Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation, The Work Of Shifting Of 11 Kv U/G Line For Construction Of Fourlane Railway Overbridge In Jhansi-Mani
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation, The Work Of Shifting Of 11 Kv U/G Line For Construction Of Fourlane Railway Overbridge In Jhansi-Manikpur Rail Section For.. - The Work Of Dismentling & Re-Erection Of 11 Kv U/G Line On 13 Mtr. Long St Poles With Xlpe Cable Due To Shifting For Construction Of Fourlane Railway Overbridge In Jhansi-Manikpur Rail Section Due To Construction Of New Bypass For Connect To Km. Jhansi-Mirzapur Marg To Naraini-Kalinger Marg In Km. 1313/9-1314 In Distt. Banda Under 33/11 Kv Ss, Bhooragarh, Banda Under Full Deposit Scheme 2026-27 Under Eudd Banda (Turn-Key Basis), Including Carriage Of All Required Material From E.S.C., Banda To Work Site, Alongwith Its Loading, Unloading & Dragging At The Respective Ends And Also Carriage Of Old/Damaged Scraped Material/Tfs From Site To Store Centre, If Any. All Works Like Erection, Fixing, Installation, Laying & Grouting Etc. Shall Be Done By Firm As Per Direction Of Engineer Incharge/Resspo Manual. During The Erection Of Lines/Poles Has To Be Done Including Cartage. Various Type Petty Materials/Work, Which Are Not Mentioned In Scope Of Work, But Actual Required Has To Be Arranged By Contractor At His Own Cost. No Extra Payment Will Be Made To Such Petty Requirement. The Material Supplied By Contractor Should Be The Best Quality And As Per Standard/Resspo Norms, Including Transportation, If Any. All Steel Material Supplied By Firm Have To Galavanised, Details Of The Work As Given Below :- , Supply Of Following Materials :- , St Pole 13 Mtr. Long Sp-70 , Stone Pad , Cable Al. 3X120 Sq.Mm. Xlpe 11 Kv , 11 Kv Cable Jointing Kit Outdoor , Barbed Wire , Alluminium Paint , Red Oxide Paint , Cross Bracing Angle With Cl S, Nut-Bolts & Washers , Nut-Bolts & Washers Of Suitable Size , Pin Insulator , Gi Pipe 6 Dia , Dropper Channel 100X50x2028 Mm. , Top Channel 100X50x2240 Mm. , Holding Cl S For Top/Dropper Channel With Nut-Bolts & Washers , Disc Insulator T&C 45 Kn , Disc Fittings T&C 45 Kn , Danger Board With Cl & Nut-Bolts , Straight Through Cable Jointing Kit 11 Kv , Stay Complete , Earthing Complete , Hdpe Pipe 120 Mm. With Supporting Cl S, Nut-Bolts Etc., If Required. , The Work Of Erection/Installation/Fixing Of Following :- , Erection & Fixing Of St Pole 13 Mtr. Long Sp-70 As Single/Double Structure , Erection & Fixing Of Stone Pad , Laying Of Cable Al. 3X120 Sq.Mm. Xlpe 11 Kv With Bricks & Sand For Looping , Fixing, Filling, Making & Commissioning Of 11 Kv Cable Jointing Kit Outdoor (Cable Boxes) And Making All Suitable Arrangements To Get The Work Done. , Erection & Fixing Of Barbed Wire , Painting Of St Poles With Alluminium Paint , Painting Of St Poles With Red Oxide Paint , Erection & Fixing Of Cross Bracing Angle With Cl S, Nut-Bolts & Washers , Erection & Fixing Of Nut-Bolts & Washers Of Suitable Size , Erection & Fixing Of Pin Insulator , Mounting & Fixing Of Cable On G.I. Pipe 6 Dia With Fitting Of All Accessories As Per Resspo Manual. , Erection & Fixing Of Dropper Channel 100X50x2028 Mm. , Erection & Fixing Of Top Channel 100X50x2240 Mm. , Erection & Fixing Of Holding Cl S For Top/Dropper Channel With Nut-Bolts & Washers , Erection & Fixing Of Disc Insulator T&C 45 Kn , Erection & Fixing Of Disc Fittings T&C 45 Kn , Erection & Fixing Of Danger Board With Cl & Nut-Bolts , Fixing, Filling, Making & Commissioning Of Straight Through Cable Jointing Kit 11 Kv (Cable Boxes) And Making All Suitable Arrangements To Get The Work Done. , Erection And Grouting Of Stay Set Complete Including The Work Of Nozelling Etc. As Per Resspo Manual And Also Including The Cost Of All Grouting Material. , Fixing Of Earthing Rod Complete As Per Direction Of Supervising Engineer/Resspo Manual. Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. , Laying Of 11 Kv 3X120 Sq.Mm. Al. Cable Xlpe By Hdd Machine On Hdpe Pipe. The Work Includes Cost Of Commissioning Of 11 Kv Cable Jointing Kits And Making All Suitable Arrangements To Get The Work Done. Cable Hoisting And Making Loops At Both Ends Are Also Includes In The Work. , Concreting/Grouting Of Newly Erected 13 Mtr. Long St Poles As Single Support/Double Pole Structures. The Support Shall Be Grouted With Cement, Sand And Brick Ballast/Stone Ballast In Ratio 1:4:8 (0.285 Cu. Mtr. Each), Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast/Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement & Direction Of Enginner Incharge. , Dismentling & Removal Of Damaged/Old Erected Cable/Conductor With Its Accessories Due To Shifting And Also Cartage Of Old/Damaged & Scrap Line Material From Work Site To Store Centre/Je(S). , Dismentling & Removal Of Existing/Erected Old Stp Poles As Single/Double Poles Structure With Its Accessories And Also Cartage Of Same From Work Site To Store Centre/Je(S) Due To Shifting. , Chopping Of Tree Branches Coming In The Vicinity Of The Lines During The Execution Of Above Work , Note: Any Quantity Of Item From Sl No. 1 To Sl No. 2.25 May Vary To Any Limit Within The Financial Value Of Agreement Against This Tender.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | The work of dismentling & re-erection of 11 KV U/G Line on 13 Mtr. long ST Poles with XLPE Cable due to shifting for construction of fourlane railway overbridge in Jhansi-Manikpur Rail Section due to construction of new bypass for connect to Km. Jhansi-Mirzapur Marg to Naraini-Kalinger Marg in Km. 1313/9-1314 in Distt. Banda under 33/11 KV SS, Bhooragarh, Banda under FULL DEPOSIT SCHEME 2026-27 under EUDD BANDA (Turn-key Basis), including carriage of all required material from E.S.C., BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/damaged scraped material/TFs from site to store centre, if any. All works like erection, fixing, installation, laying & grouting etc. shall be done by firm as per direction of Engineer incharge/RESSPO manual. During the erection of lines/poles has to be done including cartage. Various type petty materials/work, which are not mentioned in scope of work, but actual required has to be arranged by contractor at his own cost. No extra payment will be made to such petty requirement. The material supplied by contractor should be the best quality and as per standard/RESSPO norms, including transportation, if any. All steel material supplied by firm have to Galavanised, Details of the work as given below :- | The work of dismentling & re-erection of 11 KV U/G Line on 13 Mtr. long ST Poles with XLPE Cable due to shifting for construction of fourlane railway overbridge in Jhansi-Manikpur Rail Section due to construction of new bypass for connect to Km. Jhansi-Mirzapur Marg to Naraini-Kalinger Marg in Km. 1313/9-1314 in Distt. Banda under 33/11 KV SS, Bhooragarh, Banda under FULL DEPOSIT SCHEME 2026-27 under EUDD BANDA (Turn-key Basis), including carriage of all required material from E.S.C., BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/damaged scraped material/TFs from site to store centre, if any. All works like erection, fixing, installation, laying & grouting etc. shall be done by firm as per direction of Engineer incharge/RESSPO manual. During the erection of lines/poles has to be done including cartage. Various type petty materials/work, which are not mentioned in scope of work, but actual required has to be arranged by contractor at his own cost. No extra payment will be made to such petty requirement. The material supplied by contractor should be the best quality and as per standard/RESSPO norms, including transportation, if any. All steel material supplied by firm have to Galavanised, Details of the work as given below :- |
| 2 | Supply of following materials :- | Supply of following materials :- |
| 3 | ST Pole 13 Mtr. Long SP-70 | ST Pole 13 Mtr. Long SP-70 |
| 4 | Stone Pad | Stone Pad |
| 5 | Cable Al. 3x120 Sq.mm. XLPE 11 KV | Cable Al. 3x120 Sq.mm. XLPE 11 KV |
| 6 | 11 KV Cable Jointing Kit Outdoor | 11 KV Cable Jointing Kit Outdoor |
| 7 | Barbed Wire | Barbed Wire |
| 8 | Alluminium Paint | Alluminium Paint |
| 9 | Red Oxide Paint | Red Oxide Paint |
| 10 | Cross Bracing Angle with clamps, nut-bolts & washers | Cross Bracing Angle with clamps, nut-bolts & washers |
| 11 | Nut-Bolts & Washers of suitable size | Nut-Bolts & Washers of suitable size |
| 12 | Pin Insulator | Pin Insulator |
| 13 | GI Pipe 6\\" Dia | GI Pipe 6\\" Dia |
| 14 | Dropper Channel 100x50x2028 mm. | Dropper Channel 100x50x2028 mm. |
| 15 | Top Channel 100x50x2240 mm. | Top Channel 100x50x2240 mm. |
| 16 | Holding Clamps for Top/Dropper Channel with nut-bolts & washers | Holding Clamps for Top/Dropper Channel with nut-bolts & washers |
| 17 | Disc Insulator T&C 45 KN | Disc Insulator T&C 45 KN |
| 18 | Disc Fittings T&C 45 KN | Disc Fittings T&C 45 KN |
| 19 | Danger Board with Clamp & nut-bolts | Danger Board with Clamp & nut-bolts |
| 20 | Straight Through Cable Jointing Kit 11 KV | Straight Through Cable Jointing Kit 11 KV |
| 21 | Stay complete | Stay complete |
| 22 | Earthing Complete | Earthing Complete |
| 23 | HDPE Pipe 120 mm. with supporting clamps, nut-bolts etc., if required. | HDPE Pipe 120 mm. with supporting clamps, nut-bolts etc., if required. |
| 24 | The work of erection/installation/fixing of following :- | The work of erection/installation/fixing of following :- |
| 25 | Erection & fixing of ST Pole 13 Mtr. Long SP-70 as single/double structure | Erection & fixing of ST Pole 13 Mtr. Long SP-70 as single/double structure |
| 26 | Erection & fixing of Stone Pad | Erection & fixing of Stone Pad |
| 27 | Laying of Cable Al. 3x120 Sq.mm. XLPE 11 KV with bricks & sand for looping | Laying of Cable Al. 3x120 Sq.mm. XLPE 11 KV with bricks & sand for looping |
| 28 | Fixing, filling, making & commissioning of 11 KV Cable Jointing Kit Outdoor (Cable Boxes) and making all suitable arrangements to get the work done. | Fixing, filling, making & commissioning of 11 KV Cable Jointing Kit Outdoor (Cable Boxes) and making all suitable arrangements to get the work done. |
| 29 | Erection & fixing of Barbed Wire | Erection & fixing of Barbed Wire |
| 30 | Painting of ST Poles with Alluminium Paint | Painting of ST Poles with Alluminium Paint |
| 31 | Painting of ST Poles with Red Oxide Paint | Painting of ST Poles with Red Oxide Paint |
| 32 | Erection & fixing of Cross Bracing Angle with clamps, nut-bolts & washers | Erection & fixing of Cross Bracing Angle with clamps, nut-bolts & washers |
| 33 | Erection & fixing of Nut-Bolts & Washers of suitable size | Erection & fixing of Nut-Bolts & Washers of suitable size |
| 34 | Erection & fixing of Pin Insulator | Erection & fixing of Pin Insulator |
| 35 | Mounting & fixing of cable on G.I. Pipe 6\\" dia with fitting of all accessories as per RESSPO manual. | Mounting & fixing of cable on G.I. Pipe 6\\" dia with fitting of all accessories as per RESSPO manual. |
| 36 | Erection & fixing of Dropper Channel 100x50x2028 mm. | Erection & fixing of Dropper Channel 100x50x2028 mm. |
| 37 | Erection & fixing of Top Channel 100x50x2240 mm. | Erection & fixing of Top Channel 100x50x2240 mm. |
| 38 | Erection & fixing of Holding Clamps for Top/Dropper Channel with nut-bolts & washers | Erection & fixing of Holding Clamps for Top/Dropper Channel with nut-bolts & washers |
| 39 | Erection & fixing of Disc Insulator T&C 45 KN | Erection & fixing of Disc Insulator T&C 45 KN |
| 40 | Erection & fixing of Disc Fittings T&C 45 KN | Erection & fixing of Disc Fittings T&C 45 KN |
| 41 | Erection & fixing of Danger Board with Clamp & nut-bolts | Erection & fixing of Danger Board with Clamp & nut-bolts |
| 42 | Fixing, filling, making & commissioning of Straight Through Cable Jointing Kit 11 KV (Cable Boxes) and making all suitable arrangements to get the work done. | Fixing, filling, making & commissioning of Straight Through Cable Jointing Kit 11 KV (Cable Boxes) and making all suitable arrangements to get the work done. |
| 43 | Erection and grouting of stay set complete including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material. | Erection and grouting of stay set complete including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material. |
| 44 | Fixing of earthing rod complete as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. | Fixing of earthing rod complete as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. |
| 45 | LAYING OF 11 KV 3x120 Sq.mm. Al. Cable XLPE BY HDD MACHINE ON HDPE PIPE. THE WORK INCLUDES COST OF COMMISSIONING OF 11 KV CABLE JOINTING KITS AND MAKING ALL SUITABLE ARRANGEMENTS TO GET THE WORK DONE. CABLE HOISTING AND MAKING LOOPS AT BOTH ENDS ARE ALSO INCLUDES IN THE WORK. | LAYING OF 11 KV 3x120 Sq.mm. Al. Cable XLPE BY HDD MACHINE ON HDPE PIPE. THE WORK INCLUDES COST OF COMMISSIONING OF 11 KV CABLE JOINTING KITS AND MAKING ALL SUITABLE ARRANGEMENTS TO GET THE WORK DONE. CABLE HOISTING AND MAKING LOOPS AT BOTH ENDS ARE ALSO INCLUDES IN THE WORK. |
| 46 | Concreting/Grouting of newly erected 13 Mtr. long ST poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. | Concreting/Grouting of newly erected 13 Mtr. long ST poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. |
| 47 | Dismentling & removal of damaged/old erected cable/conductor with its accessories due to shifting and also cartage of old/damaged & scrap line material from work site to store centre/JE(s). | Dismentling & removal of damaged/old erected cable/conductor with its accessories due to shifting and also cartage of old/damaged & scrap line material from work site to store centre/JE(s). |
| 48 | Dismentling & removal of existing/erected old STP Poles as single/double poles structure with its accessories and also cartage of same from work site to store centre/JE(s) due to shifting. | Dismentling & removal of existing/erected old STP Poles as single/double poles structure with its accessories and also cartage of same from work site to store centre/JE(s) due to shifting. |
| 49 | Chopping of Tree Branches coming in the vicinity of the lines during the execution of above work | Chopping of Tree Branches coming in the vicinity of the lines during the execution of above work |
| 50 | Note: Any quantity of item from sl no. 1 to sl no. 2.25 may vary to any limit within the financial value of agreement against this tender. | Note: Any quantity of item from sl no. 1 to sl no. 2.25 may vary to any limit within the financial value of agreement against this tender. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender