Power Government Departments Closing in 16 days TDR #58092739

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - The Work Construction Of 11 Kv Lt Line And Other Associate Work Under Full Deposite Scheme At Various Place In Edd Sadabad Hathras; Electrical Syste

Issued by Government Departments · Hathras, Uttar Pradesh
Tender Value
20 Lakhs
Estimated cost
Bid Submission
02 Nov 2026
16 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Hathras → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - The Work Construction Of 11 Kv Lt Line And Other Associate Work Under Full Deposite Scheme At Various Place In Edd Sadabad Hathras; Electrical System Or Installation; Na - Safe Carriage Of Following Material From Electricty Store Center Hts To Pit Site Of Work Through The Kacha And Pakka Road Including Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Etc. Which Required For Proper Completion Of Work.(Distance 00-50 Kms.) , 8.5/9 Mtr. Long Pcc Poles. , 11 Mtr. Long Pcc Poles. , 9/11 Mtr. S.T. Poles , Acsr Weasel Conductor , Acsr Dog Conductor , Earthing Complete , Stay Set Complete , Teoff Channel , 33/11 Kv Pin Insulator With Pin , Disc Insulator With Disc Fitting , F Bracket , 11 Kv X-Arm , 16/25/50/95/120 Sqmm. Ab Cable , Eye Hook , Suspension Cl , Ms Angle , Top Channel , Diff Type Cl S (Cross Arm/Holding/D.P./Stay Cl / Dist. Box Cl ) , Dropper Channel , Dead End Cl , Distribution Box , Guarding Angle With Cl , G.I Wire 6/8/10 Swg , 11 Kv Xlpe Cable , 10 Kva Tf, 16 Kva Tf, 25 Kva T/F, 63 Kva T/F, 100 Kva T/F , Errection Of Following Poles Including Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit & Complete H.T./L.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Pcc Poles 8.5/9/11 Mtr. , Pcc Poles 11 Mtr. , Stp 9.0/11 Mtr. , Fixing Of Following Material As Per Respo Manual , Earthing Complete , Stay Set Complete , Teoff Channel , 33/11 Kv Pin Insulator With Pin , Disc Insulator With Disc Fitting , F Bracket , 11 Kv X-Arm , Eye Hook , Suspension Cl , Ms Angle , Top Channel , Diff Type Cl S (Cross Arm/Holding/D.P./Stay Cl / Dist. Box Cl ) , Dropper Channel , Dead End Cl , Distribution Box , Guarding Angle With Cl , Errection And Grouting Of Stays As Per Respo Norms And As Per Direction Of Supervising Engineer. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Rod As Per Respo Norms And As Per Direction Of Supervising Engineer. , Shifting Of Distribution T/Fs From Site To Another Site And Safe Installation Of Following New/Repaired Cousted T/F On Newly Constructed Double Pole In Proper Alignment Direction & Making All Ht/Lt Connection. , 10 Kva Tf, 16 Kva Tf, 25 Kva T/F, 63 Kva T/F, 100 Kva T/F , Laying, Sagging And Stringing And Jumpering / Binding Etc. Of New & Old Acsr Weasal Conductor / Gi In 11 Kv / Lt Lines As Per Respo Manual And As Per Direction Of Supervising Engineer. , Acsr Weasal Conductor , Acsr Dog Conductor , 16/25/50/95/120 Sqmm. Ab Cable , Xlpe Cable , Providing & Fixing Of Following Material , Nut,Bolt & Washer , Cable Jointing Kit , Cutting, Chopping, Triming Of Tree Branches To Clear The Line Route To Give 2 Mtr. Horizontal And Vertical Clearance To The Line Coming In The Route Of Different Feeders As Per Direction Of Supervising Engineer , Guarding/Reguarding Of 11 Kv Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parallel Gi Wire 6 Swg After Providing, Fabrication And Fixing Of Guarding Angle And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. , Installation Of Extra T On The Erected Poles Wherever Required Alongwith All Fitting As Per Direction Of Supervising Engineer Including The Cost Of Labour, T&P Etc, Required For Proper Completion Of Work. The T Pole Shall Be Grouted With Cement, Sand And Brick Ballast/Stone Ballast In Ratio 1:4:8 Including The Cost Of Material. , Dismentlling And Removal Of Existing Line From The Various Area , Dismentlling Of Pole Stp/Pcc , Back Cartage , Acsr Weasel Conductor Scrap , Iron Scrap

BOQ

Sl. No. Item TitleItem Description
1Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)
28.5/9 Mtr. long PCC Poles.8.5/9 Mtr. long PCC Poles.
311 Mtr. long PCC Poles.11 Mtr. long PCC Poles.
49/11 Mtr. S.T. Poles9/11 Mtr. S.T. Poles
5ACSR Weasel conductorACSR Weasel conductor
6ACSR Dog conductorACSR Dog conductor
7Earthing CompleteEarthing Complete
8Stay Set CompleteStay Set Complete
9Teoff ChannelTeoff Channel
1033/11 KV Pin Insulator with Pin33/11 KV Pin Insulator with Pin
11Disc Insulator with Disc FittingDisc Insulator with Disc Fitting
12F BracketF Bracket
1311 KV X-Arm11 KV X-Arm
1416/25/50/95/120 sqmm. AB Cable16/25/50/95/120 sqmm. AB Cable
15Eye HookEye Hook
16Suspension ClampSuspension Clamp
17MS AngleMS Angle
18Top ChannelTop Channel
19Diff Type Clamps (Cross Arm/Holding/D.P./Stay Clamp/ Dist. Box Clamp)Diff Type Clamps (Cross Arm/Holding/D.P./Stay Clamp/ Dist. Box Clamp)
20Dropper ChannelDropper Channel
21Dead End ClampDead End Clamp
22Distribution BoxDistribution Box
23Guarding Angle with ClampGuarding Angle with Clamp
24G.I Wire 6/8/10 SWGG.I Wire 6/8/10 SWG
2511 KV XLPE cable11 KV XLPE cable
2610 KVA TF, 16 KVA TF, 25 KVA T/F, 63 KVA T/F, 100 KVA T/F10 KVA TF, 16 KVA TF, 25 KVA T/F, 63 KVA T/F, 100 KVA T/F
27Errection of following Poles including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Errection of following Poles including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
28PCC poles 8.5/9/11 Mtr.PCC poles 8.5/9/11 Mtr.
29PCC poles 11 Mtr.PCC poles 11 Mtr.
30STP 9.0/11 Mtr.STP 9.0/11 Mtr.
31Fixing of following Material as per RESPO manualFixing of following Material as per RESPO manual
32Earthing CompleteEarthing Complete
33Stay Set CompleteStay Set Complete
34Teoff ChannelTeoff Channel
3533/11 KV Pin Insulator with Pin33/11 KV Pin Insulator with Pin
36Disc Insulator with Disc FittingDisc Insulator with Disc Fitting
37F BracketF Bracket
3811 KV X-Arm11 KV X-Arm
39Eye HookEye Hook
40Suspension ClampSuspension Clamp
41MS AngleMS Angle
42Top ChannelTop Channel
43Diff Type Clamps (Cross Arm/Holding/D.P./Stay Clamp/ Dist. Box Clamp)Diff Type Clamps (Cross Arm/Holding/D.P./Stay Clamp/ Dist. Box Clamp)
44Dropper ChannelDropper Channel
45Dead End ClampDead End Clamp
46Distribution BoxDistribution Box
47Guarding Angle with ClampGuarding Angle with Clamp
48Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
49Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
50Shifting of Distribution T/Fs from site to another site and Safe Installation of following New/Repaired cousted T/F on newly constructed double pole in proper alignment direction & making all HT/LT connection.Shifting of Distribution T/Fs from site to another site and Safe Installation of following New/Repaired cousted T/F on newly constructed double pole in proper alignment direction & making all HT/LT connection.
5110 KVA TF, 16 KVA TF, 25 KVA T/F, 63 KVA T/F, 100 KVA T/F10 KVA TF, 16 KVA TF, 25 KVA T/F, 63 KVA T/F, 100 KVA T/F
52Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
53ACSR Weasal conductorACSR Weasal conductor
54ACSR Dog conductorACSR Dog conductor
5516/25/50/95/120 sqmm. AB Cable16/25/50/95/120 sqmm. AB Cable
56XLPE CableXLPE Cable
57Providing & Fixing of Following MaterialProviding & Fixing of Following Material
58Nut,bolt & WasherNut,bolt & Washer
59Cable Jointing KitCable Jointing Kit
60Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineerCutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
61Guarding/Reguarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.Guarding/Reguarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.
62Installation of extra ''T'' on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc, required for proper completion of work. The \\"T\\" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material.Installation of extra ''T'' on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc, required for proper completion of work. The \\"T\\" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material.
63Dismentlling and removal of existing Line from the various areaDismentlling and removal of existing Line from the various area
64Dismentlling Of Pole STP/PCCDismentlling Of Pole STP/PCC
65Back CartageBack Cartage
66ACSR Weasel Conductor ScrapACSR Weasel Conductor Scrap
67Iron ScrapIron Scrap

AI Tender Summary

OUR REF NO 58092739
AUTHORITY Government Departments
TENDER VALUE 20 Lakhs
LAST DATE 02-11-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - The Work Construction Of 11 Kv Lt Line And Other Associate Work Under Full Deposite Scheme At Various Place In Edd Sadabad Hathras; Electrical System Or Installation; Na - Safe Carriage Of Following Material From Electricty Store Center Hts To Pit Site Of Work Through The Kacha And Pakka Road Including Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Etc. Which Required For Proper Completion Of Work.(Distance 00-50 Kms.) , 8.5/9 Mtr. Long Pcc Poles. , 11 Mtr. Long Pcc Poles. , 9/11 Mtr. S.T. Poles , Acsr Weasel Conductor , Acsr Dog Conductor , Earthing Complete , Stay Set Complete , Teoff Channel , 33/11 Kv Pin Insulator With Pin , Disc Insulator With Disc Fitting , F Bracket , 11 Kv X-Arm , 16/25/50/95/120 Sqmm. Ab Cable , Eye Hook , Suspension Cl , Ms Angle , Top Channel , Diff Type Cl S (Cross Arm/Holding/D.P./Stay Cl / Dist. Box Cl ) , Dropper Channel , Dead End Cl , Distribution Box , Guarding Angle With Cl , G.I Wire 6/8/10 Swg , 11 Kv Xlpe Cable , 10 Kva Tf, 16 Kva Tf, 25 Kva T/F, 63 Kva T/F, 100 Kva T/F , Errection Of Following Poles Including Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit & Complete H.T./L.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Pcc Poles 8.5/9/11 Mtr. , Pcc Poles 11 Mtr. , Stp 9.0/11 Mtr. , Fixing Of Following Material As Per Respo Manual , Earthing Complete , Stay Set Complete , Teoff Channel , 33/11 Kv Pin Insulator With Pin , Disc Insulator With Disc Fitting , F Bracket , 11 Kv X-Arm , Eye Hook , Suspension Cl , Ms Angle , Top Channel , Diff Type Cl S (Cross Arm/Holding/D.P./Stay Cl / Dist. Box Cl ) , Dropper Channel , Dead End Cl , Distribution Box , Guarding Angle With Cl , Errection And Grouting Of Stays As Per Respo Norms And As Per Direction Of Supervising Engineer. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Rod As Per Respo Norms And As Per Direction Of Supervising Engineer. , Shifting Of Distribution T/Fs From Site To Another Site And Safe Installation Of Following New/Repaired Cousted T/F On Newly Constructed Double Pole In Proper Alignment Direction & Making All Ht/Lt Connection. , 10 Kva Tf, 16 Kva Tf, 25 Kva T/F, 63 Kva T/F, 100 Kva T/F , Laying, Sagging And Stringing And Jumpering / Binding Etc. Of New & Old Acsr Weasal Conductor / Gi In 11 Kv / Lt Lines As Per Respo Manual And As Per Direction Of Supervising Engineer. , Acsr Weasal Conductor , Acsr Dog Conductor , 16/25/50/95/120 Sqmm. Ab Cable , Xlpe Cable , Providing & Fixing Of Following Material , Nut,Bolt & Washer , Cable Jointing Kit , Cutting, Chopping, Triming Of Tree Branches To Clear The Line Route To Give 2 Mtr. Horizontal And Vertical Clearance To The Line Coming In The Route Of Different Feeders As Per Direction Of Supervising Engineer , Guarding/Reguarding Of 11 Kv Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parallel Gi Wire 6 Swg After Providing, Fabrication And Fixing Of Guarding Angle And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. , Installation Of Extra T On The Erected Poles Wherever Required Alongwith All Fitting As Per Direction Of Supervising Engineer Including The Cost Of Labour, T&P Etc, Required For Proper Completion Of Work. The T Pole Shall Be Grouted With Cement, Sand And Brick Ballast/Stone Ballast In Ratio 1:4:8 Including The Cost Of Material. , Dismentlling And Removal Of Existing Line From The Various Area , Dismentlling Of Pole Stp/Pcc , Back Cartage , Acsr Weasel Conductor Scrap , Iron Scrap
Basic Detail
Tender No GEM/2026/B/8111559
Bidding Type Tender
Location
City Hathras
State Uttar Pradesh
Key Dates
Publish Date 16 Oct 2026
Submission Date 02 Nov 2026
Open Date 03 Nov 2026
Finance
Tender Value 20 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
5651a569-c62a-4b5a-9fff-fcc4c08f03d3.pdf
1791031115.xlsx
1792156765.pdf
1792156780.pdf
ATC54PDF_72cf4985-6115-4453-bbcf1792156895308_EDCHATHRASBUYER.pdf
ATC54PDF_d1d0b06c-e9a0-4023-829a1792156908533_EDCHATHRASBUYER.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 16, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 02, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 16 days
Nov 03, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 17 days

Tender Documents

Download All (ZIP) ↓
pdf

5651a569-c62a-4b5a-9fff-fcc4c08f03d3.pdf

xlsx

1791031115.xlsx

pdf

1792156765.pdf

pdf

1792156780.pdf

pdf

ATC54PDF_72cf4985-6115-4453-bbcf1792156895308_EDCHATHRASBUYER.pdf

pdf

ATC54PDF_d1d0b06c-e9a0-4023-829a1792156908533_EDCHATHRASBUYER.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender