Tender For Widening & Strengthening Of Bhatni Bhingari Road (Odr) Chainage 0.000 To 15.000 In Dist Deoria
Tender Overview
Project Description
Tender for Widening & Strengthening Of Bhatni Bhingari Road (Odr) Chainage 0.000 To 15.000 In Dist Deoria
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 24-Oct-2026 | Date and other Corrigendum-5025 | Date | 04-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Earth Work in Excavation in TrenchesExcavation for roadway in soil using manual means including loading in tranch for carriying of cut earth to embankment site with all lifts and lead upto 1000 metres. (Excluding GST) |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Excluding GST) |
| 3 | Construction of Embankment with Material obtained from BorrowpitsConstruction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Excluding GST) |
| 4 | Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. (Excluding GST) |
| 5 | Granular Sub-Base with close Graded MaterialConstruction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. (Excluding GST) |
| 6 | Wet Mix Macadam (Plant Mix Method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Excluding GST) |
| 7 | Prime Coat over WMMProviding and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. (Excluding GST) |
| 8 | Dense Graded Bituminous Macadam Grading 1Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Excluding GST) |
| 9 | Tack Coat on Bituminous surfacesProviding and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Excluding GST) |
| 10 | Bituminous ConcreteProviding and laying bituminous concrete with 120 TPH batch type hot mix plant producing an avarage output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4 to 5.6 percent of mix and filler, transporting the hot mix to work site, laying with hydostatic paver finisher with sensor control to the required grade, level and aligmnment, rolling with smooth wheeled, vibratory and tendom roller to achieve the desired compaction as per MoRT&H Specification Clause 509 complete in all respects. (Excluding GST) |
| 11 | Construction of Deep DrainEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Excluding GST) |
| 12 | Cement concrete with 4 cm. (1½\\") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. As per S.I. No. 279. (Excluding GST) |
| 13 | M 20 Grade of RCC in proptions of 1:1:2 (1 part of cement, 1 part of Approved coarse sand and 2 part of 20 mm Nominal Size Stone Grits) as per SOR & SI No. 284A. (Excluding GST) |
| 14 | Supplying, fitting, and placing MS bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202, for Bars below 36 mm dia including over laps and wastage, where they are not welded. (Excluding GST) |
| 15 | Hume Pipe & CulvertEarthwork in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Excluding GST) |
| 16 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Excluding GST) |
| 17 | Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations. (Excluding GST) |
| 18 | Providing and Laying 600 mm dia HP NP3 R.C.C Culvert. (Excluding GST) |
| 19 | Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. (Excluding GST) |
| 20 | Plaster with cement mortar (1:4) on brickwork in sub structure & super structure as per drawing and technical specification. (Excluding GST) |
| 21 | Providing and Laying 1000 mm dia HP NP3 R.C.C Culvert. (Excluding GST) |
| 22 | Furnishing and placing reintforced cement concrete M-25 in super structure as per drawing and Technical Specifications. (Excluding GST) |
| 23 | Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses. (Excluding GST) |
| 24 | Plane/Reinforced Cement concrete 20 mm in open foundation complete as per drawing and Technical Specifications. (Excluding GST) |
| 25 | Providing and laying of factory made 80 mm thick rubber moulded Interlocking cement concrete tiles (30mpa) including 25 mm thick compacted bed of fine sand compacting and proper embedding/laying of Interlocking tiles levelling and dressing of surface to required level and slope, filling joints with fine sand including the cost of material, T&P etc. required for proper completion of work as directed by Engineer-in-charge. SOR New Item 1 |
| 26 | Maintenance of constructed road for next five year after completion of work shall be paid. as per GO No 17/2024 /lk0-113/23-1-2024-23-1099-113/2023 yksd fuekZ.k foHkkx vuqHkkx&1 fnuakd 16-01-2024 ,oa dk;kZy; izeq[k vfHk;Urk ;krk;kr oxZ yks0fu0fo0 y[kuÅ dk i=kad&3689lh&vks0ih0vkj0,e0lh0@ ewy&23&24 fnuakd 17-02-2024- Payment shall be done as per satisfaction of engineer in chage regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid extra as applicable). 1st year Maintenance cost total construction of cost Item No. 1 to 25 @ Zero percent on 1st year & for 2nd year @ 0.25% on item No. 1 to 25 |
| 27 | Maintenance cost for 3rd year @0.50% on item No. 1to 25 |
| 28 | Maintenance cost for 4th year @0.75% on item No. 1 to 25 |
| 29 | Maintenance cost for 5th year @1.00% on item No. 1to 25 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.