Tender For Conversion Of Water Pipeline From Ci To Di At Bairagarh Under Ge Bhopal
Tender Value
4.36 Crore
Estimated cost
Bid Submission
14 Nov 2026
28 days left
EMD
5.11 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Bhopal → Madhya Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Conversion Of Water Pipeline From Ci To Di At Bairagarh Under Ge Bhopal
BOQ
| Sl. No. | Item Description |
| 1 | Note: (i) Please refer schedule 'A' notes before quoting the tender.(ii) Amount of Schedule of credit shall be deducted off line by the department. |
| 2 | Excavation in trenches not exc 1.5 mtr wide & not exc 1.5 mtr in depth for foundation etc or for manholes, laying of pipe lines, cables, pipes etc in any type of soft soil/water soaked soil and getting out complete all as specified and directed. Note:-(i) If excavation is carried out with mechanically or by JCB etc then damaged to the existing assets i.e. Sewage Lines/Electrical cables/Drains/Signal Cables/OFC Cables etc shall be repaired by contractor at his own cost. Damages shall be intimated through telephonically/Whats app msg and through mail and hence it is mandotary to contractor to provide one Mobile No/Whats app no and email Id before commencement of the work. If contractor failed to repair the damages then its repairing cost shall be recovered from his RAR/Bills. Contd...../- |
| 3 | (ii) Dewatering of any type of water i.e. muddy water/sewage water/potable water etc from trenches before laying of CI/ DI/GI pipe and after laying of CI/ DI/ GI pipe is included in the item rate and hence arrangement of flushing of DI/CI/GI pipe is included in the item rate. Required T&P shall be provided by the contractor.(v) Excavated material shall not be spread over /in side the Sewage chmaber and if it is spread over inside/above the sewage chamber contractor will make arrangement for removal to the same on his own arranagement and cost.(vi) Laying of pipes shall be carried out following sequence to avoid minimum shut down and make alternate arranagement of water supply system for 3 EME Center :- (a) Main Filter Pump House to PANAMA OHT interconnection Line 250mm dia(b) Panama OHT to BM Map accn Line- 200mm Dia (c) 21 CGSR to MH Bhopal main line -150mm dia (d) MH BHopal to MES Colony - 200mm dia |
| 4 | All as per item no 2.00 but for muddy soil complete all as specified |
| 5 | Returning filling in, including spreading, leveling watering & well ramming in layers not exc 25 cm thick complete all as specified and directed. |
| 6 | Removing excavated material to a distance not exc 50 mtr & depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and diected. |
| 7 | Taking out existing CI/DI pipe line, of any class including CI fitting with spigot and socket ends/ flanged end and lead joint including burning out lead joints and recovering lead for reuse in new CI pipes/fittings of any class/type complete all as specified and directed of following sizes:- Note:-(i) Existing CI/DI pipes shall be dismantled on part basis and new DI pipes shall be laid imediatelly to provide uninterrupted water supply and connections of balance CI pipe shall be again reconnected with DI pipe to restore water supply.(ii) Dewatering from trenches before laying of DI pipe and after laying of pipe is included in the item rate.(iii) Flushing system shall be made at the inlet of OHT/ whereevr required i.e. Tee, flange piece 1000mm, Sluice Valve, Flange bend 90 degree etc. These items shall be paid and measured separetely. Before taking out any type of CI pipe this system shall be installed for flushing out muddy water to avoid inconvience to user. |
| 8 | All as per item No 6.00 but for 80mm bore complete all as specified and directed |
| 9 | All as per item No 6.00 but for 100mm bore complete all as specified and directed |
| 10 | All as per item No 6.00 but for 150mm bore complete all as specified and directed |
| 11 | All as per item No 6.00 but for 200mm bore complete all as specified and directed |
| 12 | All as per item No 6.00 but for 250mm bore complete all as specified and directed |
| 13 | Relaying of CI/DI pipe including fittings with spigot and socketed end/ flanged end, centrifugally cast laid in trenches after cleaning internally and externally, drawing out forigen material/rust complete with and including new titon joint for fixing of pipe complete all as specified and directed for following sizes:-Note :- (i) Earth work, joints and CI specials/fittings of the pipes shall be measured and paid separately under appropriate item. (ii) Existing CI/DI pipes shall be dismantled on part basis and new DI pipes shall be laid imediatelly to provide uninterrupted water supply and connections of balance CI pipe shall be again reconnected with DI pipe to restore water supply.(iii) Dewatering from trenches before laying of DI pipe and after laying of pipe is included in the item rate. |
| 14 | All as per item No 12 but for 80mm bore complete all as specified and directed |
| 15 | All as per item No 12 but for 100mm bore complete all as specified and directed |
| 16 | All as per item No 12 but for 150mm bore complete all as specified and directed |
| 17 | All as per item No 12 but for 200mm bore complete all as specified and directed |
| 18 | All as per item No 12 but for 250mm bore complete all as specified and directed |
| 19 | Supply, laying, jointing and testing of DI pipes, SS class, K-9 with spigot and socketed end of standard length with internal cement mortar coating and external surface with bituminious paint, IS: 8329 including tyton joint, nuts, bolts, packing material etc; and making the joint leak proof complete all as specified and directed for the following sizes:-Note: (i) Earth work, joints and CI/DI specials/fittings of the pipes shall be measured and paid separately under appropriate item.(ii) Dewatering from trenches before laying of DI pipe and after laying of DI pipe is included in the item rate and hence arrangement of flushing of DI pipe is included in the item rate.(iii) If any lekages found in the DI pipeline after laying it shall be addrressed within 12 Hours. If contractor failed to arrest the water leakges penalty of 500 Rs per hour after first 12 Hours shall be recovered or its repairing cost shall be recovered from the payment of contractor.(iv) RCC Thrust block at every bend for DI pipe shall be provided and same is included in the item rate. Its design shall be provided by contractor before laying of the pipe on site. |
| 20 | All as per item No 18 but for 100mm bore complete all as specified and directed |
| 21 | All as per item No 18 but for 150mm bore complete all as specified and directed |
| 22 | All as per item No 18 but for 200mm bore complete all as specified and directed |
| 23 | All as per item No 18 but for 250mm bore complete all as specified and directed |
| 24 | Supply, laying, jointing and testing of DI pipes with flanged end, SS class, K-9 of standard length with internal cement mortar coating and external surface with bituminious paint, IS: 8329 including rubber gaskit/fiber gaskit, nuts, bolts, packing material etc; and making the joint leak proof complete all as specified and directed for the following sizes:-Note: (i) Earth work, joints and CI/DI specials/fittings of the pipes shall be measured and paid separately under appropriate item.(ii) Dewatering from trenches before laying of DI pipe and after laying of DI pipe is included in the item rate and hence arrangement of flushing of DI pipe is included in the item rate.(iii) Flushing system shall be made at the inlet of OHT i.e. Tee, flange piece 1000mm, Sluice Valve, Flange bend etc. These items shall be paid and measured separetely. |
| 25 | All as per item No 23 but for 100mm bore complete all as specified and directed |
| 26 | All as per item No 23but for 150mm bore complete all as specified and directed |
| 27 | All as per item No 23 but for 200mm bore complete all as specified and directed |
| 28 | All as per item No 23 but for 250mm bore complete all as specified and directed |
| 29 | Supply, laying, jointing and testing of DI pipes, SS class, K-9 with spigot and socketed end of standard length with internal cement mortar coating and external surface with bituminious paint, IS: 8329 including tyton joint, nuts, bolts, packing material etc; and making the joint leak proof complete all as specified and directed for the following sizes:-Note: (i) Earth work, joints and CI/DI specials/fittings of the pipes shall be measured and paid separately under appropriate item.(ii) Dewatering from trenches before laying of DI pipe and after laying of DI pipe is included in the item rate and hence arrangement of flushing of DI pipe is included in the item rate.(iii) If any lekages found in the DI pipeline after laying it shall be addrressed within 12 Hours. If contractor failed to arrest the water leakges penalty of 500 Rs per hour after first 12 Hours shall be recovered or its repairing cost shall be recovered from the payment of contractor.(iv) RCC Thrust block at every bend for DI pipe shall be provided and same is included in the item rate. Its design shall be provided by contractor before laying of the pipe on site. |
| 30 | All as per item No 28 but for 80mm bore complete all as specified and directed |
| 31 | All as per item No 28 but for 100mm bore complete all as specified and directed |
| 32 | All as per item No 28 but for 150mm bore complete all as specified and directed |
| 33 | All as per item No 28 but for 200mm to 250mm bore complete all as specified and directed |
| 34 | Cutting of cast iron pipes in position for insertion of new tees, branches, etc comprising of two cuts complete all as specified and directed for the following sizes:- |
| 35 | All as per item No 33 but for 80mm bore complete all as specified and directed |
| 36 | All as per item No 33 but for 100mm bore complete all as specified and directed |
| 37 | All as per item No 33 but for 150mm bore complete all as specified and directed |
| 38 | All as per item No 33 but for 200mm to 250mm bore complete all as specified and directed |
| 39 | S&F of DI bend (any type, radius and angle), tapers any type, Flanges, straight bend including decreasing or double socket etc; tee pieces, tail pieces single branch, flanged adapter, 'Y' junction, all sockets or socket and spigot or flanged, collars, caps and plugs for spigot socketed pipes of upto 150mm size complete all as specified and directed. |
| 40 | S&F of DI bend (any type, radius and angle), tapers any type, Flanges, straight bend including decreasing or double socket etc; tee pieces, tail pieces single branch, flanged adapter, 'Y' junction, all sockets or socket and spigot or flanged, collars, caps and plugs for spigot socketed pipes of 200mm to 300mm size complete all as specified and directed. |
| 41 | M&L for Floor/PCC/Footpath/RCC Road/bittuman road cutting through existing PCC/floor/Footpath/ approx size width 25cm X 90cm depth as required for Realying/Laying of pipe etc and making good with and including earthwork and necessary excavation, complete material required to match with the existing one or with PCC 1:2:4 type B1 complete all as specified and as directed by Engineer-in-charge. |
| 42 | M&L for run lead joint for spigot and socketed end CI pipe & fittings including excavation, returning and refilling complete all as specified and directed for following pipe sizes:- |
| 43 | All as per item No 41 but for 80mm bore complete all as specified and directed |
| 44 | All as per item No 41 but for 100mm bore complete all as specified and directed |
| 45 | All as per item No 41 but for 150mm bore complete all as specified and directed |
| 46 | All as per item No 41 but for 200mm to 250mm bore complete all as specified and directed |
| 47 | M&L for mild steel framed work for MS Sheet, including angle irons for supports, MS bend of various sizes for DI pipes, MS Flanges as required including necessary welding, cutting, hinges, locking arrangments, flanges for connection of GI Pipes with CI pipes and its nut bolts etc including painting with two coats of synthetic enamel paint over a coat of red oxide primer complete all as specified and directed. |
| 48 | Taking down existing GI steel tubing and connections complete all as specified and directed of following sizes:- |
| 49 | All as per item No 47 but for 80mm / 100mm bore complete all as specified and directed |
| 50 | All as per item No 47 but for 50mm bore complete all as specified and directed |
| 51 | All as per item No 47 but for 40mm bore complete all as specified and directed |
| 52 | All as per item No 47 but for 25mm bore complete all as specified and directed |
| 53 | All as per item No 47 but for 20mm bore complete all as specified and directed |
| 54 | All as per item No 47 but for 15mm bore complete all as specified and directed |
| 55 | Relaying and Refixing old retrived steel tubing and connections in new or old position including cleaning internally and externally any grade/make in trenches/wall/floor/ceiling with and including providing all type of new fittings sockets, tee, union, elbow etc complete all as specified and directed of follwing sizes:- |
| 56 | All as per item No 54 but for 80mm / 100mm bore complete all as specified and directed |
| 57 | All as per item No 54 but for 50mm bore complete all as specified and directed |
| 58 | All as per item No 54 but for 40mm bore complete all asspecified and directed |
| 59 | All as per item No 54 but for 25mm bore complete all as specified and directed |
| 60 | All as per item No 54 but for 20mm bore complete all as specified and directed |
| 61 | All as per item No 54 but for 15mm bore complete all as specified and directed |
| 62 | Supply & laying GI tubing, medium grade, ISI marked 1239 in any length including cutting, threading and making connection in new or old position with and including all type of GI new fittings for laid in trenches/wall/ceiling/floor complete all as specified and directed of following sizes:- |
| 63 | All as per item No 61 but for 80mm bore complete all as specified and directed |
| 64 | All as per item No 61 but for 50mm bore complete all as specified and directed |
| 65 | All as per item No 61 but for 40mm bore complete all as specified and directed |
| 66 | All as per item No 61 but for 25mm bore complete all as specified and directed |
| 67 | All as per item No 61 but for 20mm bore complete all as specified and directed |
| 68 | All as per item No 61 but for 15mm bore complete all as specified and directed |
| 69 | Cutting cast iron/Ductile iron pipes and reducing to required length before laying complete all as specified and directed of following sizes:- |
| 70 | All as per item No 68 but for 80mm bore complete all as specified and directed |
| 71 | All as per item No 68 but for 100mm bore complete all as specified and directed |
| 72 | All as per item No 68 but for 150mm bore complete all as specified and directed |
| 73 | All as per item No 68 but for 200mm bore complete all as specified and directed |
| 74 | All as per item No 68 but for 250mm bore complete all as specified and directed |
| 75 | Drilling and taping cast iron water mains (in position) for branch connections complete all as specified and directed of following sizes:- |
| 76 | All as per item No 74 but for 15mm bore complete all as specified and directed |
| 77 | All as per item No 74 but for 20mm bore complete all as specified and directed |
| 78 | S&F in replacement new mechnical joints of DI pipe, K9 including nuts, bolts and all connecting accessories complete all specified and directed of following sizes:- |
| 79 | All as per item No 77 but for 80mm bore complete all as specified and directed |
| 80 | All as per item No 77 but for 100mm bore complete all as specified and directed |
| 81 | All as per item No 77 but for 150mm bore complete all as specified and directed |
| 82 | All as per item No 77 but for 200mm bore complete all as specified and directed |
| 83 | All as per item No 77 but for 250mm bore complete all as specified and directed |
| 84 | S&F in replacement cast iron flanged sluice valve of class PN 1.6, long body, ISI marked, confirming to IS-14846 with stainless steel spindle and hand wheel including nuts, bolts, rubber gasket for installation of valve complete including taking down existing one all as specified and directed of following sizes:- |
| 85 | All as per item No 83 but for 80mm bore complete all as specified and directed |
| 86 | All as per item No 83 but for 100mm bore complete all as specified and directed |
| 87 | All as per item No 83 but for 150mm bore complete all as specified and directed |
| 88 | All as per item No 83 but for 200mm bore complete all as specified and directed |
| 89 | All as per item No 83 but for 250mm bore complete all as specified and directed |
| 90 | M&L for brick work with sub class B brick straight or curved on plain exc 6 m mean radius built in cement mortar 1:4 complete all as specified and directed. |
| 91 | M&L for PCC 1:2:4 type B1 using 20 mm graded stone aggregate as in copping/supports/thrust block/for RCC pipe etc and similar work including necessary form work etc complete all as specified and directed. |
| 92 | M&L for rendering 15mm thick on any face of brick work in cement mortar 1:4, finished an even and smooth without using extra cement complete all as specified and directed. |
| 93 | S&F in replacement gun metal globe or gate valves, confirming to IS 778 with iron wheel head, screwed both ends for iron pipe and fixed in existing or new position complete all as specified and directed for following size:- |
| 94 | All as per item No 92 but for 50mm bore complete all as specified and directed |
| 95 | All as per item No 92 but for 40mm bore complete all as specified and directed |
| 96 | All as per item No 92 but for 25mm bore complete all as specified and directed |
| 97 | S&F of air release valve as per IS-14845 double chamber including nuts, bolts, rubber sheets complete all as specified and directed of following sizes:- |
| 98 | All as per item No 96 but for 80mm bore complete all as specified and directed |
| 99 | All as per item No 96 but for 100mm bore complete all as specified and directed |
| 100 | S&F in repairs CI new flange type non return valves of size 100 mm ISI marked conforming to IS 5312 including nuts, bolts and all connecting accessories complete all as specified and directed. |
| 101 | S&F in repairs CI new flange type non return valves of size 150 mm ISI marked conforming to IS 5312 including nuts, bolts and all connecting accessories complete all as specified and directed. |
| 102 | S&F in repairs CI new flange type non return valves of size 200 mm ISI marked conforming to IS 5312 including nuts, bolts and all connecting accessories complete all as specified and directed. |
| 103 | M&L for valve chamber 600x600x900 mm for 80/50mm sluice valve, including brick massonary 23 cm thick with cement mortar 1:6, on PCC 1:4:8, D-2 100mm thick foundation, 10mm thick plaster internally in CM 1:6, Flooring 40mm thick in PCC 1:2:4 type B1 over 75 mm PCC base, 3mm thick for cover plate with locking arrangement, handle, etc duly painted complete all as per specifications |
| 104 | M & L for MS Clamp not less than 50mm width not less than 6mm thick and not less than 30Cm in length 02 Nos for connection of 50mm dia GI pipe with Socket for fixing 50mm dia pipe with 80mm/100mm/150mm/200/250mm dia CI/DI pipe complete all as specified and directed |
| 105 | M & L for MS Clamp 50mm width & not less than 6mm thick and not less than 30Cm in length 02 Nos for connection of 40mm dia GI pipe with Socket for fixing 40mm dia pipe with 80mm/100mm/150mm/200/250mm dia CI/DI pipe complete all as specified and directed |
| 106 | M & L for MS Clamp not less than 50mm width 6mm thick and not less than 30Cm in length 02 Nos for connection of 25/20mm dia GI pipe with Socket for fixing 25/20mm dia pipe with 80mm/100mm/150mm/200/250mm dia CI/DI pipe complete all as specified and directed |
| 107 | S&F in replacement new Dismantling Joint PN 16 double flanged type for DI pipe, K9 including nuts, bolts and all connecting accessories complete all specified and directed of following sizes:- |
| 108 | All as per item No 106 but for 80mm bore complete all as specified and directed |
| 109 | All as per item No 106 but for 100mm bore complete all as specified and directed |
| 110 | All as per item No 106 but for 150mm bore complete all as specified and directed |
| 111 | All as per item No 106 but for 200mm bore complete all as specified and directed |
| 112 | All as per item No 106 but for 250mm bore complete all as specified and directed |
| 113 | S & Fix 450mm dia Reinforced concrete pipes, class NP3, laid and jointed complete with collars complete all as specified and directed |
| 114 | S&F in Ductile iron adapter flanged type for CI pipe/DI pipe, K9 including cutting of existing pipe and grinding if required for fixing the adapter nuts, bolts and all connecting accessories complete all specified and directed of following sizes:- |
| 115 | All as per item No 113 but for 100mm bore complete all as specified and directed |
| 116 | All as per item No 113 but for 150mm bore complete all as specified and directed |
| 117 | All as per item No 113 but for 200mm bore complete all as specified and directed |
| 118 | All as per item No 113 but for 250mm bore complete all as specified and directed |
| 119 | S&F in GI sockets with nipple duly welded with MS flanged of following sizes including nuts, bolts and all connecting accessories complete all specified and directed of following sizes:-Note :- MS Flanged including is included in the item rate but nuts, bolts and washers etc shall be paid and measured seperately. |
| 120 | All as per item No 118 but 50 mm socket with GI nipple medium grade not less than 300mm complete all as specified and directed |
| 121 | All as per item No 118 but 80 mm socket with GI nipple medium garde not less than 300mm complete all as specified and directed |
| 122 | Dismantling of existing motorized valve/Sluice valve of size from 50mm to 300mm its electrical connection and connected items, setting a side and refixing the same after carriying out its servicing, oiling, greasing etc complete all as specified and directed. |
| 123 | Supply, Installation, Testing and Commissioning of 250 mm dia, Water Flow Meter as per BIS 12933, along with all necessary installation accessories like gate valve, barrel piece, double nipple, elbows/bends etc with following specification complete all as specified and directed:-Accuracy: - ±2.0% of readingFlow velocity range, m/s: - 0.02 - 5Output: - Two way isolated pulse output(pulse equivalent and output pulse canbe arbitrary programmed); two-wired system 4-20mA output.Maximum pipeline pressure, MPa / bar: - 25Ambient temperature range, °С: - 5 - 65Power Supply: - Lithium batteryContd....... |
| 124 | Protection: - IP 68Technical Specification: - Less than 0.01 m/s starting velocity, Multi line 9 digital LCD accumulative flow and 4 digitalfor instantaneous flow, Date cumulative record and data acquisition function, Various of Units selected, includingCubic meter, USA gallon, Cubic feet and Liter, With the two way PT1000 temperature transducer, which can realizethe heat measurement.Display parameters: - Flow Rate, Totalizer - Forward, Reverse, Net, No of hours meter was installed, worked.Archives have record of Daily reading for 31 days and monthly reading for 32 Months.Contd...... |
| 125 | Note -1) Supply, wiring & testing, commissioning, programming of Water Flow Meter shall be carried out by authorizedsystem integrator of the provided makes. The engineer shall submit a letter from the OEM as proof of his being anauthorized system integrator of the OEM. The engineer shall also submit a signed report on original letterhead ofthe OEM that programming, wiring & testing, commissioning has been carried out by him. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 16, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 14, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 28 daysNov 16, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 30 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender