Tender For Supply, Installation, Testing and Commissioning As Per Rec Standards For The Work Creation Of 25Kva Sub-Stations Under Constituency Development Fund (Cdf) Doda-52 During The Year 2026-27 In Respect Of Jpdcl Ed Kishtwar On Turnkey Basis.
Tender Overview
Project Description
Tender for Supply, Installation, Testing and Commissioning As Per Rec Standards For The Work Creation Of 25Kva Sub-Stations Under Constituency Development Fund (Cdf) Doda-52 During The Year 2026-27 In Respect Of Jpdcl Ed Kishtwar On Turnkey Basis.
BOQ
| Sl. No. | Item Description |
| 1 | SITC of following materials as per REC standards for the work Installation of 25KVA Transformer at Batt Mohalla Bhatyas, Ward No. 07 Pyt. Challar under CDF Doda-52 Constituency in respect of Electric Sub-Division JPDCL Bhalessa Division Kishtwar. (Approved Budget = Rs. 3.50 Lacs) |
| 2 | 25 KVA Transformer (EEL-2) with Bimettalic Connectors |
| 3 | ST Pole 8Mtr long (410SP15) (HT ) |
| 4 | ACSR Weasel conductor 30mmsq |
| 5 | GI Channel Iron Cross Arm 7 ft Long 75x40x6 mm |
| 6 | GI Channel Iron Cross Arm 5 ft Long (75x40x6) |
| 7 | GI Channel Iron Cross Arm 2 ft Long (75x40x6) |
| 8 | GI Angle iron brace 7 ft long (40X40X6) |
| 9 | GI Angle Iron Brace 1Mtr long (40x40x6) |
| 10 | 11KV Link set (Heavy Duty) 50x6 mmm Polymer |
| 11 | 11KV D.O. Set Polymer type |
| 12 | 11KV Lightening Arrestor Set (Station Type) Polymer Type |
| 13 | 11KV Disc insulator Polymer with fittings 12kV 45kN |
| 14 | 11KV Pin insulator 12kV 5KN Polymer |
| 15 | Back Clamps |
| 16 | GI Pipe 2.5mtr long, 40mm dia for earthing complete job |
| 17 | GI Strip for Earthing 40x6mm |
| 18 | Bobin Insulator complete with back clamp/angle for GI strip support |
| 19 | Bus Bar Insulator |
| 20 | Almunium Bus Bar Strip |
| 21 | PVC Cable 95 mm sq. Single Core XLPE |
| 22 | Almunium Thimble 95 mmsq |
| 23 | Nuts and Bolts of Sorts (Galvanized) |
| 24 | Applying of Red oxide and Al. Paint coating on ST Poles |
| 25 | SITC of following materials as per REC standards for the work Installation of 25KVA Transformer at Malik Mohalla Pyt Jakyas A W NO 4 under CDF Doda-52 Constituency in respect of Electric Sub-Division JPDCL Bhalessa Division Kishtwar. (Approved Budget = Rs. 3.50 Lacs) |
| 26 | 25 KVA Transformer (EEL-2) with Bimettalic Connectors |
| 27 | ST Pole 8Mtr long (410SP15) (HT ) |
| 28 | ACSR Weasel conductor 30mmsq |
| 29 | GI Channel Iron Cross Arm 7 ft Long 75x40x6 mm |
| 30 | GI Channel Iron Cross Arm 5 ft Long (75x40x6) |
| 31 | GI Channel Iron Cross Arm 2 ft Long (75x40x6) |
| 32 | GI Angle iron brace 7 ft long (40X40X6) |
| 33 | GI Angle Iron Brace 1Mtr long (40x40x6) |
| 34 | 11KV Link set (Heavy Duty) 50x6 mmm Polymer |
| 35 | 11KV D.O. Set Polymer type |
| 36 | 11KV Lightening Arrestor Set (Station Type) Polymer Type |
| 37 | 11KV Disc insulator Polymer with fittings 12kV 45kN |
| 38 | 11KV Pin insulator 12kV 5KN Polymer |
| 39 | Back Clamps |
| 40 | GI Pipe 2.5mtr long, 40mm dia for earthing complete job |
| 41 | GI Strip for Earthing 40x6mm |
| 42 | Bobin Insulator complete with back clamp/angle for GI strip support |
| 43 | Bus Bar Insulator |
| 44 | Almunium Bus Bar Strip |
| 45 | PVC Cable 95 mm sq. Single Core XLPE |
| 46 | Almunium Thimble 95 mmsq |
| 47 | Nuts and Bolts of Sorts (Galvanized) |
| 48 | Applying of Red oxide and Al. Paint coating on ST Poles |
| 49 | SITC of following materials as per REC standards for the work Installation of 25KVA Transformer at Kuttan Pyt Nandna Thathri under CDF Doda-52 Constituency in respect of Electric Sub-Division JPDCL Thathri Division Kishtwar. (Approved Budget = Rs. 3.50 Lacs) |
| 50 | ST Pole 9 Mtr long (410SP33) (HT ) |
| 51 | ACSR Weasel conductor 30mmsq |
| 52 | GI Channel Iron Cross Arm 7 ft Long 75x40x6 mm |
| 53 | GI Channel Iron Cross Arm 5 ft Long (75x40x6) |
| 54 | GI Channel Iron Cross Arm 2 ft Long (75x40x6) |
| 55 | GI Angle iron brace 7 ft long (40X40X6) |
| 56 | GI Angle Iron Brace 1Mtr long (40x40x6) |
| 57 | 11KV Link set (Heavy Duty) 50x6 mmm Polymer |
| 58 | 11KV Disc insulator Polymer with fittings 12kV 45kN |
| 59 | 11KV Pin insulator 12kV 5KN Polymer |
| 60 | Back Clamps GI 50x6 |
| 61 | Nuts and Bolts of Sorts (Galvanized) |
| 62 | Applying of Red oxide and Al. Paint coating on ST Poles |
| 63 | SITC of following materials as per REC standards for the work Installation of 25KVA Transformer at Pandit Mohalla Shahpora, Pyt Phagsoo-B under CDF Doda-52 Constituency in respect of Electric Sub-Division JPDCL Thathri Division Kishtwar. (Approved Budget = Rs. 3.50 Lacs) |
| 64 | 25 KVA Transformer (EEL-2) with Bimettalic Connectors |
| 65 | ST Pole 9Mtr long (410SP33) (HT ) |
| 66 | ST Pole 8Mtr long (410SP15) (LT ) |
| 67 | ACSR Weasel conductor 30mmsq |
| 68 | GI Channel Iron Cross Arm 7 ft Long 75x40x6 mm |
| 69 | GI Channel Iron Cross Arm 5 ft Long (75x40x6) |
| 70 | GI Channel Iron Cross Arm 2 ft Long (75x40x6) |
| 71 | GI Angle iron brace 7 ft long (40X40X6) |
| 72 | GI Angle Iron Brace 1Mtr long (40x40x6) |
| 73 | 11KV Link set (Heavy Duty) 50x6 mmm Polymer |
| 74 | 11KV D.O. Set Polymer type |
| 75 | 11KV Lightening Arrestor Set (Station Type) Polymer Type |
| 76 | 11KV Disc insulator Polymer with fittings 12kV 45kN |
| 77 | 11KV Pin insulator 12kV 5KN Polymer |
| 78 | Shackle Insulators LT |
| 79 | Mucky Clamps complete set (50x6) GI |
| 80 | Back Clamps GI 50x6 |
| 81 | GI Pipe 2.5mtr long, 40mm dia for earthing complete job |
| 82 | GI Strip for Earthing 40x6mm |
| 83 | Bobin Insulator complete with back clamp/angle for GI strip support |
| 84 | Bus Bar Insulator |
| 85 | Almunium Bus Bar Strip |
| 86 | PVC Cable 95 mm sq. Single Core XLPE |
| 87 | Almunium Thimble 95 mmsq |
| 88 | Nuts and Bolts of Sorts (Galvanized) |
| 89 | Applying of Red oxide and Al. Paint coating on ST Poles |
| 90 | SITC of following materials as per REC standards for the work Installation of 25KVA Transformer at Batt Mohalla Lower colony Main Road Pyt. Phagsoo-A under CDF Doda-52 Constituency in respect of Electric Sub-Division JPDCL Thathri Division Kishtwar. (Approved Budget = Rs. 3.50 Lacs) |
| 91 | 25 KVA Transformer (EEL-2) with Bimettalic Connectors |
| 92 | ST Pole 9Mtr long (410SP33) (HT ) |
| 93 | ACSR Weasel conductor 30mmsq |
| 94 | GI Channel Iron Cross Arm 7 ft Long 75x40x6 mm |
| 95 | GI Channel Iron Cross Arm 5 ft Long (75x40x6) |
| 96 | GI Channel Iron Cross Arm 2 ft Long (75x40x6) |
| 97 | GI Angle iron brace 7 ft long (40X40X6) |
| 98 | GI Angle Iron Brace 1Mtr long (40x40x6) |
| 99 | 11KV Link set (Heavy Duty) 50x6 mmm Polymer |
| 100 | 11KV D.O. Set Polymer type |
| 101 | 11KV Lightening Arrestor Set (Station Type) Polymer Type |
| 102 | 11KV Disc insulator Polymer with fittings 12kV 45kN |
| 103 | 11KV Pin insulator 12kV 5KN Polymer |
| 104 | Shackle Insulators LT |
| 105 | Mucky Clamps complete set (50x6) GI |
| 106 | Back Clamps GI 50x6 |
| 107 | GI Pipe 2.5mtr long, 40mm dia for earthing complete job |
| 108 | GI Strip for Earthing 40x6mm |
| 109 | Bobin Insulator complete with back clamp/angle for GI strip support |
| 110 | Bus Bar Insulator |
| 111 | Almunium Bus Bar Strip |
| 112 | PVC Cable 95 mm sq. Single Core XLPE |
| 113 | Almunium Thimble 95 mmsq |
| 114 | Nuts and Bolts of Sorts (Galvanized) |
| 115 | Applying of Red oxide and Al. Paint coating on ST Poles |
| 116 | SITC of following materials as per REC standards for the work Installation of 25KVA Transformer at Trankhal W No 6 Pyt Goila Kahara Thathri under CDF Doda-52 Constituency in respect of Electric Sub-Division JPDCL Thathri Division Kishtwar. (Approved Budget = Rs. 3.50 Lacs) |
| 117 | 25 KVA Transformer (EEL-2) with Bimettalic Connectors |
| 118 | ST Pole 8Mtr long (410SP15) (LT ) |
| 119 | ACSR Weasel conductor 30mmsq |
| 120 | 11KV Pin insulator 12kV 5KN Polymer |
| 121 | Shackle Insulators LT |
| 122 | Mucky Clamps complete set (50x6) GI |
| 123 | GI Pipe 2.5mtr long, 40mm dia for earthing complete job |
| 124 | GI Strip for Earthing 40x6mm |
| 125 | Bobin Insulator complete with back clamp/angle for GI strip support |
| 126 | Bus Bar Insulator |
| 127 | Almunium Bus Bar Strip |
| 128 | PVC Cable 95 mm sq. Single Core XLPE |
| 129 | Almunium Thimble 95 mmsq |
| 130 | Nuts and Bolts of Sorts (Galvanized) |
| 131 | Applying of Red oxide and Al. Paint coating on ST Poles |
| 132 | SITC of following materials as per REC standards for the work Installation of 25KVA Transformer at Malik Mohalla Bathri W NO 6 under CDF Doda-52 Constituency in respect of Electric Sub-Division JPDCL Bhalessa Division Kishtwar. (Approved Budget = Rs. 3.50 Lacs) |
| 133 | 25 KVA Transformer (EEL-2) with Bimettalic Connectors |
| 134 | ST Pole 8Mtr long (410SP15) (HT ) |
| 135 | ACSR Weasel conductor 30mmsq |
| 136 | GI Channel Iron Cross Arm 7 ft Long 75x40x6 mm |
| 137 | GI Channel Iron Cross Arm 5 ft Long (75x40x6) |
| 138 | GI Channel Iron Cross Arm 2 ft Long (75x40x6) |
| 139 | GI Angle iron brace 7 ft long (40X40X6) f |
| 140 | GI Angle Iron Brace 1Mtr long (40x40x6) |
| 141 | 11KV Link set (Heavy Duty) 50x6 mmm Polymer |
| 142 | 11KV D.O. Set Polymer type |
| 143 | 11KV Lightening Arrestor Set (Station Type) Polymer Type |
| 144 | 11KV Disc insulator Polymer with fittings 12kV 45kN |
| 145 | 11KV Pin insulator 12kV 5KN Polymer |
| 146 | Shackle Insulators LT |
| 147 | Mucky Clamps complete set (50x6) GI |
| 148 | Back Clamps GI 50x6 |
| 149 | GI Pipe 2.5mtr long, 40mm dia for earthing complete job |
| 150 | GI Strip for Earthing 40x6mm |
| 151 | Bobin Insulator complete with back clamp/angle for GI strip support |
| 152 | Bus Bar Insulator |
| 153 | Almunium Bus Bar Strip |
| 154 | PVC Cable 95 mm sq. Single Core XLPE |
| 155 | Almunium Thimble 95 mmsq |
| 156 | Nuts and Bolts of Sorts (Galvanized) |
| 157 | Applying of Red oxide and Al. Paint coating on ST Poles |
| 158 | SITC of following materials as per REC standards for the work Installation of 25KVA Transformer at Nai Basti Kahara Pyt Dhrouth W No 6 Kahara under CDF Doda-52 Constituency in respect of Electric Sub-Division JPDCL Thathri Division Kishtwar. (Approved Budget = Rs. 3.50 Lacs) |
| 159 | 25 KVA Transformer (EEL-2) with Bimettalic Connectors |
| 160 | ST Pole 9 Mtr long (410SP33) (HT ) |
| 161 | ACSR Weasel conductor 30mmsq |
| 162 | GI Channel Iron Cross Arm 7 ft Long 75x40x6 mm |
| 163 | GI Channel Iron Cross Arm 5 ft Long (75x40x6) |
| 164 | GI Channel Iron Cross Arm 2 ft Long (75x40x6) |
| 165 | GI Angle iron brace 7 ft long (40X40X6) |
| 166 | GI Angle Iron Brace 1Mtr long (40x40x6) |
| 167 | 11KV Link set (Heavy Duty) 50x6 mmm Polymer |
| 168 | 11KV D.O. Set Polymer type |
| 169 | 11KV Lightening Arrestor Set (Station Type) Polymer Type |
| 170 | 11KV Disc insulator Polymer with fittings 12kV 45kN |
| 171 | 11KV Pin insulator 12kV 5KN Polymer |
| 172 | Shackle Insulators LT |
| 173 | Mucky Clamps complete set (50x6) GI |
| 174 | Back Clamps GI 50x6 |
| 175 | GI Pipe 2.5mtr long, 40mm dia for earthing complete job |
| 176 | GI Strip for Earthing 40x6mm |
| 177 | Bobin Insulator complete with back clamp/angle for GI strip support |
| 178 | Bus Bar Insulator |
| 179 | Almunium Bus Bar Strip |
| 180 | PVC Cable 95 mm sq. Single Core XLPE |
| 181 | Almunium Thimble 95 mmsq |
| 182 | Nuts and Bolts of Sorts (Galvanized) |
| 183 | Applying of Red oxide and Al. Paint coating on ST Poles |
| 184 | SITC of following materials as per REC standards for the work Installation of 25KVA Transformer at Chilli Pain W NO 03 Banjar Gwari under CDF Doda-52 Constituency in respect of Electric Sub-Division JPDCL Bhalessa Division Kishtwar. (Approved Budget = Rs. 3.50 Lacs) |
| 185 | 25 KVA Transformer (EEL-2) with Bimettalic Connectors |
| 186 | ST Pole 8Mtr long (410SP15) (HT ) |
| 187 | ACSR Weasel conductor 30mmsq |
| 188 | GI Channel Iron Cross Arm 7 ft Long 75x40x6 mm |
| 189 | GI Channel Iron Cross Arm 5 ft Long (75x40x6) |
| 190 | GI Channel Iron Cross Arm 2 ft Long (75x40x6) |
| 191 | GI Angle iron brace 7 ft long (40X40X6) |
| 192 | GI Angle Iron Brace 1Mtr long (40x40x6) |
| 193 | 11KV Link set (Heavy Duty) 50x6 mmm Polymer |
| 194 | 11KV D.O. Set Polymer type |
| 195 | 11KV Lightening Arrestor Set (Station Type) Polymer Type |
| 196 | 11KV Disc insulator Polymer with fittings 12kV 45kN |
| 197 | 11KV Pin insulator 12kV 5KN Polymer |
| 198 | Shackle Insulators LT |
| 199 | Mucky Clamps complete set (50x6) GI |
| 200 | Back Clamps GI 50x6 |
| 201 | GI Pipe 2.5mtr long, 40mm dia for earthing complete job |
| 202 | GI Strip for Earthing 40x6mm |
| 203 | Bobin Insulator complete with back clamp/angle for GI strip support |
| 204 | Bus Bar Insulator |
| 205 | Almunium Bus Bar Strip |
| 206 | PVC Cable 95 mm sq. Single Core XLPE |
| 207 | Almunium Thimble 95 mmsq |
| 208 | Nuts and Bolts of Sorts (Galvanized) |
| 209 | Applying of Red oxide and Al. Paint coating on ST Poles |
| 210 | SITC of following materials as per REC standards for the work Installation of 25KVA Transformer at Bagh Mohalla Pyt Chilli Bala W No 4 under CDF Doda-52 Constituency in respect of Electric Sub-Division JPDCL Bhalessa Division Kishtwar. (Approved Budget = Rs. 3.50 Lacs) |
| 211 | 25 KVA Transformer (EEL-2) with Bimettalic Connectors |
| 212 | ST Pole 8Mtr long (410SP15) (HT ) |
| 213 | ACSR Weasel conductor 30mmsq |
| 214 | GI Channel Iron Cross Arm 7 ft Long 75x40x6 mm |
| 215 | GI Channel Iron Cross Arm 5 ft Long (75x40x6) |
| 216 | GI Channel Iron Cross Arm 2 ft Long (75x40x6) |
| 217 | GI Angle iron brace 7 ft long (40X40X6) |
| 218 | GI Angle Iron Brace 1Mtr long (40x40x6) |
| 219 | 11KV Link set (Heavy Duty) 50x6 mmm Polymer |
| 220 | 11KV D.O. Set Polymer type |
| 221 | 11KV Lightening Arrestor Set (Station Type) Polymer Type |
| 222 | 11KV Disc insulator Polymer with fittings 12kV 45kN |
| 223 | 11KV Pin insulator 12kV 5KN Polymer |
| 224 | Shackle Insulators LT |
| 225 | Mucky Clamps complete set (50x6) GI |
| 226 | Back Clamps GI 50x6 |
| 227 | GI Pipe 2.5mtr long, 40mm dia for earthing complete job |
| 228 | GI Strip for Earthing 40x6mm |
| 229 | Bobin Insulator complete with back clamp/angle for GI strip support |
| 230 | Bus Bar Insulator |
| 231 | Almunium Bus Bar Strip |
| 232 | PVC Cable 95 mm sq. Single Core XLPE |
| 233 | Almunium Thimble 95 mmsq |
| 234 | Nuts and Bolts of Sorts (Galvanized) |
| 235 | Applying of Red oxide and Al. Paint coating on ST Poles Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender