Tender For Construction Of Nh-135A Saidi Baba Se Basdevpatti Patel Basti Hote Hue Mehdiganj Kotwali Link Road In Distt. Jaunpur
Tender Value
Ref. Documents
Estimated cost
Bid Submission
22 Oct 2026
4 days left
EMD
7 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Jaunpur → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Construction Of Nh-135A Saidi Baba Se Basdevpatti Patel Basti Hote Hue Mehdiganj Kotwali Link Road In Distt. Jaunpur
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Embankment with Material Obtained from Borrow Pits / Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including All material T&P, Labour cess etc But excluding cost of GST |
| 2 | Granular Sub-base with Well Graded Material (Table 400.1) / (A) By Mix in Place Method / Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. / (i) ForGrading I Material .Including All material T&P, Labour cess etc But Excluding cost of GST |
| 3 | Cement Treated Subbase / Providing, laying and sperading Material on a prepared sub grade, adding cement @2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and toform a layer of sub-base. / Quantity of cement as 2 percent of quantity by weight for subbase.. Including All material T&P, Labour cess etc But Excluding cost of GST |
| 4 | Cement WBM Grading III / Providing, laying and spreading Material on a prepared sub base, cement @4 by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to acheive the desired unconfined compressive strength and to form a layer of sub base/base including All material T&P, Labour cess etc But Excluding cost of GST |
| 5 | Tack Coat / Providing and applying tack coat with Bitumen VG-10 using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. Including All material T&P, Labour cess etc But Excluding cost of GST and Emulsion |
| 6 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates ( two third 13.2 mm and Including one third 11.2mm grit) either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B orType C as per Technical Specification Clause 508. Case - I By Manual Means / (I) Bitumen (S-90)All material T&P, Labour cess etc But Excluding cost of GST |
| 7 | Seal Coat - Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A,Type B and Type C as per Technical Specification Clause 510 A. By Manual Means / Case - III : Type C / (I) Bitumen (S-90). |
| 8 | Construction of Subgrade and Earthen Shoulders -Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Including All material T&P, Labour cess etc But Excluding cost of GST |
| 9 | PART AMaintainance cost |
| 10 | 1st year- maintainance cost 0% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 11 | 2nd year- maintainance cost 0.75% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 12 | 3rd year- maintainance cost 1.50 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 13 | 4th year- maintainance cost 2.25% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 14 | 5th year- maintainance cost 3.00 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 15, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 22, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysOct 22, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender