Water Resources and Irrigation Government Departments Closing in 7 days TDR #58114209

Tender For Upgradation/Improvements Of Pattan Khul. (861.63 Lacs)

Issued by Government Departments · Baramulla, Jammu and Kashmir
Tender Value
8.61 Crore
Estimated cost
Bid Submission
06 Nov 2026
7 days left
EMD
17.23 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Baramulla → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Upgradation/Improvements Of Pattan Khul. (861.63 Lacs)

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 24-Oct-2026 Corrigendum Technical Bid 06-Nov-2026

BOQ

Name of Work:- Upgradation/Improvements of Pattan Khul. (861.63 lacs)
Sl. No. Item Description
1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
3Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil
4Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm (ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge.
5Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
6Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
7Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
8Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level; 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
9Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
10Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
11Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
12Dumping of stones including cost of stones. In Horizontal on level
13Dumping stone excluding cost of stones. In Horizontal on level
14Supply of Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%)
15Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
16Thermo-Mechanically Treated bars of grade Fe-500D or more.
17Centering and shuttering including strutting, propping etc. and removal of form for:
18Foundations, footings, bases of columns etc. for mass concrete.
19Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
20Suspended floors, roofs, landings, balconies and access platforms.
21Columns, pillars, piers, abutments, posts and struts.
22Lintel, beams, plinth beams, girders, bressumers and cantilevers.
23Edges of slabs and breaks in floors and walls Above 20 cm wide
24Edges of slabs and breaks in floors and walls Under 20 cm wide
25Providing, installation, commissioning and testing of single winch machine, complete set of standard quality of 03 ton capacity with double threaded 50 mm dia winch rod, gears, peddestal rain cover, greese lids, MS sleeves, operating handle with locking arrangement incl. greesing, oiling ,Painting, Stair, all sorts of carriages and extra carriages etc upto site of work complete job
2612 mm Cement plaster of mix: ( 1 cement : 4 fine sand)
27Providing & Fixing of Rubber Seal for Expansion Joints @25mm C/C ..Complete Job
28Carraige of materials from souce to road site of work by Mechanical transport including cost of loading, unloading and stacking
29Gabion avg lead of 30 km from srinagar
30Nallah Stones for an avg lead of 01 Km from Lolpora
31Stone soling for an avg lead of 3 Kms from Babagund
32Stone soling for an avg lead of 04 Kms from kunzer
33Stone soling for an avg lead of 05 Kms from kunzer
34Stone soling for an avg lead of 25 Kms
35Stone Aggregate 40 mm from Kunzer for an avg lead of 03 Kms
36Stone Aggregate 40 mm for an avg lead of 04 Kms
37Stone Aggregate 40 mm for an avg lead of 25 Kms from Kunzar
38Stone Aggregate 40 mm for an avg lead of 05 Kms from Lolpora
39Stone Aggregate 40 mm for an avg lead of 10 Kms from Lolpora
40Stone Aggregate 40 mm for an avg lead of 07 Kms from Kunzer
41Stone Aggregate 20 mm for an avg lead of 10 Kms from Lolpora
42Stone Aggregate 20 mm for an avg lead of 07 Kms from Kunzar
43Stone Aggregate 20 mm for an avg lead of 03 Kms from Kunzer
44Stone Aggregate 20 mm for an avg lead of 05 Kms from Lolpora
45Stone Aggregate 20 mm for an avg lead of 04 Kms from Kunzer
46Sand for an avg lead of 30kms from Sumbal
47Sand for an avg lead of 22 kms
48Sand from Sumbal for an avg lead of 25 kms
49Cement/Steel for an avg lead of 5 kms from Pattan
50Cement from Pattan for an avg lead of 01 kms
51Extra Carraige of materials from Road site to actual site of work by Mannual means including cost of loading, unloading and stacking etcfor an avg lead of 100 mtrs
52Stones
53Stone Aggregates 40 mm
54Stone Aggregates 20 mm/ Sand
55Cement
56Steel
57Gabions
58Extra Carraige of materials from Road site to actual site of work by Mannual means including cost of loading, unloading and stacking etcfor an avg lead of 300 mtrs
59Stone Soling
60Stone Aggregates 40 mm
61Stone Aggregates 20 mm/ Sand
62Stone Aggregates 20 mm/ Sand Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58114209
AUTHORITY Government Departments
TENDER VALUE 8.61 Crore
LAST DATE 06-11-2026
Authority
Authority Name Irrigation And Flood Control Department
Work Description Tender for Upgradation/Improvements Of Pattan Khul. (861.63 Lacs)
Basic Detail
Tender No enit.11.IFCD.SPR.2026.27
Bidding Type Tender
Location
City Baramulla
State Jammu and Kashmir
Key Dates
Publish Date 24 Oct 2026
Submission Date 06 Nov 2026
Open Date 01 Jan 0001
Finance
Tender Value 8.61 Crore
Tender Fee 10000
EMD 17.23 Lakhs
Exemption Not Available
Document List
BOQ_1112092.xls
cd6773ff-398b-4b79-a6d8-f63219a9ad8e.html
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 24, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 06, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 7 days
Nov 06, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_1112092.xls

html

cd6773ff-398b-4b79-a6d8-f63219a9ad8e.html

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender