Rural Development Government Departments Closing in 0 days TDR #58075246

Tender For Borewell Drilling And Installation Of Handpump/Electric Pump For Zilla Parishad Ratnagiri.

Issued by Government Departments · Ratnagiri, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Oct 2026
0 days left
EMD
50000
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ratnagiri → Maharashtra
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Borewell Drilling And Installation Of Handpump/Electric Pump For Zilla Parishad Ratnagiri.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 23-Oct-2026 Second Call Date 28-Oct-2026

BOQ

Name of Work:- Borewell drilling and installation of handpump/Electric Pump for Zilla Parishad Ratnagiri.
Sl. No. Item Description
1Borewell drilling - 200/215 mm Dia. bore drilling in soft murum & soil & 150 mm dia. bore drilling in hard rock.Wet Drilling by DTH Machine including transporting of Bore drilling Machine
2Yield Testing of Borewell by Air lift Method with help of 90 degree V Notch method for minimum 0.5 Hrs. continous after completion of Borewell
3Proving & Placing 180 mm dia. PVC Casing pipe 6kg/cm2 (IS 4985-1988) .
4Lowering & laying of 180 mm dia. Pvc Casing Pipe 6kg/cm2, 8kg/cm2 upto hardrock incluiding Grouting (upto 12m casing)
5Lowering & laying of 180 mm dia. Pvc Casing Pipe 6kg/cm2, 8kg/cm2 upto hardrock incluiding Grouting (Above 12m casing)
6Proving & Placing 180 mm dia. PVC Casing pipe 8kg/cm2 (IS 4985-1988).
7Proving Cap for PVC Casing pipe 180 mm
8Borewell drilling - 115 mm Dia. bore drilling in hard rock & including 150 mm drilling in soft murum & soil and. Wet Drilling by DTH Machine including transportion.
9yield Testing of 115 mm Borewell by Air lift Method with 90 degree V Notch method for minimum 2 Hrs. continous
10Proving & Placing 140 mm dia. PVC Casing pipe 4 kg/cm2 (IS 4985-1988).
11Lowering & laying of 140 mm dia. Pvc Casing Pipe 4kg/cm2 upto hardrock incluiding Grouting
12Proving & Placing 140 mm dia. PVC Casing pipe 6 kg/cm2 (IS 4985-1988).
13Lowering & laying of 140 mm dia. Pvc Casing Pipe 6kg/cm2 upto hardrock incluiding Grouting
14Proving Cap for PVC Casing pipe 140 mm
15Proving & Placing 150 mm dia. Medium class Thread M.S. Casing pipe ERW medium class (IS:1239) with 4.8 mm Thickness
16Lowering & Laying of 150 mm dia. Thread M.S. Casing pipe Welding with Grouting etc Complete
17Proving & Placing 125 mm dia. Threaded M.S. Casing pipe ERW medium class (IS:1239) with 4.8 mm Thickness
18Lowering & Laying of 125 mm dia. Thread M.S. Casing pipe with Grouting with 4.8 mm thickness
19Proving Cap for M.S. Threaded Casing pipe 125 mm (IS 1239)
20Installation of Handpump India Mark II. (Handpump set will Provide by Department)
21a) Exacavation as per Measurement for Construction of Handpump Plateform as per govt.. aproved design & govt. approved rate.
22b) Dry Rubble Stone Filling as per Measurement for Construction of Handpump Plateform as per govt.. aproved design & govt. approved rate.
23c) 1:2:4 (M-150) Cement concrete as per Measurement for Construction of Handpump Plateform as per govt.. aproved design & govt. approved rate.
24Transportation charges for Installation of Handpump & Construction of Platform (Upto 40 Km )
25Fully Galvanised Special Water Chember for Duel Pump Installation.
26stainless Steel Bottom Nipple for Duel Pump Installation.
27Yield Testing of Borewell by Power Pump & Generator.
28Handpump removing & Re-fitting for flushing, Yield Testing etc.
29150/115 mm dia. Borewell rejuvenation/ Redrilling / Flushing with Transportation Charges pre Borewell
30Providing India Mark II Handpump BIS (IS 15500 Part-2) marked fully hot dip galvanised deepwell Handpump complete unit with 12 Nos. of Connecting Rod & 12 Nos G.I.Pipes (As per)
31150mm dia M.S. casing pipe threaded lowering & welding
32Supplying and erecting minimum Three & above star rated submersible pump set of 0.75 KW/1 HP with 230 V, 50 c/s AC supply suitable for 100 mmdia. borewell suitable for 10 to 60 LPM discharge at 88 to 33 m head & discharge & delivery pipe of Size-32 mm diameter with a necessary H type clamps as per specification No. WP-SMP [Pwd ele CSR 23-24 /I/P 171/12-2-33] 18552+5%=19479.6
33Supplying and erecting minimum Three & above star rated submersible pump set of 0.75 KW/1 HP with 230 V, 50 c/s AC supply suitable for 100 mmdia. borewell suitable for 10 to 40 LPM discharge at 95 to 42 m head & discharge & delivery pipe of Size-32 mm diameter with a necessary H type clamps as per specification No. WP-SMP[Pwd ele CSR 23-24 /I/P 172/12-2-45] 20482+5%=21506.1
34Supplying and erecting minimum Three & above star rated submersible pump set of 1.125 KW/1.5 HP with 230 V, 50 c/s AC supply suitable for 100mm dia. borewell suitable for 10 to 100 LPM discharge at 137 to 40 m head & discharge & delivery pipe of Size-32 mm diameter with a necessary H type clamps as per specification No. WP-SMP [Pwd ele CSR 23-24 /I/P 171/12-2-38]22019+5%=23119.95
35Supplying and erecting minimum Three & above star rated submersible pump set of 1.125 KW/1.5 HP with 230 V, 50 c/s AC supply suitable for 100mm dia. borewell suitable for 10 to 50 LPM discharge at 150 to 40 m head & discharge & delivery pipe of Size-32 mm diameter with a necessary H type clamps as per specification No. WP-SMP[Pwd ele CSR 23-24 /I/P 173/12-2-50]29094+5%=30548.7
36Supplying and erecting minimum Three & above star rated submersible pump set of 1.5 KW/2 HP with 230 V, 50 c/s AC supply suitable for 100 mmdia. borewell suitable for 30 to 140 LPM discharge at 85 to 32 m head & discharge & delivery pipe of Size-40 mm diameter with a necessary H type clamps as per specification No. WP-SMP [Pwd ele CSR 23-24 /I/P 172/2-2-48]28399+5%=29818.95
37Supplying and erecting minimum Three & above star rated submersible pump set of 1.5 KW/2 HP with 230 V, 50 c/s AC supply suitable for 100 mmdia. borewell suitable for 20 to 100 LPM discharge at 101 to 410 m head & discharge & delivery pipe of Size-40 mm diameter with a necessary H typeclamps as per specification No. WP-[Pwd ele CSR 23-24 /I/P 173/12-2-54]25792+5%=27081.6
38For Rising Main & Distrubution- Supply & Erecting HDPE ISI mark 32 mm dia. suitable for pressure 6 kg/cm2 Connected to jet/submersible pump with required material complete ( PWD DSR 23-24 electrical page no 219 Item No. 16-5-16) 60+5%=
39For Rising Main & Distrubution- Supply & Erecting HDPE ISI mark 40 mm dia. suitable for pressure 6 kg/cm2 Connected to jet/submersible pump with required material complete ( PWD DSR 23-24 electrical page no 219 Item No. 16-5-17) 100+5%
40For Rising Main & Distrubution- Supply & Erecting HDPE ISI mark 50 mm dia. suitable for pressure 6 kg/cm2 Connected to jet/submersible pump with required material complete ( PWD DSR 23-24 electrical page no 219 Item No. 16-5-18) 135+5%=141.75
41Supplying and erecting flat flexible submersible cable with copper conductor, PVC insulated and PVC sheathed 3core 2.5 sq.mm. [Pwd ele 23-24 P/I-175/12-4-8] 141+5%=148.05
42Supplying and erecting non return valve 25 mm dia in position made of gun metal complete. (PWD Ele DSR /2023-24 P/I-220/16-6-19 ) 580+5%=609
43Providing & Fixing control panel with, main switch starter, volt meter ,ammeter, indicating lamp, condensers etc. complete with Dry Run protection (As per market rate.)
44Supplying and erecting marine (Waterproof) plywood 18/19 mm thick fixed to wall or on provided panel board with necessary materials such as screws, wall fasteners, supports, nut bolts etc. complete with compliance to IS 720:2010. ( PWD Ele DSR 2023-24 P/I-90/6-1-14 ) 1529+5%=1605.45
45Providing pipe type earthing with 40mm. dia. G.I. pipe or 20 mm dia. G.I. Rod complete with all materials testing and recording the results as per specification no. EA-EP ( PWD Ele DSR 2023-24 P/I-140/ 9-1-4 ) 1537+5%=1613.85
46Excavation for foundation / pipe trench in earth, soils of all types,sand, gravels and soft murum, including removing excavated material up to distance of 50 m. and lift as below stacking spreading as directed de-watering showing and structing preparing the bed for foundation and excluing back filling lift 0 to 1.5 m. Mjp .DSR23-24 P/I 37/1
47Excavation for foundation / pipe trench in Hard Murum including removing excavated material up to distance of 50 m. beyond the ara and lift as below stacking spreading as directed by Engineer-in-charge,normal de-watering, preparing the bed for foundation and excluing back filling lift 0 to 1.5 m etc complete Mjp .DSR 23-24 P/I 37/2
48Excavation for foundation / pipe trench in Hard Murum and boulders, W.B.M. road including removing excavated material up to distance of 50 m. beyond the ara and lift as below stacking spreading as directed by Engineer-in-charge,normal de-watering, preparing the bed for foundation and excluing back filling lift 0 to 1.5 m etc complete Mjp .DSR 2023-24 P/I 37/3
49Excavation in laterite rock masses mechanically, Including lift upto 1.5 m including trimming and levelling the bed removing excavated material up to distance of 50 m. beyond the ara and lift as below stacking by as directed by Engineer-in-charge,normal de-watering excluing back fillingetc complete Mjp ..DSR 2023-24 P/I 38/8
50For Dismentaling of handpump platform -Excavation for foundation / pipe trenches in􀀃 hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming andlevelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normaldewatering, excluding backfilling, etc. complete􀀃by􀀃all􀀃means.􀀃(Bd-A-6/259) Mjp ..DSR 2023-24 P/I 38/7
51Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc complete Mjp ..DSR 2023-24 P/I 40/15
52For site clearance - Rent for JCB ( Mjp ..DSR 2023-24 P/I 15/13
53transportation charges for intsallation of handpump above 40 km distance
54Providing and fixing Name Board as directed by Engineer incharge. (As per market rate)
55Drilling of Horizontal Borewell
56drilling of 115 mm dia. Bore in different directions (Including loading and unloading of trolly in well and transportation with all Taxes) (As per standing committe Resolution Date - 27/02/2024 )
57Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices includingdisposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc.complete. (Bd-A-9/261) MJP SSR 2023-24 I/P 14/40 Rs. 89 HP/Hr
58Rent for Crane MJP SSR 2023-24 P/I 15/12
59Welder MJP SSR 2023-24 P/I 14/28
60Rent for welding set with Electric set MJP SSR 2023-24 P/I 15/7
61Helper MJP SSR 2023-24 MJP SSR 2023-24 P/I 14/12
62plumber (Building/ pipeline) MJP SSR 2023-24 MJP SSR 2023-24 P/I 14/34 Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58075246
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 28-10-2026
Authority
Authority Name Rural Development Department
Work Description Tender for Borewell Drilling And Installation Of Handpump/Electric Pump For Zilla Parishad Ratnagiri.
Basic Detail
Tender No RWSD E TENDER/01/OPEN/26-27
Bidding Type Tender
Location
City Ratnagiri
State Maharashtra
Key Dates
Publish Date 23 Oct 2026
Submission Date 28 Oct 2026
Open Date 30 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee 590
EMD 50000
Exemption Available
Document List
1.pdf
abfb567a-50c5-4c61-b471-8fb0ea45bbca.html
B1.pdf
BOQ_2298610.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 28, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Today
Oct 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Today
Oct 30, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
pdf

1.pdf

html

abfb567a-50c5-4c61-b471-8fb0ea45bbca.html

pdf

B1.pdf

xls

BOQ_2298610.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender