Tender For Upgradation/Improvements Of Pattan Khul. (861.63 Lacs)
Tender Value
8.61 Crore
Estimated cost
Bid Submission
06 Nov 2026
7 days left
EMD
17.23 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Baramulla → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Upgradation/Improvements Of Pattan Khul. (861.63 Lacs)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 24-Oct-2026 | Corrigendum | Technical Bid | 06-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil |
| 4 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm (ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge. |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level; 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 11 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 12 | Dumping of stones including cost of stones. In Horizontal on level |
| 13 | Dumping stone excluding cost of stones. In Horizontal on level |
| 14 | Supply of Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%) |
| 15 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level |
| 16 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 17 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 18 | Foundations, footings, bases of columns etc. for mass concrete. |
| 19 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 20 | Suspended floors, roofs, landings, balconies and access platforms. |
| 21 | Columns, pillars, piers, abutments, posts and struts. |
| 22 | Lintel, beams, plinth beams, girders, bressumers and cantilevers. |
| 23 | Edges of slabs and breaks in floors and walls Above 20 cm wide |
| 24 | Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 25 | Providing, installation, commissioning and testing of single winch machine, complete set of standard quality of 03 ton capacity with double threaded 50 mm dia winch rod, gears, peddestal rain cover, greese lids, MS sleeves, operating handle with locking arrangement incl. greesing, oiling ,Painting, Stair, all sorts of carriages and extra carriages etc upto site of work complete job |
| 26 | 12 mm Cement plaster of mix: ( 1 cement : 4 fine sand) |
| 27 | Providing & Fixing of Rubber Seal for Expansion Joints @25mm C/C ..Complete Job |
| 28 | Carraige of materials from souce to road site of work by Mechanical transport including cost of loading, unloading and stacking |
| 29 | Gabion avg lead of 30 km from srinagar |
| 30 | Nallah Stones for an avg lead of 01 Km from Lolpora |
| 31 | Stone soling for an avg lead of 3 Kms from Babagund |
| 32 | Stone soling for an avg lead of 04 Kms from kunzer |
| 33 | Stone soling for an avg lead of 05 Kms from kunzer |
| 34 | Stone soling for an avg lead of 25 Kms |
| 35 | Stone Aggregate 40 mm from Kunzer for an avg lead of 03 Kms |
| 36 | Stone Aggregate 40 mm for an avg lead of 04 Kms |
| 37 | Stone Aggregate 40 mm for an avg lead of 25 Kms from Kunzar |
| 38 | Stone Aggregate 40 mm for an avg lead of 05 Kms from Lolpora |
| 39 | Stone Aggregate 40 mm for an avg lead of 10 Kms from Lolpora |
| 40 | Stone Aggregate 40 mm for an avg lead of 07 Kms from Kunzer |
| 41 | Stone Aggregate 20 mm for an avg lead of 10 Kms from Lolpora |
| 42 | Stone Aggregate 20 mm for an avg lead of 07 Kms from Kunzar |
| 43 | Stone Aggregate 20 mm for an avg lead of 03 Kms from Kunzer |
| 44 | Stone Aggregate 20 mm for an avg lead of 05 Kms from Lolpora |
| 45 | Stone Aggregate 20 mm for an avg lead of 04 Kms from Kunzer |
| 46 | Sand for an avg lead of 30kms from Sumbal |
| 47 | Sand for an avg lead of 22 kms |
| 48 | Sand from Sumbal for an avg lead of 25 kms |
| 49 | Cement/Steel for an avg lead of 5 kms from Pattan |
| 50 | Cement from Pattan for an avg lead of 01 kms |
| 51 | Extra Carraige of materials from Road site to actual site of work by Mannual means including cost of loading, unloading and stacking etcfor an avg lead of 100 mtrs |
| 52 | Stones |
| 53 | Stone Aggregates 40 mm |
| 54 | Stone Aggregates 20 mm/ Sand |
| 55 | Cement |
| 56 | Steel |
| 57 | Gabions |
| 58 | Extra Carraige of materials from Road site to actual site of work by Mannual means including cost of loading, unloading and stacking etcfor an avg lead of 300 mtrs |
| 59 | Stone Soling |
| 60 | Stone Aggregates 40 mm |
| 61 | Stone Aggregates 20 mm/ Sand |
| 62 | Stone Aggregates 20 mm/ Sand Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 24, 2026
11:30 IST
Tender Published
Tender notice published.
Completed
Nov 06, 2026
18:00 IST
Corrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 7 daysNov 06, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender