Tender For Shifting Of Eb Poles For The Formation Of Road From Madurai Ring Road (Near Viraganoor) To Old Thondi Road (Near Sakkudi) Km 0/0 - 8/061 Leading To Sivagangai
Tender Value
77.35 Lakhs
Estimated cost
Bid Submission
04 Nov 2026
6 days left
EMD
50000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Madurai → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Shifting Of Eb Poles For The Formation Of Road From Madurai Ring Road (Near Viraganoor) To Old Thondi Road (Near Sakkudi) Km 0/0 - 8/061 Leading To Sivagangai
BOQ
| Sl. No. | Item Description |
| 1 | Electrical Work |
| 2 | Shifting of EB Poles at Km 0/000 - 0/200 (LHS & RHS) of Madurai Ring Road (Near Viraganoor) to Old Thondi Road (Near Sakkudi)(Supplying and fixing of HT/LT POLES & LINES ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., As per EB Sanction No:1) CE/D/MDU/14.696/C/012/2026-27/ Dt.02.07.2026 ) |
| 3 | Mini Tower |
| 4 | RSJ 42`Fabricated Pole |
| 5 | Joist Rs 250x125 mm 42' Length 470 kg x Rs.64.00 |
| 6 | Base Plate |
| 7 | Tapping Channel Cross Arm 11kv |
| 8 | V Cross Arm 4.5' |
| 9 | Guarding X Arm |
| 10 | LT 3 ph Angle Cross arm |
| 11 | HT TI Fitting |
| 12 | Back Clamp SPL for RSJ Pole |
| 13 | Stay Clamp Ord RSJ Pole |
| 14 | Insulator 11kv Polymer Composite Disc(W)Mp (117.03 +208) |
| 15 | Insulator 11kv Polymer Composite Pin Typ |
| 16 | Insulator LT shackle (w) Mp (19.00+48.07) |
| 17 | LT GI Pin(W) Insulator (41.50+21.14) |
| 18 | Aluminium Knob |
| 19 | Stay Set Complete |
| 20 | Guy Insulator LT |
| 21 | Guarding Arrangements |
| 22 | Pole concreting |
| 23 | Pole Earthing |
| 24 | M.S.Bolt & Nuts |
| 25 | AAAC 7/2.50 mm Conductor |
| 26 | AAAC 7/3.15 mm Conductor |
| 27 | AAAC 7/4.09 mm Conductor |
| 28 | Storage charges 3% of Cost of the Materials Suppplied at Site |
| 29 | Labours and Transport Charges 15% |
| 30 | Shifting of 1 Ph Service connections |
| 31 | Shifting of 3 Ph Service connections |
| 32 | Transport Charges Part - D of Credit estimate |
| 33 | Shifting of EB Poles at Km 0/000 - 0/200 (LHS & RHS) of Madurai Ring Road (Near Viraganoor) to Old Thondi Road (Near Sakkudi)Supplying and fixing of DT STRUCTURE ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., As per EB Sanction No: 1) CE/D/MDU/14.696/C/ 012/2026-27/Dt.02.07.2026 |
| 34 | Joist Rs.250x125 mm 42'Length 500 kg xRs.64.00 |
| 35 | BASE PLATE |
| 36 | 11 Kv AB Switch with PT Insulators |
| 37 | 11 Kv H.G.Fuse set |
| 38 | Tr. Struc.materials 10 ft centre including struc. Clamps (5693.65+5358.35) |
| 39 | LT LAS |
| 40 | LT Open type fuse unit |
| 41 | LT Fixed capacitor 2X9 KVAR |
| 42 | 11 KV LAS |
| 43 | Centre Support RSJ 12 Pole 135*64 |
| 44 | Stay Set Complete with HT guy (1844+100.06) |
| 45 | Jumpering materials(25sq MM single core PVC Cable 25 Mts, 240 sqmm lug 30 nos). (22*25)+(22*30) |
| 46 | ACSR 7/4.09 sqmm Conductor |
| 47 | M.S. Bolt & Nuts |
| 48 | Structure Earthing with G.I.Pipe 40 MM dia 10', 3 nos, MS Flat 50x6MM - 5 KG, Bolt & Nut (11x5/8\\")6KG, GI No.8 SWG wire 35 kg )(970X3)(66X5)+(120.36X6)+(69X35) |
| 49 | Concreting per Structure (cement 1/2 Bag, River, Sand, Blue metal) (348/2+536+516)X2 |
| 50 | Storage charges 3% of Cost of the Materials Suppplied at Site |
| 51 | Labours and Transport Charges 15% |
| 52 | Labour &Transport Charges Part - A of Credit estimate |
| 53 | Transport Charges Part - D of Credit estimate |
| 54 | Shifting of EB Poles at Km 1/400 (LHS & RHS) of Madurai Ring Road (Near Viraganoor) to Old Thondi Road (Near Sakkudi)Supplying and fixing of HT/LT POLES & LINES ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., As per EB Sanction No: 2) CE/D/MDU/14.696/C/ 016/2026-27/Dt.16.07.2026 |
| 55 | Mini Tower |
| 56 | Tapping Channel Cross Arm 11kv |
| 57 | Insulator 11kv Polymer Composite Disc(W)Mp (194.89 +117.03) |
| 58 | Insulator 11kv Polymer Composite Pin Typ |
| 59 | Guarding Arrangements |
| 60 | M.S.Bolt & Nuts |
| 61 | AAAC 7/3.15 mm Conductor |
| 62 | Storage charges 3% of Cost of the Materials Suppplied at Site |
| 63 | Labours and Transport Charges 15% |
| 64 | Transport Charges Part - D of Credit estimate |
| 65 | Shifting of EB Poles at Km 1/500 - 1/600 (LHS & RHS) of Madurai Ring Road (Near Viraganoor) to Old Thondi Road (Near Sakkudi)Supplying and fixing of HT/LT POLES & LINES ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., As per EB Sanction No: 3) SE/MEDC/MDU/14.696/ S/014/2026-27/Dt.20.06.2026 |
| 66 | FABRICATED RS JOIST POLE 250X125 MM 42' |
| 67 | RSJ 42'Pole joist RS 250x125 mm (500kgx64) |
| 68 | Base Plate |
| 69 | LT 3 ph Angle Cross arm |
| 70 | LT S ph Angle Cross arm |
| 71 | Back Clamp for RSJ Pole |
| 72 | Stay Clamp for RSJ Pole |
| 73 | LT TI Fitting |
| 74 | LT shackle with Metal parts (19.00+48.07) |
| 75 | LT Pin Insulator with Pin (21.14+41.50) |
| 76 | Aluminium Knob |
| 77 | Stay Set Complete with guy |
| 78 | Guarding Arrangements |
| 79 | Pole Concreting ( Cement 1/2Bag, River Sand, Blue metal) (348/2+536+516) |
| 80 | Pole Earthing (G.I wire (8swg*5kg),Bolt& Nut (3 1/2X5/8\\")) |
| 81 | M.S.Bolt & Nuts and Binding wire etc |
| 82 | AAAC 7/2.50 mm Conductor |
| 83 | Storage charges 3% of Cost of the Materials Suppplied at Site |
| 84 | Labours and Transport Charges 15% |
| 85 | Shifting of 1 Ph Service connections |
| 86 | Shifting of Street light fittings |
| 87 | Transport Charges Part - D of Credit estimate |
| 88 | Shifting of EB Poles at Km 1/650 (LHS & RHS) of Madurai Ring Road (Near Viraganoor) to Old Thondi Road (Near Sakkudi)Supplying and fixing of HT/LT POLES & LINES ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., As per EB Sanction No: 4) SE/MEDC/MDU/14.696/ S/015/2026-27/Dt.20.06.2026 |
| 89 | FABRICATED RS JOIST POLE 250X125 MM 42' |
| 90 | Base Plate |
| 91 | Tapping Channel Cross Arm 11kv |
| 92 | LT 3 ph Angle Cross arm |
| 93 | LT S ph Angle Cross arm |
| 94 | Back Clamp for RSJ Pole |
| 95 | Stay Clamp for RSJ Pole |
| 96 | HT TI Fitting |
| 97 | Insulator 11kv Polymer Composite Disc(W)Mp (191.48 +121.70) |
| 98 | Insulator 11kv Polymer Composite Pin Typ |
| 99 | LT shackle with Metal parts (19.00+48.07) |
| 100 | LT Pin Insulator with Pin (21.14+41.50) |
| 101 | Aluminium Knob |
| 102 | Guarding Arrangements |
| 103 | Pole Concreting ( Cement 1/2Bag, River Sand, Blue metal) (348/2+536+516) |
| 104 | Pole Earthing (G.I wire (8swg*5kg),Bolt& Nut (3 1/2X5/8\\")) |
| 105 | M.S.Bolt & Nuts and Binding wire etc |
| 106 | AAAC 7/2.50 mm Conductor |
| 107 | AAAC 7/3.15 mm Conductor |
| 108 | Storage charges 3% of Cost of the Materials Suppplied at Site |
| 109 | Labours and Transport Charges 15% |
| 110 | Shifting of 3 Ph Service connections |
| 111 | Shifting of Street light fittings |
| 112 | Transport Charges Part - D of Credit estimate |
| 113 | Shifting of EB Poles at Km 5/500 (LHS & RHS) of Madurai Ring Road (Near Viraganoor) to Old Thondi Road (Near Sakkudi)Supplying and fixing of HT/LT POLES & LINES ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., As per EB Sanction No: 5) SE/MEDC/MDU/14.696/ S/016/2026-27/Dt.20.06.2026 |
| 114 | FABRICATED RS JOIST POLE 250X125 MM 42' |
| 115 | RSJ 42'Pole joist RS 250x125 mm (500kgx64) |
| 116 | Base Plate |
| 117 | LT 3 ph Angle Cross arm |
| 118 | Back Clamp for RSJ Pole |
| 119 | LT shackle with Metal parts (19.00+48.07) |
| 120 | LT Pin Insulator with Pin (21.14+41.50) |
| 121 | Aluminium Knob |
| 122 | Stay Set Complete with guy |
| 123 | Guarding Arrangements |
| 124 | Pole Concreting ( Cement 1/2Bag, River Sand, Blue metal) (348/2+536+516) |
| 125 | Pole Earthing (G.I wire (8swg*5kg),Bolt& Nut (3 1/2X5/8\\")) |
| 126 | M.S.Bolt & Nuts and Binding wire etc |
| 127 | AAAC 7/2.50 mm Conductor |
| 128 | Storage charges 3% of Cost of the Materials Suppplied at Site |
| 129 | Labours and Transport Charges 15% |
| 130 | Transport Charges Part - D of Credit estimate |
| 131 | Shifting of EB Poles Km 7/600 (LHS & RHS) of Madurai Ring Road (Near Viraganoor) to Old Thondi Road (Near Sakkudi)Supplying and fixing of HT/LT POLES & LINES ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., As per EB Sanction No: 6) EE/D/MDU/14.696/E1/ Highways -001/2026-27/Dt.06.04.2026 |
| 132 | Fabricated Pole RSJ 42`feet pole (470KG)(250*125) |
| 133 | Base Plate |
| 134 | LT S ph Channel X arm |
| 135 | Back Clamp SPL for RSJ Pole |
| 136 | LT shackle (w) Mp |
| 137 | LT Pin Insulator with pin |
| 138 | Aluminium Knob |
| 139 | AAAC 7/2.50 mm Conductor |
| 140 | M.S.Bolt & Nuts (5kg Per Loc) |
| 141 | M.S.Washer (1kg Per Loc) |
| 142 | Earthing & Concreting (10% Escalation 3070 ) |
| 143 | Guarding Arrangements |
| 144 | Storage charges 3% of Cost of the Materials Suppplied at Site |
| 145 | Labours and Transport Charges 15% |
| 146 | Shifting of Street light fittings |
| 147 | Transport Charges Part - D of Credit estimate |
| 148 | Shifting of EB Poles at Km 7/700 - 8/061 (LHS & RHS) of Madurai Ring Road (Near Viraganoor) to Old Thondi Road (Near Sakkudi)Supplying and fixing of HT/LT POLES & LINES ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., As per EB Sanction No: 7) CE/D/MDU/14.696/C/ 07/2026-27/Dt.29.05.2026 |
| 149 | Mini Tower |
| 150 | RSJ 42`Fabricated Pole |
| 151 | Joist Rs 250x125 mm 42' Length 470 kg x Rs.64.00 |
| 152 | Joist Rs 250x125 mm 36' Length 403 kg x Rs.64.00 |
| 153 | Base Plate |
| 154 | LT 3 ph Angle Cross arm |
| 155 | LT TI Fitting |
| 156 | Back Clamp SPL for RSJ Pole |
| 157 | Stay Clamp Ord RSJ Pole |
| 158 | Insulator LT shackle (w) Mp (19.00+48.07) |
| 159 | LT GI Pin(W) Insulator (41.50+21.14) |
| 160 | Aluminium Knob |
| 161 | Guarding Arrangements |
| 162 | Pole concreting |
| 163 | Pole Earthing |
| 164 | M.S.Bolt & Nuts |
| 165 | AAAC 7/2.50 mm Conductor |
| 166 | Storage charges 3% of Cost of the Materials Suppplied at Site |
| 167 | Labours and Transport Charges 15% |
| 168 | Shifting of 3 Ph Service connections |
| 169 | Shifting of Street light fittings |
| 170 | Transport Charges Part - D of Credit estimate |
| 171 | Calculation of SubTotal, GST and Total Amount carried out by system automatically |
| 172 | Basic cost of value put to tender as per estimate |
| 173 | Add GST at 18% |
| 174 | Total Value put to Tender |
| 175 | Quoted Percentage |
| 176 | Quoted Value |
| 177 | Add GST at 18% of Final Quoted Value |
| 178 | Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information |
| 179 | Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 16, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 04, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysNov 04, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender