Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - The Work Of Laying Sagging Installation Of 11 Kv 33Kv And Lt Line And Other Associate Work Under Full Deposite Scheme At Various Place In Edd Odhpur
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - The Work Of Laying Sagging Installation Of 11 Kv 33Kv And Lt Line And Other Associate Work Under Full Deposite Scheme At Various Place In Edd Odhpura Hathras; Electrical.. - Safe Carriage Of Following Material From Electricty Store Center Hts To Pit Site Of Work Through The Kacha And Pakka Road Including Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Etc. Difference Place Which Required For Proper Completion Of Work.(Distance 00-50 Kms.) , 8.5 Mtr. Long Pcc Poles. , 9 Mtr. Long Pcc Poles. , 11 Mtr. Long Pcc Poles. , 9 Mtr. S.T. Poles , 11 Mtr. S.T. Poles , 13 Mtr. S.T. Poles , Acsr Weasel Conductor , 10 Kva T/F , 16 Kva T/F , 25 Kva T/F , 63 Kva T/F , 100 Kva T/F , Earthing Complete , Shackle Insulator , Stay Set Complete , Tee Off Channel , 11 Kv Pin Insulator With Pin , Disc Insulator With Disc Fitting , 11 Kv X-Arm , 1*16 Sqmm. Ab Cable , 3*50 Sqmm. Ab Cable , 3*95 Sqmm. Ab Cable , 3*120 Sqmm. Ab Cable , G.I Wire 6/8/10 Swg , 11 Kv Xlpe Cable 3*70 , 11 Kv Xlpe Cable 3*120 , 11 Kv Xlpe Cable 3*185 , Top Channel , Dropper Channel , Tf Base Angel , Errection Of Following Poles Including Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit & Complete H.T./L.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , 8.5 Mtr. Long Pcc Poles. , 9 Mtr. Long Pcc Poles. , 11 Mtr. Long Pcc Poles. , 9 Mtr. S.T. Poles , 11 Mtr. S.T. Poles , 13 Mtr. S.T. Poles , 10 Kva T/F , 16 Kva T/F , 25 Kva T/F , 63 Kva T/F , 100 Kva T/F , Earthing Complete , Shackle Insulator , Stay Set Complete , Tee Off Channel , 11 Kv Pin Insulator With Pin , Disc Insulator With Disc Fitting , 11 Kv X-Arm , Double Pole , Errection Of Following Material As Per Respo Manual Material Provide By Contractor , Cable Jointing Kit , Suspension Cl , Dead End Cl , Shackle Insulator , Holding Cl , Lt Cl , F Bracket , 11 Kv X-Arm Cl , Off Size Nut Bolt & Washer , 3 Phase Distribution Box With Cl , Prc Connector , Eye Hook , T/F Cl 10/16 Kva , Grouting Of Stays As Per Respo Norms And As Per Direction Of Supervising Engineer. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Grouting Of St/Pcc Pole As Per Respo Norms And As Per Direction Of Supervising Engineer. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Rod As Per Respo Norms And As Per Direction Of Supervising Engineer. , Laying, Sagging And Stringing And Jumpering / Binding Etc. Of New & Old Acsr Weasal Conductor / Gi In 11 Kv / Lt Lines As Per Respo Manual And As Per Direction Of Supervising Engineer. , Acsr Weasal Conductor , 1*16+1*25 Sqmm. Ab Cable , 50/95/120 Sqmm. Ab Cable , 11 Kv Xlpe Cable 3*70/120/185 Sqmm , Cutting, Chopping, Triming Of Tree Branches To Clear The Line Route To Give 2 Mtr. Horizontal And Vertical Clearance To The Line Coming In The Route Of Different Feeders As Per Direction Of Supervising Engineer , Dismentlling And Removal Of Existing Acsr Conductor, Pole, T/F & Accessoreis From The Various Area To Store Hts , Acsr Conductor , St Pole , 11 Kv X-Arm , 11 Kv Cl S , 11 Kv Pin Insulator With Pin , 11 Kv Disc Insulator , Installation 16/25/63/100 Kva T/F On Erected Pole
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. Difference Place which required for proper completion of work.(Distance 00-50 Kms.) | Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. Difference Place which required for proper completion of work.(Distance 00-50 Kms.) |
| 2 | 8.5 Mtr. long PCC Poles. | 8.5 Mtr. long PCC Poles. |
| 3 | 9 Mtr. long PCC Poles. | 9 Mtr. long PCC Poles. |
| 4 | 11 Mtr. long PCC Poles. | 11 Mtr. long PCC Poles. |
| 5 | 9 Mtr. S.T. Poles | 9 Mtr. S.T. Poles |
| 6 | 11 Mtr. S.T. Poles | 11 Mtr. S.T. Poles |
| 7 | 13 Mtr. S.T. Poles | 13 Mtr. S.T. Poles |
| 8 | ACSR Weasel conductor | ACSR Weasel conductor |
| 9 | 10 KVA T/F | 10 KVA T/F |
| 10 | 16 KVA T/F | 16 KVA T/F |
| 11 | 25 KVA T/F | 25 KVA T/F |
| 12 | 63 KVA T/F | 63 KVA T/F |
| 13 | 100 KVA T/F | 100 KVA T/F |
| 14 | Earthing Complete | Earthing Complete |
| 15 | Shackle Insulator | Shackle Insulator |
| 16 | Stay Set Complete | Stay Set Complete |
| 17 | Tee off Channel | Tee off Channel |
| 18 | 11 KV Pin Insulator with Pin | 11 KV Pin Insulator with Pin |
| 19 | Disc Insulator with Disc Fitting | Disc Insulator with Disc Fitting |
| 20 | 11 KV X-Arm | 11 KV X-Arm |
| 21 | 1*16 sqmm. AB Cable | 1*16 sqmm. AB Cable |
| 22 | 3*50 sqmm. AB Cable | 3*50 sqmm. AB Cable |
| 23 | 3*95 sqmm. AB Cable | 3*95 sqmm. AB Cable |
| 24 | 3*120 sqmm. AB Cable | 3*120 sqmm. AB Cable |
| 25 | G.I Wire 6/8/10 SWG | G.I Wire 6/8/10 SWG |
| 26 | 11 KV XLPE cable 3*70 | 11 KV XLPE cable 3*70 |
| 27 | 11 KV XLPE cable 3*120 | 11 KV XLPE cable 3*120 |
| 28 | 11 KV XLPE cable 3*185 | 11 KV XLPE cable 3*185 |
| 29 | Top Channel | Top Channel |
| 30 | Dropper Channel | Dropper Channel |
| 31 | TF Base Angel | TF Base Angel |
| 32 | Errection of following Poles including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Errection of following Poles including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 33 | 8.5 Mtr. long PCC Poles. | 8.5 Mtr. long PCC Poles. |
| 34 | 9 Mtr. long PCC Poles. | 9 Mtr. long PCC Poles. |
| 35 | 11 Mtr. long PCC Poles. | 11 Mtr. long PCC Poles. |
| 36 | 9 Mtr. S.T. Poles | 9 Mtr. S.T. Poles |
| 37 | 11 Mtr. S.T. Poles | 11 Mtr. S.T. Poles |
| 38 | 13 Mtr. S.T. Poles | 13 Mtr. S.T. Poles |
| 39 | 10 KVA T/F | 10 KVA T/F |
| 40 | 16 KVA T/F | 16 KVA T/F |
| 41 | 25 KVA T/F | 25 KVA T/F |
| 42 | 63 KVA T/F | 63 KVA T/F |
| 43 | 100 KVA T/F | 100 KVA T/F |
| 44 | Earthing Complete | Earthing Complete |
| 45 | Shackle Insulator | Shackle Insulator |
| 46 | Stay Set Complete | Stay Set Complete |
| 47 | Tee off Channel | Tee off Channel |
| 48 | 11 KV Pin Insulator with Pin | 11 KV Pin Insulator with Pin |
| 49 | Disc Insulator with Disc Fitting | Disc Insulator with Disc Fitting |
| 50 | 11 KV X-Arm | 11 KV X-Arm |
| 51 | Double Pole | Double Pole |
| 52 | Errection of following material as per RESPO manual material provide by contractor | Errection of following material as per RESPO manual material provide by contractor |
| 53 | Cable Jointing Kit | Cable Jointing Kit |
| 54 | Suspension Clamp | Suspension Clamp |
| 55 | Dead End Clamp | Dead End Clamp |
| 56 | Shackle Insulator | Shackle Insulator |
| 57 | Holding Clamp | Holding Clamp |
| 58 | LT Clamp | LT Clamp |
| 59 | F Bracket | F Bracket |
| 60 | 11 KV X-Arm clamp | 11 KV X-Arm clamp |
| 61 | Off size nut bolt & Washer | Off size nut bolt & Washer |
| 62 | 3 Phase Distribution Box with Clamp | 3 Phase Distribution Box with Clamp |
| 63 | PRC Connector | PRC Connector |
| 64 | Eye Hook | Eye Hook |
| 65 | T/F Clamp 10/16 KVA | T/F Clamp 10/16 KVA |
| 66 | grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. | grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 67 | grouting of ST/PCC Pole as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. | grouting of ST/PCC Pole as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 68 | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. |
| 69 | Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer. | Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer. |
| 70 | ACSR Weasal conductor | ACSR Weasal conductor |
| 71 | 1*16+1*25 sqmm. AB Cable | 1*16+1*25 sqmm. AB Cable |
| 72 | 50/95/120 sqmm. AB Cable | 50/95/120 sqmm. AB Cable |
| 73 | 11 KV XLPE Cable 3*70/120/185 sqmm | 11 KV XLPE Cable 3*70/120/185 sqmm |
| 74 | Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer | Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer |
| 75 | Dismentlling and removal of existing ACSR Conductor, Pole, T/F & Accessoreis from the various area to Store Hts | Dismentlling and removal of existing ACSR Conductor, Pole, T/F & Accessoreis from the various area to Store Hts |
| 76 | ACSR Conductor | ACSR Conductor |
| 77 | ST Pole | ST Pole |
| 78 | 11 KV X-Arm | 11 KV X-Arm |
| 79 | 11 Kv Clamps | 11 Kv Clamps |
| 80 | 11 KV Pin Insulator with Pin | 11 KV Pin Insulator with Pin |
| 81 | 11 KV Disc Insulator | 11 KV Disc Insulator |
| 82 | Installation 16/25/63/100 KVA T/F on erected pole | Installation 16/25/63/100 KVA T/F on erected pole |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender