Power Government Departments Closing in 8 days TDR #58110862

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation, The Work Of Shifting Of 11 Kv U/G Line For Construction Of Fourlane Railway Overbridge In Jhansi-Mani

Issued by Government Departments · Banda, Uttar Pradesh
Tender Value
22 Lakhs
Estimated cost
Bid Submission
28 Oct 2026
8 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Banda → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation, The Work Of Shifting Of 11 Kv U/G Line For Construction Of Fourlane Railway Overbridge In Jhansi-Manikpur Rail Section For.. - The Work Of Dismentling & Re-Erection Of 11 Kv U/G Line On 13 Mtr. Long St Poles With Xlpe Cable Due To Shifting For Construction Of Fourlane Railway Overbridge In Jhansi-Manikpur Rail Section Due To Construction Of New Bypass For Connect To Km. Jhansi-Mirzapur Marg To Naraini-Kalinger Marg In Km. 1313/9-1314 In Distt. Banda Under 33/11 Kv Ss, Bhooragarh, Banda Under Full Deposit Scheme 2026-27 Under Eudd Banda (Turn-Key Basis), Including Carriage Of All Required Material From E.S.C., Banda To Work Site, Alongwith Its Loading, Unloading & Dragging At The Respective Ends And Also Carriage Of Old/Damaged Scraped Material/Tfs From Site To Store Centre, If Any. All Works Like Erection, Fixing, Installation, Laying & Grouting Etc. Shall Be Done By Firm As Per Direction Of Engineer Incharge/Resspo Manual. During The Erection Of Lines/Poles Has To Be Done Including Cartage. Various Type Petty Materials/Work, Which Are Not Mentioned In Scope Of Work, But Actual Required Has To Be Arranged By Contractor At His Own Cost. No Extra Payment Will Be Made To Such Petty Requirement. The Material Supplied By Contractor Should Be The Best Quality And As Per Standard/Resspo Norms, Including Transportation, If Any. All Steel Material Supplied By Firm Have To Galavanised, Details Of The Work As Given Below :- , Supply Of Following Materials :- , St Pole 13 Mtr. Long Sp-70 , Stone Pad , Cable Al. 3X120 Sq.Mm. Xlpe 11 Kv , 11 Kv Cable Jointing Kit Outdoor , Barbed Wire , Alluminium Paint , Red Oxide Paint , Cross Bracing Angle With Cl S, Nut-Bolts & Washers , Nut-Bolts & Washers Of Suitable Size , Pin Insulator , Gi Pipe 6 Dia , Dropper Channel 100X50x2028 Mm. , Top Channel 100X50x2240 Mm. , Holding Cl S For Top/Dropper Channel With Nut-Bolts & Washers , Disc Insulator T&C 45 Kn , Disc Fittings T&C 45 Kn , Danger Board With Cl & Nut-Bolts , Straight Through Cable Jointing Kit 11 Kv , Stay Complete , Earthing Complete , Hdpe Pipe 120 Mm. With Supporting Cl S, Nut-Bolts Etc., If Required. , The Work Of Erection/Installation/Fixing Of Following :- , Erection & Fixing Of St Pole 13 Mtr. Long Sp-70 As Single/Double Structure , Erection & Fixing Of Stone Pad , Laying Of Cable Al. 3X120 Sq.Mm. Xlpe 11 Kv With Bricks & Sand For Looping , Fixing, Filling, Making & Commissioning Of 11 Kv Cable Jointing Kit Outdoor (Cable Boxes) And Making All Suitable Arrangements To Get The Work Done. , Erection & Fixing Of Barbed Wire , Painting Of St Poles With Alluminium Paint , Painting Of St Poles With Red Oxide Paint , Erection & Fixing Of Cross Bracing Angle With Cl S, Nut-Bolts & Washers , Erection & Fixing Of Nut-Bolts & Washers Of Suitable Size , Erection & Fixing Of Pin Insulator , Mounting & Fixing Of Cable On G.I. Pipe 6 Dia With Fitting Of All Accessories As Per Resspo Manual. , Erection & Fixing Of Dropper Channel 100X50x2028 Mm. , Erection & Fixing Of Top Channel 100X50x2240 Mm. , Erection & Fixing Of Holding Cl S For Top/Dropper Channel With Nut-Bolts & Washers , Erection & Fixing Of Disc Insulator T&C 45 Kn , Erection & Fixing Of Disc Fittings T&C 45 Kn , Erection & Fixing Of Danger Board With Cl & Nut-Bolts , Fixing, Filling, Making & Commissioning Of Straight Through Cable Jointing Kit 11 Kv (Cable Boxes) And Making All Suitable Arrangements To Get The Work Done. , Erection And Grouting Of Stay Set Complete Including The Work Of Nozelling Etc. As Per Resspo Manual And Also Including The Cost Of All Grouting Material. , Fixing Of Earthing Rod Complete As Per Direction Of Supervising Engineer/Resspo Manual. Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. , Laying Of 11 Kv 3X120 Sq.Mm. Al. Cable Xlpe By Hdd Machine On Hdpe Pipe. The Work Includes Cost Of Commissioning Of 11 Kv Cable Jointing Kits And Making All Suitable Arrangements To Get The Work Done. Cable Hoisting And Making Loops At Both Ends Are Also Includes In The Work. , Concreting/Grouting Of Newly Erected 13 Mtr. Long St Poles As Single Support/Double Pole Structures. The Support Shall Be Grouted With Cement, Sand And Brick Ballast/Stone Ballast In Ratio 1:4:8 (0.285 Cu. Mtr. Each), Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast/Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement & Direction Of Enginner Incharge. , Dismentling & Removal Of Damaged/Old Erected Cable/Conductor With Its Accessories Due To Shifting And Also Cartage Of Old/Damaged & Scrap Line Material From Work Site To Store Centre/Je(S). , Dismentling & Removal Of Existing/Erected Old Stp Poles As Single/Double Poles Structure With Its Accessories And Also Cartage Of Same From Work Site To Store Centre/Je(S) Due To Shifting. , Chopping Of Tree Branches Coming In The Vicinity Of The Lines During The Execution Of Above Work , Note: Any Quantity Of Item From Sl No. 1 To Sl No. 2.25 May Vary To Any Limit Within The Financial Value Of Agreement Against This Tender.

BOQ

Sl. No. Item TitleItem Description
1The work of dismentling & re-erection of 11 KV U/G Line on 13 Mtr. long ST Poles with XLPE Cable due to shifting for construction of fourlane railway overbridge in Jhansi-Manikpur Rail Section due to construction of new bypass for connect to Km. Jhansi-Mirzapur Marg to Naraini-Kalinger Marg in Km. 1313/9-1314 in Distt. Banda under 33/11 KV SS, Bhooragarh, Banda under FULL DEPOSIT SCHEME 2026-27 under EUDD BANDA (Turn-key Basis), including carriage of all required material from E.S.C., BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/damaged scraped material/TFs from site to store centre, if any. All works like erection, fixing, installation, laying & grouting etc. shall be done by firm as per direction of Engineer incharge/RESSPO manual. During the erection of lines/poles has to be done including cartage. Various type petty materials/work, which are not mentioned in scope of work, but actual required has to be arranged by contractor at his own cost. No extra payment will be made to such petty requirement. The material supplied by contractor should be the best quality and as per standard/RESSPO norms, including transportation, if any. All steel material supplied by firm have to Galavanised, Details of the work as given below :-The work of dismentling & re-erection of 11 KV U/G Line on 13 Mtr. long ST Poles with XLPE Cable due to shifting for construction of fourlane railway overbridge in Jhansi-Manikpur Rail Section due to construction of new bypass for connect to Km. Jhansi-Mirzapur Marg to Naraini-Kalinger Marg in Km. 1313/9-1314 in Distt. Banda under 33/11 KV SS, Bhooragarh, Banda under FULL DEPOSIT SCHEME 2026-27 under EUDD BANDA (Turn-key Basis), including carriage of all required material from E.S.C., BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/damaged scraped material/TFs from site to store centre, if any. All works like erection, fixing, installation, laying & grouting etc. shall be done by firm as per direction of Engineer incharge/RESSPO manual. During the erection of lines/poles has to be done including cartage. Various type petty materials/work, which are not mentioned in scope of work, but actual required has to be arranged by contractor at his own cost. No extra payment will be made to such petty requirement. The material supplied by contractor should be the best quality and as per standard/RESSPO norms, including transportation, if any. All steel material supplied by firm have to Galavanised, Details of the work as given below :-
2Supply of following materials :-Supply of following materials :-
3ST Pole 13 Mtr. Long SP-70ST Pole 13 Mtr. Long SP-70
4Stone PadStone Pad
5Cable Al. 3x120 Sq.mm. XLPE 11 KVCable Al. 3x120 Sq.mm. XLPE 11 KV
611 KV Cable Jointing Kit Outdoor11 KV Cable Jointing Kit Outdoor
7Barbed WireBarbed Wire
8Alluminium PaintAlluminium Paint
9Red Oxide PaintRed Oxide Paint
10Cross Bracing Angle with clamps, nut-bolts & washersCross Bracing Angle with clamps, nut-bolts & washers
11Nut-Bolts & Washers of suitable sizeNut-Bolts & Washers of suitable size
12Pin InsulatorPin Insulator
13GI Pipe 6\\" DiaGI Pipe 6\\" Dia
14Dropper Channel 100x50x2028 mm.Dropper Channel 100x50x2028 mm.
15Top Channel 100x50x2240 mm.Top Channel 100x50x2240 mm.
16Holding Clamps for Top/Dropper Channel with nut-bolts & washersHolding Clamps for Top/Dropper Channel with nut-bolts & washers
17Disc Insulator T&C 45 KNDisc Insulator T&C 45 KN
18Disc Fittings T&C 45 KNDisc Fittings T&C 45 KN
19Danger Board with Clamp & nut-boltsDanger Board with Clamp & nut-bolts
20Straight Through Cable Jointing Kit 11 KVStraight Through Cable Jointing Kit 11 KV
21Stay completeStay complete
22Earthing CompleteEarthing Complete
23HDPE Pipe 120 mm. with supporting clamps, nut-bolts etc., if required.HDPE Pipe 120 mm. with supporting clamps, nut-bolts etc., if required.
24The work of erection/installation/fixing of following :-The work of erection/installation/fixing of following :-
25Erection & fixing of ST Pole 13 Mtr. Long SP-70 as single/double structureErection & fixing of ST Pole 13 Mtr. Long SP-70 as single/double structure
26Erection & fixing of Stone PadErection & fixing of Stone Pad
27Laying of Cable Al. 3x120 Sq.mm. XLPE 11 KV with bricks & sand for loopingLaying of Cable Al. 3x120 Sq.mm. XLPE 11 KV with bricks & sand for looping
28Fixing, filling, making & commissioning of 11 KV Cable Jointing Kit Outdoor (Cable Boxes) and making all suitable arrangements to get the work done.Fixing, filling, making & commissioning of 11 KV Cable Jointing Kit Outdoor (Cable Boxes) and making all suitable arrangements to get the work done.
29Erection & fixing of Barbed WireErection & fixing of Barbed Wire
30Painting of ST Poles with Alluminium PaintPainting of ST Poles with Alluminium Paint
31Painting of ST Poles with Red Oxide PaintPainting of ST Poles with Red Oxide Paint
32Erection & fixing of Cross Bracing Angle with clamps, nut-bolts & washersErection & fixing of Cross Bracing Angle with clamps, nut-bolts & washers
33Erection & fixing of Nut-Bolts & Washers of suitable sizeErection & fixing of Nut-Bolts & Washers of suitable size
34Erection & fixing of Pin InsulatorErection & fixing of Pin Insulator
35Mounting & fixing of cable on G.I. Pipe 6\\" dia with fitting of all accessories as per RESSPO manual.Mounting & fixing of cable on G.I. Pipe 6\\" dia with fitting of all accessories as per RESSPO manual.
36Erection & fixing of Dropper Channel 100x50x2028 mm.Erection & fixing of Dropper Channel 100x50x2028 mm.
37Erection & fixing of Top Channel 100x50x2240 mm.Erection & fixing of Top Channel 100x50x2240 mm.
38Erection & fixing of Holding Clamps for Top/Dropper Channel with nut-bolts & washersErection & fixing of Holding Clamps for Top/Dropper Channel with nut-bolts & washers
39Erection & fixing of Disc Insulator T&C 45 KNErection & fixing of Disc Insulator T&C 45 KN
40Erection & fixing of Disc Fittings T&C 45 KNErection & fixing of Disc Fittings T&C 45 KN
41Erection & fixing of Danger Board with Clamp & nut-boltsErection & fixing of Danger Board with Clamp & nut-bolts
42Fixing, filling, making & commissioning of Straight Through Cable Jointing Kit 11 KV (Cable Boxes) and making all suitable arrangements to get the work done.Fixing, filling, making & commissioning of Straight Through Cable Jointing Kit 11 KV (Cable Boxes) and making all suitable arrangements to get the work done.
43Erection and grouting of stay set complete including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material.Erection and grouting of stay set complete including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material.
44Fixing of earthing rod complete as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work.Fixing of earthing rod complete as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work.
45LAYING OF 11 KV 3x120 Sq.mm. Al. Cable XLPE BY HDD MACHINE ON HDPE PIPE. THE WORK INCLUDES COST OF COMMISSIONING OF 11 KV CABLE JOINTING KITS AND MAKING ALL SUITABLE ARRANGEMENTS TO GET THE WORK DONE. CABLE HOISTING AND MAKING LOOPS AT BOTH ENDS ARE ALSO INCLUDES IN THE WORK.LAYING OF 11 KV 3x120 Sq.mm. Al. Cable XLPE BY HDD MACHINE ON HDPE PIPE. THE WORK INCLUDES COST OF COMMISSIONING OF 11 KV CABLE JOINTING KITS AND MAKING ALL SUITABLE ARRANGEMENTS TO GET THE WORK DONE. CABLE HOISTING AND MAKING LOOPS AT BOTH ENDS ARE ALSO INCLUDES IN THE WORK.
46Concreting/Grouting of newly erected 13 Mtr. long ST poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge.Concreting/Grouting of newly erected 13 Mtr. long ST poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge.
47Dismentling & removal of damaged/old erected cable/conductor with its accessories due to shifting and also cartage of old/damaged & scrap line material from work site to store centre/JE(s).Dismentling & removal of damaged/old erected cable/conductor with its accessories due to shifting and also cartage of old/damaged & scrap line material from work site to store centre/JE(s).
48Dismentling & removal of existing/erected old STP Poles as single/double poles structure with its accessories and also cartage of same from work site to store centre/JE(s) due to shifting.Dismentling & removal of existing/erected old STP Poles as single/double poles structure with its accessories and also cartage of same from work site to store centre/JE(s) due to shifting.
49Chopping of Tree Branches coming in the vicinity of the lines during the execution of above workChopping of Tree Branches coming in the vicinity of the lines during the execution of above work
50Note: Any quantity of item from sl no. 1 to sl no. 2.25 may vary to any limit within the financial value of agreement against this tender.Note: Any quantity of item from sl no. 1 to sl no. 2.25 may vary to any limit within the financial value of agreement against this tender.

AI Tender Summary

OUR REF NO 58110862
AUTHORITY Government Departments
TENDER VALUE 22 Lakhs
LAST DATE 28-10-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation, The Work Of Shifting Of 11 Kv U/G Line For Construction Of Fourlane Railway Overbridge In Jhansi-Manikpur Rail Section For.. - The Work Of Dismentling & Re-Erection Of 11 Kv U/G Line On 13 Mtr. Long St Poles With Xlpe Cable Due To Shifting For Construction Of Fourlane Railway Overbridge In Jhansi-Manikpur Rail Section Due To Construction Of New Bypass For Connect To Km. Jhansi-Mirzapur Marg To Naraini-Kalinger Marg In Km. 1313/9-1314 In Distt. Banda Under 33/11 Kv Ss, Bhooragarh, Banda Under Full Deposit Scheme 2026-27 Under Eudd Banda (Turn-Key Basis), Including Carriage Of All Required Material From E.S.C., Banda To Work Site, Alongwith Its Loading, Unloading & Dragging At The Respective Ends And Also Carriage Of Old/Damaged Scraped Material/Tfs From Site To Store Centre, If Any. All Works Like Erection, Fixing, Installation, Laying & Grouting Etc. Shall Be Done By Firm As Per Direction Of Engineer Incharge/Resspo Manual. During The Erection Of Lines/Poles Has To Be Done Including Cartage. Various Type Petty Materials/Work, Which Are Not Mentioned In Scope Of Work, But Actual Required Has To Be Arranged By Contractor At His Own Cost. No Extra Payment Will Be Made To Such Petty Requirement. The Material Supplied By Contractor Should Be The Best Quality And As Per Standard/Resspo Norms, Including Transportation, If Any. All Steel Material Supplied By Firm Have To Galavanised, Details Of The Work As Given Below :- , Supply Of Following Materials :- , St Pole 13 Mtr. Long Sp-70 , Stone Pad , Cable Al. 3X120 Sq.Mm. Xlpe 11 Kv , 11 Kv Cable Jointing Kit Outdoor , Barbed Wire , Alluminium Paint , Red Oxide Paint , Cross Bracing Angle With Cl S, Nut-Bolts & Washers , Nut-Bolts & Washers Of Suitable Size , Pin Insulator , Gi Pipe 6 Dia , Dropper Channel 100X50x2028 Mm. , Top Channel 100X50x2240 Mm. , Holding Cl S For Top/Dropper Channel With Nut-Bolts & Washers , Disc Insulator T&C 45 Kn , Disc Fittings T&C 45 Kn , Danger Board With Cl & Nut-Bolts , Straight Through Cable Jointing Kit 11 Kv , Stay Complete , Earthing Complete , Hdpe Pipe 120 Mm. With Supporting Cl S, Nut-Bolts Etc., If Required. , The Work Of Erection/Installation/Fixing Of Following :- , Erection & Fixing Of St Pole 13 Mtr. Long Sp-70 As Single/Double Structure , Erection & Fixing Of Stone Pad , Laying Of Cable Al. 3X120 Sq.Mm. Xlpe 11 Kv With Bricks & Sand For Looping , Fixing, Filling, Making & Commissioning Of 11 Kv Cable Jointing Kit Outdoor (Cable Boxes) And Making All Suitable Arrangements To Get The Work Done. , Erection & Fixing Of Barbed Wire , Painting Of St Poles With Alluminium Paint , Painting Of St Poles With Red Oxide Paint , Erection & Fixing Of Cross Bracing Angle With Cl S, Nut-Bolts & Washers , Erection & Fixing Of Nut-Bolts & Washers Of Suitable Size , Erection & Fixing Of Pin Insulator , Mounting & Fixing Of Cable On G.I. Pipe 6 Dia With Fitting Of All Accessories As Per Resspo Manual. , Erection & Fixing Of Dropper Channel 100X50x2028 Mm. , Erection & Fixing Of Top Channel 100X50x2240 Mm. , Erection & Fixing Of Holding Cl S For Top/Dropper Channel With Nut-Bolts & Washers , Erection & Fixing Of Disc Insulator T&C 45 Kn , Erection & Fixing Of Disc Fittings T&C 45 Kn , Erection & Fixing Of Danger Board With Cl & Nut-Bolts , Fixing, Filling, Making & Commissioning Of Straight Through Cable Jointing Kit 11 Kv (Cable Boxes) And Making All Suitable Arrangements To Get The Work Done. , Erection And Grouting Of Stay Set Complete Including The Work Of Nozelling Etc. As Per Resspo Manual And Also Including The Cost Of All Grouting Material. , Fixing Of Earthing Rod Complete As Per Direction Of Supervising Engineer/Resspo Manual. Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. , Laying Of 11 Kv 3X120 Sq.Mm. Al. Cable Xlpe By Hdd Machine On Hdpe Pipe. The Work Includes Cost Of Commissioning Of 11 Kv Cable Jointing Kits And Making All Suitable Arrangements To Get The Work Done. Cable Hoisting And Making Loops At Both Ends Are Also Includes In The Work. , Concreting/Grouting Of Newly Erected 13 Mtr. Long St Poles As Single Support/Double Pole Structures. The Support Shall Be Grouted With Cement, Sand And Brick Ballast/Stone Ballast In Ratio 1:4:8 (0.285 Cu. Mtr. Each), Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast/Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement & Direction Of Enginner Incharge. , Dismentling & Removal Of Damaged/Old Erected Cable/Conductor With Its Accessories Due To Shifting And Also Cartage Of Old/Damaged & Scrap Line Material From Work Site To Store Centre/Je(S). , Dismentling & Removal Of Existing/Erected Old Stp Poles As Single/Double Poles Structure With Its Accessories And Also Cartage Of Same From Work Site To Store Centre/Je(S) Due To Shifting. , Chopping Of Tree Branches Coming In The Vicinity Of The Lines During The Execution Of Above Work , Note: Any Quantity Of Item From Sl No. 1 To Sl No. 2.25 May Vary To Any Limit Within The Financial Value Of Agreement Against This Tender.
Basic Detail
Tender No GEM/2026/B/8177107
Bidding Type Tender
Location
City Banda
State Uttar Pradesh
Key Dates
Publish Date 17 Oct 2026
Submission Date 28 Oct 2026
Open Date 29 Oct 2026
Finance
Tender Value 22 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
13f35ea6-720f-4384-be4e-1e6a4d8a1e1d.pdf
1792244700.xlsx
1792244709.pdf
1792244713.pdf
1792244718.pdf
1792244721.pdf
ATC49_98f46f53-9c55-4bc6-808a1792245112293_EDCBANDABUYER.pdf
SoW49_b97a13dc-166c-4930-a86e1792245124495_EDCBANDABUYER.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 17, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Oct 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
pdf

13f35ea6-720f-4384-be4e-1e6a4d8a1e1d.pdf

xlsx

1792244700.xlsx

pdf

1792244709.pdf

pdf

1792244713.pdf

pdf

1792244718.pdf

pdf

1792244721.pdf

pdf

ATC49_98f46f53-9c55-4bc6-808a1792245112293_EDCBANDABUYER.pdf

pdf

SoW49_b97a13dc-166c-4930-a86e1792245124495_EDCBANDABUYER.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender