Bids Are invited for Facility Management Services - Lumpsum Based - Procurement / Execution Of Specialised Artistic Work For Construction, Fabrication, Finishing And Installation; Of Kareri Trek Entry Gate With Ticket Counter Through Gem Portal Under
Tender Overview
Project Description
Bids Are invited for Facility Management Services - Lumpsum Based - Procurement / Execution Of Specialised Artistic Work For Construction, Fabrication, Finishing And Installation; Of Kareri Trek Entry Gate With Ticket Counter Through Gem Portal Under Services; Consumable.. - Earthwork Excavation In Foundation Trenches In Ordinary Soil, Including Dressing Of Sides, Ramming Of Bottoms, Disposal Of Surplus Excavated Earth And All Leads/Lifts Complete For Gate Pillars And Ticket-Counter Foundations. , Providing And Laying Cement Concrete 1:4:8 (1 Cement : 4 Coarse Sand : 8 Graded Stone Aggregate 40 Mm Nominal Size) In Foundations/Bedding, Including Mixing, Laying, Compacting, Curing And All Carriage Complete. , Providing Random Rubble Masonry In Foundation And Plinth In Cement Mortar 1:6 Using Locally Available Natural Undressed Stone, Including Quoins, Hearting, Bonding, Scaffolding, Curing And Carriage Complete. , Providing Random Rubble Masonry In Superstructure In Cement Mortar 1:6 With Selected Natural Stone, Properly Bonded, Including Gate Piers And Ticket-Counter External Walls, Scaffolding, Curing And Finishing Joints Complete. , Providing Dressed/Selected Natural Stone Quoins, Jambs, Sill And Lintel Bands Around Ticket Window/Door And Gate Pier Edges, Including Dressing, Setting And Pointing Complete. , Providing Rcc 1:1.5:3 In Lintels/Roof Bearing Bands Including Centering, Shuttering, Mixing, Placing, Vibrating And Curing Complete (Reinforcement Measured Separately). , Providing Tmt Reinforcement Steel Fe500 For Rcc Work Including Cutting, Bending, Binding And Placing In Position Complete. , Providing And Fixing Structural Seasoned Timber Members For Pitched Roof Over Ticket Counter And Entrance Canopy, Including Rafters, Purlins, Wall Plates, Fascia And Preservative Treatment, Complete. , Providing And Fixing 20–25 Mm Thick Wooden Boarding Below Slate Roof Over Timber Framework, Including Nails/Screws And Preservative Treatment Complete. , Providing And Laying Traditional Natural Slate Roofing In Required Slope Over Wooden Boarding, Including Underlay, Hooks/Nails, Laps, Ridge Treatment, Cutting And All Fittings Complete. , Providing And Fixing Wooden Fascia/Barge Boards And Decorative Exposed Timber Trim To Pitched Roof, Planed And Preservative Treated Complete. , Providing And Fixing Heavy-Duty Wooden Entrance Cross Beam/Header Between Stone Piers, Including Anchoring, Preservative Treatment And Hardware Complete. , Providing And Fixing Wooden Framed And Glazed Ticket-Counter Service Window With Openable Shutters, Frame, Glass, Fittings, Locking Arrangement And Exterior Weather Protection Complete. , Providing And Fixing Solid Wooden Framed/Ledged Door For Ticket-Counter Room Including Frame, Shutters, Hinges, Handles, Tower Bolts, Lock And Finishing Complete. , Providing 40 Mm Thick Natural Stone Slab Flooring Over Prepared Base Inside Ticket Counter, Including Cement Mortar Bedding, Jointing And Polishing/Cleaning Complete. , Providing Cement Concrete Floor Base 1:4:8, Average 75 Mm Thick Below Stone Flooring, Including Compaction And Curing Complete. , Pointing Exposed Rr Stone Masonry With Cement Mortar 1:3 In Recessed/Flush Finish, Cleaning Stone Faces And Curing Complete. , Providing And Fixing Decorative Wooden Signboard Kareri – Trek • Nature • Heritage With Raised/Weatherproof Lettering And Mountain Motif, Including Mounting Brackets And Exterior Polish Complete. , Providing And Fixing Ticket Counter Name Board In Seasoned Wood With Raised/Weatherproof Lettering, Including Brackets And Polish Complete. , Providing And Fixing Ms Wildlife Silhouette Decorative Panels On Entrance Stone Pier, Laser/Cnc Cut From 3 Mm Ms Sheet With Stiffeners, Primer And Exterior Paint, Including Anchoring Complete. , Providing Basic Internal Electrical Installation For Ticket Counter Comprising Concealed/Surface Wiring, Led Lights, Switches, Sockets, Mcb/Db And Earthing Connection Complete. , Providing Exterior Grade Wood Preservative/Stain And Protective Clear Coat To All Exposed Timber Surfaces, Including Surface Preparation, Minimum Two Coats Complete. , Site Development And Approach Finishing Immediately Around Entrance/Ticket Counter With Natural Stone Pitching/Paving Including Bedding And Jointing Complete. , Providing Rainwater Disposal Arrangement To Slate Roof Including Gutters/Downpipes And Fittings, Complete.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Earthwork excavation in foundation trenches in ordinary soil, including dressing of sides, ramming of bottoms, disposal of surplus excavated earth and all leads/lifts complete for gate pillars and ticket-counter foundations. | Earthwork excavation in foundation trenches in ordinary soil, including dressing of sides, ramming of bottoms, disposal of surplus excavated earth and all leads/lifts complete for gate pillars and ticket-counter foundations. |
| 2 | Providing and laying cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) in foundations/bedding, including mixing, laying, compacting, curing and all carriage complete. | Providing and laying cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) in foundations/bedding, including mixing, laying, compacting, curing and all carriage complete. |
| 3 | Providing random rubble masonry in foundation and plinth in cement mortar 1:6 using locally available natural undressed stone, including quoins, hearting, bonding, scaffolding, curing and carriage complete. | Providing random rubble masonry in foundation and plinth in cement mortar 1:6 using locally available natural undressed stone, including quoins, hearting, bonding, scaffolding, curing and carriage complete. |
| 4 | Providing random rubble masonry in superstructure in cement mortar 1:6 with selected natural stone, properly bonded, including gate piers and ticket-counter external walls, scaffolding, curing and finishing joints complete. | Providing random rubble masonry in superstructure in cement mortar 1:6 with selected natural stone, properly bonded, including gate piers and ticket-counter external walls, scaffolding, curing and finishing joints complete. |
| 5 | Providing dressed/selected natural stone quoins, jambs, sill and lintel bands around ticket window/door and gate pier edges, including dressing, setting and pointing complete. | Providing dressed/selected natural stone quoins, jambs, sill and lintel bands around ticket window/door and gate pier edges, including dressing, setting and pointing complete. |
| 6 | Providing RCC 1:1.5:3 in lintels/roof bearing bands including centering, shuttering, mixing, placing, vibrating and curing complete (reinforcement measured separately). | Providing RCC 1:1.5:3 in lintels/roof bearing bands including centering, shuttering, mixing, placing, vibrating and curing complete (reinforcement measured separately). |
| 7 | Providing TMT reinforcement steel Fe500 for RCC work including cutting, bending, binding and placing in position complete. | Providing TMT reinforcement steel Fe500 for RCC work including cutting, bending, binding and placing in position complete. |
| 8 | Providing and fixing structural seasoned timber members for pitched roof over ticket counter and entrance canopy, including rafters, purlins, wall plates, fascia and preservative treatment, complete. | Providing and fixing structural seasoned timber members for pitched roof over ticket counter and entrance canopy, including rafters, purlins, wall plates, fascia and preservative treatment, complete. |
| 9 | Providing and fixing 20–25 mm thick wooden boarding below slate roof over timber framework, including nails/screws and preservative treatment complete. | Providing and fixing 20–25 mm thick wooden boarding below slate roof over timber framework, including nails/screws and preservative treatment complete. |
| 10 | Providing and laying traditional natural slate roofing in required slope over wooden boarding, including underlay, hooks/nails, laps, ridge treatment, cutting and all fittings complete. | Providing and laying traditional natural slate roofing in required slope over wooden boarding, including underlay, hooks/nails, laps, ridge treatment, cutting and all fittings complete. |
| 11 | Providing and fixing wooden fascia/barge boards and decorative exposed timber trim to pitched roof, planed and preservative treated complete. | Providing and fixing wooden fascia/barge boards and decorative exposed timber trim to pitched roof, planed and preservative treated complete. |
| 12 | Providing and fixing heavy-duty wooden entrance cross beam/header between stone piers, including anchoring, preservative treatment and hardware complete. | Providing and fixing heavy-duty wooden entrance cross beam/header between stone piers, including anchoring, preservative treatment and hardware complete. |
| 13 | Providing and fixing wooden framed and glazed ticket-counter service window with openable shutters, frame, glass, fittings, locking arrangement and exterior weather protection complete. | Providing and fixing wooden framed and glazed ticket-counter service window with openable shutters, frame, glass, fittings, locking arrangement and exterior weather protection complete. |
| 14 | Providing and fixing solid wooden framed/ledged door for ticket-counter room including frame, shutters, hinges, handles, tower bolts, lock and finishing complete. | Providing and fixing solid wooden framed/ledged door for ticket-counter room including frame, shutters, hinges, handles, tower bolts, lock and finishing complete. |
| 15 | Providing 40 mm thick natural stone slab flooring over prepared base inside ticket counter, including cement mortar bedding, jointing and polishing/cleaning complete. | Providing 40 mm thick natural stone slab flooring over prepared base inside ticket counter, including cement mortar bedding, jointing and polishing/cleaning complete. |
| 16 | Providing cement concrete floor base 1:4:8, average 75 mm thick below stone flooring, including compaction and curing complete. | Providing cement concrete floor base 1:4:8, average 75 mm thick below stone flooring, including compaction and curing complete. |
| 17 | Pointing exposed RR stone masonry with cement mortar 1:3 in recessed/flush finish, cleaning stone faces and curing complete. | Pointing exposed RR stone masonry with cement mortar 1:3 in recessed/flush finish, cleaning stone faces and curing complete. |
| 18 | Providing and fixing decorative wooden signboard 'KARERI – TREK • NATURE • HERITAGE' with raised/weatherproof lettering and mountain motif, including mounting brackets and exterior polish complete. | Providing and fixing decorative wooden signboard 'KARERI – TREK • NATURE • HERITAGE' with raised/weatherproof lettering and mountain motif, including mounting brackets and exterior polish complete. |
| 19 | Providing and fixing ticket counter name board in seasoned wood with raised/weatherproof lettering, including brackets and polish complete. | Providing and fixing ticket counter name board in seasoned wood with raised/weatherproof lettering, including brackets and polish complete. |
| 20 | Providing and fixing MS wildlife silhouette decorative panels on entrance stone pier, laser/CNC cut from 3 mm MS sheet with stiffeners, primer and exterior paint, including anchoring complete. | Providing and fixing MS wildlife silhouette decorative panels on entrance stone pier, laser/CNC cut from 3 mm MS sheet with stiffeners, primer and exterior paint, including anchoring complete. |
| 21 | Providing basic internal electrical installation for ticket counter comprising concealed/surface wiring, LED lights, switches, sockets, MCB/DB and earthing connection complete. | Providing basic internal electrical installation for ticket counter comprising concealed/surface wiring, LED lights, switches, sockets, MCB/DB and earthing connection complete. |
| 22 | Providing exterior grade wood preservative/stain and protective clear coat to all exposed timber surfaces, including surface preparation, minimum two coats complete. | Providing exterior grade wood preservative/stain and protective clear coat to all exposed timber surfaces, including surface preparation, minimum two coats complete. |
| 23 | Site development and approach finishing immediately around entrance/ticket counter with natural stone pitching/paving including bedding and jointing complete. | Site development and approach finishing immediately around entrance/ticket counter with natural stone pitching/paving including bedding and jointing complete. |
| 24 | Providing rainwater disposal arrangement to slate roof including gutters/downpipes and fittings, complete. | Providing rainwater disposal arrangement to slate roof including gutters/downpipes and fittings, complete. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender