Bids Are Invited For Hiring Of Agency For It Projects- Milestone Basis - Provision Of Aocc Central Solution At 15 Airports
Tender Overview
Project Description
Bids Are Invited For Hiring Of Agency For It Projects- Milestone Basis - Provision Of Aocc Central Solution At 15 Airports
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 05-Nov-2026 | 16-Nov-2026 | ||
| 2 | 16-Nov-2026 | 23-Nov-2026 |
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Sub-head 1: Phase 1 (06 Airports) - AOCC Central Application on Cloud | Sub-head 1: Phase 1 (06 Airports) - AOCC Central Application on Cloud |
| 2 | End-to-End development/ deployment of AOCC Central Application on Cloud (both DC & DR) with AODB for 06 Airports under Phase 1, including customizable operational rules/ rule sets processing and interface for bi-directional data exchange.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 06 Airports.) | End-to-End development/ deployment of AOCC Central Application on Cloud (both DC & DR) with AODB for 06 Airports under Phase 1, including customizable operational rules/ rule sets processing and interface for bi-directional data exchange.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 06 Airports.) |
| 3 | End-to-end development/ deployment of the Multi-Airport Resource Layer (MARL) at cloud to manage individual Airports under Phase 1, including RMS, with allocation, auto-execution & what-if analysis of operational rules and integration with the AOCC Central Application.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 06 Airports.) | End-to-end development/ deployment of the Multi-Airport Resource Layer (MARL) at cloud to manage individual Airports under Phase 1, including RMS, with allocation, auto-execution & what-if analysis of operational rules and integration with the AOCC Central Application.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 06 Airports.) |
| 4 | End-to-end development/ deployment of the Central Dashboard & Reporting layer on cloud to provide a real-time/ near real-time master view of all Airports, including comprehensive data lake, analytics, customizable and downloadable reporting, as per AAI requirement for Phase 1 Airports.This includes 1-year warranty from date of Project Commissioning of Airport. | End-to-end development/ deployment of the Central Dashboard & Reporting layer on cloud to provide a real-time/ near real-time master view of all Airports, including comprehensive data lake, analytics, customizable and downloadable reporting, as per AAI requirement for Phase 1 Airports.This includes 1-year warranty from date of Project Commissioning of Airport. |
| 5 | Provision of Cyber Security of AOCC Central Solution for 24x7 Threat intelligence gathering, monitoring and response, VAPT and Vulnerability resolution for Phase - 1 Airports.This includes 1-year warranty from date of Project Commissioning of Airport. | Provision of Cyber Security of AOCC Central Solution for 24x7 Threat intelligence gathering, monitoring and response, VAPT and Vulnerability resolution for Phase - 1 Airports.This includes 1-year warranty from date of Project Commissioning of Airport. |
| 6 | End-to-end development/ deployment of the Airport level Dashboard & Reporting layer on cloud to provide a real-time/ near real-time individual view of all Airports, including comprehensive data view of respective airports, airport level alerts, analytics, customizable and downloadable reporting, as per AAI requirement for Phase 1 Airports.This includes 1-year warranty from date of Project Commissioning. | End-to-end development/ deployment of the Airport level Dashboard & Reporting layer on cloud to provide a real-time/ near real-time individual view of all Airports, including comprehensive data view of respective airports, airport level alerts, analytics, customizable and downloadable reporting, as per AAI requirement for Phase 1 Airports.This includes 1-year warranty from date of Project Commissioning. |
| 7 | Development/ Deployment of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Central dashboard, as per AAI requirement, deployed for Phase 1 Airports as one Central instance.This includes 1-year warranty from date of Project Commissioning. | Development/ Deployment of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Central dashboard, as per AAI requirement, deployed for Phase 1 Airports as one Central instance.This includes 1-year warranty from date of Project Commissioning. |
| 8 | Development/ Deployment of comprehensive SLA, Network and Ticket/ Service Monitoring Tools and Implementation of 24x7 remote support and Backend Technical Services — L2/L3 Support.This includes 1-year warranty from date of Project Commissioning. | Development/ Deployment of comprehensive SLA, Network and Ticket/ Service Monitoring Tools and Implementation of 24x7 remote support and Backend Technical Services — L2/L3 Support.This includes 1-year warranty from date of Project Commissioning. |
| 9 | Development/ Deployment and Integration of the Central Interface(s) with the AOCC Central Application including converters/wrappers/APIs for continuous data exchange per IATA AIDX format, SOP and ICD, AOCC business process/transition rules, and error & warning handling.This is one-time activity for all applicable airports, irrespective of the AOCC deployment Phase(s). This includes Testing and sign-off. | Development/ Deployment and Integration of the Central Interface(s) with the AOCC Central Application including converters/wrappers/APIs for continuous data exchange per IATA AIDX format, SOP and ICD, AOCC business process/transition rules, and error & warning handling.This is one-time activity for all applicable airports, irrespective of the AOCC deployment Phase(s). This includes Testing and sign-off. |
| 10 | Sub-head 2: Phase 1 (06 Airports) - Enablement of Designated AAI Airports | Sub-head 2: Phase 1 (06 Airports) - Enablement of Designated AAI Airports |
| 11 | Local Airport Core Room Infrastructure setup including Supply, Installation, Testing and Commissioning (SITC) of equipment as per SOW and local cyber security setup.This includes 1-year warranty from date of Project Commissioning. | Local Airport Core Room Infrastructure setup including Supply, Installation, Testing and Commissioning (SITC) of equipment as per SOW and local cyber security setup.This includes 1-year warranty from date of Project Commissioning. |
| 12 | Data Continuity and Local Resiliency through Airport-specific integration of individual Airport level Core Room with Multi-Airport Resource Layer (MARL) at AOCC Central Cloud & RMS, for bi-directional data exchange, including provision of a dedicated dual network link for each airport.This includes 1-year warranty from date of Project Commissioning. | Data Continuity and Local Resiliency through Airport-specific integration of individual Airport level Core Room with Multi-Airport Resource Layer (MARL) at AOCC Central Cloud & RMS, for bi-directional data exchange, including provision of a dedicated dual network link for each airport.This includes 1-year warranty from date of Project Commissioning. |
| 13 | End-to-end development/ deployment of airport-specific converters/wrappers/APIs for continuous data exchange per IATA AIDX format, for Integration of Airport subsystem(s) through Multi-Airport Resource Layer (MARL) with AOCC Central Solution, including SOP and ICD, AOCC business process/transition rules, and error & warning handling.This includes 1-year warranty from date of Project Commissioning. | End-to-end development/ deployment of airport-specific converters/wrappers/APIs for continuous data exchange per IATA AIDX format, for Integration of Airport subsystem(s) through Multi-Airport Resource Layer (MARL) with AOCC Central Solution, including SOP and ICD, AOCC business process/transition rules, and error & warning handling.This includes 1-year warranty from date of Project Commissioning. |
| 14 | Development/ Deployment of Identification & Authorization Module (IAM), having Central-Admin, Airport-Admin and various User roles, along with an integrated audit trail and incident tracking.This includes 1-year warranty from date of Project Commissioning. | Development/ Deployment of Identification & Authorization Module (IAM), having Central-Admin, Airport-Admin and various User roles, along with an integrated audit trail and incident tracking.This includes 1-year warranty from date of Project Commissioning. |
| 15 | End to End Third party Audit of AOCC Central Solution (both Central & at Airport) across Phase 1 (06 Airports) to obtain Project Commissioning. | End to End Third party Audit of AOCC Central Solution (both Central & at Airport) across Phase 1 (06 Airports) to obtain Project Commissioning. |
| 16 | Integration of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Airport level dashboard, as per AAI requirement, deployed as one Airport-specific instance at each of the 06 airports.This includes 1-year warranty from date of Project Commissioning. | Integration of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Airport level dashboard, as per AAI requirement, deployed as one Airport-specific instance at each of the 06 airports.This includes 1-year warranty from date of Project Commissioning. |
| 17 | Data Migration from the existing AOCC system(s) for 06 Airports(s) and integration with the new AOCC — extraction, validation, transformation and loading. | Data Migration from the existing AOCC system(s) for 06 Airports(s) and integration with the new AOCC — extraction, validation, transformation and loading. |
| 18 | Sub-head 3: Phase 2 (09 Airports) - AOCC Central Application on Cloud | Sub-head 3: Phase 2 (09 Airports) - AOCC Central Application on Cloud |
| 19 | Augmentation/ deployment of AOCC Central Application on Cloud (both DC & DR) with AODB for 09 Airports under Phase 2, including customizable operational rules/ rule sets processing and interface for bi-directional data exchange.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 09 Airports.) | Augmentation/ deployment of AOCC Central Application on Cloud (both DC & DR) with AODB for 09 Airports under Phase 2, including customizable operational rules/ rule sets processing and interface for bi-directional data exchange.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 09 Airports.) |
| 20 | Augmentation / deployment of the Multi-Airport Resource Layer (MARL) at cloud to manage individual Airports under Phase 2, including RMS, with allocation, auto-execution & what-if analysis of operational rules and integration with the AOCC Central Application.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 09 Airports.) | Augmentation / deployment of the Multi-Airport Resource Layer (MARL) at cloud to manage individual Airports under Phase 2, including RMS, with allocation, auto-execution & what-if analysis of operational rules and integration with the AOCC Central Application.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 09 Airports.) |
| 21 | Augmentation / deployment of the Central Dashboard & Reporting layer on cloud to provide a real-time/ near real-time master view of all Airports, including comprehensive data lake, analytics, customizable and downloadable reporting, as per AAI requirement for Phase-2 Airports.This includes 1-year warranty from date of Project Commissioning. | Augmentation / deployment of the Central Dashboard & Reporting layer on cloud to provide a real-time/ near real-time master view of all Airports, including comprehensive data lake, analytics, customizable and downloadable reporting, as per AAI requirement for Phase-2 Airports.This includes 1-year warranty from date of Project Commissioning. |
| 22 | Augmentation of Cyber Security of AOCC Central Solution for 24x7 Threat intelligence gathering, monitoring and response, VAPT and Vulnerability resolution for Phase-2 Airports.This includes 1-year warranty from date of Project Commissioning. | Augmentation of Cyber Security of AOCC Central Solution for 24x7 Threat intelligence gathering, monitoring and response, VAPT and Vulnerability resolution for Phase-2 Airports.This includes 1-year warranty from date of Project Commissioning. |
| 23 | Augmentation / deployment of the Airport level Dashboard & Reporting layer on cloud to provide a real-time/ near real-time individual view of all Airports, including comprehensive data view of respective airports, airport level alerts, analytics, customizable and downloadable reporting, as per AAI requirement for Phase-2 Airports. This includes 1-year warranty from date of Project Commissioning. | Augmentation / deployment of the Airport level Dashboard & Reporting layer on cloud to provide a real-time/ near real-time individual view of all Airports, including comprehensive data view of respective airports, airport level alerts, analytics, customizable and downloadable reporting, as per AAI requirement for Phase-2 Airports. This includes 1-year warranty from date of Project Commissioning. |
| 24 | Augmentation of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Central dashboard, as per AAI requirement, deployed for Phase-2 Airports on existing Central instance.This includes 1-year warranty from date of Project Commissioning. | Augmentation of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Central dashboard, as per AAI requirement, deployed for Phase-2 Airports on existing Central instance.This includes 1-year warranty from date of Project Commissioning. |
| 25 | Augmentation/ Deployment of comprehensive SLA, Network and Ticket/ Service Monitoring Tools and Implementation of 24x7 remote support and Backend Technical Services — L2/L3 Support.This includes 1-year warranty from date of Project Commissioning. | Augmentation/ Deployment of comprehensive SLA, Network and Ticket/ Service Monitoring Tools and Implementation of 24x7 remote support and Backend Technical Services — L2/L3 Support.This includes 1-year warranty from date of Project Commissioning. |
| 26 | Sub-head 4: Phase 2 (09 Airports) - Enablement of Designated AAI Airports | Sub-head 4: Phase 2 (09 Airports) - Enablement of Designated AAI Airports |
| 27 | Local Airport Core Room Infrastructure setup including Supply, Installation, Testing and Commissioning (SITC) of equipment as per SOW and local cyber security setup.This includes 1-year warranty from date of Project Commissioning. | Local Airport Core Room Infrastructure setup including Supply, Installation, Testing and Commissioning (SITC) of equipment as per SOW and local cyber security setup.This includes 1-year warranty from date of Project Commissioning. |
| 28 | Data Continuity and Local Resiliency through Airport-specific integration of individual Airport level Core Room with Multi-Airport Resource Layer (MARL) at AOCC Central Cloud & RMS, for bi-directional data exchange, including provision of a dedicated dual network link for each airport.This includes 1-year warranty from date of Project Commissioning. | Data Continuity and Local Resiliency through Airport-specific integration of individual Airport level Core Room with Multi-Airport Resource Layer (MARL) at AOCC Central Cloud & RMS, for bi-directional data exchange, including provision of a dedicated dual network link for each airport.This includes 1-year warranty from date of Project Commissioning. |
| 29 | Configuration/ deployment of airport-specific converters/wrappers/APIs for continuous data exchange per IATA AIDX format, for Integration of Airport subsystem(s) through Multi-Airport Resource Layer (MARL) with AOCC Central Solution, including SOP and ICD, AOCC business process/transition rules, and error & warning handling.This includes 1-year warranty from date of Project Commissioning. | Configuration/ deployment of airport-specific converters/wrappers/APIs for continuous data exchange per IATA AIDX format, for Integration of Airport subsystem(s) through Multi-Airport Resource Layer (MARL) with AOCC Central Solution, including SOP and ICD, AOCC business process/transition rules, and error & warning handling.This includes 1-year warranty from date of Project Commissioning. |
| 30 | Augmentation/ Deployment of Identification & Authorization Module (IAM), having Central-Admin, Airport-Admin and various User roles, along with an integrated audit trail and incident tracking.This includes 1-year warranty from date of Project Commissioning. | Augmentation/ Deployment of Identification & Authorization Module (IAM), having Central-Admin, Airport-Admin and various User roles, along with an integrated audit trail and incident tracking.This includes 1-year warranty from date of Project Commissioning. |
| 31 | End to End Third party Audit of AOCC Central Solution (both Central & at Airport) across Phase 2 (09 Airports) to obtain Project Commissioning. | End to End Third party Audit of AOCC Central Solution (both Central & at Airport) across Phase 2 (09 Airports) to obtain Project Commissioning. |
| 32 | Integration of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Airport level dashboard, as per AAI requirement, deployed as one Airport-specific instance at each of the 09 airports. | Integration of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Airport level dashboard, as per AAI requirement, deployed as one Airport-specific instance at each of the 09 airports. |
| 33 | Sub-head 5: (1-year Warranty Period Post Project Commissioning) – L1 Support Services | Sub-head 5: (1-year Warranty Period Post Project Commissioning) – L1 Support Services |
| 34 | Phase 1: On-Premise/ Physical presence of L1 support service 24x7, at each airport to manage Airport Level Network, on-premise Hardware cleaning and maintenance, raising ticket for OEM support and other assigned operational activity, post Project Commissioning. | Phase 1: On-Premise/ Physical presence of L1 support service 24x7, at each airport to manage Airport Level Network, on-premise Hardware cleaning and maintenance, raising ticket for OEM support and other assigned operational activity, post Project Commissioning. |
| 35 | Phase 2: On-Premise/ Physical presence of L1 support service 24x7, at each airport to manage Airport Level Network, on-premise Hardware cleaning and maintenance, raising ticket for OEM support and other assigned operational activity, post Project Commissioning. | Phase 2: On-Premise/ Physical presence of L1 support service 24x7, at each airport to manage Airport Level Network, on-premise Hardware cleaning and maintenance, raising ticket for OEM support and other assigned operational activity, post Project Commissioning. |
| 36 | Sub-head 6: 1st Year of CAMC post warranty | Sub-head 6: 1st Year of CAMC post warranty |
| 37 | CAMC of 1.01 | CAMC of 1.01 |
| 38 | CAMC of 1.02 | CAMC of 1.02 |
| 39 | CAMC of 1.03 | CAMC of 1.03 |
| 40 | CAMC of 1.04 | CAMC of 1.04 |
| 41 | CAMC of 1.05 | CAMC of 1.05 |
| 42 | CAMC of 1.06 | CAMC of 1.06 |
| 43 | CAMC of 1.07 | CAMC of 1.07 |
| 44 | CAMC of 1.08 | CAMC of 1.08 |
| 45 | CAMC of 2.01 | CAMC of 2.01 |
| 46 | CAMC of 2.02 | CAMC of 2.02 |
| 47 | CAMC of 2.03 | CAMC of 2.03 |
| 48 | CAMC of 2.04 | CAMC of 2.04 |
| 49 | CAMC of 2.06 | CAMC of 2.06 |
| 50 | CAMC of 3.01 | CAMC of 3.01 |
| 51 | CAMC of 3.02 | CAMC of 3.02 |
| 52 | CAMC of 3.03 | CAMC of 3.03 |
| 53 | CAMC of 3.04 | CAMC of 3.04 |
| 54 | CAMC of 3.05 | CAMC of 3.05 |
| 55 | CAMC of 3.06 | CAMC of 3.06 |
| 56 | CAMC of 3.07 | CAMC of 3.07 |
| 57 | CAMC of 4.01 | CAMC of 4.01 |
| 58 | CAMC of 4.02 | CAMC of 4.02 |
| 59 | CAMC of 4.03 | CAMC of 4.03 |
| 60 | CAMC of 4.04 | CAMC of 4.04 |
| 61 | CAMC of 4.06 | CAMC of 4.06 |
| 62 | Annual L1 Support Services at each airport in lieu of 5.01 | Annual L1 Support Services at each airport in lieu of 5.01 |
| 63 | Annual L1 Support Services at each airport in lieu of 5.02 | Annual L1 Support Services at each airport in lieu of 5.02 |
| 64 | Sub-head 7: 2nd Year of CAMC post warranty | Sub-head 7: 2nd Year of CAMC post warranty |
| 65 | CAMC of 1.01 | CAMC of 1.01 |
| 66 | CAMC of 1.02 | CAMC of 1.02 |
| 67 | CAMC of 1.03 | CAMC of 1.03 |
| 68 | CAMC of 1.04 | CAMC of 1.04 |
| 69 | CAMC of 1.05 | CAMC of 1.05 |
| 70 | CAMC of 1.06 | CAMC of 1.06 |
| 71 | CAMC of 1.07 | CAMC of 1.07 |
| 72 | CAMC of 1.08 | CAMC of 1.08 |
| 73 | CAMC of 2.01 | CAMC of 2.01 |
| 74 | CAMC of 2.02 | CAMC of 2.02 |
| 75 | CAMC of 2.03 | CAMC of 2.03 |
| 76 | CAMC of 2.04 | CAMC of 2.04 |
| 77 | CAMC of 2.06 | CAMC of 2.06 |
| 78 | CAMC of 3.01 | CAMC of 3.01 |
| 79 | CAMC of 3.02 | CAMC of 3.02 |
| 80 | CAMC of 3.03 | CAMC of 3.03 |
| 81 | CAMC of 3.04 | CAMC of 3.04 |
| 82 | CAMC of 3.05 | CAMC of 3.05 |
| 83 | CAMC of 3.06 | CAMC of 3.06 |
| 84 | CAMC of 3.07 | CAMC of 3.07 |
| 85 | CAMC of 4.01 | CAMC of 4.01 |
| 86 | CAMC of 4.02 | CAMC of 4.02 |
| 87 | CAMC of 4.03 | CAMC of 4.03 |
| 88 | CAMC of 4.04 | CAMC of 4.04 |
| 89 | CAMC of 4.06 | CAMC of 4.06 |
| 90 | Annual L1 Support Services at each airport in lieu of 5.01 | Annual L1 Support Services at each airport in lieu of 5.01 |
| 91 | Annual L1 Support Services at each airport in lieu of 5.02 | Annual L1 Support Services at each airport in lieu of 5.02 |
| 92 | Sub-head 8: 3rd Year of CAMC post warranty | Sub-head 8: 3rd Year of CAMC post warranty |
| 93 | CAMC of 1.01 | CAMC of 1.01 |
| 94 | CAMC of 1.02 | CAMC of 1.02 |
| 95 | CAMC of 1.03 | CAMC of 1.03 |
| 96 | CAMC of 1.04 | CAMC of 1.04 |
| 97 | CAMC of 1.05 | CAMC of 1.05 |
| 98 | CAMC of 1.06 | CAMC of 1.06 |
| 99 | CAMC of 1.07 | CAMC of 1.07 |
| 100 | CAMC of 1.08 | CAMC of 1.08 |
| 101 | CAMC of 2.01 | CAMC of 2.01 |
| 102 | CAMC of 2.02 | CAMC of 2.02 |
| 103 | CAMC of 2.03 | CAMC of 2.03 |
| 104 | CAMC of 2.04 | CAMC of 2.04 |
| 105 | CAMC of 2.06 | CAMC of 2.06 |
| 106 | CAMC of 3.01 | CAMC of 3.01 |
| 107 | CAMC of 3.02 | CAMC of 3.02 |
| 108 | CAMC of 3.03 | CAMC of 3.03 |
| 109 | CAMC of 3.04 | CAMC of 3.04 |
| 110 | CAMC of 3.05 | CAMC of 3.05 |
| 111 | CAMC of 3.06 | CAMC of 3.06 |
| 112 | CAMC of 3.07 | CAMC of 3.07 |
| 113 | CAMC of 4.01 | CAMC of 4.01 |
| 114 | CAMC of 4.02 | CAMC of 4.02 |
| 115 | CAMC of 4.03 | CAMC of 4.03 |
| 116 | CAMC of 4.04 | CAMC of 4.04 |
| 117 | CAMC of 4.06 | CAMC of 4.06 |
| 118 | Annual L1 Support Services at each airport in lieu of 5.01 | Annual L1 Support Services at each airport in lieu of 5.01 |
| 119 | Annual L1 Support Services at each airport in lieu of 5.02 | Annual L1 Support Services at each airport in lieu of 5.02 |
| 120 | Sub-head 9: 4th Year of CAMC post warranty | Sub-head 9: 4th Year of CAMC post warranty |
| 121 | CAMC of 1.01 | CAMC of 1.01 |
| 122 | CAMC of 1.02 | CAMC of 1.02 |
| 123 | CAMC of 1.03 | CAMC of 1.03 |
| 124 | CAMC of 1.04 | CAMC of 1.04 |
| 125 | CAMC of 1.05 | CAMC of 1.05 |
| 126 | CAMC of 1.06 | CAMC of 1.06 |
| 127 | CAMC of 1.07 | CAMC of 1.07 |
| 128 | CAMC of 1.08 | CAMC of 1.08 |
| 129 | CAMC of 2.01 | CAMC of 2.01 |
| 130 | CAMC of 2.02 | CAMC of 2.02 |
| 131 | CAMC of 2.03 | CAMC of 2.03 |
| 132 | CAMC of 2.04 | CAMC of 2.04 |
| 133 | CAMC of 2.06 | CAMC of 2.06 |
| 134 | CAMC of 3.01 | CAMC of 3.01 |
| 135 | CAMC of 3.02 | CAMC of 3.02 |
| 136 | CAMC of 3.03 | CAMC of 3.03 |
| 137 | CAMC of 3.04 | CAMC of 3.04 |
| 138 | CAMC of 3.05 | CAMC of 3.05 |
| 139 | CAMC of 3.06 | CAMC of 3.06 |
| 140 | CAMC of 3.07 | CAMC of 3.07 |
| 141 | CAMC of 4.01 | CAMC of 4.01 |
| 142 | CAMC of 4.02 | CAMC of 4.02 |
| 143 | CAMC of 4.03 | CAMC of 4.03 |
| 144 | CAMC of 4.04 | CAMC of 4.04 |
| 145 | CAMC of 4.06 | CAMC of 4.06 |
| 146 | Annual L1 Support Services at each airport in lieu of 5.01 | Annual L1 Support Services at each airport in lieu of 5.01 |
| 147 | Annual L1 Support Services at each airport in lieu of 5.02 | Annual L1 Support Services at each airport in lieu of 5.02 |
| 148 | Sub-head 10: 5th Year of CAMC post warranty | Sub-head 10: 5th Year of CAMC post warranty |
| 149 | CAMC of 1.01 | CAMC of 1.01 |
| 150 | CAMC of 1.02 | CAMC of 1.02 |
| 151 | CAMC of 1.03 | CAMC of 1.03 |
| 152 | CAMC of 1.04 | CAMC of 1.04 |
| 153 | CAMC of 1.05 | CAMC of 1.05 |
| 154 | CAMC of 1.06 | CAMC of 1.06 |
| 155 | CAMC of 1.07 | CAMC of 1.07 |
| 156 | CAMC of 1.08 | CAMC of 1.08 |
| 157 | CAMC of 2.01 | CAMC of 2.01 |
| 158 | CAMC of 2.02 | CAMC of 2.02 |
| 159 | CAMC of 2.03 | CAMC of 2.03 |
| 160 | CAMC of 2.04 | CAMC of 2.04 |
| 161 | CAMC of 2.06 | CAMC of 2.06 |
| 162 | CAMC of 3.01 | CAMC of 3.01 |
| 163 | CAMC of 3.02 | CAMC of 3.02 |
| 164 | CAMC of 3.03 | CAMC of 3.03 |
| 165 | CAMC of 3.04 | CAMC of 3.04 |
| 166 | CAMC of 3.05 | CAMC of 3.05 |
| 167 | CAMC of 3.06 | CAMC of 3.06 |
| 168 | CAMC of 3.07 | CAMC of 3.07 |
| 169 | CAMC of 4.01 | CAMC of 4.01 |
| 170 | CAMC of 4.02 | CAMC of 4.02 |
| 171 | CAMC of 4.03 | CAMC of 4.03 |
| 172 | CAMC of 4.04 | CAMC of 4.04 |
| 173 | CAMC of 4.06 | CAMC of 4.06 |
| 174 | Annual L1 Support Services at each airport in lieu of 5.01 | Annual L1 Support Services at each airport in lieu of 5.01 |
| 175 | Annual L1 Support Services at each airport in lieu of 5.02 | Annual L1 Support Services at each airport in lieu of 5.02 |
| 176 | Sub-head 11: 6th Year of CAMC post warranty | Sub-head 11: 6th Year of CAMC post warranty |
| 177 | CAMC of 1.01 | CAMC of 1.01 |
| 178 | CAMC of 1.02 | CAMC of 1.02 |
| 179 | CAMC of 1.03 | CAMC of 1.03 |
| 180 | CAMC of 1.04 | CAMC of 1.04 |
| 181 | CAMC of 1.05 | CAMC of 1.05 |
| 182 | CAMC of 1.06 | CAMC of 1.06 |
| 183 | CAMC of 1.07 | CAMC of 1.07 |
| 184 | CAMC of 1.08 | CAMC of 1.08 |
| 185 | CAMC of 2.01 | CAMC of 2.01 |
| 186 | CAMC of 2.02 | CAMC of 2.02 |
| 187 | CAMC of 2.03 | CAMC of 2.03 |
| 188 | CAMC of 2.04 | CAMC of 2.04 |
| 189 | CAMC of 2.06 | CAMC of 2.06 |
| 190 | CAMC of 3.01 | CAMC of 3.01 |
| 191 | CAMC of 3.02 | CAMC of 3.02 |
| 192 | CAMC of 3.03 | CAMC of 3.03 |
| 193 | CAMC of 3.04 | CAMC of 3.04 |
| 194 | CAMC of 3.05 | CAMC of 3.05 |
| 195 | CAMC of 3.06 | CAMC of 3.06 |
| 196 | CAMC of 3.07 | CAMC of 3.07 |
| 197 | CAMC of 4.01 | CAMC of 4.01 |
| 198 | CAMC of 4.02 | CAMC of 4.02 |
| 199 | CAMC of 4.03 | CAMC of 4.03 |
| 200 | CAMC of 4.04 | CAMC of 4.04 |
| 201 | CAMC of 4.06 | CAMC of 4.06 |
| 202 | Annual L1 Support Services at each airport in lieu of 5.01 | Annual L1 Support Services at each airport in lieu of 5.01 |
| 203 | Annual L1 Support Services at each airport in lieu of 5.02 | Annual L1 Support Services at each airport in lieu of 5.02 |
| 204 | Sub-head 12: AOCC Training & Certification for AAI Officials – Annually or as per AAI Requirement. | Sub-head 12: AOCC Training & Certification for AAI Officials – Annually or as per AAI Requirement. |
| 205 | User Training (5 Days) – Physical Training to be carried out at respective airport’s AOCC premises, including logistical support. | User Training (5 Days) – Physical Training to be carried out at respective airport’s AOCC premises, including logistical support. |
| 206 | Admin Training (5 Days) - Physical Training, Training will be provided by Contractor, including logistical support. | Admin Training (5 Days) - Physical Training, Training will be provided by Contractor, including logistical support. |
| 207 | Business Analytics, Dashboard, Cloud Training & Certification (5 Days) - Physical Training related to technologies deployed and Update/ upgrade(s) in Project scope for AAI officers, including logistical support. | Business Analytics, Dashboard, Cloud Training & Certification (5 Days) - Physical Training related to technologies deployed and Update/ upgrade(s) in Project scope for AAI officers, including logistical support. |
| 208 | Sub-head 13: Video & DC/DR Drills | Sub-head 13: Video & DC/DR Drills |
| 209 | Development of AOCC Video for each AOCC Airport in Hindi, English and Regional Language | Development of AOCC Video for each AOCC Airport in Hindi, English and Regional Language |
| 210 | Conduction of DC/DR Drills (with 2 Days of Operational activity form DR) on Quarterly basis for 7 years post Project Commissioning of First 06 AOCC Airports, including proper integration of Summer/ Winter schedule, as available from time to time. | Conduction of DC/DR Drills (with 2 Days of Operational activity form DR) on Quarterly basis for 7 years post Project Commissioning of First 06 AOCC Airports, including proper integration of Summer/ Winter schedule, as available from time to time. |
| 211 | Change Request | Change Request |
| 212 | Change request for Software Development, Configuration and Integration Effort | Change request for Software Development, Configuration and Integration Effort |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender