Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation, The Work Of Shifting Of 33 Kv/11 Kv Lines Due To Road Widening At Mahokhar Bypass, Block Badokhar Khu
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation, The Work Of Shifting Of 33 Kv/11 Kv Lines Due To Road Widening At Mahokhar Bypass, Block Badokhar Khurd And Khet Singh Kha.. - The Following Work Under Full Deposit Scheme 2026-27 Under Eudd Banda (Semi-Turn-Key Basis), Including Carriage Of All Required Material From E.S.C., Banda To Work Site, Alongwith Its Loading, Unloading & Dragging At The Respective Ends And Also Carriage Of Old/Damaged Scraped Material/Tfs From Site To Store Centre, If Any. All Works Like Erection, Fixing, Installation, Laying & Grouting Etc. Shall Be Done By Firm As Per Direction Of Engineer Incharge/Resspo Manual. During The Erection Of Lines/Poles Has To Be Done Including Cartage. Various Type Petty Materials/Work, Which Are Not Mentioned In Scope Of Work, But Actual Required Has To Be Arranged By Contractor At His Own Cost. No Extra Payment Will Be Made To Such Petty Requirement. The Material Supplied By Contractor Should Be The Best Quality And As Per Standard/Resspo Norms, Including Transportation, If Any. All Steel Material Supplied By Firm Have To Galavanised, Details Of The Work As Given Below :- , Supply Of Following Materials :- , 11 Kv St Pole 11 Mtr. Long , Stone Pad , 11 Kv V-Type Steel X-Arm , 11 Kv X-Arm Holding Cl With Nut-Bolts & Washers , 11 Kv F-Cl With Nut-Bolts & Washers , 11 Kv Disc Insulator With Fitting , 11 Kv Pin Insulator With Pin , Earthing Complete , Stay Set Complete , Number Plate With Nut-Bolts , Pg Cl , Red Oxide Paint , Alluminium Paint , The Work Of Erection/Installation/Fixing Of Following :- , Erection & Fixing Of 11 Kv St Pole 11 Mtr. Long As Single/Double Structure , Erection & Fixing Of Stone Pad , Erection & Fixing Of 11 Kv V-Type Steel X-Arm , Erection & Fixing Of 11 Kv X-Arm Holding Cl With N&B , Erection & Fixing Of 11 Kv F-Cl , Laying, Sagging, Stringing, Binding And Jumpering Of New Acsr Dog Conductor On The Erected Poles In 11 Kv Ht Lines As Per Direction Of Supervising Engineer/Resspo Manual. Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work (Privided By Department). , Erection & Fixing Of 11 Kv Disc Insulator With Fitting , Erection & Fixing Of 11 Kv Pin Insulator With Pin , Fixing Of Earthing Rod Complete As Per Direction Of Supervising Engineer/Resspo Manual. Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Stay Set Complete Including The Work Of Nozelling Etc. As Per Resspo Manual And Also Including The Cost Of All Grouting Material. , Erection & Fixing Of Number Plate , Erection & Fixing Of Pg Cl , Painting Of St Poles With Red Oxide Paint , Painting Of St Poles With Alluminium Paint , Concreting/Grouting Of Newly Erected 11 Mtr. Long St Poles As Single Support/Double Pole Structures. The Support Shall Be Grouted With Cement, Sand And Brick Ballast/Stone Ballast In Ratio 1:4:8 (0.285 Cu. Mtr. Each), Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast/Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement & Direction Of Enginner Incharge. , Dismentling & Removal Of Damaged/Old Erected Conductor With Its Accessories Due To Shifting And Also Cartage Of Old/Damaged & Scrap Line Material From Work Site To Store Centre/Je(S). , Dismentling & Removal Of Existing/Erected Old Stp Poles As Single/Double Poles Structure With Its Accessories And Also Cartage Of Same From Work Site To Store Centre/Je(S) Due To Shifting. , Note: Any Quantity Of Item From Sl No. 1 To Sl No. 2.17 May Vary To Any Limit Within The Financial Value Of Agreement Against This Tender. , Supply Of Following Materials :- , St Pole 11 Mtr. Long , St Pole 13 Mtr. Long , Stone Pad , 11 Kv Pin Insulator With Pin And Nut , 11 Kv Disc Insulator With Fitting , T-Off Channel With Cl & Nut-Bolts , Dropper Channel With Cl & Nut-Bolts , Top Channel With Cl & Nut-Bolts , Base Angle 75X75x62028 Mm. With Cl & Nut-Bolts , Nut-Bolts & Washers Of Suitable Size , 11 Kv Tpmo Set , 11 Kv Fuse Set , Lt Distribution Box 3 Phase With Mounting Cl , Lt Cl With I Bolt And Nut-Bolts , Suspension Cl Insulated , Dead End Cl With I Bolt For Abc , Abc Conductor (3X50+1X35+1X16 Mm2) , Eye Hook , J-Hook , Prc 125/95 Sq.Mm. , 11 Kv V-Type Steel X-Arm , 11 Kv X-Arm Holding Cl With Nut-Bolts & Washers , 11 Kv F-Cl With Nut-Bolts & Washers , Danger Board With Nut-Bolts , Guarding Angle With Cl & Nut-Bolts , Gi Wire 8 Swg , Stay Set Complete (Stay Rod 16X1800 Mm, Stay Wire 5 Kg., Stay Cl , Bolt-Nuts Etc). , Red Oxide Paint , Alluminium Paint , Earthing Complete (Earthing Rod Of 20X2500 Mm & 6 Swg Earthing Wire Etc.) , The Work Of Erection/Installation/Fixing Of Following :- , Erection & Fixing Of St Pole 11 Mtr. Long As Single/Double Structure , Erection & Fixing Of St Pole 13 Mtr. Long As Single/Double Structure , Erection & Fixing Of Stone Pad , Laying, Sagging, Stringing, Binding And Jumpering Of New Acsr Weasel/Dog Conductor On The Erected Poles In 11 Kv Ht Lines As Per Direction Of Supervising Engineer/Resspo Manual. Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. (Privided By Department). , Erection & Fixing Of 11 Kv Pin Insulator With Pin And Nut , Erection & Fixing Of 11 Kv Disc Insulator With Fitting , Erection & Fixing Of T-Off Channel With Cl & Nut-Bolts , Erection & Fixing Of Dropper Channel With Cl & Nut-Bolts , Erection & Fixing Of Top Channel With Cl & Nut-Bolts , Erection & Fixing Of Base Angle 75X75x62028 Mm. With Cl & Nut-Bolts , Erection & Fixing Of Nut-Bolts & Washers Of Suitable Size , Erection & Fixing Of 11 Kv Tpmo Set , Erection & Fixing Of 11 Kv Fuse Set , Erection & Fixing Of Lt Distribution Box 3 Phase With Mounting Cl , Erection & Fixing Of Lt Cl With I Bolt And Nut-Bolts , Erection & Fixing Of Suspension Cl Insulated , Erection & Fixing Of Dead End Cl With I Bolt For Abc , Laying, Stringing, Binding And Termination Etc. Of Abc Conductor (3X50+1X35+1X16 Mm2) On The Erected Poles As Per Direction Of Supervising Engineer/Resspo Manual. , Erection & Fixing Of Eye Hook , Erection & Fixing Of J-Hook , Erection & Fixing Of Prc 125/95 Sq.Mm. , Erection & Fixing Of 11 Kv V-Type Steel X-Arm , Erection & Fixing Of 11 Kv X-Arm Holding Cl With Nut-Bolts & Washers , Erection & Fixing Of 11 Kv F-Cl With Nut-Bolts & Washers , Erection & Fixing Of Danger Board With Nut-Bolts , Erection & Fixing Of Guarding Angle With Cl & Nut-Bolts , Erection & Fixing Of Gi Wire 8 Swg , Erection And Grouting Of Stay Set Complete Including The Work Of Nozelling Etc. As Per Resspo Manual And Also Including The Cost Of All Grouting Material. , Painting Of St Poles With Red Oxide Paint , Painting Of St Poles With Alluminium Paint , Fixing Of Earthing Rod Complete As Per Direction Of Supervising Engineer/Resspo Manual. Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. , Concreting/Grouting Of Newly Erected 11/13 Mtr. Long St Poles As Single Support/Double Pole Structures. The Support Shall Be Grouted With Cement, Sand And Brick Ballast/Stone Ballast In Ratio 1:4:8 (0.285 Cu. Mtr. Each), Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast/Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement & Direction Of Enginner Incharge. , Safely Shifting, Cartage & Installation/Erection/Commisioning Of 63 Kva Transformers On The Newly Erected Doube Pole Structure In Proper Alignment And As Per Direction Of Supervising Engineer/Resspo Manual, Including The Work Of Dragging Due To Road Widening. , Dismentling & Removal Of Damaged/Old Erected Conductor With Its Accessories Due To Shifting And Also Cartage Of Old/Damaged & Scrap Line Material From Work Site To Store Centre/Je(S). , Dismentling & Removal Of Existing/Erected Old Stp Poles As Single/Double Poles Structure With Its Accessories And Also Cartage Of Same From Work Site To Store Centre/Je(S) Due To Shifting. , Note: Any Quantity Of Item From Sl No. 1.00 To Sl No. 2.35 May Vary To Any Limit Within The Financial Value Of Agreement Against This Tender. , Supply Of Following Materials :- , 33 Kv St Pole 13 Mtr. Long , Stone Pad , 33 Kv V-Type Steel X-Arm , 33 Kv X-Arm Holding Cl With Nut-Bolts & Washers , 33 Kv F-Cl With Nut-Bolts & Washers , 33 Kv Polymer Disc Insulator With Fitting , 33 Kv Polymer Pin Insulator With Pin , 33 Kv Top Channel With Cl S And Nut-Bolts, Washers , 33 Kv Dropper Channel With Cl S And Nut-Bolts, Washers , 33 Kv Bracing Angle 75X75x6x2028 Mm. With Cl S And Nut-Bolts, Washers , Pg Cl For Dog , Guarding Wire 10 Swg , Guarding X-Arm With Cl S And Nut-Bolts, Washers , Earthing Complete , Stay Set Complete , 33 Kv Danger Board With Nut-Bolts , 33 Kv Number Plate With Nut-Bolts , Alluminium Paint , Red Oxide Paint , The Work Of Erection/Installation/Fixing Of Following :- , Erection & Fixing Of 33 Kv St Pole 13 Mtr. Long As Single/Double Structure , Erection & Fixing Of Stone Pad , Erection & Fixing Of 33 Kv V-Type Steel X-Arm , Erection & Fixing Of 33 Kv X-Arm Holding Cl With N&B , Erection & Fixing Of 33 Kv F-Cl , Laying, Sagging, Stringing, Binding And Jumpering Of New Acsr Dog Conductor On The Erected Poles In 33 Kv Lines As Per Direction Of Supervising Engineer/Resspo Manual. Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. (Provided By Department) , Erection & Fixing Of 33 Kv Polymer Disc Insulator With Fitting , Erection & Fixing Of 33 Kv Polymer Pin Insulator With Pin , Erection & Fixing Of 33 Kv Top Channel With Cl S And Nut-Bolts, Washers , Erection & Fixing Of 33 Kv Dropper Channel With Cl S And Nut-Bolts, Washers , Erection & Fixing Of 33 Kv Bracing Angle 75X75x6x2028 Mm. With Cl S And Nut-Bolts, Washers , Erection & Fixing Of Pg Cl For Dog , Erection & Fixing Of Guarding Wire 10 Swg , Erection & Fixing Of Guarding X-Arm With Cl S And Nut-Bolts, Washers , Fixing Of Earthing Rod Complete As Per Direction Of Supervising Engineer/Resspo Manual. Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Stay Set Complete Including The Work Of Nozelling Etc. As Per Resspo Manual And Also Including The Cost Of All Grouting Material. , Erection & Fixing Of 33 Kv Danger Board With Nut-Bolts , Erection & Fixing Of 33 Kv Number Plate With Nut-Bolts , Painting Of St Poles With Alluminium Paint , Painting Of St Poles With Red Oxide Paint , Concreting/Grouting Of Newly Erected 13 Mtr. Long St Poles As Single Support/Double Pole Structures. The Support Shall Be Grouted With Cement, Sand And Brick Ballast/Stone Ballast In Ratio 1:4:8 (0.285 Cu. Mtr. Each), Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast/Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement & Direction Of Enginner Incharge. , Dismentling & Removal Of Damaged/Old Erected Conductor With Its Accessories Due To Shifting And Also Cartage Of Old/Damaged & Scrap Line Material From Work Site To Store Centre/Je(S). , Dismentling & Removal Of Existing/Erected Old Stp Poles As Single/Double Poles Structure With Its Accessories And Also Cartage Of Same From Work Site To Store Centre/Je(S) Due To Shifting. , Note: Any Quantity Of Item From Sl No. 1 To Sl No. 2.23 May Vary To Any Limit Within The Financial Value Of Agreement Against This Tender.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | The following work under FULL DEPOSIT SCHEME 2026-27 under EUDD BANDA (Semi-Turn-key Basis), including carriage of all required material from E.S.C., BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/damaged scraped material/TFs from site to store centre, if any. All works like erection, fixing, installation, laying & grouting etc. shall be done by firm as per direction of Engineer incharge/RESSPO manual. During the erection of lines/poles has to be done including cartage. Various type petty materials/work, which are not mentioned in scope of work, but actual required has to be arranged by contractor at his own cost. No extra payment will be made to such petty requirement. The material supplied by contractor should be the best quality and as per standard/RESSPO norms, including transportation, if any. All steel material supplied by firm have to Galavanised, Details of the work as given below :- | The following work under FULL DEPOSIT SCHEME 2026-27 under EUDD BANDA (Semi-Turn-key Basis), including carriage of all required material from E.S.C., BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/damaged scraped material/TFs from site to store centre, if any. All works like erection, fixing, installation, laying & grouting etc. shall be done by firm as per direction of Engineer incharge/RESSPO manual. During the erection of lines/poles has to be done including cartage. Various type petty materials/work, which are not mentioned in scope of work, but actual required has to be arranged by contractor at his own cost. No extra payment will be made to such petty requirement. The material supplied by contractor should be the best quality and as per standard/RESSPO norms, including transportation, if any. All steel material supplied by firm have to Galavanised, Details of the work as given below :- |
| 2 | Supply of following materials :- | Supply of following materials :- |
| 3 | 11 KV ST Pole 11 Mtr. Long | 11 KV ST Pole 11 Mtr. Long |
| 4 | Stone Pad | Stone Pad |
| 5 | 11 KV V-Type Steel X-arm | 11 KV V-Type Steel X-arm |
| 6 | 11 KV X-arm Holding clamp with Nut-Bolts & washers | 11 KV X-arm Holding clamp with Nut-Bolts & washers |
| 7 | 11 KV F-Clamp with Nut-Bolts & washers | 11 KV F-Clamp with Nut-Bolts & washers |
| 8 | 11 KV Disc Insulator with fitting | 11 KV Disc Insulator with fitting |
| 9 | 11 KV Pin Insulator with pin | 11 KV Pin Insulator with pin |
| 10 | Earthing Complete | Earthing Complete |
| 11 | Stay Set Complete | Stay Set Complete |
| 12 | Number Plate with Nut-Bolts | Number Plate with Nut-Bolts |
| 13 | PG Clamp | PG Clamp |
| 14 | Red Oxide Paint | Red Oxide Paint |
| 15 | Alluminium Paint | Alluminium Paint |
| 16 | The work of erection/installation/fixing of following :- | The work of erection/installation/fixing of following :- |
| 17 | Erection & fixing of 11 KV ST Pole 11 Mtr. Long as single/double structure | Erection & fixing of 11 KV ST Pole 11 Mtr. Long as single/double structure |
| 18 | Erection & fixing of Stone Pad | Erection & fixing of Stone Pad |
| 19 | Erection & fixing of 11 KV V-Type Steel X-arm | Erection & fixing of 11 KV V-Type Steel X-arm |
| 20 | Erection & fixing of 11 KV X-arm Holding clamp with N&B | Erection & fixing of 11 KV X-arm Holding clamp with N&B |
| 21 | Erection & fixing of 11 KV F-Clamp | Erection & fixing of 11 KV F-Clamp |
| 22 | Laying, sagging, stringing, binding and jumpering of new ACSR Dog Conductor on the erected poles in 11 KV HT lines as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work (Privided by department). | Laying, sagging, stringing, binding and jumpering of new ACSR Dog Conductor on the erected poles in 11 KV HT lines as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work (Privided by department). |
| 23 | Erection & fixing of 11 KV Disc Insulator with fitting | Erection & fixing of 11 KV Disc Insulator with fitting |
| 24 | Erection & fixing of 11 KV Pin Insulator with pin | Erection & fixing of 11 KV Pin Insulator with pin |
| 25 | Fixing of earthing rod complete as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. | Fixing of earthing rod complete as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. |
| 26 | Erection and grouting of stay set complete including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material. | Erection and grouting of stay set complete including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material. |
| 27 | Erection & fixing of Number Plate | Erection & fixing of Number Plate |
| 28 | Erection & fixing of PG Clamp | Erection & fixing of PG Clamp |
| 29 | Painting of ST Poles with Red Oxide Paint | Painting of ST Poles with Red Oxide Paint |
| 30 | Painting of ST Poles with Alluminium Paint | Painting of ST Poles with Alluminium Paint |
| 31 | Concreting/Grouting of newly erected 11 Mtr. long ST poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. | Concreting/Grouting of newly erected 11 Mtr. long ST poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. |
| 32 | Dismentling & removal of damaged/old erected conductor with its accessories due to shifting and also cartage of old/damaged & scrap line material from work site to store centre/JE(s). | Dismentling & removal of damaged/old erected conductor with its accessories due to shifting and also cartage of old/damaged & scrap line material from work site to store centre/JE(s). |
| 33 | Dismentling & removal of existing/erected old STP Poles as single/double poles structure with its accessories and also cartage of same from work site to store centre/JE(s) due to shifting. | Dismentling & removal of existing/erected old STP Poles as single/double poles structure with its accessories and also cartage of same from work site to store centre/JE(s) due to shifting. |
| 34 | Note: Any quantity of item from sl no. 1 to sl no. 2.17 may vary to any limit within the financial value of agreement against this tender. | Note: Any quantity of item from sl no. 1 to sl no. 2.17 may vary to any limit within the financial value of agreement against this tender. |
| 35 | Supply of following materials :- | Supply of following materials :- |
| 36 | ST Pole 11 Mtr. Long | ST Pole 11 Mtr. Long |
| 37 | ST Pole 13 Mtr. Long | ST Pole 13 Mtr. Long |
| 38 | Stone Pad | Stone Pad |
| 39 | 11 KV Pin Insulator with pin and nut | 11 KV Pin Insulator with pin and nut |
| 40 | 11 KV Disc Insulator with fitting | 11 KV Disc Insulator with fitting |
| 41 | T-Off Channel with Clamp & nut-bolts | T-Off Channel with Clamp & nut-bolts |
| 42 | Dropper Channel with Clamp & nut-bolts | Dropper Channel with Clamp & nut-bolts |
| 43 | Top Channel with Clamp & nut-bolts | Top Channel with Clamp & nut-bolts |
| 44 | Base Angle 75x75x62028 mm. with Clamp & nut-bolts | Base Angle 75x75x62028 mm. with Clamp & nut-bolts |
| 45 | Nut-Bolts & washers of suitable size | Nut-Bolts & washers of suitable size |
| 46 | 11 KV TPMO Set | 11 KV TPMO Set |
| 47 | 11 KV Fuse Set | 11 KV Fuse Set |
| 48 | LT Distribution Box 3 phase with Mounting Clamp | LT Distribution Box 3 phase with Mounting Clamp |
| 49 | LT Clamp with I Bolt and Nut-Bolts | LT Clamp with I Bolt and Nut-Bolts |
| 50 | Suspension Clamp Insulated | Suspension Clamp Insulated |
| 51 | Dead End Clamp with I Bolt for ABC | Dead End Clamp with I Bolt for ABC |
| 52 | ABC Conductor (3x50+1x35+1x16 mm2) | ABC Conductor (3x50+1x35+1x16 mm2) |
| 53 | Eye Hook | Eye Hook |
| 54 | J-Hook | J-Hook |
| 55 | PRC 125/95 Sq.mm. | PRC 125/95 Sq.mm. |
| 56 | 11 KV V-Type Steel X-arm | 11 KV V-Type Steel X-arm |
| 57 | 11 KV X-arm Holding clamp with Nut-Bolts & washers | 11 KV X-arm Holding clamp with Nut-Bolts & washers |
| 58 | 11 KV F-Clamp with Nut-Bolts & washers | 11 KV F-Clamp with Nut-Bolts & washers |
| 59 | Danger Board with Nut-Bolts | Danger Board with Nut-Bolts |
| 60 | Guarding Angle with clamp & Nut-bolts | Guarding Angle with clamp & Nut-bolts |
| 61 | GI Wire 8 SWG | GI Wire 8 SWG |
| 62 | Stay Set Complete (Stay Rod 16x1800 mm, Stay Wire 5 Kg., Stay Clamp, Bolt-Nuts etc). | Stay Set Complete (Stay Rod 16x1800 mm, Stay Wire 5 Kg., Stay Clamp, Bolt-Nuts etc). |
| 63 | Red Oxide Paint | Red Oxide Paint |
| 64 | Alluminium Paint | Alluminium Paint |
| 65 | Earthing Complete (Earthing Rod of 20x2500 mm & 6 SWG earthing wire etc.) | Earthing Complete (Earthing Rod of 20x2500 mm & 6 SWG earthing wire etc.) |
| 66 | The work of erection/installation/fixing of following :- | The work of erection/installation/fixing of following :- |
| 67 | Erection & fixing of ST Pole 11 Mtr. Long as single/double structure | Erection & fixing of ST Pole 11 Mtr. Long as single/double structure |
| 68 | Erection & fixing of ST Pole 13 Mtr. Long as single/double structure | Erection & fixing of ST Pole 13 Mtr. Long as single/double structure |
| 69 | Erection & fixing of Stone Pad | Erection & fixing of Stone Pad |
| 70 | Laying, sagging, stringing, binding and jumpering of new ACSR Weasel/Dog Conductor on the erected poles in 11 KV HT lines as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. (Privided by department). | Laying, sagging, stringing, binding and jumpering of new ACSR Weasel/Dog Conductor on the erected poles in 11 KV HT lines as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. (Privided by department). |
| 71 | Erection & fixing of 11 KV Pin Insulator with pin and nut | Erection & fixing of 11 KV Pin Insulator with pin and nut |
| 72 | Erection & fixing of 11 KV Disc Insulator with fitting | Erection & fixing of 11 KV Disc Insulator with fitting |
| 73 | Erection & fixing of T-Off Channel with Clamp & nut-bolts | Erection & fixing of T-Off Channel with Clamp & nut-bolts |
| 74 | Erection & fixing of Dropper Channel with Clamp & nut-bolts | Erection & fixing of Dropper Channel with Clamp & nut-bolts |
| 75 | Erection & fixing of Top Channel with Clamp & nut-bolts | Erection & fixing of Top Channel with Clamp & nut-bolts |
| 76 | Erection & fixing of Base Angle 75x75x62028 mm. with Clamp & nut-bolts | Erection & fixing of Base Angle 75x75x62028 mm. with Clamp & nut-bolts |
| 77 | Erection & fixing of Nut-Bolts & washers of suitable size | Erection & fixing of Nut-Bolts & washers of suitable size |
| 78 | Erection & fixing of 11 KV TPMO Set | Erection & fixing of 11 KV TPMO Set |
| 79 | Erection & fixing of 11 KV Fuse Set | Erection & fixing of 11 KV Fuse Set |
| 80 | Erection & fixing of LT Distribution Box 3 phase with Mounting Clamp | Erection & fixing of LT Distribution Box 3 phase with Mounting Clamp |
| 81 | Erection & fixing of LT Clamp with I Bolt and Nut-Bolts | Erection & fixing of LT Clamp with I Bolt and Nut-Bolts |
| 82 | Erection & fixing of Suspension Clamp Insulated | Erection & fixing of Suspension Clamp Insulated |
| 83 | Erection & fixing of Dead End Clamp with I Bolt for ABC | Erection & fixing of Dead End Clamp with I Bolt for ABC |
| 84 | Laying, stringing, binding and termination etc. of ABC Conductor (3x50+1x35+1x16 mm2) on the erected poles as per direction of supervising engineer/RESSPO manual. | Laying, stringing, binding and termination etc. of ABC Conductor (3x50+1x35+1x16 mm2) on the erected poles as per direction of supervising engineer/RESSPO manual. |
| 85 | Erection & fixing of Eye Hook | Erection & fixing of Eye Hook |
| 86 | Erection & fixing of J-Hook | Erection & fixing of J-Hook |
| 87 | Erection & fixing of PRC 125/95 Sq.mm. | Erection & fixing of PRC 125/95 Sq.mm. |
| 88 | Erection & fixing of 11 KV V-Type Steel X-arm | Erection & fixing of 11 KV V-Type Steel X-arm |
| 89 | Erection & fixing of 11 KV X-arm Holding clamp with Nut-Bolts & washers | Erection & fixing of 11 KV X-arm Holding clamp with Nut-Bolts & washers |
| 90 | Erection & fixing of 11 KV F-Clamp with Nut-Bolts & washers | Erection & fixing of 11 KV F-Clamp with Nut-Bolts & washers |
| 91 | Erection & fixing of Danger Board with Nut-Bolts | Erection & fixing of Danger Board with Nut-Bolts |
| 92 | Erection & fixing of Guarding Angle with clamp & Nut-bolts | Erection & fixing of Guarding Angle with clamp & Nut-bolts |
| 93 | Erection & fixing of GI Wire 8 SWG | Erection & fixing of GI Wire 8 SWG |
| 94 | Erection and grouting of stay set complete including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material. | Erection and grouting of stay set complete including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material. |
| 95 | Painting of ST Poles with Red Oxide Paint | Painting of ST Poles with Red Oxide Paint |
| 96 | Painting of ST Poles with Alluminium Paint | Painting of ST Poles with Alluminium Paint |
| 97 | Fixing of earthing rod complete as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. | Fixing of earthing rod complete as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. |
| 98 | Concreting/Grouting of newly erected 11/13 Mtr. long ST poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. | Concreting/Grouting of newly erected 11/13 Mtr. long ST poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. |
| 99 | Safely shifting, cartage & installation/erection/commisioning of 63 KVA Transformers on the newly erected doube pole structure in proper alignment and as per direction of supervising engineer/RESSPO manual, including the work of dragging due to road widening. | Safely shifting, cartage & installation/erection/commisioning of 63 KVA Transformers on the newly erected doube pole structure in proper alignment and as per direction of supervising engineer/RESSPO manual, including the work of dragging due to road widening. |
| 100 | Dismentling & removal of damaged/old erected conductor with its accessories due to shifting and also cartage of old/damaged & scrap line material from work site to store centre/JE(s). | Dismentling & removal of damaged/old erected conductor with its accessories due to shifting and also cartage of old/damaged & scrap line material from work site to store centre/JE(s). |
| 101 | Dismentling & removal of existing/erected old STP Poles as single/double poles structure with its accessories and also cartage of same from work site to store centre/JE(s) due to shifting. | Dismentling & removal of existing/erected old STP Poles as single/double poles structure with its accessories and also cartage of same from work site to store centre/JE(s) due to shifting. |
| 102 | Note: Any quantity of item from sl no. 1.00 to sl no. 2.35 may vary to any limit within the financial value of agreement against this tender. | Note: Any quantity of item from sl no. 1.00 to sl no. 2.35 may vary to any limit within the financial value of agreement against this tender. |
| 103 | Supply of following materials :- | Supply of following materials :- |
| 104 | 33 KV ST Pole 13 Mtr. Long | 33 KV ST Pole 13 Mtr. Long |
| 105 | Stone Pad | Stone Pad |
| 106 | 33 KV V-Type Steel X-arm | 33 KV V-Type Steel X-arm |
| 107 | 33 KV X-arm Holding clamp with Nut-Bolts & washers | 33 KV X-arm Holding clamp with Nut-Bolts & washers |
| 108 | 33 KV F-Clamp with Nut-Bolts & washers | 33 KV F-Clamp with Nut-Bolts & washers |
| 109 | 33 KV Polymer Disc Insulator with fitting | 33 KV Polymer Disc Insulator with fitting |
| 110 | 33 KV Polymer Pin Insulator with pin | 33 KV Polymer Pin Insulator with pin |
| 111 | 33 KV Top Channel with clamps and Nut-Bolts, washers | 33 KV Top Channel with clamps and Nut-Bolts, washers |
| 112 | 33 KV Dropper Channel with clamps and Nut-Bolts, washers | 33 KV Dropper Channel with clamps and Nut-Bolts, washers |
| 113 | 33 KV Bracing Angle 75x75x6x2028 mm. with clamps and Nut-Bolts, washers | 33 KV Bracing Angle 75x75x6x2028 mm. with clamps and Nut-Bolts, washers |
| 114 | PG Clamp for dog | PG Clamp for dog |
| 115 | Guarding Wire 10 SWG | Guarding Wire 10 SWG |
| 116 | Guarding X-Arm with clamps and Nut-Bolts, washers | Guarding X-Arm with clamps and Nut-Bolts, washers |
| 117 | Earthing Complete | Earthing Complete |
| 118 | Stay Set Complete | Stay Set Complete |
| 119 | 33 KV Danger Board with Nut-Bolts | 33 KV Danger Board with Nut-Bolts |
| 120 | 33 KV Number Plate with Nut-Bolts | 33 KV Number Plate with Nut-Bolts |
| 121 | Alluminium Paint | Alluminium Paint |
| 122 | Red Oxide Paint | Red Oxide Paint |
| 123 | The work of erection/installation/fixing of following :- | The work of erection/installation/fixing of following :- |
| 124 | Erection & fixing of 33 KV ST Pole 13 Mtr. Long as single/double structure | Erection & fixing of 33 KV ST Pole 13 Mtr. Long as single/double structure |
| 125 | Erection & fixing of Stone Pad | Erection & fixing of Stone Pad |
| 126 | Erection & fixing of 33 KV V-Type Steel X-arm | Erection & fixing of 33 KV V-Type Steel X-arm |
| 127 | Erection & fixing of 33 KV X-arm Holding clamp with N&B | Erection & fixing of 33 KV X-arm Holding clamp with N&B |
| 128 | Erection & fixing of 33 KV F-Clamp | Erection & fixing of 33 KV F-Clamp |
| 129 | Laying, sagging, stringing, binding and jumpering of new ACSR Dog Conductor on the erected poles in 33 KV Lines as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. (Provided by department) | Laying, sagging, stringing, binding and jumpering of new ACSR Dog Conductor on the erected poles in 33 KV Lines as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. (Provided by department) |
| 130 | Erection & fixing of 33 KV Polymer Disc Insulator with fitting | Erection & fixing of 33 KV Polymer Disc Insulator with fitting |
| 131 | Erection & fixing of 33 KV Polymer Pin Insulator with pin | Erection & fixing of 33 KV Polymer Pin Insulator with pin |
| 132 | Erection & fixing of 33 KV Top Channel with clamps and Nut-Bolts, washers | Erection & fixing of 33 KV Top Channel with clamps and Nut-Bolts, washers |
| 133 | Erection & fixing of 33 KV Dropper Channel with clamps and Nut-Bolts, washers | Erection & fixing of 33 KV Dropper Channel with clamps and Nut-Bolts, washers |
| 134 | Erection & fixing of 33 KV Bracing Angle 75x75x6x2028 mm. with clamps and Nut-Bolts, washers | Erection & fixing of 33 KV Bracing Angle 75x75x6x2028 mm. with clamps and Nut-Bolts, washers |
| 135 | Erection & fixing of PG Clamp for dog | Erection & fixing of PG Clamp for dog |
| 136 | Erection & fixing of Guarding Wire 10 SWG | Erection & fixing of Guarding Wire 10 SWG |
| 137 | Erection & fixing of Guarding X-Arm with clamps and Nut-Bolts, washers | Erection & fixing of Guarding X-Arm with clamps and Nut-Bolts, washers |
| 138 | Fixing of earthing rod complete as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. | Fixing of earthing rod complete as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. |
| 139 | Erection and grouting of stay set complete including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material. | Erection and grouting of stay set complete including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material. |
| 140 | Erection & fixing of 33 KV Danger Board with Nut-Bolts | Erection & fixing of 33 KV Danger Board with Nut-Bolts |
| 141 | Erection & fixing of 33 KV Number Plate with Nut-Bolts | Erection & fixing of 33 KV Number Plate with Nut-Bolts |
| 142 | Painting of ST Poles with Alluminium Paint | Painting of ST Poles with Alluminium Paint |
| 143 | Painting of ST Poles with Red Oxide Paint | Painting of ST Poles with Red Oxide Paint |
| 144 | Concreting/Grouting of newly erected 13 Mtr. long ST poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. | Concreting/Grouting of newly erected 13 Mtr. long ST poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. |
| 145 | Dismentling & removal of damaged/old erected conductor with its accessories due to shifting and also cartage of old/damaged & scrap line material from work site to store centre/JE(s). | Dismentling & removal of damaged/old erected conductor with its accessories due to shifting and also cartage of old/damaged & scrap line material from work site to store centre/JE(s). |
| 146 | Dismentling & removal of existing/erected old STP Poles as single/double poles structure with its accessories and also cartage of same from work site to store centre/JE(s) due to shifting. | Dismentling & removal of existing/erected old STP Poles as single/double poles structure with its accessories and also cartage of same from work site to store centre/JE(s) due to shifting. |
| 147 | Note: Any quantity of item from sl no. 1 to sl no. 2.23 may vary to any limit within the financial value of agreement against this tender. | Note: Any quantity of item from sl no. 1 to sl no. 2.23 may vary to any limit within the financial value of agreement against this tender. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.