Defence Government Departments Closing in 7 days TDR #58084984

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Teg Class Of Ships; Rrc For Undertaking Routines/Repairs Of Palfinger Cranes Fitted Onboard Teg Class Of Ships; Service Provider - Replacemn

Issued by Government Departments · Mumbai, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
26 Oct 2026
7 days left
EMD
3.10 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai → Maharashtra
EMD Exemption
Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Teg Class Of Ships; Rrc For Undertaking Routines/Repairs Of Palfinger Cranes Fitted Onboard Teg Class Of Ships; Service Provider - Replacemnt Of Defective Hoses And To Be Proved After Fitment , A) Removal Of Old Hose Cover B) Fitment Of New One , A)Removal Of Luffing Cylinder From Boom. B)Shifting Of Luffing Cylinder To Vasai Workshop. C) Dismantling Of Luffing Cylinder , Replacement Of Seal/ Piston Rod , Boxing Up And Pressure Testing D) Fitment Of Luffing Cylinder Onboard And Proving Of Operation , A)Removal Of Luffing Cylinder From Boom. B) Renewal Of Bearing Bush /Distance Washer. C) Fitment Of Cyliner In Place And Proving Of Operation , A) Adjustment Of Load Holding Valve Cpuv0013 Or , B) Replacing Of Load Holding Valve Cpuv0013 , A) Adjustment Of Load Holding Valve Ev3941 Or , B) Replacing Of Load Holding Valve Ev3941 , A)Removal Of Knuckle Cylinder From Boom. B)Shifting Of Knuckle Cylinder To Vasai Workshop. C) Dismantling Of Knuckle Cylinder , Replacement Of Seal/ Piston Rod , Boxing Up And Pressure Testing D) Fitment Of Knuckle Cylinder Onboard And Proving Of Operation , A) Adjustment Of Load Holding Valve Front And Rear Cpuv0014 Or , B) Replacing Of Load Holding Valve Front And Rear Cpuv0014 , A) Adjustment Of Load Holding Valve Front And Rear Ev612 Or , B) Replacing Of Load Holding Valve Front And Rear Ev612 , A) Adjustment Of Load Holding Valve Front And Rear Ev636 , B) Replacing Of Load Holding Valve Front And Rear Ev636 , A) Removal Of Cylinder Tube By Opening 8 Nos Allen Bolts Of 12Mm*80Mm Long With Lock Nut . B) Replacement Of Seal. C) Testing And Prooving Of Operation , Servicing Of L.H.V. Or To Be Replace Ev3867 , Removal Of Slewing Cylinder Tube, Ram , Removal Of Entire Structure From Base For Renewal Of Dust Seal , A)Removal Of Telescopic Cylinder From Boom. B)Shifting Of Telescopic Cylinder To Vasai Workshop. C) Dismantling Of Telescopic Cylinder , Replacement Of Seal/ Piston Rod , Boxing Up And Pressure Testing D) Fitment Of Telescopic Cylinder Onboard And Proving Of Operation , Malfunctioning Of L.H.V. To Be Servicing Or To Be Replace Telescopic Extension Boom , Removal Of Wire Rope , 2 Nos Telescopic Cylinder Extension Boom 2 , Removal Of Wire Rope , Removal Of 2 Nos Telescopic Cylinder , Removal Of Wire Rope , Removal Of 2 Nos Telescopic Cylinder Extension Boom 2, Removal Of Extension Boom 1 , Require Overhauling And Check Break Assembly After Dismantling In Workshop . Require Seal Kit And Break Assembly. , Suspect Of L.H.V. , Lower Limit Valve , Or Dcv Relief Valve And Roller Assembly , Removal Of Old Rope And Windup Of New Wire Rope , Removal Of Wire Rop Shifting Of Rope To Workshop And Fitment Of New Timble With Crimping , Removal Of Wire Rop, Replacement Of Locking Wedge And Winding Of Wire Rope , Suspect Of Sequense Valve, To Be Service Or To Be Replace For Overload Protection Uv248m , Suspect Of Disc Spring Protection Es1231 , Suspect Of Over Load Block For Overload Protection Ev2315 , Removal Of Dcv And To Be Taken At Workshop For Overhauling. Renewing Of Seals. If Require Then Relief Valve To Be Replace , Removal Of Electrical Motor, Removal Of Pump And Overhauling Of Pump , Servicing Of Oil Tank By Removing Oil And Replacing It With New Oil For Hpu Unit , Changing Of Breather Filter , Changing Of Gear Coupling , Changing Of Coupling Spider , Replacement Of Oil Level Indicator , Replacement Of Filter Element , Replacement Of Pressure Line Filter , Replacement Of Shut Off Cock , Replacement Of Shut Off Cock Lever , Replacement Of Non Return Valve , Replacement Of Collecting Block , Replacement Of Stop Button , Replacement Of Indication L , Replacement Of On/Off Switch , Replacement Of Start Push Button , Replacement Of Stop Push Button , Replacement Of Phase Monitoring Relay , Replacement Of Step Down Trasformer , Replacement Of Rectifier Unit , Replacement Of Mccb/Circuit Breaker , Replacement Of Contactor , Replacement Of Auxilury Contact No & Nc Type , Replacement Of Panel Door Lock , Replacement Of Relay , Replacement Of Flood Light , Replacement Of Flood Light Switch With Element , Replacement Of Proximity Sensor , Replacement Of Electro Coil 24 V Dc , Replacement Of Selector Switch , Removal Of Existing Pipe And Fitment Of New Pipe , Removal Of Existing Pipe Fitment Of New Pipe

BOQ

Sl. No. Item TitleItem Description
1Replacemnt of defective hoses and to be proved after fitmentReplacemnt of defective hoses and to be proved after fitment
2a) Removal of old hose cover b) Fitment of new onea) Removal of old hose cover b) Fitment of new one
3a)Removal of Luffing cylinder from boom. b)Shifting of Luffing cylinder to vasai workshop. c) Dismantling of Luffing cylinder , replacement of seal/ piston rod , boxing up and pressure testing d) Fitment of Luffing cylinder onboard and proving of operationa)Removal of Luffing cylinder from boom. b)Shifting of Luffing cylinder to vasai workshop. c) Dismantling of Luffing cylinder , replacement of seal/ piston rod , boxing up and pressure testing d) Fitment of Luffing cylinder onboard and proving of operation
4a)Removal of Luffing cylinder from boom. b) Renewal of bearing bush /Distance washer. c) Fitment of cyliner in place and proving of operationa)Removal of Luffing cylinder from boom. b) Renewal of bearing bush /Distance washer. c) Fitment of cyliner in place and proving of operation
5a) Adjustment of load holding valve CPUV0013 ORa) Adjustment of load holding valve CPUV0013 OR
6b) replacing of load holding valve CPUV0013b) replacing of load holding valve CPUV0013
7a) adjustment of load holding valve EV3941 ORa) adjustment of load holding valve EV3941 OR
8b) replacing of load holding valve EV3941b) replacing of load holding valve EV3941
9a)Removal of Knuckle cylinder from boom. b)Shifting of Knuckle cylinder to vasai workshop. c) Dismantling of Knuckle cylinder , replacement of seal/ piston rod , boxing up and pressure testing d) Fitment of Knuckle cylinder onboard and proving of operationa)Removal of Knuckle cylinder from boom. b)Shifting of Knuckle cylinder to vasai workshop. c) Dismantling of Knuckle cylinder , replacement of seal/ piston rod , boxing up and pressure testing d) Fitment of Knuckle cylinder onboard and proving of operation
10a) adjustment of load holding valve front and rear CPUV0014 ORa) adjustment of load holding valve front and rear CPUV0014 OR
11b) replacing of load holding valve front and rear CPUV0014b) replacing of load holding valve front and rear CPUV0014
12a) adjustment of load holding valve front and rear EV612 ORa) adjustment of load holding valve front and rear EV612 OR
13b) replacing of load holding valve front and rear EV612b) replacing of load holding valve front and rear EV612
14a) adjustment of load holding valve front and rear EV636a) adjustment of load holding valve front and rear EV636
15b) replacing of load holding valve front and rear EV636b) replacing of load holding valve front and rear EV636
16a) Removal of cylinder tube by opening 8 nos Allen bolts of 12mm*80mm long with lock nut . b) Replacement of seal. c) Testing and prooving of operationa) Removal of cylinder tube by opening 8 nos Allen bolts of 12mm*80mm long with lock nut . b) Replacement of seal. c) Testing and prooving of operation
17servicing of L.H.V. or to be replace EV3867servicing of L.H.V. or to be replace EV3867
18Removal of slewing cylinder tube, ramRemoval of slewing cylinder tube, ram
19Removal of entire structure from base for renewal of dust sealRemoval of entire structure from base for renewal of dust seal
20a)Removal of telescopic cylinder from boom. b)Shifting of telescopic cylinder to vasai workshop. c) Dismantling of telescopic cylinder , replacement of seal/ piston rod , boxing up and pressure testing d) Fitment of telescopic cylinder onboard and proving of operationa)Removal of telescopic cylinder from boom. b)Shifting of telescopic cylinder to vasai workshop. c) Dismantling of telescopic cylinder , replacement of seal/ piston rod , boxing up and pressure testing d) Fitment of telescopic cylinder onboard and proving of operation
21Malfunctioning of L.H.V. To be servicing or to be replace telescopic extension boomMalfunctioning of L.H.V. To be servicing or to be replace telescopic extension boom
22Removal of wire rope , 2 nos telescopic cylinder extension boom 2Removal of wire rope , 2 nos telescopic cylinder extension boom 2
23Removal of wire rope , Removal of 2 nos telescopic cylinderRemoval of wire rope , Removal of 2 nos telescopic cylinder
24Removal of wire rope , Removal of 2 nos telescopic cylinder extension boom 2, removal of extension boom 1Removal of wire rope , Removal of 2 nos telescopic cylinder extension boom 2, removal of extension boom 1
25Require overhauling and check break assembly after dismantling in workshop . Require seal kit and break assembly.Require overhauling and check break assembly after dismantling in workshop . Require seal kit and break assembly.
26suspect of L.H.V. , Lower limit valve , or dcv relief valve and roller assemblysuspect of L.H.V. , Lower limit valve , or dcv relief valve and roller assembly
27Removal of old rope and windup of new wire ropeRemoval of old rope and windup of new wire rope
28removal of wire rop shifting of rope to workshop and fitment of new timble with crimpingremoval of wire rop shifting of rope to workshop and fitment of new timble with crimping
29removal of wire rop, replacement of locking wedge and winding of wire roperemoval of wire rop, replacement of locking wedge and winding of wire rope
30suspect of sequense valve, to be service or to be replace for overload protection UV248Msuspect of sequense valve, to be service or to be replace for overload protection UV248M
31suspect of disc spring protection ES1231suspect of disc spring protection ES1231
32suspect of over load block for overload protection EV2315suspect of over load block for overload protection EV2315
33removal of dcv and to be taken at workshop for overhauling. Renewing of seals. If require then relief valve to be replaceremoval of dcv and to be taken at workshop for overhauling. Renewing of seals. If require then relief valve to be replace
34removal of electrical motor, removal of pump and overhauling of pumpremoval of electrical motor, removal of pump and overhauling of pump
35servicing of oil tank by removing oil and replacing it with new oil for HPU unitservicing of oil tank by removing oil and replacing it with new oil for HPU unit
36changing of breather filterchanging of breather filter
37changing of gear couplingchanging of gear coupling
38changing of coupling spiderchanging of coupling spider
39replacement of oil level indicatorreplacement of oil level indicator
40replacement of filter elementreplacement of filter element
41replacement of pressure line filterreplacement of pressure line filter
42replacement of shut off cockreplacement of shut off cock
43replacement of shut off cock leverreplacement of shut off cock lever
44replacement of non return valvereplacement of non return valve
45replacement of collecting blockreplacement of collecting block
46replacement of stop buttonreplacement of stop button
47replacement of indication lampreplacement of indication lamp
48replacement of on/off switchreplacement of on/off switch
49replacement of start push buttonreplacement of start push button
50replacement of stop push buttonreplacement of stop push button
51replacement of phase monitoring relayreplacement of phase monitoring relay
52replacement of step down trasformerreplacement of step down trasformer
53replacement of rectifier unitreplacement of rectifier unit
54replacement of MCCB/circuit breakerreplacement of MCCB/circuit breaker
55replacement of contactorreplacement of contactor
56replacement of Auxilury contact NO & NC typereplacement of Auxilury contact NO & NC type
57replacement of panel door lockreplacement of panel door lock
58replacement of relayreplacement of relay
59replacement of flood lightreplacement of flood light
60replacement of flood light switch with elementreplacement of flood light switch with element
61replacement of proximity sensorreplacement of proximity sensor
62replacement of electro coil 24 V DCreplacement of electro coil 24 V DC
63replacement of selector switchreplacement of selector switch
64removal of existing pipe and fitment of new piperemoval of existing pipe and fitment of new pipe
65removal of existing pipe fitment of new piperemoval of existing pipe fitment of new pipe

AI Tender Summary

OUR REF NO 58084984
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 26-10-2026
Authority
Authority Name Indian Navy
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Teg Class Of Ships; Rrc For Undertaking Routines/Repairs Of Palfinger Cranes Fitted Onboard Teg Class Of Ships; Service Provider - Replacemnt Of Defective Hoses And To Be Proved After Fitment , A) Removal Of Old Hose Cover B) Fitment Of New One , A)Removal Of Luffing Cylinder From Boom. B)Shifting Of Luffing Cylinder To Vasai Workshop. C) Dismantling Of Luffing Cylinder , Replacement Of Seal/ Piston Rod , Boxing Up And Pressure Testing D) Fitment Of Luffing Cylinder Onboard And Proving Of Operation , A)Removal Of Luffing Cylinder From Boom. B) Renewal Of Bearing Bush /Distance Washer. C) Fitment Of Cyliner In Place And Proving Of Operation , A) Adjustment Of Load Holding Valve Cpuv0013 Or , B) Replacing Of Load Holding Valve Cpuv0013 , A) Adjustment Of Load Holding Valve Ev3941 Or , B) Replacing Of Load Holding Valve Ev3941 , A)Removal Of Knuckle Cylinder From Boom. B)Shifting Of Knuckle Cylinder To Vasai Workshop. C) Dismantling Of Knuckle Cylinder , Replacement Of Seal/ Piston Rod , Boxing Up And Pressure Testing D) Fitment Of Knuckle Cylinder Onboard And Proving Of Operation , A) Adjustment Of Load Holding Valve Front And Rear Cpuv0014 Or , B) Replacing Of Load Holding Valve Front And Rear Cpuv0014 , A) Adjustment Of Load Holding Valve Front And Rear Ev612 Or , B) Replacing Of Load Holding Valve Front And Rear Ev612 , A) Adjustment Of Load Holding Valve Front And Rear Ev636 , B) Replacing Of Load Holding Valve Front And Rear Ev636 , A) Removal Of Cylinder Tube By Opening 8 Nos Allen Bolts Of 12Mm*80Mm Long With Lock Nut . B) Replacement Of Seal. C) Testing And Prooving Of Operation , Servicing Of L.H.V. Or To Be Replace Ev3867 , Removal Of Slewing Cylinder Tube, Ram , Removal Of Entire Structure From Base For Renewal Of Dust Seal , A)Removal Of Telescopic Cylinder From Boom. B)Shifting Of Telescopic Cylinder To Vasai Workshop. C) Dismantling Of Telescopic Cylinder , Replacement Of Seal/ Piston Rod , Boxing Up And Pressure Testing D) Fitment Of Telescopic Cylinder Onboard And Proving Of Operation , Malfunctioning Of L.H.V. To Be Servicing Or To Be Replace Telescopic Extension Boom , Removal Of Wire Rope , 2 Nos Telescopic Cylinder Extension Boom 2 , Removal Of Wire Rope , Removal Of 2 Nos Telescopic Cylinder , Removal Of Wire Rope , Removal Of 2 Nos Telescopic Cylinder Extension Boom 2, Removal Of Extension Boom 1 , Require Overhauling And Check Break Assembly After Dismantling In Workshop . Require Seal Kit And Break Assembly. , Suspect Of L.H.V. , Lower Limit Valve , Or Dcv Relief Valve And Roller Assembly , Removal Of Old Rope And Windup Of New Wire Rope , Removal Of Wire Rop Shifting Of Rope To Workshop And Fitment Of New Timble With Crimping , Removal Of Wire Rop, Replacement Of Locking Wedge And Winding Of Wire Rope , Suspect Of Sequense Valve, To Be Service Or To Be Replace For Overload Protection Uv248m , Suspect Of Disc Spring Protection Es1231 , Suspect Of Over Load Block For Overload Protection Ev2315 , Removal Of Dcv And To Be Taken At Workshop For Overhauling. Renewing Of Seals. If Require Then Relief Valve To Be Replace , Removal Of Electrical Motor, Removal Of Pump And Overhauling Of Pump , Servicing Of Oil Tank By Removing Oil And Replacing It With New Oil For Hpu Unit , Changing Of Breather Filter , Changing Of Gear Coupling , Changing Of Coupling Spider , Replacement Of Oil Level Indicator , Replacement Of Filter Element , Replacement Of Pressure Line Filter , Replacement Of Shut Off Cock , Replacement Of Shut Off Cock Lever , Replacement Of Non Return Valve , Replacement Of Collecting Block , Replacement Of Stop Button , Replacement Of Indication L , Replacement Of On/Off Switch , Replacement Of Start Push Button , Replacement Of Stop Push Button , Replacement Of Phase Monitoring Relay , Replacement Of Step Down Trasformer , Replacement Of Rectifier Unit , Replacement Of Mccb/Circuit Breaker , Replacement Of Contactor , Replacement Of Auxilury Contact No & Nc Type , Replacement Of Panel Door Lock , Replacement Of Relay , Replacement Of Flood Light , Replacement Of Flood Light Switch With Element , Replacement Of Proximity Sensor , Replacement Of Electro Coil 24 V Dc , Replacement Of Selector Switch , Removal Of Existing Pipe And Fitment Of New Pipe , Removal Of Existing Pipe Fitment Of New Pipe
Basic Detail
Tender No GEM/2026/B/8005775
Bidding Type Tender
Location
City Mumbai
State Maharashtra
Key Dates
Publish Date 16 Oct 2026
Submission Date 26 Oct 2026
Open Date 27 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 3.10 Lakhs
Exemption Available
Document List
f1abc32c-690c-42fa-9f04-75ef498b9cc1.pdf
1792140014.xlsx
1792140547.pdf
1792140549.pdf
1792140551.pdf
1792140553.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 16, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 26, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days
Oct 27, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 8 days

Tender Documents

Download All (ZIP) ↓
pdf

f1abc32c-690c-42fa-9f04-75ef498b9cc1.pdf

xlsx

1792140014.xlsx

pdf

1792140547.pdf

pdf

1792140549.pdf

pdf

1792140551.pdf

pdf

1792140553.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender