Tender For Construction Retaining Wall In Km 12Th On Tikri Katra Road.
Tender Value
40 Lakhs
Estimated cost
Bid Submission
02 Nov 2026
0 days left
EMD
80000
Bank guarantee accepted
Document Fee
600
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Reasi → Jammu and Kashmir
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Retaining Wall In Km 12Th On Tikri Katra Road.
BOQ
| Sl. No. | Item Description |
| 1 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts,laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. |
| 2 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications On bitumen surface @ 0.50 Kg/sqm. |
| 3 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stone chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately).With paving Asphalt grade VG-30 with no solvent. |
| 4 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-30 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete |
| 5 | Engaging Labour for clearing potholes |
| 6 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains,pipes,cables etc. (not exceeding 1.5m in width) and for shafts, wells cesspits and the like not exceeding 10sqm on plan,including dressing of sides and ramming of bottoms lift upto 1.50m,including getting out excavated earth and disposal of surplus excavated earth as directed,within a lead of 50meters. 70%All kind of soil 30% Ordinary Rock |
| 7 | 70% All kind of soil |
| 8 | 30% Ordinary Rock |
| 9 | Providing and laying in position of cement concrete of specified grade including curring but excluding the cost of centring and shuttering.All work upto plinth level 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 10 | Providing and laying in position of cement concrete of specified grade including curring but excluding the cost of centring and shuttering.All work upto plinth level 1:3:6 (1 cement:3 coarse sand :6 graded stone aggregates 20mm nominal size) |
| 11 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses,string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 12 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. |
| 15 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. |
| 16 | Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 17 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 18 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 19 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 20 | 15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 fine sand) |
| 21 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) |
| 22 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work |
| 23 | Hand packing stones filling behind R/wall including cost of stones. |
| 24 | Carriage of Material 27 km by MT including loading / unloading & stacking complete. |
| 25 | Aggregates below 40 mm |
| 26 | Aggregates 40 mm & above |
| 27 | Stone Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 17, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 02, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
TodayNov 03, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender