Civil Aviation Boards / Undertakings / PSU Closing in 1 days TDR #58101355

Bids Are Invited For Hiring Of Agency For It Projects- Milestone Basis - Provision Of Aocc Central Solution At 15 Airports

Issued by Boards / Undertakings / PSU · Delhi, Delhi
Tender Value
189.40 Crore
Estimated cost
Bid Submission
23 Nov 2026
1 days left
EMD
2.14 Crore
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Available
Quantity
1

Project Description

Bids Are Invited For Hiring Of Agency For It Projects- Milestone Basis - Provision Of Aocc Central Solution At 15 Airports

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 05-Nov-2026 16-Nov-2026
2 16-Nov-2026 23-Nov-2026

BOQ

Sl. No. Item TitleItem Description
1Sub-head 1: Phase 1 (06 Airports) - AOCC Central Application on CloudSub-head 1: Phase 1 (06 Airports) - AOCC Central Application on Cloud
2End-to-End development/ deployment of AOCC Central Application on Cloud (both DC & DR) with AODB for 06 Airports under Phase 1, including customizable operational rules/ rule sets processing and interface for bi-directional data exchange.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 06 Airports.)End-to-End development/ deployment of AOCC Central Application on Cloud (both DC & DR) with AODB for 06 Airports under Phase 1, including customizable operational rules/ rule sets processing and interface for bi-directional data exchange.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 06 Airports.)
3End-to-end development/ deployment of the Multi-Airport Resource Layer (MARL) at cloud to manage individual Airports under Phase 1, including RMS, with allocation, auto-execution & what-if analysis of operational rules and integration with the AOCC Central Application.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 06 Airports.)End-to-end development/ deployment of the Multi-Airport Resource Layer (MARL) at cloud to manage individual Airports under Phase 1, including RMS, with allocation, auto-execution & what-if analysis of operational rules and integration with the AOCC Central Application.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 06 Airports.)
4End-to-end development/ deployment of the Central Dashboard & Reporting layer on cloud to provide a real-time/ near real-time master view of all Airports, including comprehensive data lake, analytics, customizable and downloadable reporting, as per AAI requirement for Phase 1 Airports.This includes 1-year warranty from date of Project Commissioning of Airport.End-to-end development/ deployment of the Central Dashboard & Reporting layer on cloud to provide a real-time/ near real-time master view of all Airports, including comprehensive data lake, analytics, customizable and downloadable reporting, as per AAI requirement for Phase 1 Airports.This includes 1-year warranty from date of Project Commissioning of Airport.
5Provision of Cyber Security of AOCC Central Solution for 24x7 Threat intelligence gathering, monitoring and response, VAPT and Vulnerability resolution for Phase - 1 Airports.This includes 1-year warranty from date of Project Commissioning of Airport.Provision of Cyber Security of AOCC Central Solution for 24x7 Threat intelligence gathering, monitoring and response, VAPT and Vulnerability resolution for Phase - 1 Airports.This includes 1-year warranty from date of Project Commissioning of Airport.
6End-to-end development/ deployment of the Airport level Dashboard & Reporting layer on cloud to provide a real-time/ near real-time individual view of all Airports, including comprehensive data view of respective airports, airport level alerts, analytics, customizable and downloadable reporting, as per AAI requirement for Phase 1 Airports.This includes 1-year warranty from date of Project Commissioning.End-to-end development/ deployment of the Airport level Dashboard & Reporting layer on cloud to provide a real-time/ near real-time individual view of all Airports, including comprehensive data view of respective airports, airport level alerts, analytics, customizable and downloadable reporting, as per AAI requirement for Phase 1 Airports.This includes 1-year warranty from date of Project Commissioning.
7Development/ Deployment of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Central dashboard, as per AAI requirement, deployed for Phase 1 Airports as one Central instance.This includes 1-year warranty from date of Project Commissioning.Development/ Deployment of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Central dashboard, as per AAI requirement, deployed for Phase 1 Airports as one Central instance.This includes 1-year warranty from date of Project Commissioning.
8Development/ Deployment of comprehensive SLA, Network and Ticket/ Service Monitoring Tools and Implementation of 24x7 remote support and Backend Technical Services — L2/L3 Support.This includes 1-year warranty from date of Project Commissioning.Development/ Deployment of comprehensive SLA, Network and Ticket/ Service Monitoring Tools and Implementation of 24x7 remote support and Backend Technical Services — L2/L3 Support.This includes 1-year warranty from date of Project Commissioning.
9Development/ Deployment and Integration of the Central Interface(s) with the AOCC Central Application including converters/wrappers/APIs for continuous data exchange per IATA AIDX format, SOP and ICD, AOCC business process/transition rules, and error & warning handling.This is one-time activity for all applicable airports, irrespective of the AOCC deployment Phase(s). This includes Testing and sign-off.Development/ Deployment and Integration of the Central Interface(s) with the AOCC Central Application including converters/wrappers/APIs for continuous data exchange per IATA AIDX format, SOP and ICD, AOCC business process/transition rules, and error & warning handling.This is one-time activity for all applicable airports, irrespective of the AOCC deployment Phase(s). This includes Testing and sign-off.
10Sub-head 2: Phase 1 (06 Airports) - Enablement of Designated AAI AirportsSub-head 2: Phase 1 (06 Airports) - Enablement of Designated AAI Airports
11Local Airport Core Room Infrastructure setup including Supply, Installation, Testing and Commissioning (SITC) of equipment as per SOW and local cyber security setup.This includes 1-year warranty from date of Project Commissioning.Local Airport Core Room Infrastructure setup including Supply, Installation, Testing and Commissioning (SITC) of equipment as per SOW and local cyber security setup.This includes 1-year warranty from date of Project Commissioning.
12Data Continuity and Local Resiliency through Airport-specific integration of individual Airport level Core Room with Multi-Airport Resource Layer (MARL) at AOCC Central Cloud & RMS, for bi-directional data exchange, including provision of a dedicated dual network link for each airport.This includes 1-year warranty from date of Project Commissioning.Data Continuity and Local Resiliency through Airport-specific integration of individual Airport level Core Room with Multi-Airport Resource Layer (MARL) at AOCC Central Cloud & RMS, for bi-directional data exchange, including provision of a dedicated dual network link for each airport.This includes 1-year warranty from date of Project Commissioning.
13End-to-end development/ deployment of airport-specific converters/wrappers/APIs for continuous data exchange per IATA AIDX format, for Integration of Airport subsystem(s) through Multi-Airport Resource Layer (MARL) with AOCC Central Solution, including SOP and ICD, AOCC business process/transition rules, and error & warning handling.This includes 1-year warranty from date of Project Commissioning.End-to-end development/ deployment of airport-specific converters/wrappers/APIs for continuous data exchange per IATA AIDX format, for Integration of Airport subsystem(s) through Multi-Airport Resource Layer (MARL) with AOCC Central Solution, including SOP and ICD, AOCC business process/transition rules, and error & warning handling.This includes 1-year warranty from date of Project Commissioning.
14Development/ Deployment of Identification & Authorization Module (IAM), having Central-Admin, Airport-Admin and various User roles, along with an integrated audit trail and incident tracking.This includes 1-year warranty from date of Project Commissioning.Development/ Deployment of Identification & Authorization Module (IAM), having Central-Admin, Airport-Admin and various User roles, along with an integrated audit trail and incident tracking.This includes 1-year warranty from date of Project Commissioning.
15End to End Third party Audit of AOCC Central Solution (both Central & at Airport) across Phase 1 (06 Airports) to obtain Project Commissioning.End to End Third party Audit of AOCC Central Solution (both Central & at Airport) across Phase 1 (06 Airports) to obtain Project Commissioning.
16Integration of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Airport level dashboard, as per AAI requirement, deployed as one Airport-specific instance at each of the 06 airports.This includes 1-year warranty from date of Project Commissioning.Integration of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Airport level dashboard, as per AAI requirement, deployed as one Airport-specific instance at each of the 06 airports.This includes 1-year warranty from date of Project Commissioning.
17Data Migration from the existing AOCC system(s) for 06 Airports(s) and integration with the new AOCC — extraction, validation, transformation and loading.Data Migration from the existing AOCC system(s) for 06 Airports(s) and integration with the new AOCC — extraction, validation, transformation and loading.
18Sub-head 3: Phase 2 (09 Airports) - AOCC Central Application on CloudSub-head 3: Phase 2 (09 Airports) - AOCC Central Application on Cloud
19Augmentation/ deployment of AOCC Central Application on Cloud (both DC & DR) with AODB for 09 Airports under Phase 2, including customizable operational rules/ rule sets processing and interface for bi-directional data exchange.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 09 Airports.)Augmentation/ deployment of AOCC Central Application on Cloud (both DC & DR) with AODB for 09 Airports under Phase 2, including customizable operational rules/ rule sets processing and interface for bi-directional data exchange.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 09 Airports.)
20Augmentation / deployment of the Multi-Airport Resource Layer (MARL) at cloud to manage individual Airports under Phase 2, including RMS, with allocation, auto-execution & what-if analysis of operational rules and integration with the AOCC Central Application.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 09 Airports.)Augmentation / deployment of the Multi-Airport Resource Layer (MARL) at cloud to manage individual Airports under Phase 2, including RMS, with allocation, auto-execution & what-if analysis of operational rules and integration with the AOCC Central Application.This includes 1-year warranty from date of Project Commissioning.(NB: Per airport cost shall be derived on Pro-rata basis from this single lot cost of 09 Airports.)
21Augmentation / deployment of the Central Dashboard & Reporting layer on cloud to provide a real-time/ near real-time master view of all Airports, including comprehensive data lake, analytics, customizable and downloadable reporting, as per AAI requirement for Phase-2 Airports.This includes 1-year warranty from date of Project Commissioning.Augmentation / deployment of the Central Dashboard & Reporting layer on cloud to provide a real-time/ near real-time master view of all Airports, including comprehensive data lake, analytics, customizable and downloadable reporting, as per AAI requirement for Phase-2 Airports.This includes 1-year warranty from date of Project Commissioning.
22Augmentation of Cyber Security of AOCC Central Solution for 24x7 Threat intelligence gathering, monitoring and response, VAPT and Vulnerability resolution for Phase-2 Airports.This includes 1-year warranty from date of Project Commissioning.Augmentation of Cyber Security of AOCC Central Solution for 24x7 Threat intelligence gathering, monitoring and response, VAPT and Vulnerability resolution for Phase-2 Airports.This includes 1-year warranty from date of Project Commissioning.
23Augmentation / deployment of the Airport level Dashboard & Reporting layer on cloud to provide a real-time/ near real-time individual view of all Airports, including comprehensive data view of respective airports, airport level alerts, analytics, customizable and downloadable reporting, as per AAI requirement for Phase-2 Airports. This includes 1-year warranty from date of Project Commissioning.Augmentation / deployment of the Airport level Dashboard & Reporting layer on cloud to provide a real-time/ near real-time individual view of all Airports, including comprehensive data view of respective airports, airport level alerts, analytics, customizable and downloadable reporting, as per AAI requirement for Phase-2 Airports. This includes 1-year warranty from date of Project Commissioning.
24Augmentation of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Central dashboard, as per AAI requirement, deployed for Phase-2 Airports on existing Central instance.This includes 1-year warranty from date of Project Commissioning.Augmentation of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Central dashboard, as per AAI requirement, deployed for Phase-2 Airports on existing Central instance.This includes 1-year warranty from date of Project Commissioning.
25Augmentation/ Deployment of comprehensive SLA, Network and Ticket/ Service Monitoring Tools and Implementation of 24x7 remote support and Backend Technical Services — L2/L3 Support.This includes 1-year warranty from date of Project Commissioning.Augmentation/ Deployment of comprehensive SLA, Network and Ticket/ Service Monitoring Tools and Implementation of 24x7 remote support and Backend Technical Services — L2/L3 Support.This includes 1-year warranty from date of Project Commissioning.
26Sub-head 4: Phase 2 (09 Airports) - Enablement of Designated AAI AirportsSub-head 4: Phase 2 (09 Airports) - Enablement of Designated AAI Airports
27Local Airport Core Room Infrastructure setup including Supply, Installation, Testing and Commissioning (SITC) of equipment as per SOW and local cyber security setup.This includes 1-year warranty from date of Project Commissioning.Local Airport Core Room Infrastructure setup including Supply, Installation, Testing and Commissioning (SITC) of equipment as per SOW and local cyber security setup.This includes 1-year warranty from date of Project Commissioning.
28Data Continuity and Local Resiliency through Airport-specific integration of individual Airport level Core Room with Multi-Airport Resource Layer (MARL) at AOCC Central Cloud & RMS, for bi-directional data exchange, including provision of a dedicated dual network link for each airport.This includes 1-year warranty from date of Project Commissioning.Data Continuity and Local Resiliency through Airport-specific integration of individual Airport level Core Room with Multi-Airport Resource Layer (MARL) at AOCC Central Cloud & RMS, for bi-directional data exchange, including provision of a dedicated dual network link for each airport.This includes 1-year warranty from date of Project Commissioning.
29Configuration/ deployment of airport-specific converters/wrappers/APIs for continuous data exchange per IATA AIDX format, for Integration of Airport subsystem(s) through Multi-Airport Resource Layer (MARL) with AOCC Central Solution, including SOP and ICD, AOCC business process/transition rules, and error & warning handling.This includes 1-year warranty from date of Project Commissioning.Configuration/ deployment of airport-specific converters/wrappers/APIs for continuous data exchange per IATA AIDX format, for Integration of Airport subsystem(s) through Multi-Airport Resource Layer (MARL) with AOCC Central Solution, including SOP and ICD, AOCC business process/transition rules, and error & warning handling.This includes 1-year warranty from date of Project Commissioning.
30Augmentation/ Deployment of Identification & Authorization Module (IAM), having Central-Admin, Airport-Admin and various User roles, along with an integrated audit trail and incident tracking.This includes 1-year warranty from date of Project Commissioning.Augmentation/ Deployment of Identification & Authorization Module (IAM), having Central-Admin, Airport-Admin and various User roles, along with an integrated audit trail and incident tracking.This includes 1-year warranty from date of Project Commissioning.
31End to End Third party Audit of AOCC Central Solution (both Central & at Airport) across Phase 2 (09 Airports) to obtain Project Commissioning.End to End Third party Audit of AOCC Central Solution (both Central & at Airport) across Phase 2 (09 Airports) to obtain Project Commissioning.
32Integration of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Airport level dashboard, as per AAI requirement, deployed as one Airport-specific instance at each of the 09 airports.Integration of AI/ML Predictive Analytics Engine including planning, forecasting, proactive identification of potential problems, cross verification of operational rules & data, and automated recommendations for optimized resource allocation and integration with Airport level dashboard, as per AAI requirement, deployed as one Airport-specific instance at each of the 09 airports.
33Sub-head 5: (1-year Warranty Period Post Project Commissioning) – L1 Support ServicesSub-head 5: (1-year Warranty Period Post Project Commissioning) – L1 Support Services
34Phase 1: On-Premise/ Physical presence of L1 support service 24x7, at each airport to manage Airport Level Network, on-premise Hardware cleaning and maintenance, raising ticket for OEM support and other assigned operational activity, post Project Commissioning.Phase 1: On-Premise/ Physical presence of L1 support service 24x7, at each airport to manage Airport Level Network, on-premise Hardware cleaning and maintenance, raising ticket for OEM support and other assigned operational activity, post Project Commissioning.
35Phase 2: On-Premise/ Physical presence of L1 support service 24x7, at each airport to manage Airport Level Network, on-premise Hardware cleaning and maintenance, raising ticket for OEM support and other assigned operational activity, post Project Commissioning.Phase 2: On-Premise/ Physical presence of L1 support service 24x7, at each airport to manage Airport Level Network, on-premise Hardware cleaning and maintenance, raising ticket for OEM support and other assigned operational activity, post Project Commissioning.
36Sub-head 6: 1st Year of CAMC post warrantySub-head 6: 1st Year of CAMC post warranty
37CAMC of 1.01CAMC of 1.01
38CAMC of 1.02CAMC of 1.02
39CAMC of 1.03CAMC of 1.03
40CAMC of 1.04CAMC of 1.04
41CAMC of 1.05CAMC of 1.05
42CAMC of 1.06CAMC of 1.06
43CAMC of 1.07CAMC of 1.07
44CAMC of 1.08CAMC of 1.08
45CAMC of 2.01CAMC of 2.01
46CAMC of 2.02CAMC of 2.02
47CAMC of 2.03CAMC of 2.03
48CAMC of 2.04CAMC of 2.04
49CAMC of 2.06CAMC of 2.06
50CAMC of 3.01CAMC of 3.01
51CAMC of 3.02CAMC of 3.02
52CAMC of 3.03CAMC of 3.03
53CAMC of 3.04CAMC of 3.04
54CAMC of 3.05CAMC of 3.05
55CAMC of 3.06CAMC of 3.06
56CAMC of 3.07CAMC of 3.07
57CAMC of 4.01CAMC of 4.01
58CAMC of 4.02CAMC of 4.02
59CAMC of 4.03CAMC of 4.03
60CAMC of 4.04CAMC of 4.04
61CAMC of 4.06CAMC of 4.06
62Annual L1 Support Services at each airport in lieu of 5.01Annual L1 Support Services at each airport in lieu of 5.01
63Annual L1 Support Services at each airport in lieu of 5.02Annual L1 Support Services at each airport in lieu of 5.02
64Sub-head 7: 2nd Year of CAMC post warrantySub-head 7: 2nd Year of CAMC post warranty
65CAMC of 1.01CAMC of 1.01
66CAMC of 1.02CAMC of 1.02
67CAMC of 1.03CAMC of 1.03
68CAMC of 1.04CAMC of 1.04
69CAMC of 1.05CAMC of 1.05
70CAMC of 1.06CAMC of 1.06
71CAMC of 1.07CAMC of 1.07
72CAMC of 1.08CAMC of 1.08
73CAMC of 2.01CAMC of 2.01
74CAMC of 2.02CAMC of 2.02
75CAMC of 2.03CAMC of 2.03
76CAMC of 2.04CAMC of 2.04
77CAMC of 2.06CAMC of 2.06
78CAMC of 3.01CAMC of 3.01
79CAMC of 3.02CAMC of 3.02
80CAMC of 3.03CAMC of 3.03
81CAMC of 3.04CAMC of 3.04
82CAMC of 3.05CAMC of 3.05
83CAMC of 3.06CAMC of 3.06
84CAMC of 3.07CAMC of 3.07
85CAMC of 4.01CAMC of 4.01
86CAMC of 4.02CAMC of 4.02
87CAMC of 4.03CAMC of 4.03
88CAMC of 4.04CAMC of 4.04
89CAMC of 4.06CAMC of 4.06
90Annual L1 Support Services at each airport in lieu of 5.01Annual L1 Support Services at each airport in lieu of 5.01
91Annual L1 Support Services at each airport in lieu of 5.02Annual L1 Support Services at each airport in lieu of 5.02
92Sub-head 8: 3rd Year of CAMC post warrantySub-head 8: 3rd Year of CAMC post warranty
93CAMC of 1.01CAMC of 1.01
94CAMC of 1.02CAMC of 1.02
95CAMC of 1.03CAMC of 1.03
96CAMC of 1.04CAMC of 1.04
97CAMC of 1.05CAMC of 1.05
98CAMC of 1.06CAMC of 1.06
99CAMC of 1.07CAMC of 1.07
100CAMC of 1.08CAMC of 1.08
101CAMC of 2.01CAMC of 2.01
102CAMC of 2.02CAMC of 2.02
103CAMC of 2.03CAMC of 2.03
104CAMC of 2.04CAMC of 2.04
105CAMC of 2.06CAMC of 2.06
106CAMC of 3.01CAMC of 3.01
107CAMC of 3.02CAMC of 3.02
108CAMC of 3.03CAMC of 3.03
109CAMC of 3.04CAMC of 3.04
110CAMC of 3.05CAMC of 3.05
111CAMC of 3.06CAMC of 3.06
112CAMC of 3.07CAMC of 3.07
113CAMC of 4.01CAMC of 4.01
114CAMC of 4.02CAMC of 4.02
115CAMC of 4.03CAMC of 4.03
116CAMC of 4.04CAMC of 4.04
117CAMC of 4.06CAMC of 4.06
118Annual L1 Support Services at each airport in lieu of 5.01Annual L1 Support Services at each airport in lieu of 5.01
119Annual L1 Support Services at each airport in lieu of 5.02Annual L1 Support Services at each airport in lieu of 5.02
120Sub-head 9: 4th Year of CAMC post warrantySub-head 9: 4th Year of CAMC post warranty
121CAMC of 1.01CAMC of 1.01
122CAMC of 1.02CAMC of 1.02
123CAMC of 1.03CAMC of 1.03
124CAMC of 1.04CAMC of 1.04
125CAMC of 1.05CAMC of 1.05
126CAMC of 1.06CAMC of 1.06
127CAMC of 1.07CAMC of 1.07
128CAMC of 1.08CAMC of 1.08
129CAMC of 2.01CAMC of 2.01
130CAMC of 2.02CAMC of 2.02
131CAMC of 2.03CAMC of 2.03
132CAMC of 2.04CAMC of 2.04
133CAMC of 2.06CAMC of 2.06
134CAMC of 3.01CAMC of 3.01
135CAMC of 3.02CAMC of 3.02
136CAMC of 3.03CAMC of 3.03
137CAMC of 3.04CAMC of 3.04
138CAMC of 3.05CAMC of 3.05
139CAMC of 3.06CAMC of 3.06
140CAMC of 3.07CAMC of 3.07
141CAMC of 4.01CAMC of 4.01
142CAMC of 4.02CAMC of 4.02
143CAMC of 4.03CAMC of 4.03
144CAMC of 4.04CAMC of 4.04
145CAMC of 4.06CAMC of 4.06
146Annual L1 Support Services at each airport in lieu of 5.01Annual L1 Support Services at each airport in lieu of 5.01
147Annual L1 Support Services at each airport in lieu of 5.02Annual L1 Support Services at each airport in lieu of 5.02
148Sub-head 10: 5th Year of CAMC post warrantySub-head 10: 5th Year of CAMC post warranty
149CAMC of 1.01CAMC of 1.01
150CAMC of 1.02CAMC of 1.02
151CAMC of 1.03CAMC of 1.03
152CAMC of 1.04CAMC of 1.04
153CAMC of 1.05CAMC of 1.05
154CAMC of 1.06CAMC of 1.06
155CAMC of 1.07CAMC of 1.07
156CAMC of 1.08CAMC of 1.08
157CAMC of 2.01CAMC of 2.01
158CAMC of 2.02CAMC of 2.02
159CAMC of 2.03CAMC of 2.03
160CAMC of 2.04CAMC of 2.04
161CAMC of 2.06CAMC of 2.06
162CAMC of 3.01CAMC of 3.01
163CAMC of 3.02CAMC of 3.02
164CAMC of 3.03CAMC of 3.03
165CAMC of 3.04CAMC of 3.04
166CAMC of 3.05CAMC of 3.05
167CAMC of 3.06CAMC of 3.06
168CAMC of 3.07CAMC of 3.07
169CAMC of 4.01CAMC of 4.01
170CAMC of 4.02CAMC of 4.02
171CAMC of 4.03CAMC of 4.03
172CAMC of 4.04CAMC of 4.04
173CAMC of 4.06CAMC of 4.06
174Annual L1 Support Services at each airport in lieu of 5.01Annual L1 Support Services at each airport in lieu of 5.01
175Annual L1 Support Services at each airport in lieu of 5.02Annual L1 Support Services at each airport in lieu of 5.02
176Sub-head 11: 6th Year of CAMC post warrantySub-head 11: 6th Year of CAMC post warranty
177CAMC of 1.01CAMC of 1.01
178CAMC of 1.02CAMC of 1.02
179CAMC of 1.03CAMC of 1.03
180CAMC of 1.04CAMC of 1.04
181CAMC of 1.05CAMC of 1.05
182CAMC of 1.06CAMC of 1.06
183CAMC of 1.07CAMC of 1.07
184CAMC of 1.08CAMC of 1.08
185CAMC of 2.01CAMC of 2.01
186CAMC of 2.02CAMC of 2.02
187CAMC of 2.03CAMC of 2.03
188CAMC of 2.04CAMC of 2.04
189CAMC of 2.06CAMC of 2.06
190CAMC of 3.01CAMC of 3.01
191CAMC of 3.02CAMC of 3.02
192CAMC of 3.03CAMC of 3.03
193CAMC of 3.04CAMC of 3.04
194CAMC of 3.05CAMC of 3.05
195CAMC of 3.06CAMC of 3.06
196CAMC of 3.07CAMC of 3.07
197CAMC of 4.01CAMC of 4.01
198CAMC of 4.02CAMC of 4.02
199CAMC of 4.03CAMC of 4.03
200CAMC of 4.04CAMC of 4.04
201CAMC of 4.06CAMC of 4.06
202Annual L1 Support Services at each airport in lieu of 5.01Annual L1 Support Services at each airport in lieu of 5.01
203Annual L1 Support Services at each airport in lieu of 5.02Annual L1 Support Services at each airport in lieu of 5.02
204Sub-head 12: AOCC Training & Certification for AAI Officials – Annually or as per AAI Requirement.Sub-head 12: AOCC Training & Certification for AAI Officials – Annually or as per AAI Requirement.
205User Training (5 Days) – Physical Training to be carried out at respective airport’s AOCC premises, including logistical support.User Training (5 Days) – Physical Training to be carried out at respective airport’s AOCC premises, including logistical support.
206Admin Training (5 Days) - Physical Training, Training will be provided by Contractor, including logistical support.Admin Training (5 Days) - Physical Training, Training will be provided by Contractor, including logistical support.
207Business Analytics, Dashboard, Cloud Training & Certification (5 Days) - Physical Training related to technologies deployed and Update/ upgrade(s) in Project scope for AAI officers, including logistical support.Business Analytics, Dashboard, Cloud Training & Certification (5 Days) - Physical Training related to technologies deployed and Update/ upgrade(s) in Project scope for AAI officers, including logistical support.
208Sub-head 13: Video & DC/DR DrillsSub-head 13: Video & DC/DR Drills
209Development of AOCC Video for each AOCC Airport in Hindi, English and Regional LanguageDevelopment of AOCC Video for each AOCC Airport in Hindi, English and Regional Language
210Conduction of DC/DR Drills (with 2 Days of Operational activity form DR) on Quarterly basis for 7 years post Project Commissioning of First 06 AOCC Airports, including proper integration of Summer/ Winter schedule, as available from time to time.Conduction of DC/DR Drills (with 2 Days of Operational activity form DR) on Quarterly basis for 7 years post Project Commissioning of First 06 AOCC Airports, including proper integration of Summer/ Winter schedule, as available from time to time.
211Change RequestChange Request
212Change request for Software Development, Configuration and Integration EffortChange request for Software Development, Configuration and Integration Effort

AI Tender Summary

OUR REF NO 58101355
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 189.40 Crore
LAST DATE 23-11-2026
Authority
Authority Name Airports Authority Of India
Work Description Bids Are Invited For Hiring Of Agency For It Projects- Milestone Basis - Provision Of Aocc Central Solution At 15 Airports
Basic Detail
Tender No GEM/2026/B/8161724
Bidding Type Tender
Location
City Delhi
State Delhi
Key Dates
Publish Date 16 Nov 2026
Submission Date 23 Nov 2026
Open Date 24 Nov 2026
Finance
Tender Value 189.40 Crore
Tender Fee Ref. Documents
EMD 2.14 Crore
Exemption Available
Document List
5183cdec-2a7e-44c4-85b1-7c32aa9407e1.pdf
1792059910.xlsx
1792060014.pdf
1792060026.pdf
1792060034.pdf
SLA_93a82a91-c05d-4f41-b7af1792045344631_JE_IT1.pdf
ATC_V3_512f64d4-6ed0-444a-b6801792060124072_JE_IT1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 16, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 16, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 23, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 1 day
Nov 23, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 1 day
Nov 24, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
pdf

5183cdec-2a7e-44c4-85b1-7c32aa9407e1.pdf

xlsx

1792059910.xlsx

pdf

1792060014.pdf

pdf

1792060026.pdf

pdf

1792060034.pdf

pdf

SLA_93a82a91-c05d-4f41-b7af1792045344631_JE_IT1.pdf

pdf

ATC_V3_512f64d4-6ed0-444a-b6801792060124072_JE_IT1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender