Tender For Annual Comprehensive Maintenance Of The Entire electrical installation Works Including Fuel Consumption & Servicing Charges Of Diesel Generator Set At Sainthia State General Hospita, Under Birbhum Electrical Division , Pwd . During The Per
Tender Overview
Project Description
Tender for Annual Comprehensive Maintenance Of The Entire electrical installation Works Including Fuel Consumption & Servicing Charges Of Diesel Generator Set At Sainthia State General Hospita, Under Birbhum Electrical Division , Pwd . During The Period For -365 Days.. Including Holidays.
BOQ
| Sl. No. | Item Description |
| 1 | Annual Comprehensive Maintenance work related with Lighting System installed including Fuel Consumption & servicing Charges of D.G. set at Sainthia State General Hospita, under Birbhum Electrical Division , PWD . During the period for -365 days.. including Holidays.The Agency has to depute :i) One (01) Highly Skilled Eletrician( Grade-I) in one shift' or in the shift as per direction of EIC. means the period of eight hours. ii)One(01) Eletrician( Skilled), and One(01) Assistant Wireman( Semi-Skilled) in 1st shift or in the shift as per direction of EIC.iii)One(01) Eletrician( Skilled), and One(01) Assistant Wireman( Semi-Skilled) in 2nd shift or in the shift as per direction of EIC.vi)One(01) Eletrician( Skilled), and One(01) Assistant Wireman( Semi-Skilled) in 3rd shift or in the shift as per direction of EIC.Period- 12 months |
| 2 | Fuel Consumption Charges for 200 KVA Diesel Generator Set:- The fuel consumption rate and recent fuel price may vary depending on the location, generator efficiency, and market conditions. The following calculation is an estimate based on the Average daily run time: 30 minutes.Fuel consumption rate: 30 liters per hour (approximate value for a 200 KVA diesel generator set)- Daily fuel consumption: 30 liters/hour x 0.5 hours (30 minutes) = 15 liters/day- Recent fuel price (as of [current date ]): ₹100 [current fuel price] per liter- Daily fuel cost: 15 liters/day x ₹ 100 per liter = ₹ 1500- Monthly fuel cost (assuming 30 days): ₹ 1500 x 30 = ₹45000 at Sainthia State General Hospita (including carriage charge). as per terms and condition.Period 12 months |
| 3 | i)Charges for annual preventive & corrective maintenance and servicing of 01 (One) nos. Ashok Leyland make Diesel Generator set with DG control panel, A.M.F panel at Sainthia State General Hospita as per terms and condition by deputation of Service Personnel of the D.G set manufacturing company for every month and in case of any breakdown (unlimited breakdown visit). ii)Charges for supply of Consumable spares/ materials comprising of Lube Oil Filter, Engine Oil, Fuel Filter cum Water Separator, Primary Air Filter Element, Fuel Strainer, Coolant etc. once in a year for annual preventive and corrective maintenance of said DG Set with DG control panel. (iii)200 KVA DG Set (Engine Sl. No.- NPEM704145) |
| 4 | SCOPE & TERMS & CONDITIONS :-1. Maintenance & up-keeping of the above electrical installation in safe and proper working condition.2. All the fitting, fixture, PBDB, SPNDB, Main-switches, LT Panel, HT GEAR, Sub-Station Register, U.P.S/Servo voltage stabilizer line only & other Electrical Installation inside all the block/floor/bldgs as well as for compound lighting installation must be kept in a tip top condition by cleaning of all the said electrical equipments, dusting off accumulated dirt, cobweb etc. and all the cleaning materials like detergent etc. are to be supplied by the agency free of cost. |
| 5 | 3. Checking & maintenance of tumbler switch/piano key switch, fans, light fittings etc. complete for their safe and proper functioning. Maintenance work in respect of the above-said electrical installation requires free supply of pretty materials like fuse wire, insulating tapes, screw, washers, small nuts & bolts etc. to ensure the smooth running of the installation as per instruction of concerned Executive Engineer, Assistant Engineer and Junior Engineer.4. To keep close watch on overall condition of the E.I. and performance of different accessories & submission of periodical report to the Junior Engineer concerned. |
| 6 | 5. Maintenance materials viz. Incandescent lamps, Main switches , Power DB, SPN BDB, Main & Sub-main cables, fluorescent tubes, Chokes, Igniters, Condensers etc. will be supplied by the Department and the dismantled unserviceable materials are to be deposited to the concerned Junior Engineer, against which fresh materials are supplied by the Department.6. The Agency should depute his Supervisor to supervise the whole electrical components in the whole campus as per scope of the works. 7. The agency will take care to prepare the requisition of materials required for the maintenance within his jurisdiction well in advance and submit the same to the concerned Junior Engineer so that no delay in repair / replacement cause trouble in the system & hampering of the Hospital service thereof. 8. The Agency must have a routine check-up of the entire system to prevent any damage / fire hazard due to loose contact in the Elecl. Installation.9. Insulation test with the help of Megger for the entire Electrical Installation as well as earth resistance of the earthing installation are to be carried out in the presence of concerned Assistant Engineer/ Junior Engineer and the result thereof is to be furnished to the Engineer-In-Charge. |
| 7 | 10. The agency will be provided all type of tools and tackles like Screwdrivers set, multimeter, tongtester, thermal imager, well calibrated megger, earth resistance meter, blower/vaccum cleaner ect. Which cost are including as per schedule/rates analysis segment .11. Failing of compliance of any of the above-mentioned points, this Department possess the right to deduct the cost from the bills of the agency on prorate basis determined by the Engineer –in-charge.12. Space for accommodation of staff of the agency will be provided by the competent authority.13. The Agency is required to submit a copy of Challan for permission of the Junior Engineer before taking any material out of the premises.14. The agency must have their dedicated Cell phone/Mobile phone ( comprising camera facility) to be provide for emergency call services and should be responded without delay. |
| 8 | 15. The agency should be responsible for any damage in the installation due to mishandling / mal-operation done by his staff and shall be liable for the compensation for the same which would be recovered from the bill as per direction of E.I.C. and the accused staff should be replaced immediately.16. The agency must maintain a Log Book for recording there nature of work done with materials replaced and verious type of Register Book like Fan Register, Panel Register, Sub-Station Register, U.P.S/Servo voltage stabilizer Register etc. as per direction of the Engineer –in charge. The Log Book must be signed by the concerned Junior Engineer or Assistant Engineer on regular basis. The log book should be sent to the Executive Engineer concerned through proper channel at the time of submission of bills.17. The maintenance work of the DG Set of the agency must maintain a Log Book for Maintene & recording diesel consumption with monthly balance sheet in, all details of checking duly signed by the Junior Engineer/Assistant Engineer concerned. The list of materials such as Lube Oil Filter, Fuel Filter, Air Filter, Coolant (5 Ltr), Lab Oil (20 Ltr) and Fan Belt etc to be supplied and replaced in every year. Which cost are including as per schedule/rates analysis segment .. |
| 9 | 18. During each schedule visit of the 200KVA Diesel Generator set, the service Engineer will check the followings.. i) Check Generator ii) Remove dust from inside the alterate. iii) Check for any abnormal noise and temperature, iv) Check Self-starter, Charging Alternator, AVR v) Check Control Panel and A.M.F. panel, vi) Check battery voltage, firstly cleaning dust of battery terminal & then applying of petroleum jelly and also mainten battery water level periodically.19. Regular smooth maintenance of the said installation is absolutely imperative for delivering proper service withou hindrances. The agency will execute the maintenance work as per submitted terms & condition and attend & rectify the fault within the least down time on getting the complaint.20. Bills should be submitted at the end of every three months with the certification of concerned Engineers on satisfactory completion.21. The agency should must submit P.F and E.S.I 's challan and payment acknowledgement document of the respective labours during submission of bill. |
| 10 | 22. The agency has to depute licensed electriciann having electrical workman permit license [ minimum I(a), I(b) ] from respective authority along with helper having sufficient experience in the said job for carrying out the maintenance work smoothly with due regard to the safety of the maintenance staff. The duty hours for the maintenance staff to be provided by the agency shall be normally whole day (24 hrs.) i.e. 3-shift including Saturday, Sunday & other holidays, along with the name & contact phone no. of the persons. The agency must obey all relevent sections of Labour acts.23. The contract may be terminated with one month’s notice from either side.24. The rates should be quoted both in words and figures on monthly basis. No. quotation with price variation clause will be accepted. Rates offered should be stable for the entire period of maintenance.25. In case of any accident of the maintenance staffs the deployment agency will be wholely liable. |
| 11 | Terms& ConditionsObjective :The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible. |
| 12 | A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets |
| 13 | A.1 General Requirements : The agency shall: A.1.1 Materials & Consumables Provide all consumables required for maintenance, including: Cotton waste, insulation tape, grease, battery water, fuse wires, CTC and other cleaning agents, Soaps etc. Cable Tie, Split pin and Jam Nuts of Ceiling Fans in sufficient quantity, nuts/bolts, Ferrules & lugs and other minor accessories All Logbooks and/ or Register as mentioned in this document. A.1.2 Tools & Instruments Provide and maintain calibrated tools and instruments, including: Digital multimeter, Digital clamp on Ammeter, Megger (500V & 5000V) |
| 14 | Continuity Tester, Earth tester Complete set of screwdrivers (flat, star, insulated) and Line Tester Combination pliers& Long Nose Pliers, Wire stripper Pipe wrench, Ring and open-end spanner set and Socket wrench set Electric Drill machine, Double Test Lamp, Hackshaw & Hammer, Torch Crimping tools upto 400 Sq.mm, Sockets of some common sizes Insulated ladder etc. |
| 15 | A.1.3 Safety & Equipment : Provide caution boards such as “Men on Line”, “Don’t Switch On”, etc. Ensure all staff use proper uniforms Follow all provisions of the Central Electricity Authority Safety Regulations (2023) and ensure any non-compliant installations are corrected immediately. Adhere strictly to BIS Code 5216:1982 for electrical safety practices. Keep electrical areas (substations, switch rooms, DG rooms, cable shafts) clean and free from storage or waste. Store inflammable materials only in designated rooms built as per legal requirements. |
| 16 | Provide proper safety gear (gloves, earthing rods, belts, resuscitation equipment) to staff. Maintain accessible first-aid boxes with standard supplies. Before electrical work: disconnect power, display warning signs, secure fuses, and obtain a “Permit to Work.” Ensure high-tension lines are fully discharged and earthed. After work: remove tools, ensure no personnel remain inside, restore normal connections, and officially close the permit before re-energizing. In case of electrical accidents: immediately switch off power, safely remove the victim using non-conductive materials, move them to safety, and provide continuous artificial respiration. |
| 17 | A.1.4 Uniform and Safety : Gear Provide at least two sets of uniforms and safety gear (helmet, Insulated hand gloves,Umbrella, raincoat, gumboots, etc.) to each staff member.The color end embossing should be as per direction of EIC. A.1.5 Surveillance System : To be installed at the Call Center or at any other location where sitting arrangement would be provided for agency deployed staffs, as per direction of EIC Provide SIM-based, Standalone, IP surveillance camera (at least 2 MP) system with recording facility in Memory Card and should be capable of monitoring through multiple mobile phones, as decided by E.I.C. |
| 18 | Provide at least 2 Memory Card for the Camera each of capacity sufficient for holding at least 1 month footage. Provide External Harddisk/ SSD for taking backup from Memory Card to ensure at least 1 year footage is available with the department. Maintain and back up footage as required Submit footage to AE at contract completion (precondition towards releasing Final Bill). N.B. - The Camera including accessories would be handed over to the agency after expiry of contract. |
| 19 | A.1.6 Attendance & Monitoring : Provide biometric attendance system for agency deployed staffs Maintain and monitor attendance records Maintain Registers and logbooks A.1.7 Security : Ensure watch and ward of all installations |
| 20 | A.2 Preventive Maintenance : The agency shall carry out the following: Periodic Checking of all electrical installations as mentioned under A.i to A.xi Setting/ Resetting of Relays and Meters of H.T./ L.T panel – Yearly once Performing all relevant Electrical safety and Performance test e.g. BDV Test (for both Vegetable and Mineral Oil type), IR value of Transformer and submitting report – Yearly Once Servicing and overhauling of complete HT & LT Panels Tightening of termination screws of all electrical equipments and LT Panels, DBs etc – Bi-annually Cleaning of installations at least once every three months Cleaning and Housekeeping of substations, DG Room, panel rooms, Electrical shafts, etc. once in 3 months and ensuring that inflammable substances are not stored in them. |
| 21 | Cleaning of H.T. and L.T. switchgear contacts, Starter and Relay contacts using appropriate materials Checking of Exhaust Fans, Ceiling fans (especially split pins and Jam Nut), Light Fittings and other hanging Electrical Items every 3 months to prevent unwanted falling of Ceiling Fans, failing which responsibility will be fixed up upon the agency.New Split Pins must be used once existing Split Pin is removed. Conduct Earth Testing and Insulation Resistance Testing annually and submit Test Report Measure electrical parameters (current, voltage, temperature) as follows: o Panels/transformers: Daily or as per direction of EIC / AE / JE o DBs: Weekly |
| 22 | Use thermal imaging for detecting abnormalities, submit reports with image and preserve indexed image. Checking of all Lightning Conductor systems once a year – preferably before onset of Monsoon and submit report. Operate lighting and electrical systems as per direction of A.E. to prevent unnecessary usage beyond working hours DG set operation including checking of fuel level of DG Set, carrying & pouring of Fuel if necessary Monthly test runs, as per direction of EIC / AE / JE and recording details in respective Log Book Periodic Operation of Switch Gears, Starters etc. as per direction of AE Maintain all required logbooks and registers keeping records of all aforementioned activities. |
| 23 | A.3 Corrective / Breakdown Maintenance :The agency shall: Attend and rectify all electrical faults within the scope of work with absolute promptness. Rectification of any abnormality noticed during Preventive maintenance. Repair all types of light fittings and fixtures, all types of fans (excluding rewinding) Replace defective Fans, Fittings & Fixtures and any other Electrical/ Electro-mechanical Items using department-supplied materialsincluding dismantling/ taking down and re-fixing of the same. |
| 24 | Replacement of materials either consumable or non-consumable such as fluorescent tubes, lamps, chokes, starters, holders, HRC fuse links, MCB's, isolators, switches, sockets, cable connections & terminations etc. All minors repairs, adjustment of relays, timer etc. Restore power supply in case of breakdowns using available or temporary arrangements, till completion of restoration work. Maintain records of faults, repairs, and restoration time Respond promptly to all complaints and instructions from EIC / AE / JE |
| 25 | . Manpower Requirements : B.1 Personnel Categories :The agency shall deploy manpower as per following chart 1. Electrical Supervisor : Mandatory Requirement Having SCC as mentioned in the NIT 2. Skilled Electrician : Having Electrical/ Workman Permit i(b), ii, iii & iv issued by Directorate of Electricity, West Bengal, preferably ITI / Equivalent Certificate Holder. 3. Semi-Skilled Electrician : Workman Permit i(b) and (ii) issued by Directorate of Electricity, West Bengal. 4. Un-skilled Personnel/ Helper : Basic knowledge of Electrical works. |
| 26 | B.2 General Conditions for Manpower : Personnel should have valid ID (Aadhar Card) and should fulfill Mandatory Requirement as shown in above chart. Staff shall carry Photo identity cards at all times, issued by the agency. One copy of said card should be submitted to JE for record. Suitable manpower should be deputed at the Call center provided by the agency, during the entire period under scope of maintenance, who will be responsible for recording maintenance/ breakdown calls from authorities as well as departmental officers in call register manually or in Software Database through PC, if any, and forward the calls to respective maintenance staffs (including AC, Lift and all type of utility), duly recorded in Soft/ Hard Register. He should also be responsible for maintaining liaison among Supervisor of the agency & maintenance staffs and departmental officers as well. For DG Sets, Operator should be experienced and skilled, who will be responsible for Test Run of DG, manual operation of DG when and wherever required, maintenance of Log Book and all DG related jobs. |
| 27 | B.3 Supervision :The Electrical Supervisor shall: Oversee all maintenance activities Maintain, verify and authenticate logbooks by signing Monitor staff attendance and performance C. Workforce Management :The agency shall Submit mandatorily the list of staffs mentioning their Name, contact Mobile No., category, along with photo copy of Valid Workman Permit, proper identity and address proof valid Aadhaar Card. etc, attested by him, in writing to the concerned JE &AE before commencing the work and in case of mid-term replacement. |
| 28 | Not be permitted for frequent changing of Maintenance personnel, deputed at site. If changing of manpower is inevitable, such replacement should be informed to the A.E well in advance after depositing the I. Card of the outgoing Person. Prepare a Duty Roster of the Maintenance Staffs at the end of preceding month or prior to commencement of work, as the case may be, or as directed from time to time. A copy of the said Duty Roster, duly signed by all staffs, should be submitted to the concerned JE and one copy should be available at the call center. maintain shift wise attendance register at call center/ any other location as decided by The A.E, to record the attendance of the staffs on duty, besides digitally in Biometric Attendance system. |
| 29 | not depute any maintenance staff in more than one consecutive shifts. Provide suitable replacement staff within one hour in case of absence of any Maintenance Staffs, with intimation to JE, failing which, the charges for that day will be deducted from the bill of the agency on pro-rata basis. arrange adequate relief staff for weekly rest days and holidays at no extra cost. provide one dedicated GPS activated smart phone to the call center for attending phone calls by attending call center attendant, on duty. The cost of the handset and running cost i.e. phone bills have to be borne by the agency. Provide Mobile Nos. of authorized Supervisor and all the electricians deputed at worksite and such numbers should be intimated to the A.E. &J.E concerned, in writing. The telephone call should be responded without delay. |
| 30 | D. Material Management : Materials required as replacement during maintenance of electrical installations e.g. Lamps, SFUs, SPNDB, TPNDB, Wires, Cables etc. will be supplied by the Department for which requisition of Page 4 of 7 Materials, signed by the Supervisor/ authorized representative of the agency, should be submitted to the concerned JE (Electrical) well in advance. A separate material stock register should be maintained by the agency where entries related to Issue, Consumption & present stock position of Materials should be made. Consumable and petty materials shall be supplied by Agency as mentioned in A 1.1 The agency shall have to deposit Defective/ partly defective, dismantled materials such as fused lamps, defective condensers, starters, and timers, MCBs etc. to the concerned Section Office or any other locations within worksite premises by its own laborers / arrangements / tools and tackles as per the direction of the Assistant Engineer/ JE concerned. Fresh materials will be issued against respective defective materials. No materials should be taken out of the maintenance site without the permission and necessary challan of the site-in-charge/JE. Sufficient frequently used Tools & Tackles must be available at site. |
| 31 | E. Operations & Coordination : The agency shall himself or his supervisor/ Engineer/ authorized representative shall Coordinate with CESC authority/ other power supply authorities, as the case may be, during outages. Operate interconnections and load management systems as required in consultation with concerned Junior Engineers & Assistant Engineer during such outage and as and when required. Maintain communication with EIC / AE / JE at all times Cooperate with other agencies working at site. |
| 32 | F. Safety & Compliance : The agency shall Follow all electrical safety regulations and take required safety precautions while doing work on the equipments. observe Local security rules including his staffs. have proper & constant vigilance and check that, there is no sign of heating-up, burning smell, discoloration or sparking at any of BDBs, panel boards, rising main etc. due to overloading or loose termination. Care should be taken to check any highly unbalance in loading at any point. Maintain vigilance for faults or hazards Comply with labor laws Minimum wages as per existing Labor Act should be paid to the Electrician(s) and Helper(s) and documentary evidence for the same should be submitted to the concerned JE/ AE. |
| 33 | G. Liability & Responsibility :The agency shall be responsible for: any damage in the installation due to negligence, mishandling or mal-operation by its staffs and shall be liable for rectification / replacement, as the case may be, of the damaged installation/ equipment within time frame to be fixed by concerned A.E. and at own cost, failing which the said rectification/ replacement of affected equipment/ installation would be executed by external agency and the cost thereof would be recovered from the bill/ Security Deposit. conduct and behavior of the Staff engaged / appointed by him. In case any report or complaint of irregularities and/ or misbehaviors against any staff(s), he/ they should be withdrawn. The Department shall be within its right to forbid the entry of such staffs at the site. However, in normal cases, frequent change of Maintenance Staffs will not be allowed. |
| 34 | In case of any Accident and or physical illness of the staffs of the agency, while on duty, no claim will be entertained by this department and all responsibilities thereof should be shouldered by the agency only. any loss due to theft / pilferage and/or damage to the Govt. property and when such incidence is, in the opinion of the EIC, caused due to negligence, carelessness or any fault on the part of the Contractor or his Workmen / employees engaged for the services. The contractor shall ensure that the character and antecedents of the personnel engaged by him are duly verified before such engagement. In case of any accident during the operation and/or maintenance of the Electrical Installations, leading to injuries / damages to human beings / equipment, the agency will settle all claims and indemnify the department against any claims arising out of such accident, consequent damages to other system will however be not recoverable from the agency. The liability of the agency, if any, under various laws is emphasized, in case the Department suffers in any manner due to non-compliance of any law on the part of the agency, the agency shall indemnify the Department in all respects. |
| 35 | H. Documentation & Reporting : Building wise registers / log books (For Fans, DBs, UPSs, Timers, Daily Breakdown records, Sub Station Records, Power Monitoring Records, LPS test record, Call entry records, attendance register, shift wise manpower allocation duty roaster, DG Operation Logbook (containing Time of Start, Time of Stop, Current, Voltage, Frequency, Fuel level at the time of start and stop, Fuel issue and consumption record etc.), Fan register are to be maintained. Format of Logbooks/ Registers shall be provided by the Department. all records in the Logbooks/ Registers must be entered in real time and signed by respective staffs (each record) authenticated by Supervisor/ Engineer and verified by JE / AE (periodically). Bi-Annual/ Annual, as the case may be, Test Certificate of Electrical Installations, including LC, issued by Supervisor and authenticated by the agency must be submitted to EIC/AE/JE. Such Test certificates may also required to be submitted as and when required. Footage of Surveillance Camera should be submitted to concerned JE and AE monthly, who will check the footage and acknowledgement of receipt should be obtained. All data-filled Log-books shall be property of the Government. As such all the Logbooks should be handed over to concerned A.E. on the expiry of the contract. |
| 36 | I. Payment Terms : Cost towards providing and/or execution of all items, mentioned above under ‘Scope of Work” shall be borne by the Bidder at his own cost and responsibilities. No additional claim whatsoever shall be entertained in this regard. Bills should be submitted quarterly with the certification of satisfactory performance of the concerned JE and AE. Photocopy of Logbook and Attendance Register should also accompany the Bill, if asked for by the EIC. Bills should accompany Payment acquittance of staffs, along with system generated EPF and ESI Contribution statement of staffs, working at site, up to date of last accounting month and such Contribution amount must be at par with the prevailing Wages. No claim of payment against any telephone bill (Voice and/or Data) towards usage of agency staff, Call Center Mobile, SIM used in Surveillance Camera will be entertained by this department. Final Bill shall be drawn subject to: o Completion of annual activities eg. Annual Tests and submission of report e.g. Comprehensive Test reports of Transformers including IR value, BDV test report (if applicable), Reports on overhauling and maintenance of HT & LT Panel and all relevant Electrical Safety and Performance test reports as per applicable Standards and regulation etc. o Submission of surveillance footage during his entire period of contract. |
| 37 | J. Penalties & Deductions : frequent absence and subsequent failure to provide reliever may attract penalty, the amount to be fixed up by EIC If any kind of incapability & negligence are noticed in observing all the aforesaid terms & conditions causing inconveniences to public service, is subject to unilateral penalty, be it detected on the spot or thereafter (even after payment). This Department also reserves the right to deduct the cost from the bills of the contractor on pro-rate basis as determined by the Engineer –InCharge for any shortfall in observing above T&C. In that case, the above-said contract may be terminated without issuing any notice and Stringent & punishable action may be taken against the contractor. The TIA reserves the right to terminate the contract in case of repeated failure to abide by the Terms and conditions and to comply scope of Work, without showing further reason. |
| 38 | K. General Conditions : Agency shall indemnify the department against legal liabilities Himself/ his Engineer visit the site / office once in a week and also as and when required. No residential accommodation shall be provided by the Department. However, The space for sitting accommodation for the staffs of the agency inside worksite premises shall be provided. Weekly site inspection by Agency and/or his Engineer are mandatory. New or ongoing projects completed during contract period shall be included in scope The contract may be terminated with One month prior notice. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender