Tender For Addition/Alteration And Renovation Of Echs Main Bldg Of Polyclinic At 151 Bh Under Ge Guwahati
Tender Overview
Project Description
Tender For Addition/Alteration And Renovation Of Echs Main Bldg Of Polyclinic At 151 Bh Under Ge Guwahati
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 30-Oct-2026 | Date Corrigendum | Date | 14-Nov-2026 |
| 2 | 14-Nov-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 21-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Demolition Wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets, etc complete all as specified and directed. |
| 2 | M&L for false ceiling with 10 mm thick 600mmx900mm plaster of paris sheets fixed with machine screws on and incl GI chanel 18 gauge thick grid work, main joints placed at 750mm center to center, cross joints placed at 450mm center to center, hanging with 6mm dia GI wire suspenders from roof and fixed with 'J' hooks bolts and nuts etc and treating the POP sheets with thin layer of POP with gypsum anhydrous binder and perpare the surface till smooth surface is achieved; and applying two coats of plastic emulsion paint over a coat of primer matching with the colour of ceiling sheets all complete as required as per manufacture's instructions etc complete as specified and directed. Note - rate included for lowering /shortening of electric fitting such as fan , light fitting etc complete all as specified and directed. |
| 3 | Demolition of PCC in ground floor or paving of any description n.exc. 15cm thickness (Un re-inforced) below or above GL complete all as specified and directed. |
| 4 | M&L for 75 mm thick PCC 1:3:6 type C2 using 40mm graded stone agg as in sub base and plinth protection, finished even and smooth w/o using extra cement complete all as specified and directed. |
| 5 | Taking down cement plaster on brick wall/stone wall, ceilings, sunken floors etc, racking out joints, hacking for key & scrubbing with water completely complete as specified and directed. |
| 6 | M&L for rendering 15mm thick plaster in two layers ( 10mm +5mm ) on brick or concrete surfaces in CM 1:4 mixed with WPC on second layer finished the surface even and smooth without using extra cement complete all as specified and directed. (Note- supply only WPC shall be measured and paid seperately). |
| 7 | Supply only Liquid water proofing compound complete all as specified and directed. |
| 8 | M&L for rendering 10mm thick plaster on other than fair faces of brick or concrete surfaces in CM 1:6 finished the surface even and smooth without using extra cement complete all as specified and directed. |
| 9 | M&L for preparation of newly plastered surfaces of wall and applying two coats of water based acrylic distemper over a coat of primer over a coat of 1.5mm thick wall care putty complete all as specified and directed. |
| 10 | M&L for preparing newly plastered surfaces and applying two or more coats of Acrylic Smooth exterior paint of required shade : New work @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm complete all as specified and directed. |
| 11 | M&L for complete removal of existing treatment on wall/ roof projections including facia, cornices etc by scrapping with mechanical sander (having mechanical vaccum mechanism) with sanding pad of appropriate grit to make surface clean,free from dust, loose paint etc by skilled labour complete all as specified and directed. |
| 12 | M&L for waterproof cement based putty @ 1 Kg (undiluted) per sq mtr. of average thickness 1 mm over the plastered/old painted wall after scrapping to prepare the surface even and smooth complete and sanding of the putty surface with mechanical wall sander (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 240 Grit or above to make the surface free from dust etc. by skilled labour as per following steps:- Step 1) Mix the putty powder by adding water as per manufacturer instructions and mix it with putty mixer with the mixing capacity of min 2.5 kg putty per minute. Step 2) Apply the first coat the prepared mixer with the help of fully automatic airless spray machine of putty application having flow speed of max 6 ltrs per minutes with a maximum pressure 3300 PSI Step 3) Allow 6-8 hrs time to dry the putty surface complete all as specified and as directed and also all as per the Notes given below |
| 13 | M&L for one coat of acrylic water based exterior grade primer @0.9 ltr (undiluted)/10 sq mtrs diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI Allow 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and as directed and also all as per the Notes given below |
| 14 | M&L for one coat of acrylic water based interior grade primer @ 0.8 ltr (undiluted)/10 sq mtrs diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI Allow 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and as directed and also all as per the Notes given below |
| 15 | M&L for two coat water based premium acrylic smooth exterior emulsion of approved colour with silicon additive & Color stay Technology, Excellent Dirt Pick up resistance with low VOC less than 50 gram/ litre as per the LEEDS specifications, Anti Algal properties in two coats @ 1.79 ltr (undiluted)/ 10 sqm diluted with water as per manufacturer instructions applied over priming coat with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI.Allow 6-8 hrs to dry the surface in both the coats of paint with using auto roller for making the surface uniform complete all as specified and as directed and also all as per the Notes given below |
| 16 | M&L for two coats of smooth interior acrylic emulsion with rich matt finish having VOC less than 50 grams per ltr complying LEEDS criteria @1 ltrs(unndiluted) /10 sq mtrs diluted with water in 2:1 ratio applied over priming coat with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI.Allow 6-8 hrs to dry the surface in both the coats of paint as per manufacturer instructions complete all as specified and as directed and also all as per the Notes given below |
| 17 | NOTES for BOQ serial item No.12.00 to 16.00- (a) TThe work pertaining to periodical services & Water Proofing shall be executed from authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by Garrison Engineer.(b) Cost of scafolding upto 13m hight of building is included in this item.(c) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work.(d) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats.NOTES CONTINIED BELOW AS 16.20 Please Enable Macros to View BoQ information |
| 18 | NOTES for BOQ serial item No.12.00 to 16.00- (a) TThe work pertaining to periodical services & Water Proofing shall be executed from authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by Garrison Engineer.(b) Cost of scafolding upto 13m hight of building is included in this item.(c) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work.(d) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats.NOTES CONTINIED BELOW AS 16.20 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
TodayBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender