 IEC 255-5 : 5 kV; 1.2 / 50 μs; 0.5 J High frequency interference test voltage, inputs and outputs between themselves and to the relay frame as per DIN IEC 255-6 : 2.5 kV / 1MHz Electrostatic discharge (ESD) test as per DIN VDE 0843, part 2 IEC 801-2 : 8 kV Electrostatic discharge (ESD) test as per DIN VDE 0843, part 4 IEC 801-4 : 4 kV / 2.5 kHz, 15 ms Radio interference suppression test as per EN 55011 : limit value class B Radio interference field test as per DIN DVE 0843, part 3 IEC 801-4 : electrical field strength 10 V/m Mechanical tests: Shock : class 1 acc. to DIN IEC 255-21-2 Vibration : class 1 acc. to DIN IEC 255-21-1complete all as directed by Engineer-in-charge. Make:- ELMEASURE/RISHABH/SCHNEIDER/SELEC . Only Original OEM is entitled for work . Contractor has to ensure it.Necessary test certificates & Latest Purchase Vouchers to be scrutnised / approved by Engineer-in-Charge & GE first before execution at site . Any Defect occuring during this period due to bad workmanship of material, manufacturing defect shall be rectified or replaced free of cost. The contractor shall furnish written gaurantee on letter head for above mentioned to the GE immidiately after completion of work. Contractor has to ensure Post Audit of work, without that completion will not be issued.
14Dismantling of old damaged burnt cable and bus bars and re arranging it proper by replacement with new CT suitable for 3 phase supply delta connected of ratio as per site min 100 /5 amp to 500 / 5 amp copper wound with bi-directional command .Ambient Temperature: $-5°C to +50°C.Relative Humidity: Up to 95%.Altitude: Up to 1000m above sea level.Highest System Voltage0.72 kV (Standard) or 1.1 kVA Class of Accuracy 0.5S or 0.5 (Revenue Metering); 1.0 (Indicating)Rated Burden 5 VA,Instrument Security Factor (ISF) < 5 (To protect meters during faults)Short-Time Thermal Current Typically 5kA to 40kA for 1.0 second also provided with sensor synchronised with the power supply for providing a circulating path for the zero-sequence currents.complete all as directed by Engineer-in-charge. Make :- Kappa/ABB/Schnider/Partner
15MS. L. necessary for Communication Layer SIM-Based Gateway acts as the data aggregator, polling data from multiple meters and uploading it to the cloud. Processor 32-bit ARM Cortex-M4 or equivalent Cellular Connectivity integrated 4G LTE/3G/GPRS module with an extemal high-gain antenna SIM Interface: Standard / Micro SIM slot (unlocked for all major carriers) Downlink Protocol RS485 (Modbus RTU). supporting up to 32 nodes (meters). Uplink Protocol: MOTT/HTTPS/JSON with SSL encryption for secure data transfer Data Logging: Internal flash memory (minimum 8MB) for data buffering during network outages to prevent data loss. Power Supply: 90V-270V AC/DC auxiliary supply. Online Monitoring & Reporting Engine with cloud platform processes the raw data into actionatie insights and automated documentation. Real-Time Monitoring Live Dashboard. Web and Mobile-based interface displaying instantaneous values (Voltage, Load, Power Factor). Status Indicators: Online/Offline status of individual sites or Diprade Plug & Play Current Tranics-up to 31st Level for Voltage & Current % THD Measurement User assignable screens User Assignable Registers for quick data access Polycarbonate Housing with UL94 V-imestamp Accuracy class 1.0 as per IEC 62053-21, 0.5s option, Class 0.2s User programmable Password Protection Measures THD and Individual harmonics up to 63rd order with a sampling rate of 512 samples/cycle Captures and measures power quality events K factor, Crest factor. Sag / Swell, Interruption and Unbalance in accordance. Display basic, power, energy, demand for both import and export Darameters Representation of waveforms for instantaneous V. I. Sag/Swell voltage and current harmonics histogram Records events such as Sag / Swell for voltage with the time stamp in is duration CO2 ON Hr. Power Interruptions. Max demand & high / 4 low, Flash 6MB, 12am snapshot, 31st day snapshot Simultaneous sampling of voltage and current, programmable PT & CT ratic Demand update every second to forecast System Voits, System Current Volts L1-N. Volts L2-N 5. Volts L3-N 6. Volts L1-L2 7 Volts L2-L3 8. Volts L3-L19 Current L1 10. Current L2 11 Cument L3 12. Neutral Cument 13. Frequency 14. System Active Power (kW) 15. Active Power L1 (kW16. Active Power L2 (kW) 17. Active Power L3 (kW18. System Re-active Power (kVAr) 19 complete all as specified by Engg-in-Charge Make:- PARTNER / CG /KIRLOSKAR /SCHNIDER /BCH / L&T approved by GE
16Material and labour complete for SITC of PLC Panel including AC siquence switching with necessary software /hardware programmer for LIVE display and auto recorder equipped with Intel Core i3 Processor or equivalent at minimum 2.00 GHz ( 2 MB L2 cache ), Intel Server Based Motherboard with minimum 800 Mhz BUS Speed , 2 GB DDR 2 SDRAM@ 667 Mhz , 160 GB SATA HDD , 2 x USB 2.0, 2 x Serial Port, Gigabyte LAN with 65-inch monitor: Large Format Displays (LFD) for offices/commercial use, High-End Gaming Monitors, or Smart TVs used as monitors. Physical Dimensions (Typical) Diagonal Size: 64.5 to 65 inches. Width: Approx. 56.7 inches 144 cm. Height: Approx. 31.9 inches without a stand. Weight: Ranges from 13kg Display & Picture Quality Resolution: 4K UHD Panel Type: OLED/QLED: Best for contrast and color (ideal for media and high-end presentations). IPS/VA with Mini-LED: High brightness (ideal for well-lit offices or industrial control rooms). Refresh Rate: Standard/Commercial: 60Hz. Brightness: 350 to 500 nits (Typical); High-end HDR models can reach 1000+nits. Connectivity (The \\"Business\\" Side) HDMI: At least 3 ports (Look for HDMI 2.1 for 4K at 120 Hz support). DisplayPort: Usually found on dedicated \\"Monitors\\" (LFDs), rarely on TVs. USB Hub: Often includes USB-A/USB-C ports for direct file playback or powering IoT gateways/sticks. Ethernet (RJ45): For stable internet in smart models or remote management in industrial units. Duty Cycle 16/7 or 24/7 operation. Internal OS Often includes a basic SoC (System on Chip) for digital signage. Smart TV OS (Android/Fire/WebOS). Important Considerations for Your Setup: Text Clarity: If you plan to use this for monitoring or reading detailed technical drawings, ensure the display supports 4:4:4 Chroma Subsampling. Merged and equipped with Software along with Hardware, Software complete for 11 kV Substation having all Breaker, i) application software shall have minimum following inherent features :- (a) Online/standby /offline state of communication front ends.(b) Connection status of all the station. (d) Connection status of all the Server station. (e) Data analysis (Comparison between last day value with present value ) and recording all parameters for time interval of 5 min, 15 min configurable as per user requirement (f) Reporting (Power consumption, Input & output electric consumption and electric parameter parameter phase wise ( A, V,KVA, KW, PF, KVAH, Hz) complete all as directed by Engineer-in-charge (Make:- HP/DELL/LENOVA / Elmeasure/partner /ISO 9001:2015 Certified ) ONLY Original OEM is entitled for work .
17Contractor has to ensure it.Necessary test certificates & Latest Purchase Vouchers to be scrutinised / approved by Engg-in-Charge & GE first before execution at site . Any Defect occuring during this period due to bad workmanship of material, manufacturing defect shall be rectified or replaced free of cost. The contractor shall furnish written guarantee on letter head for above mentioned to the GE immediately after completion of work. Complete all as directed by Engr-in-charge. Providing the physical enclosure (IP55/IP65 rated), internal wiring, circuit breakers (MCBs), power supplies (24V DC), and the PLC hardware itself. Installation: Mounting the panel on-site and connecting field sensors (temperature, pressure, humidity) and actuators (fan motors, valves) to the PLC's I/O modules. Testing & Commissioning: Performing \\"Point-to-Point\\" checks to ensure every wire is connected correctly and the hardware powers up without faults. PLC Programming Logic Development: Writing code (usually in Ladder Logic or Function Block Diagram) to maintain set points, manage compressor cycles, and handle PID loops for precise temperature control. Safety Interlocks: Programming \\"trip\\" conditions (e.g., high pressure or motor overheat) to shut down the unit and prevent damage. Visualization: High-resolution graphics showing real-time status of fans, compressors, and airflow. Control: Allows operators to change set points or manually override a unit from a central computer Alarm Management: Logging every fault with a timestamp for troubleshooting. Online Monitoring with Offline Reporting Online Monitoring: Continuous, live data streaming from the AC units Offline Reporting with PLC to programme control over the contactors of each load group. Hardware Interface: The (Direct Digital Controller) or a secondary PLC uses Digital Output (DO) modules to trigger interposing relays. These relays, in turn, control the coil circuit of the main contactors for the AC units or motors.
18Feedback Loop: A Digital Input (DI) from the DG’s control panel (e.g., a \\"Potential Free Contact\\" for 'DG on Load') tells the BMS to initiate the sequence. The logic is typically based on either a fixed time delay or a \\"Smart Sensing\\" approach. This is the most common approach. Each group of loads is assigned a specific delay after the DG signal is received. Group 1 (Priority): Starts at T + 0 seconds (Emergency lighting, critical fans). Group 2: Starts at T + 15 seconds (First block of ACs). Group 3: Starts at T + 30 seconds (Second block of ACs). Logic: T_{delay} > the time required for the DG's AVR (Automatic Voltage Regulator) to stabilize after the previous group's inrush. With monitors the total current (I) and frequency (f). It only triggers Group 2 once the current has dropped from its peak (Inrush) back to a steady state and the frequency has returned to 50 Hz. The system automatically archives data into a database (like SQL). You can generate PDF or Excel reports daily, weekly, or monthly to analyze energy consumption and performance trends without needing a live connection. Series Cyber Secure Main PL with era of industrial hacking, \\"Level 2\\" (L2) security is critical. Hardware: A specialized PLC designed with built-in encryption and secure boot features. Cyber Security: Includes features like Role-Based Access Control (RBAC), disabled unused ports, and encrypted communication protocols to ensure that unauthorized users cannot \\"hijack\\" the AC system. Web Application (Web Enabled) taking the data beyond the local control room. Accessibility: Using a web server (often hosted on the PC or a cloud gateway), authorized users can view the AC status via a standard browser (Chrome/Edge) on their phones or laptops. Responsive Design: The interface scales to fit mobile screens, providing a \\"glass cockpit\\" view of the facility from anywhere in the world. Testing and Commissioning (T&C) FAT (Factory Acceptance Test): Testing the panel and code at the workshop before shipping. SAT (Site Acceptance Test): Testing the full system on-site with actual AC loads. Loop Checking: Verifying that a 5°C change at the sensor shows up as exactly 5°C on the Web App.
19Performance Trial: Running the system for 24–72 hours straight to ensure stability under different environmental conditions. Main Characteristics Total I/O Count: 40 Rated Supply Voltage: 24 V DC (Limits: 20.4…28.8 V) Power Consumption: 18 W at 24 V DC (at maximum I/O) Programming Port: USB Mini-B 2.0 Memory: 512 bytes internal flash for program backup; supports up to 32 GB Micro SD card. Discrete Inputs Total Inputs: 24 Input Logic: Sink or Source (Positive/Negative) Voltage/Current: 24 V DC / 7 m Input Breakdown: High-Speed Inputs: 4 (I0, I1, I6, I7) at 100 kHz (32-bit) Fast Inputs: 4 (I2 to I5) Regular Inputs: 16 (I8 to I23) Response Time: 5 µs (High-Speed), 35 µs (Fast), 55 µs to 100 µs (Regular) Discrete Outputs Total Outputs: 16 Output Type: Transistor Output Logic: Positive Logic (Source) Rated Voltage/Current: 24 V DC / 0.5 A Output Breakdown: Fast Outputs: 2 (Q0, Q1) supporting PTO/PWM/PLS modes at 100 kHz Standard Outputs: 14 (Q2 to Q15) Protection: Overload and short-circuit protection (2 A) Communication & Connectivity Ethernet: 1 x RJ45 port (10/100BASE-T) supporting Modbus TCP/IP (Client/Server) Serial Link 1: Non-isolated RS485 (Terminal block) Serial Link 2: Non-isolated RS232/RS485 Expandability: Supports up to 4 expansion modules (TM3 series) complete all as directed by Engineer-in-charge. Make:- PARTNER/SIEMENS/SCHNIDER/ ABB. approved by GE minimum ISO 9001:2015 Certified . Note :- The Entire work at site is to be executed only by OEM approved by GE. Original OEM is entitled for work . Contractor has to ensure it.Necessary test certificates to be approved by Engineer-in-Charge and GE first before execution at site .
20Dismantling of old unserviceable unit up to 125 KVA load of Old existing protection device 3 phase 4 wire complete including replacement of the switching 02 Numbers DC contactor 25 Amps operating voltage 12/ 24 volts DC also comprising automatic battery charger 12 volt/24 volt 15 amps with auto cut off at 13.2/ 27 volts including delivering UNINTERUPTED 220 volts AC 100 watts output & Automation with restoration of electric supply with in 05 seconds (I) If the mains fail, or one or more phase of mains is not available. If any phase voltage of mains is out of present limits however there should be a provision to set the limits of higher and lower phase voltages Microprocessor server type password protected with concurrence of Eng.-In-Charge and GE as per the site requirement. The mains supply with in this range shall be considered as healthy so as to avoid continuous running of Engine Alternator Set. Switch the load to the engine supply after suitable time delay, after starting the engine on mains failure/phase failure / low voltage / high voltage. Switch the load back to the mains supply after suitable time delay, when healthy mains supply is restored and stopping the Engine. Attempt to start the Engine up to three times on failure of earlier attempts with suitable time intervals. , with automatic temperature controller built with 02 numbers 6 inch cooling fans with proper installation at LT panel as directed by Engg-in-Charge provide following settable features :- (a) Mains failure time - to initiate automatic EA start after 0 to 300 seconds of mains failure. (b) Mains restore time - to initiate automatic stop of EA after 0 to 300 seconds of mains in stable conditions. (c) Low oil pressure delay time - 0 to 99 seconds delay of the low pressure oil input alarm from engine start. (d) Stop solenoid time - 10 to 99 seconds enabling time for \\"stop solenoid\\". (e) Cranking up time - 0 to 99 seconds enabling time for starter. The timer is reset if the engine starts before the programmed time. (f) Start attempts - 1 to 3 numbers of automatic attempts during automatic start cycle (g) Attempts interval - 1 to 99 seconds time interval between starting pulse attempts. (h) Cooling down time - 0 to 300 seconds engine coolng time before stopping. During this time the engine runs without load.
21(I) Generator voltage time - time of stable generator voltage to close EA contactor to load (0 to 300 seconds). Multifunctional meter to indicate Voltage, Current, PF, Frequency & kWh of DG Set. including SAFETY CONTROL. Stop fault . Start fault . Engine Temperature high . Alternator fault . BTS battery low . Mains ok / mains faulty Overload . Over / under voltage Under /Over Frequency also including S/I/T/C of 02 sets Resin Casting current Transformers one for input and second for output load 3 phase 4 wire 03 of 15 VA burden 1100 volts insulation FUNCTION Limit the Inrush Current, Improve the THD/PF at Light Load or High Line, Improved Stability with a Type 2 Compensation Network--Phase Unbalance, Auto Phase Reversal tripping suitable for suitable load as per site requirement , Phase Missing Under Voltage and Over Voltage Monitor and Control, Neutral Open Protection. ALSO SPECIAL ZERO CROSSING SWITCHING OPERATION PROTECTION SYSTEM BUILT Phase Un balance (1 to 20%) (Adjustable) Power consumption 15VA / 3W Setting Accuracy voltage ± 4V, Minimum setting current 0.5A, Maximum setting current =5A (Above 5A - external CT setting max.1000/5 in steps of 5), Setting Accuracy Current ± 5% of full scale ±1digit, Trip time delay1 to 250secs settable for UB, OV, UV , UC & OC, Trip time accuracy± 1% of set delay ±2sec., Trip setting, Phase failure 3 sec Max. factory set., Phase Reversal Auto tripping, Phase Un balance1 to 20% (Adjustable), Under Voltage and over voltage 5V to 60V AC (Adjustable Individually ), Recovery Time2 sec Min Power On Delay10 sec Max., Service life(under no load) 10Lakh operations minimum , Electrical life, (under full load) 10 Lakh operations minimum with Micro processor based Supply, installation, commissioning of wireless database logger with one incoming and four out going distribution system capable of handling upto.433 KV with suitable FND display digital metering for each distribution system complete all as directed by Engineer-in-charge. Make:- PARTNER / CG /KIRLOSKAR /SCHNIDER /BCH / L&T approved by GE minimum ISO 9001:2015 Certified . Note :- The Entire work at site is to be executed only by OEM approved by GE
22Dismantling of old unserviceable unit up to 30 KVA load of Old existing protection device 3 phase 4 wire complete including replacement of the switching 02 Numbers DC contactor 25 Amps operating voltage 12/ 24 volts DC also comprising automatic battery charger 12 volt/24 volt 15 amps with auto cut off at 13.2/ 27 volts including delivering UNINTERUPTED 220 volts AC 100 watts output & Automation with restoration of electric supply with in 05 seconds (I) If the mains fail, or one or more phase of mains is not available. If any phase voltage of mains is out of present limits however there should be a provision to set the limits of higher and lower phase voltages Microprocessor server type password protected with concurrence of Eng.-In-Charge and GE as per the site requirement. The mains supply with in this range shall be considered as healthy so as to avoid continuous running of Engine Alternator Set. Switch the load to the engine supply after suitable time delay, after starting the engine on mains failure/phase failure / low voltage / high voltage. Switch the load back to the mains supply after suitable time delay, when healthy mains supply is restored and stopping the Engine. Attempt to start the Engine up to three times on failure of earlier attempts with suitable time intervals. , with automatic temperature controller built with 02 numbers 6 inch cooling fans with proper installation at LT panel as directed by Engg-in-Charge provide following settable features :- (a) Mains failure time - to initiate automatic EA start after 0 to 300 seconds of mains failure. (b) Mains restore time - to initiate automatic stop of EA after 0 to 300 seconds of mains in stable conditions. (c) Low oil pressure delay time - 0 to 99 seconds delay of the low pressure oil input alarm from engine start. (d) Stop solenoid time - 10 to 99 seconds enabling time for \\"stop solenoid\\". (e) Cranking up time - 0 to 99 seconds enabling time for starter. The timer is reset if the engine starts before the programmed time. (f) Start attempts - 1 to 3 numbers of automatic attempts during automatic start cycle (g) Attempts interval - 1 to 99 seconds time interval between starting pulse attempts. (h) Cooling down time - 0 to 300 seconds engine coolng time before stopping. During this time the engine runs without load. (I) Generator voltage time - time of stable generator voltage to close EA contactor to load (0 to 300 seconds). Multifunctional meter to indicate Voltage, Current, PF, Frequency & kWh of DG Set. including SAFETY CONTROL. Stop fault . Start fault . Engine Temperature high . Alternator fault . BTS battery low . Mains ok / mains faulty Overload . Over / under voltage Under /Over Frequency also including S/I/T/C of 02 sets Resin Casting current Transformers one for input and second for output load 3 phase 4 wire 03 of 15 VA burden 1100 volts insulation FUNCTION Limit the Inrush Current, Improve the THD/PF at Light Load or High Line, Improved Stability with a Type 2 Compensation Network--Phase Unbalance,
23Auto Phase Reversal tripping suitable for suitable load as per site requirement , Phase Missing Under Voltage and Over Voltage Monitor and Control, Neutral Open Protection. ALSO SPECIAL ZERO CROSSING SWITCHING OPERATION PROTECTION SYSTEM BUILT Phase Un balance (1 to 20%) (Adjustable) Power consumption 15VA / 3W Setting Accuracy voltage ± 4V, Minimum setting current 0.5A, Maximum setting current =5A (Above 5A - external CT setting max.1000/5 in steps of 5), Setting Accuracy Current ± 5% of full scale ±1digit, Trip time delay1 to 250secs settable for UB, OV, UV , UC & OC, Trip time accuracy± 1% of set delay ±2sec., Trip setting, Phase failure 3 sec Max. factory set., Phase Reversal Auto tripping, Phase Un balance1 to 20% (Adjustable), Under Voltage and over voltage 5V to 60V AC (Adjustable Individually ), Recovery Time2 sec Min Power On Delay10 sec Max., Service life(under no load) 10Lakh operations minimum , Electrical life, (under full load) 10 Lakh operations minimum with Micro processor based Supply, installation, commissioning of wireless database logger with one incoming and four out going distribution system capable of handling upto.433 KV with suitable FND display digital metering for each distribution system complete all as directed by Engineer-in-charge. Make:- PARTNER/SIEMENS/SCHNIDER/BCH/L&T approved by GE minimum ISO 9001:2015 Certified . Note :- The Entire work at site is to be executed only by OEM approved by GE
24Dismantling of old unserviceable unit up to 63 KVA load of Old existing protection device 3 phase 4 wire complete including replacement of the switching 02 Numbers DC contactor 25 Amps operating voltage 12/ 24 volts DC also comprising automatic battery charger 12 volt/24 volt 15 amps with auto cut off at 13.2/ 27 volts including delivering UNINTERUPTED 220 volts AC 100 watts output & Automation with restoration of electric supply with in 05 seconds (I) If the mains fail, or one or more phase of mains is not available. If any phase voltage of mains is out of present limits however there should be a provision to set the limits of higher and lower phase voltages Microprocessor server type password protected with concurrence of Eng.-In-Charge and GE as per the site requirement. The mains supply with in this range shall be considered as healthy so as to avoid continuous running of Engine Alternator Set. Switch the load to the engine supply after suitable time delay, after starting the engine on mains failure/phase failure / low voltage / high voltage. Switch the load back to the mains supply after suitable time delay, when healthy mains supply is restored and stopping the Engine. Attempt to start the Engine up to three times on failure of earlier attempts with suitable time intervals. , with automatic temperature controller built with 02 numbers 6 inch cooling fans with proper installation at LT panel as directed by Engg-in-Charge provide following settable features :- (a) Mains failure time - to initiate automatic EA start after 0 to 300 seconds of mains failure. (b) Mains restore time - to initiate automatic stop of EA after 0 to 300 seconds of mains in stable conditions. (c) Low oil pressure delay time - 0 to 99 seconds delay of the low pressure oil input alarm from engine start. (d) Stop solenoid time - 10 to 99 seconds enabling time for \\"stop solenoid\\". (e) Cranking up time - 0 to 99 seconds enabling time for starter. The timer is reset if the engine starts before the programmed time. (f) Start attempts - 1 to 3 numbers of automatic attempts during automatic start cycle
25(g) Attempts interval - 1 to 99 seconds time interval between starting pulse attempts. (h) Cooling down time - 0 to 300 seconds engine coolng time before stopping. During this time the engine runs without load. (I) Generator voltage time - time of stable generator voltage to close EA contactor to load (0 to 300 seconds). Multifunctional meter to indicate Voltage, Current, PF, Frequency & kWh of DG Set. including SAFETY CONTROL. Stop fault . Start fault . Engine Temperature high . Alternator fault . BTS battery low . Mains ok / mains faulty Overload . Over / under voltage Under /Over Frequency also including S/I/T/C of 02 sets Resin Casting current Transformers one for input and second for output load 3 phase 4 wire 03 of 15 VA burden 1100 volts insulation FUNCTION Limit the Inrush Current, Improve the THD/PF at Light Load or High Line, Improved Stability with a Type 2 Compensation Network--Phase Unbalance, Auto Phase Reversal tripping suitable for suitable load as per site requirement , Phase Missing Under Voltage and Over Voltage Monitor and Control, Neutral Open Protection. ALSO SPECIAL ZERO CROSSING SWITCHING OPERATION PROTECTION SYSTEM BUILT Phase Un balance (1 to 20%) (Adjustable) Power consumption 15VA / 3W Setting Accuracy voltage ± 4V, Minimum setting current 0.5A, Maximum setting current =5A (Above 5A - external CT setting max.1000/5 in steps of 5), Setting Accuracy Current ± 5% of full scale ±1digit, Trip time delay1 to 250secs settable for UB, OV, UV , UC & OC, Trip time accuracy± 1% of set delay ±2sec., Trip setting, Phase failure 3 sec Max. factory set., Phase Reversal Auto tripping, Phase Un balance1 to 20% (Adjustable), Under Voltage and over voltage 5V to 60V AC (Adjustable Individually ), Recovery Time2 sec Min Power On Delay10 sec Max., Service life(under no load) 10Lakh operations minimum , Electrical life, (under full load) 10 Lakh operations minimum with Micro processor based Supply, installation, commissioning of wireless database logger with one incoming and four out going distribution system capable of handling upto.433 KV with suitable FND display digital metering for each distribution system complete all as directed by Engineer-in-charge. Make:- PARTNER/SIEMENS/SCHNIDER/BCH/L&T approved by GE minimum ISO 9001:2015 Certified . Note :- The Entire work at site is to be executed only by OEM approved by GE Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58115524
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 1.40 Crore
LAST DATE 14-11-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Special Repair/ Replacement Of Essential Electrical Infrastructure Alongwith Restoration Resolving Critical Grid Remediation Including Repair Strategic Network Mains And Fault Rectification With System Upgrades Having Network Wiring And Insulation Backup Power And Generator Readiness Main And Connected Items Under Ge (N) Patiala
Basic Detail
Tender No CWE/PAT/T-68/2026-27
Bidding Type Tender
Location
City Patiala
State Punjab
Key Dates
Publish Date 17 Oct 2026
Submission Date 14 Nov 2026
Open Date 16 Nov 2026
Finance
Tender Value 1.40 Crore
Tender Fee 1000
EMD 2.15 Lakhs
Exemption Not Available
Document List
BOQ_891253.xls
cf2fa401-9554-4f95-a736-303c5b277ac4.html
Tendernotice_1.pdf
tendert68.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 17, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 14, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Nov 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 20 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_891253.xls

html

cf2fa401-9554-4f95-a736-303c5b277ac4.html

pdf

Tendernotice_1.pdf

pdf

tendert68.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender