Power Boards / Undertakings / PSU Closing in 3 days TDR #58115159

Tender For Ttps - Operation Circle - Ttps - Operation Circle - Mpm I - Unit Iii- Overhauling Of Mill Gear Box, Under Bowl, Separator Top Assembly Etc., Of Mills During The Forthcoming Overhaul

Issued by Boards / Undertakings / PSU · Tuticorin, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
26 Oct 2026
3 days left
EMD
14500
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Tuticorin → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Ttps - Operation Circle - Ttps - Operation Circle - Mpm I - Unit Iii- Overhauling Of Mill Gear Box, Under Bowl, Separator Top Assembly Etc., Of Mills During The Forthcoming Overhaul

BOQ

Name of Work:- TTPS – Operation Circle – TTPS – Operation Circle – MPM I – Unit III- Overhauling of Mill gear box, under bowl, Separator Top assembly etc., of Mills during the forthcoming overhaul
Sl. No. Item Description
1Draining of Mill gearbox oil completely, cleaning the gearbox internals like worm shaft and worms wheel. After inspection, filling the gearbox with old/new oil including devolution of old oil if ant to stores etc, (Department vehicle will be provided for drawl of oil at free of cost).
2Charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples, replacement of worn out parts, reassembling the same as per the direction of engineer-in-charge.
3Charges for providing wedges between lower skirt and Mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. Lowering the thrust bearings and reassembling of all the above parts, providing SS shims at the bottom cover flange. Blue matching the worm shaft and worm wheel engagement till we get 20 to 50% pattern by trial method releasing/ providing thin SS shim sheet at the bottom cover flange and to get proper running clearance and centering of engagement.
4Charges for dismantling and removing worn out thrust bearing of Mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft and assembling back new thrust bearing after heating the racer in oil bath.
5Charges for Renewal of thrust bearing adopter by oil heating and using necessary fixture for assembling the adopter in correct position after positioning the shims below the worm gear hub lock nut. Removing the thrust bearing adopter (worn out) and assembling the new adopter by heating.
6Charges for Dismantling of upper skirt assembly, lower skirt assembly, Mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of Mill bottom cover, upper bearing housing cover, oil seals etc., Complete overhauling, assembling back the lower skirt assembly, scrapper assembly and arresting the oil leakages in the return line and also spillage’s at the rear side of gearbox to prevent Mill fire including cleaning and tapping the threaded holes.
7Charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc.
8Charges for checking the bearing clearance after dismantling the thrust bearing and radial bearing housing covers, removing the bushes, springs etc. thoroughly cleaning the bearing housings and other components inspecting the thrust bearings, resetting the axial clearance by reducing the thickness of shims in the thrust bearing housing cover, providing of new shims and by trial method adjusting the clearance to 0.10 mm to 0.15 mm. Assembling back the thrust and radial bearing housing properly and renewing the gland studs and gland packing in the worm shaft assembly.
9Charges for changing the worm shaft thrust bearing after gas heating and releasing the old bearings from the worm shaft, heating the new bearing in oil bath and providing the new bearing in the worm shaft in proper position.
10Charges for renewing radial bearing in the worm shaft after gas heating and releasing the old bearing and providing new bearing in the worm shaft after heating the bearing in oil bath.
11Charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing and reassembling the new radial bearing in the new/old radial bearing housing and assembling the new/old pump hub and bushing.
12Charges for changing worn out scraper pin, bush, pin cover, re conditioning of scrapper, cleaning of under bowl, checking of clearance, inspection and welding of wheels support lugs, wall side liners etc in mill under bowl.
13Dismantling of worn out classifier assembly, inspection of deflector blade, cleaning, replacing of worn out deflector blade components renewal and assembling of new classifier assembly with its links. The overhauled classifier assembly was checked from 0 to 6 positions and ensured that the deflector blades, links move correspondingly to its position without any malfunction.
14Charges for dismantling the Spool pieces, multiple port outlet bodies and transition pipes 4 Nos. each after assembling the coal pipe inspection with center feed pipe structures including transportation of supporting material from stores to site and refixing the Spool piece, MPO bodies and transition pieces and assembling to its original position and carrying out necessary related works. And devolution of scraps to stores etc. for a mill.
15Charges for removal of orifice 1 No. after dismantling the victaulic coupling, inspecting and inverting the same orifice or new orifice and assembling in position.
16Dismantling the mill top, cutting the centre feed pipe to the required length so as to lift eroded inner cone and brought it to 4.5 Mt. level as per the direction of Engineer in charge.
17Charges for dismantling the eroded inner cone from mill top and assembling the new / reconditioned inner cone.
18Charges for dismantling the drum section of inner cone from mill top and replacing the new/ reconditioned one.
19Charges for dismantling venturi outlet assembly from mill top with the removal of venturi outlet, venturi vanes, venturi outlet conical collar assembly, coal feed pipe and devolution of scrap to stores
20Charges for fixing of new venturi vane and assembling the venturi outlet assembly, venturi outlet conical collar assembly with coal feed pipe and the mill top
21Charges for complete painting of mills 1A to 1F seal air lines leading to mill cooling water line, mill tramp iron chute, MDV body, MPO, Mill body and under bowl etc, with one coat of red oxide primer and two coats of first quality enamal paint after cleaning with wire plus and emery sheet including transportation of materials.(75mtr/mill)
22Material On Contractor Scope:18L Victaulic coupling silicon rubber gasket
23Material On Contractor Scope:Full Threaded Hexagonal Head HT Bolt & Nut With Plain Washer. Size: M 24 x 90 mm Property class 10.9 as per IS:1367
24Material On Contractor Scope:Full Threaded Hexagonal Head HT Bolt & Nut With Plain Washer Size: M 24 x 120mm Property class 10.9 as per IS:1367
25Material On Contractor Scope:Full Threaded Hexagonal Head HT Bolt & Nut With Plain Washer. Size: M 24 x 70mm Property class 10.9 as perIS:1367
26Material On Contractor Scope:MS bolt and nut with 2nos flat round washer IS 2062 Gr. 4.6 Size: M 20 x 120mm
27Material On Contractor Scope:MS bolt and nut with 2nos flat round washer IS 2062 Gr. 4.6 Size: M 16 x 60mm
28Material On Contractor Scope:M 16mm MS Hexagonal Nut Gr. 8.8
29Material On Contractor Scope:Allen Cap screw M16 x 60mm Charges for inspection, overhauling and commissioning of actuators for both manual and electrical operation in hot air dampers. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58115159
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 26-10-2026
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Tender for Ttps - Operation Circle - Ttps - Operation Circle - Mpm I - Unit Iii- Overhauling Of Mill Gear Box, Under Bowl, Separator Top Assembly Etc., Of Mills During The Forthcoming Overhaul
Basic Detail
Tender No CE/SE/O/TTPS/Spec.No157/26-27
Bidding Type Tender
Location
City Tuticorin
State Tamil Nadu
Key Dates
Publish Date 17 Oct 2026
Submission Date 26 Oct 2026
Open Date 27 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 14500
Exemption Available
Document List
12d355b7-f998-45ac-a7ec-fe7e105d87b2.html
BOQ_859804.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 17, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 26, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Oct 27, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 4 days

Tender Documents

Download All (ZIP) ↓
html

12d355b7-f998-45ac-a7ec-fe7e105d87b2.html

xls

BOQ_859804.xls

pdf

Tendernotice_1.pdf