Road Transport and Highways Government Departments Closing in 13 days TDR #58074928

Tender For Rfp For The Balance Work For Widening To Four Lane Of Bhadohi To Varanasi Section Of Nh 731B From Design Km 49.200 To Km 89.285 On Percentage Rate Basis In The State Of Uttar Pradesh.

Issued by Government Departments · Bhadohi, Uttar Pradesh
Tender Value
236.94 Crore
Estimated cost
Bid Submission
30 Nov 2026
13 days left
EMD
2.37 Crore
Bank guarantee accepted
Document Fee
30000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bhadohi → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Rfp For The Balance Work For Widening To Four Lane Of Bhadohi To Varanasi Section Of Nh 731B From Design Km 49.200 To Km 89.285 On Percentage Rate Basis In The State Of Uttar Pradesh.

BOQ

Name of Work:- RFP for the Balance work for widening to four lane of Bhadohi to Varanasi section of NH 731B from design km 49.200 to Km 89.285 on percentage rate basis in the State of Uttar Pradesh.
Sl. No. Item Description
1Bill No. 1 : Main Carriagway ,Service Road, Bus Shelter, Truck lay bye, Major & Minor junctions & Slip Road as per Approved Design and Drawings)
2Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
3Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
4Cement Treated Crushed Stone Sub base (Construction of granular sub-base by providing graded Material, mixing with cement in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with Mechanical Paver on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 )
5Wet Mix Macadam laying Using Mechanical Paver (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)
6Cement Treated Crushed Stone Base (Plant Mix Method) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)
7Providing and laying Aggregate Interlayer (AIL) over the prepared existing pavement/base, using approved well-graded crushed aggregates of specified grading and quality, including preparation of underlying surface, transportation, spreading in uniform layers, watering, grading and compaction with suitable rollers to the required density and profile, including all materials, labour, plant, machinery, leads and lifts, complete as per approved drawings, design, relevant MoRTH/IRC specifications and directions of Engineer-in-Charge.
8Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means
9Dense Graded Bituminous Macadam-II (Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.)
10Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.)
11Bituminous Concrete Grading -II (Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects)
12Providing, constructing, fabricating, supplying, erecting and completing Bus Shelter as per approved architectural/structural drawings, Technical Specifications and directions of the Engineer-in-Charge, including all materials, labour, tools, plants, machinery, transportation, loading/unloading and all incidental works necessary for completion of the Bus Shelter in all respects.The work shall include, but shall not be limited to, the following:1- Earthwork and Foundation Works: Setting out, excavation in all types of soil for foundations, dressing and levelling of excavated surfaces, disposal of surplus earth, filling and compaction wherever required, and all allied foundation works.2- RCC and Reinforcement Works: Providing and laying M-25 grade RCC for raft, foundations, columns and other structural members, including centering, shuttering, compaction, curing and finishing, together with providing, cutting, bending, placing and binding of HYSD reinforcement steel including laps, chairs, spacers, binding wire and wastage, complete as per approved structural drawings.3- Foundation Steel Works: Providing and fixing foundation/anchor bolts, MS base plates, stiffener plates and other necessary structural steel components, including cutting, drilling, welding, fabrication, alignment, levelling, fixing, nuts, washers and all accessories, complete as per approved drawings.4- Structural Steel Bus Shelter: Providing, fabricating, supplying and erecting complete structural steel framework for the Bus Shelter, including columns, beams, trusses, purlins, brackets, supports, connections, welding, bolting, fasteners, fabrication, erection, alignment, grinding and protective primer/paint/coating, complete in all respects.
135- Roofing and Advertisement Provision: Providing and fixing corrugated GI sheet roofing with all necessary purlins, supports, flashing, ridge/edge treatment, fasteners and accessories, together with approved polypropylene sheet/panel provision for advertisement, complete as per approved design and Technical Specifications.6- Guard Railing: Providing and fixing GI pipe guard railing of approved diameter and thickness around the Bus Shelter, including fabrication, cutting, welding/joints, brackets, clamps, fasteners, supports, fixing and finishing, complete as per approved drawings.7- Flooring Works: Providing and laying vitrified tile flooring over cement mortar bed, including surface preparation, mortar, cutting, laying, alignment, levelling, joint filling/grouting, cleaning, curing and finishing, complete as per approved drawings and Technical Specifications.8- ACP Place Identification Board: Providing and fixing Aluminium Composite Panel (ACP) place identification/name board at the Bus Shelter, including supporting frame, lettering/graphics, brackets, fasteners, fixing accessories and complete installation as per approved design and instructions of the Engineer-in-Charge.8- Seating Arrangement: Providing and fixing approved Bus Shelter seating/chairs/benches, including supporting frame, structural members, fasteners, fabrication, fixing, finishing and all necessary accessories, complete as per approved design.9- Drinking Water Facility: Providing and installing a complete drinking water facility at the Bus Shelter, including water storage/dispensing arrangement, water supply piping, taps, valves, fittings, supports, connections and all necessary accessories, including testing and commissioning, complete and functional as per approved drawings and Technical Specifications.10- Finishing and Miscellaneous Works: Including all necessary painting, protective coatings, surface finishing, cleaning, minor civil/structural works, fixtures, fittings and other incidental works required to make the Bus Shelter complete, safe, aesthetically finished and fully functional.
14Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)
15Bill No. 2 : Hume Pipe and RCC Box Culvert
16Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
17Plain Cement Concrete M-15 Grade in Open Foundation complete as per Drawing and Technical Specifications
18Plain/Reinforced cement concrete M-20 Grade in sub-structure complete as per drawing and Technical Specifications
19a) Providing Plain cement concrete M-20
20b) RCC-M20 Encasing Slab
21Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per 2900 of MoRTH Specification.
22Furnishing and Placing Reinforced M-30 Grade in super-structure as per drawing and Technical Specification
23Drainage Spouts complete as per drawing and Technical specification as per MoRTH Specification 2705.
24Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification 710.1.4.of IRC:78 and 2504.2 of MoRTH.
25Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification 710.1.4.of IRC:78 & 2200 of MoRTH.
26Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications 2504 of MoRTH
27Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification 2504 of MoRTH
28Providing and laying boulders apron on river bed for protection
29Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall as per MoRTH Specification 2507.2
30Supplying, fitting and placing HYSD / TMT bar reinforcement in super-structure complete as per drawing and technical specifications 1600 of MoRTH in HPC
31Supplying, fitting and placing HYSD / TMT bar reinforcement in super-structure complete as per drawing and technical specifications 1600 of MoRTH.
32Bill No. 3 : Minor Bridge-5 Nos, ROB at LC No. 24C special, RE Wall for approach at ROB.
33Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
34Providing and laying of PCC M10 levelling course
35Providing and laying of PCC M15 levelling course 100mm thick below the pile cap & below structure as per MoRTH specification 1100 & 1700.
36Reinforced Cement Concrete M-35 Grade in Open Foundation complete as per Drawing and Technical Specifications as per MoRTH Specification 1500,1700 & 2100.
37Supplying, Fitting and Placing un-coated HYSD / TMT bar Reinforcement in Foundation complete as per Drawing and Technical Specifications as per MoRTH specification 1600.
38Reinforced cement concrete M-35 Grade in sub-structure complete as per drawing and Technical Specifications as per MoRTH Specification 1500,1700 & 2100.
39Supplying, fitting and placing HYSD / TMT bar reinforcement in sub-structure complete as per drawing and Technical Specifications as per MoRTH 1600& 2200.
40Furnishing and Placing Reinforced cement concrete M-40 Grade in super-structure as per drawing and Technical Specification 1500,1600 & 1700 of MoRTH.
41Supplying, fitting and placing HYSD / TMT bar reinforcement in super-structure complete as per drawing and technical specifications as per MoRTH Specification 1600.
42PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification as per MoRTH Specification 2700.
43Reinforced cement concrete M-30 Grade approach slab including reinforcement and formwork complete as per drawing and Technical specification as per MoRTH Specification 1500,1600,1700 & 2704.
44RCC coping beam
45HYSD in Coping beam
46Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications 2703,1500,1600 & 1700 of MoRTH in ROB
47Railing in MNB
48Provision of an Reinforced cement concrete M-40 grade crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with Reinforced Cement Concrete with HYSD reinforcement conforming to conforming MoRT&H Specification and as per details given IRC -5 (Fig.-5, b) including dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board etc.,as per approved drawing and at locations directed by the Engineer, all as specified. (Area-0.243 Sqm. /Meter, Single Face)
49Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications.
50Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation as per approved drawings and technical specifications 2607 of MoRTH.
51Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications 2600 of MoRTH.
52Drainage Spouts complete as per drawing and Technical specification as per MoRTH Specification 2705.
53Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications 2504 of MoRTH
54Reinforced earth Structures have four main components as under:a)Excavation for foundation, foundation concrete and cement concrete grooved seating in the foundation for facing elements (facia material). b) Facia material Precast RCC M-35 Grade of Concrete with approved design and its placement With reinforcing elements of synthetic geogridsc) Assembling, joining with facing elements and laying of the reinforcing elements with Glass reinforced polymer/fibre reinforced polymer/polymeric stripsd) Earth fill with granular material which is to be retained by the wall.e) Including all required material as per approved design to complete the work as per required MoRTH Specification clause 3103 & 703.
55Reinforced cement concrete M-40 grade crash barrier with friction slab at the edges of the road, approaches to bridge structures and medians, constructed with Reinforced Cement Concrete with HYSD/ TMT Bar reinforcement conforming to conforming MoRT&H Specification and as per details given IRC -5 (Fig.-5, b) including dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board etc..,as per approved drawing and at locations directed by the Engineer, all as specified. (Area-0.243 Sqm. /Meter, Single Face)
56Painting two coats after filling the surface with Retroreflective Paint paint in all shades on new plastered concrete surfaces including water based putty on overall surface.
57Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification 2504 of MoRTH
58Mastic Asphalt (Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-39, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine-grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516.)
59Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification 710.1.4.of IRC:78 & 2200 of MoRTH.
60Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall as per MoRTH Specification 2507.2
61Providing and laying boulders apron with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
62Bill No. 4 : Drain, Rectification of Drain, New Jersey Crash Barrier, New Drain in Abadi Portion, Toe Wall,
63Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
64Plain Cement Concrete M-15 Grade in Open Foundation complete as per Drawing and Technical SpecificationS 1500,1700 & 2100 of MoRTH
65Reinforced Cement Concrete M-20 Grade in Open Foundation complete as per Drawing and Technical SpecificationS 1500,1700 & 2100 of MoRTH
66Reinforced Cement Concrete M-25 Grade in Open Foundation complete as per Drawing and Technical SpecificationS 1500,1700 & 2100 of MoRTH
67Supplying, Fitting and Placing un-coated HYSD/ TMT bar Reinforcement in Foundation complete as per Drawing and Technical Specifications as per MoRTH specification 1600.
68Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres as per specification 202 of MoRTH.
69Lifting of superstructure span by jacking up from below i.e. by placing the jacks on pier/abutment caps for span length of 30m. (Existing Drain Slab)
70Provision of an Reinforced cement concrete New jersey crash barrier at the medians, constructed with Reinforced Cement Concrete with HYSD reinforcement conforming to conforming MoRT&H Specification and as per details given IRC -119 (Fig.-26) including dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board etc.., as per approved drawing and at locations directed by the Engineer, all as specified. (Area-0.261 Sqm. /Meter, Double Face)
71Providing and laying of HDPE 100 mm dia in New Jersey Crash Barrier for laying of cable for stree light including all material and labour charges etc complete as per approved design and drawing.
72Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
73Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
74Supplying & laying of drainage composite for use behind walls, between two different fills, alongside drains of road, below concrete lining of canals etc. Geocomposite for planar drainage, realized by thermobonding a draining core in extruded monofilaments with two filtering nonwoven geotextiles that may also be working as separation or protecting layers. The draining three dimensional core will have a “W” configuration as longitudinal parallel channels. Minimum thickness to be 7.2mm, with two filtering UV stabilized polypropylene nonwoven geotextile of minimum thickness of 0.75 mm having pores of 150 micron and tensile strength of 8.0 kN/m that will be working as separation or protecting layer, geocomposite having in plane flow capacity of 2.1 L / (m.s) at hydraulic gradient of 1.0 & 20 kpa pressure and tensile strength of 18 kN/m , with mass per unit area of 740 gsm, supplied in the form of roll for easy transportation to site of work as per detailed specification all complete as per directions of Engineer in charge.
75Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification 710.1.4.of IRC:78 and 2504.2 of MoRTH.
76Bill No. 5 : Small Vechicle Underpass- 4Nos in Bhadohi Bypass
77Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
78Plain Cement Concrete M-15 Grade in Open Foundation complete as per Drawing and Technical Specifications
79Reinforced Cement Concrete M-35 Grade in Open Foundation complete as per Drawing and Technical Specifications as per MoRTH Specification 1500,1700 & 2100.
80Reinforced cement concrete M-30 Grade in sub-structure complete as per drawing and Technical Specifications as per MoRTH Specification 1500,1700 & 2100.
81Supplying, Fitting and Placing un-coated HYSD / TMT bar Reinforcement in Foundation complete as per Drawing and Technical Specifications as per MoRTH specification 1600.
82Reinforced cement concrete M-35 Grade in sub-structure complete as per drawing and Technical Specifications as per MoRTH Specification 1500,1700 & 2100.
83Reinforced cement concrete M-30 Grade in sub-structure complete as per drawing and Technical Specifications as per MoRTH Specification 1500,1700 & 2100.
84Supplying, fitting and placing HYSD / TMT bar reinforcement in sub-structure complete as per drawing and Technical Specifications as per MoRTH 1600& 2200.
85Furnishing and Placing Reinforced cement concrete M-35 Grade in super-structure as per drawing and Technical Specification 1500,1600 & 1700 of MoRTH.
86Furnishing and Placing Reinforced cement concrete M-30 Grade in super-structure as per drawing and Technical Specification 1500,1600 & 1700 of MoRTH.
87Supplying, fitting and placing HYSD / TMT bar reinforcement in super-structure complete as per drawing and technical specifications as per MoRTH Specification 1600.
88Provision of an Reinforced cement concrete M-40 Grade crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with Reinforced Cement Concrete with HYSD reinforcement conforming to conforming MoRT&H Specification and as per details given IRC -5 (Fig.-5, b) including dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board etc.,as per approved drawing and at locations directed by the Engineer, all as specified. (Area-0.243 Sqm. /Meter, Single Face)
89PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification as per MoRTH Specification 2700.
90Reinforced cement concrete M-30 Grade approach slab including reinforcement and formwork complete as per drawing and Technical specification as per MoRTH Specification 1500,1600,1700 & 2704.
91Drainage Spouts complete as per drawing and Technical specification as per MoRTH Specification 2705.
92Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification 710.1.4.of IRC:78 and 2504.2 of MoRTH.
93Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification 710.1.4.of IRC:78 & 2200 of MoRTH.
94Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications 2504 of MoRTH
95Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification 2504 of MoRTH
96Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall as per MoRTH Specification 2507.2
97Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
98Bill No. 6 : Toll Plaza including Admin Block, Toilet Block, Cement Concrete Carriagway and Equipment, T&P etc.
99Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
100Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirementof table No. 300-2
101Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
102Construction of dry lean cement concrete Subbase over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
103Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
104Providing and constructing the toll booth in accordance with the approved drawings and Technical Specifications, as directed by the Engineer-in-Charge. Payment shall be made based on the measured plinth area, in accordance with the applicable rules, specifications, and prevailing laws.”
105Providing and constructing the Toll Plaza office building in accordance with the approved drawings and Technical Specifications, as directed by the Engineer-in-Charge. Payment shall be made based on the measured plinth area, in accordance with the applicable rules, specifications, and prevailing laws.”
106Providing and constructing the Toilet Blocks etc building in accordance with the approved drawings and Technical Specifications, as directed by the Engineer-in-Charge. Payment shall be made based on the measured plinth area, in accordance with the applicable rules, specifications, and prevailing laws.”
107ETC RFID transceiver near Pay axis - mounted on Canopy
108Electronics apparatus
109Lane controller with Industrial PC
110AvC including sensors, loop and detector
111User Fare display with mounting pole
112Automatic Barrier Gate
113Overhead Lane status light (ORLS)
114Traffic light with mounting Pole
115Loops with detector
116Incident capture camera with mounting pole
117License Plate image capture camera with mounting pole
118TFT monitor
119Customized industrial grade Key board
120Thermal Receipt Printer
121Barcode reader with stand
122violation light & Alarm (on existing pole) and foot switch in booth
123Booth CCTv Camera with voice recording
124Cabling/Networking/Installation/Comissioning (Lump Sum)
125Software - Lane level
126Intercom Slave unit in booth
127Providing, installing & operating weigh in machine for checking & preventing overload of vehicle at toll plaza on toll lanes as per drawing or as directed by Engineer incharge
128Providing & installing canopy over toll plaza
129Plaza server in hot-standby configuration
130Providing , installing and operating stattic weigh bridge machine fior checking and preventing overload of vehicle at toll plaza with separatelane as per drawing or as directed by engineer incharge
131Work stations for MIS, Cashup, Audit & LSDU (Lane status display unit in control room)
132Network Printer
1338 Port Network switch (Layer 3)
13424 Port Network switch (Layer 3)
135Internet router for connection to the CCR
136Software - Plaza Level
137Broadband Internet connection with minimum 2 Mbps link
138UPS system as required for complete Rybrid ETC Toll Plaza System
13955\\" LED Display for CCTv Monitoring
140Network video recorder (NvR) for CCTv Recording
141CCTv Cameras for Plaza building surveillance (Server room, control room, cashup room, admin)
142Intercom Master Unit in Control Room -20 channel (For >8 lanes)
143Highmast light on Toll plaza on start & End also include expenditure of Installation & Energination cost from Electrical Owning deptt i.e. Transfer, Connection Cable etc complete.
144Toll Plaza Sign boards,Safety barriers, etc. as per IRC manual complete with all respects
145Bill No. 7 : Misc Work like as Road Safety, Boundary Pillar, W-Beam Crash Barrier.
146Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade on WMM base layer, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 4091-TCS-1 New Construction 4-Lane with Paved Shoulder (Flexible Pavement)2- TCS-6 Construction of 4-lane ROB Approach with Service Road in Open Area (Flexible Pavement)TCS-7 Construction of 4-Lane Divide Carrigeway with pave shoulder Builtup Area (Flexible Pavement)TCS-8 Existing ROB Cum Flyover
147Providing, fitting and fixing mild steel Pedestrian Guard Railing complete as per drawing and Technical Specification 2703.2 & 1900 of MoRTH .
148Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, 2mm thick aluminium sheeting, 3mm/4mm thick Aluminum composite material sheet depending on the size of the sign fixed over back support frame of min 25x25x3mm Angle mounted on a mild steel circular pipe 65 NB ,3.2 mm thicknness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing as per MoRTH Specification 801.
149900mm Octagonal.
1501200mm Triangle
151900mm Triangle
152900mm Circular
153600mm Circular
154Route Marker
155Petrol Pump
156Chervon
157Hazard 300x900mm
158Hazard on median cut 450X900mm
159Direction Board 800x600 MM
160Providing and erecting direction and place identification retro-reflectorised sign as per IRC :67 made of High Intensity grade sheeting lause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminum composite material sheet with overall thickness of 4 mm with area exceeding 0.9 sqm fixed over back support frame of min 40 x 40 x 5 mm MS Angle mounted on two nos. of mild steel circular pipe 65 NB ,3.2 mm thicknness and 4.5 meter total height firmly fixed to the ground by means of properly designed foundation with M 25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing
161Max Speed Limit 1200x1500
162Direction Board 1500x1200 MM
163Direction Board 1500x1500 MM
164Over Head Structure 12 m- 15 m span Supply, fixing & eraction of built up Overhead Structure of 12M-15M span & 1.50 m Height comprising of two vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M S plate at bottom. The horizontal Truss shall comprise of 50 mm dia heavy class M.S. pipe and 40 mm dia heavy M S pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel plant. The work includes construction of RCC Foundation of size 0.90x0.90 mm of required depth as per site condition for built up structure including Earth work in excavation 100 mm thick Lean Concrete in 1:4:8 (cement coarse sand and 40 mm gauge S.B) RCC with 1:2:4 (cement, coarse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearances and complete. Supply, fixing & eraction of built up Overhead Structure of 12M-15M span comprising of three vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M S plate at bottom. The horizontal Truss shall comprise of 50 mm dia heavy class M.S. pipe and 40 mm dia heavy M S pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel plant. The work includes construction of RCC Foundation of size 0.90x0.90 mm of required depth as per site condition for built up structure including Earth work in excavation 100 mm thick Lean Concrete in 1:4:8 (cement coarse sand and 40 mm gauge S.B) RCC with 1:2:4 (cement, coarse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearances and complete.
165Cantilever Structure 5.00-6.00 M span , Supply, fixing & eraction of built up Overhead Structure of 5.00-6.00 M span & 1.50m height comprising of One vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M S plate at bottom. The horizontal Truss shall comprise of 50 mm dia heavy class M.S. pipe and 40 mm dia heavy M S pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel plant. The work includes construction of RCC Foundation of size 0.90x0.90 mm of required depth as per site condition for built up structure including Earth work in excavation 100 mm thick Lean Concrete in 1:4:8 (cement coarse sand and 40 mm gauge S.B) RCC with 1:2:4 (cement, coarse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearances and complete. Supply, fixing & eraction of built up Overhead Structure of 5.00-6.00 M span comprising of three vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M S plate at bottom. The horizontal Truss shall comprise of 50 mm dia heavy class M.S. pipe and 40 mm dia heavy M S pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel plant. The work includes construction of RCC Foundation of size 0.90x0.90 mm of required depth as per site condition for built up structure including Earth work in excavation 100 mm thick Lean Concrete in 1:4:8 (cement coarse sand and 40 mm gauge S.B) RCC with 1:2:4 (cement, coarse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearances and complete.
166Providing & fixing of reflective signs with a corrosion resistant 4 mm thick aluminium composite panel face to be fully covered with High Intensity prismatic sheeting type IV as per IRC-67:2010 retro reflective sheeting with MS angle frame of 35x3 for Over Head Signage etc complete as per Section 800 of MoRTH Specification.
167Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
168Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8, fixing in position including painting and printing etc
1695th KM Stone
170KM STONE
171HECTOMETER STONE
172Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming toIRC-79 and the drawings.
173Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973)
174Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting
175Providing and erecting a \\"W\\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811
176Bill No. 8 : Installation of Street Lighting on Project Stretches
177S/F of 09 mtr GI Octagonal Pole of approved make ( top dia 70mm, Bottom dia 155mm and base plate 16m thick having 3mm thickness with double arm bracket (1Mtr length) in 1:2:4 RCC foundation including the cost of foundation, foundation bolts, excavation & back filling and Required T& P complete in all respect (PWD Schedule 2024 SI No. 21.2.5) including(1) S/F of LED light Street Light fitting with mandatory driver set having die cast aluminium body with toughened glass/UV stabilized PC Cover and lens suitable for 140watt To 150 Watt. confirming to IP 66 and IK 07 and above Protection having company LOGO Engraved compete in all including labour. (PWD Schedule 2024 SI No 23.18) CAT-AAA with 05 year warranty including(2) S/L of 25sq.mm 3 1 2 core Aluminium conductor PVC insulated armored served sheathed cables 1100 Volts grade at a depth of 750 mm below ground level over a cushion 75mm thick sand all around cable as directed by Engineer in Charge complete in al respect including excavation and refilling. (PWD schedule 2024 SI No. 20.1.10) (3) S/F of Distribution Fuse board Natural link four pole with 32Amp MCB and lugs complete in all respect.(4) S/L of 1.5mm 3 core copper wire for connection of LED light. From LED light to distribution fuse board complete in all respect ISI Mark(5) S/F 40 AMP TPN capacity of automatic street light cubicle control panel complete in all respect. (PWD-2018 SI No. 807 (f)(II))(6) S/L 50mm Dia HDPE Pipe for cabling ISI Mark complete all respect(7) S/B of G.I Pipe Earthing complete in all respect (PWD-2018 S.I 701) (8) Its also include expenditure of Installation & Energination cost from Electrical Owning deptt i.e. Transfer, Connection Cable etc complete.
178Single arm
179Double Arm
18020 m High Mast Lighting System, hot-dip galvanized, polygonal, raising and lowering type, designed as per IS 875 (Part 3), complete with 12/16 Nos. LED floodlights and all accessories, location are as Major Junction at Indirameel Chauraha, Dhaurahara Chauraha, Junction at 49.200, Junction at 89.285 (Varanasi Ring Road) also include expenditure of Installation & Energination cost from Electrical Owning deptt i.e. Transfer, Connection Cable etc complete.
181Bill No. 9 : Shifting of Utility - Electrical Pole and Line regarding LT Line, 11 KV & 33 KV as line diagram submitted by Electric Deptt.
1823 Phase LT Line in Distt Varanasi
183Providing, supplying, transporting, erecting, testing and commissioning of 3 Phase LT ABC overhead line complete with all required materials, accessories, fittings and allied works, including STP-11 M-IS-410 SP-55 poles – 170 Nos.; LT ABC Cable (3×120 + 1×95 + 1×16) Sq. mm – 12,060 m; 3-Phase LT Distribution Box with Clamp – 185 Nos.; Extra Stay at Angle Locations – 25 Nos.; Earthing Complete – 170 Nos.; Dead End Clamp with N&B – 96 Nos.; Eye Hook – 410 Nos.; Suspension Clamp – 314 Nos.; PG Clamp – 740 Nos.; Aluminium Paint – 170 Nos.; Red Oxide Paint – 170 Nos.; Nuts & Bolts of Various Sizes – 374 Nos.; 3-Phase LT Distribution Box Clamp – 185 Nos.; Concreting of Stay – 25 Nos.; Concreting of Pole/Muffing – 170 Nos.; including all necessary excavation, concreting, pole erection, muffing, stay arrangement, clamps, hooks, earthing, painting, nuts and bolts, jointing/termination, connections, cartage, loading/unloading, erection and testing, complete in all respects. The work shall also include cartage and erection charges with 100% completion as per Item 9(1), Sl. Nos. 1 to 15, retrieval/return of all surplus materials, dismantling of existing LT line conductors/AB cable and associated fittings wherever required, and disposal/stacking of dismantled materials at the designated location, complete as directed by the Engineer-in-Charge and in accordance with the relevant specifications, drawings and instructions. Rate shall be inclusive of all labour, materials, tools, plants, transportation, loading/unloading, testing, taxes, duties and all incidental charges required for complete execution of the work.
184Underground LT Line in Distt Varanasi
185The work shall comprise supply, installation, laying, testing, commissioning, cartage, erection, and complete execution of Underground LT Line works in District Varanasi, including LT XLPE Aluminium Cable 3.5 × 240 Sq.mm (90 × 2 = 180) for 8,640 m, STP 11 M-IS 410 SP-55 poles (164 Nos.), Top Channel 125 × 65 mm and MS Channel (Dropper) for fuse sets, MS angle-iron bracing with clamps, complete stay sets, pole earthing with MS earthing rods and 6 SWG wire, GI pipe 6\\" dia with holding clamps, cable holding clamps, HDPE pipe 140 mm dia for laying across NHI roads, aluminium and red oxide painting, bolts, nuts, washers and other clamps, cable laying by digging/drilling for 5,760 m, cartage of cable/material from store to site, hoisting of cable on poles with GI pipe arrangements, concreting of stays and pole muffing, and all allied works necessary for proper and safe installation. The scope shall further include dismantling of the existing LT line/conductor/AB cable wherever required, complete erection and cartage, restoration of the site, and handing over of the entire work in fully completed and operational condition, including all labour, tools, plants, machinery, transportation, testing, safety arrangements and incidental works, with 100% completion as per the approved specifications and tender requirements, and with all dismantled/recovered materials duly accounted for and returned to the designated store/department.
186Underground 11KV Road Crossing in Distt Varanasi
187The work shall comprise complete supply, installation, laying, testing, commissioning and execution of Underground 11 KV Road Crossing works in District Varanasi, including 3×185 Sq.mm 11 KV XLPE cable for 5,610 m, 3×300 Sq.mm 33 KV XLPE cable for 400 m, outdoor cable jointing kits for 33 KV and 11 KV cables, STP 11 M-IS 410 SP-55 poles, top channels, MS dropper channels, MS angle-iron bracing with clamps, complete stay sets, pole earthing with MS earthing rods and 6 SWG wire, GI pipes with pipe and cable holding clamps, HDPE pipes of 140 mm dia for road crossings, painting, bolts, nuts, washers and all necessary clamps and fittings. The scope shall also include cable laying by digging/drilling, road crossing works, cartage of cables and materials from store to site, hoisting of cables on poles with GI pipe arrangements, concreting of stays and pole muffing, jointing and termination of cables, dismantling of existing LT/AB cable/conductor and associated installations wherever required, safe handling and return of dismantled/recovered materials to the designated department/store, restoration of road and site to its original condition, and all allied civil, electrical, mechanical and incidental works necessary for complete and satisfactory execution. The contractor shall provide all labour, tools, plants, machinery, transportation, safety arrangements, testing equipment and other resources required for 100% completion of the work as per the approved specifications, drawings, departmental requirements and tender conditions, including complete cartage and erection, testing, commissioning and handing over of the system in safe and operational condition.
18811KV Overhead in Distt Varanasi
189The work shall comprise complete supply, installation, erection, stringing, testing and commissioning of 11 KV Overhead Line works in District Varanasi, including 11 m long STP poles – 150 Nos., MS angle 65×65×6 mm V-type X-arms – 50 Nos., 11 KV polymeric pin insulators – 450 Nos., MS channel 125×65×1300 mm (T-O-M) – 117 Nos., MS dropper channel 100×50×2028 mm – 100 Nos., 11 KV polymeric disc insulators – 51 Nos., 11 KV disc fittings – 51 Nos., ACSR Rabbit conductor 7790×3 with 54% sag – 24.538 Km, complete stay sets – 17 Sets, pole earthing with MS earthing rods 20×2500 mm and 6 SWG earthing wire – 150 Nos., X-arm holding clamps with nuts and bolts – 50 Nos., F-brackets for pin-top insulators with nuts and bolts – 50 Nos., aluminium binding wire – 41 Kg, danger boards with clamps and bolts – 150 Nos., bolts, nuts and washers of all sizes – 165 Kg, barbed wire – 59 Kg, red oxide paint – 150 Ltr, aluminium paint – 150 Ltr, cement, sand and grit for pole fixing – 150 Nos., and concreting of stays – 17 Nos. The scope shall also include cartage of all materials from store to site, complete erection and alignment of poles and line accessories, conductor stringing with required sag and tension, installation of insulators and fittings, earthing, painting, pole foundation and concreting, dismantling of existing LT line/conductor/AB cable wherever required, safe handling and return of all dismantled/recovered materials to the designated store, restoration of the work site, testing, safety arrangements and all allied civil, electrical and incidental works, with all labour, tools, plants, machinery, transportation and equipment necessary for 100% completion of the work as per approved specifications, drawings and tender conditions, including complete cartage and erection, testing and commissioning, and handing over of the overhead 11 KV line in safe, complete and operational condition.
19011KV/0.40KV LT Substation(9 Nos Dots) in Distt Varanasi
191The work shall comprise complete supply, installation, erection, testing and commissioning of 11 KV/0.40 KV LT Substation works at 9 locations in District Varanasi, including STP 11 M-IS 410 SP-55 poles – 36 Nos., Top Channel 125×65 mm – 36 Nos., MS Channel (Dropper) 100×50×2028 mm for fuse set – 54 Nos., MS Angle 75×75×6×2028 mm with clamps, bolts and nuts for transformer base – 54 Nos., polymeric 11 KV disc insulators – 108 Nos., 11 KV disc fittings – 18 Sets, polymeric 11 KV pin insulators – 18 Nos., complete stay – 1 No., pole earthing with MS earthing rod 20×2500 mm and 6 SWG wire – 1 No., Henley-type tailless unit protection cubical panels 500A/650V for 250 KVA distribution transformers – 90 Nos., Henley-type tailless unit protection cubical panels 500A/650V for 400 KVA distribution transformers – 18 Nos., clamps with bolts and nuts – 4 Nos., danger boards with clamps – 4 Nos., copper L-pieces 50×225×10 mm – 160 m, copper L-pieces 62×225×12 mm – 18 Nos., LT XLPE Aluminium cable 1×240 Sq.mm – 18 Kg, number plates with clamps, bolts and nuts – 18 Nos., GI barbed wire – 5 Kg, aluminium paint – 18 Kg, aluminium binding wire – 18 Nos., and bolts, nuts and washers – 18 Nos. The scope shall further include cartage of all materials from store to site, complete erection and assembly of the 11 KV/0.40 KV substations, installation and connection of transformer protection panels, insulators, transformer-base supports, copper connections, LT cable, earthing and safety accessories, pole alignment and foundation/concreting wherever required, testing and commissioning, dismantling of existing LT line/conductor/AB cable and associated installations wherever required, safe handling and return of all dismantled/recovered materials to the designated store, restoration of the site, and all allied civil, electrical, mechanical and incidental works, including all labour, tools, plants, machinery, transportation, testing equipment and safety arrangements necessary for 100% completion as per approved specifications, drawings and tender conditions, and handing over each substation in safe, complete and operational condition.
192Shifting of LT line in Distt Bhadohi
193The work shall comprise complete shifting, dismantling, re-erection, installation, testing and commissioning of LT electrical lines in District Bhadohi, including 11 m long STP poles – 201 Nos., AB conductor (3×120+1×95+1×16) – 14,180, LT XLPE cable 1×630 Sq.mm – 80 m, 1×240 Sq.mm – 400 m, 1×400 Sq.mm – 160 m, 3.5×150 Sq.mm – 2,000 m, 3.5×240 Sq.mm – 3,000 m, GI pipe – 600 m, dead-end clamps – 112 m, piercing clamps – 201 Nos., LT clamps – 201 Nos., suspension clamps – 201 Nos., sections on double poles – 60 Nos., hooks – 201 Nos., stay sets – 42 Nos., LT side branching – 100 Nos., complete earthing – 201 Nos., distribution box clamps – 201 Nos., distribution boxes – 201 Nos., 140 mm OD PN-4 PE-80 Grade UV-stabilized HDPE pipe conforming to IS:4984 in 6 m lengths – 500 Nos., stone pads – 201 Nos., red oxide paint – 201 Ltr, silver paint – 201 Ltr, pole concreting – 201 Nos., stay grouting – 42 Nos., laying of 3×300 Sq.mm 11 KV XLPE cable with sand and bricks – 2,500, and 11 KV road-crossing charges – 2,500. The scope shall further include cartage of all materials from store to site, dismantling of existing LT lines, conductors/AB cables, poles, accessories and associated installations wherever required, safe removal and stacking/return of dismantled materials, shifting and re-erection of poles, complete stringing and termination of conductors and cables, installation of clamps, hooks, stays, branching arrangements, distribution boxes, earthing, GI/HDPE pipes, underground cable laying with required sand and brick protection, road crossings, pole concreting and stay grouting, painting, testing and commissioning, restoration of roads and work sites, and all allied civil, electrical and incidental works. The contractor shall provide all labour, tools, plants, machinery, transportation, testing equipment, safety arrangements and other resources necessary for 100% completion of the work as per approved specifications, drawings and tender conditions, including complete cartage and erection, and shall hand over the shifted LT system in safe, complete and operational condition with all recovered/dismantled materials duly accounted for and returned to the designated department/store.
194Shifting of 11KV line in Distt Bhadohi
195The work shall comprise complete shifting, dismantling, re-erection, installation, testing and commissioning of the 11 KV electrical line in District Bhadohi, including 11 m long STP poles – 241 Nos., 11 KV XLPE cable 2×300 Sq.mm – 3,000 m, 11 KV XLPE cable 2×185 Sq.mm – 2,000 m, ACSR Weasel conductor – 27,081 m, 11 KV V-type X-arms – 141 Nos., 11 KV pin insulators with pins – 721 Nos., T-off channels – 10 Nos., 11 KV disc insulators with fittings – 10 Nos., 11 KV cross-arm holding clamps – 71 Nos., channel clamps – 141 Nos., 11 KV top channels – 120 Nos., 11 KV dropper channels – 19 Nos., substation bases with angles – 19 Nos., danger boards with clamps – 40 Nos., stone pads – 241 Nos., F-brackets – 241 Nos., aluminium binding wire – 241 Nos., jointing kits for 11 KV XLPE cable – 80 Kg, jointing kits for 3×300 Sq.mm 11 KV XLPE cable – 40 Nos., ACSR Weasel jointing sleeves – 80 Nos., complete stay sets – 100 Nos., 11 KV TPMO – 60 Nos., 11 KV fuses – 10 Nos., 140 mm OD PN-4 PE-80 Grade UV-stabilized HDPE pipe conforming to IS:4984 in 6 m lengths – 500 Nos., double-pole sections on 11 m HT poles – 60 Nos., complete earthing – 241 Nos., ACSR Dog conductor – 3,350 m, fencing for 400/250 KVA transformers – 10 Nos., guarding angles – 100 Nos., GI pipe – 300 m, side-branching angles with clamps – 100 Nos., GI wire for guarding – 3,030 Kg, red oxide paint – 241 Ltr, silver paint – 241 Ltr, aluminium tape – 40 Nos., shifting of 10/16/25/100 KVA transformers – 25 Nos., pole concreting – 241 Nos., stay grouting – 60 Nos., number plates – 241 Nos., aluminium paint – 201 Ltr, laying of 3×300 Sq.mm 11 KV XLPE cable with sand and bricks – 2,500 m, chemical earthing for 400/250 KVA transformers – 34 Nos., transformer plinths for 400/250 KVA transformers – 10 Nos., bolts with nuts and washers – 50 Kg, and 11 KV road-crossing works – 2,500 m. The scope shall further include cartage of all materials from store to site, dismantling of existing 11 KV lines, conductors, cables, poles, transformer arrangements and associated accessories wherever required, safe removal, stacking and return of dismantled/recovered materials, shifting and re-erection of poles and transformers, complete stringing and termination of conductors and cables, installation of insulators, cross-arms, channels, clamps, stays, TPMO, fuses, branching arrangements, guarding, fencing, earthing, GI/HDPE pipes, underground cable laying with sand and brick protection, road crossings, transformer shifting, plinth construction, chemical earthing, pole concreting, stay grouting, painting, numbering, testing and commissioning, restoration of roads and work sites, and all allied civil, electrical, mechanical and incidental works. The contractor shall provide all labour, tools, plants, machinery, transportation, testing equipment, safety arrangements and other resources necessary for 100% completion of the work as per approved specifications, drawings and tender conditions, including complete cartage and erection, and shall hand over the shifted 11 KV system in safe, complete and operational condition with all recovered/dismantled materials duly accounted for and returned to the designated department/store.
196Shifting of 33KV line in Distt Bhadohi
197The work shall comprise complete shifting, dismantling, re-erection, installation, testing and commissioning of the 33 KV electrical line in District Bhadohi, including 13 m long ST poles – 123 Nos., ACSR Dog conductor – 15 Km, 33 KV V-type X-arms – 63 Nos., 33 KV XLPE cable 3×300 Sq.mm – 1.60 Km, 33 KV polymeric pin insulators – 329 Nos., 33 KV outdoor cable jointing kits – 28 Nos., 33 KV pins with nuts – 329 Nos., aluminium binding wire – 60 Kg, complete earthing – 123 Nos., danger boards with clamps – 93 Nos., barbed wire – 186 Nos., polymeric disc insulators, B&S type – 329 Nos., PG clamps for ACSR Dog conductor – 180 Nos., 120 mm OD PN-4 PE-80 Grade UV-stabilized HDPE pipe conforming to IS:4984 in 6 m lengths – 120 Nos., GI pipe – 140 m, complete stay sets – 60 Nos., four-pole sections – 15 Nos., double-pole sections – 16 Nos., 33 KV side-branching angles – 60 Nos., F-brackets – 108 Nos., earth-wire clamps with bolts and nuts – 93 Nos., number plates with clamps, nuts and bolts – 93 Nos., bolts, nuts and washers of all sizes – 153 Kg, red oxide paint – 93 Ltr, aluminium paint – 93 Ltr, cable laying charges with materials – 0.75 Km, road-crossing works – 0.70 Km, stone pads – 123 Nos., pole concreting – 123 Nos., and stay grouting – 60 Nos. The scope shall further include cartage of all materials from store to site, dismantling of existing 33 KV lines, conductors, cables, poles and associated accessories wherever required, safe removal, stacking and return of dismantled/recovered materials, shifting and re-erection of poles, complete stringing and sagging of ACSR Dog conductor, installation of X-arms, insulators, pins, clamps, stays, branching arrangements, earth-wire arrangements, danger boards, number plates, guarding and fencing, earthing, GI/HDPE pipes, underground 33 KV cable laying, cable jointing and termination, road crossings, pole concreting, stay grouting, painting, testing and commissioning, restoration of roads and work sites, and all allied civil, electrical, mechanical and incidental works. The contractor shall provide all labour, tools, plants, machinery, transportation, testing equipment, safety arrangements and other resources necessary for 100% completion of the work as per approved specifications, drawings and tender conditions, including complete cartage and erection, and shall hand over the shifted 33 KV system in safe, complete and operational condition with all recovered/dismantled materials duly accounted for and returned to the designated department/store.
198Shifting/height raising of 132 kV Bhadohi–Jaunpur S/C Line at Highway Ch. 52+200, 132 kV Bhadohi–Bhadohi (220 kV) D/C Line at Ch. 52+360 including erection/modification of towers, raising of lowest conductor to the required height above FRL, all materials, labour, carriage, compensation for land, shutdown charges and all incidental works, complete as per directions of the concerned Electrical Transmission Department and applicable norms. Payment shall be made only after completion of the works and submission of the requisite completion/safety certificate from the concerned Electrical Transmission Department.
199Shifting of Common Property Resouces like as Temple, Boundary wall , welcome gate, Maszid etc in Distt Bhadohi as per approved drawing and designed and as per Engineer In-Charge.
200Welcome Gate & Check Post at Chainage 70+340 RHS
201Welcome Gate at Ch 71+789 RHS
202Welcome Gate at CH 72+185 RHS
203STATUE at CH 76+380 Center
204MASJID B/WALL at CH 73+700 LHS
205Welcome Gate at CH 74+870 LHS
206MANDIR at CH 75+120 LHS
207Welcome Gate at Ch 76+120 RHS
208Welcome Gate at CH 77+355 RHS
209CHABUTRA at CH 77+380 LHS
210MANDIR at CH 79+900 LHS
211MANDIR at CH 82+430 LHS
212MANDIR at CH 82+710 RHS
213Welcome Gate at CH 82+985 RHS
214MANDIR at Ch 83+260 RHS
215MANDIR at CH 83+700 RHS
216MANDIR at CH 84+150 RHS
217Welcome Gate at CH 84+695 LHS
218STATUE at CH 85+510 Center
219Maszid at Ch 88+930 RHS
220Welcome Gate at Ch 89+050 LHS
221Shifting of Common Property Resouces like as Temple, Boundary wall , welcome gate, Maszid etc in Distt Varanasi as per approved drawing and designed and as per Engineer In-Charge.
222MANDIR at CH 54+820 LHS
223POLICE CHAUKI at CH 54+820 RHS
224MANDIR at CH 55+410 RHS
225MANDIR at CH 58+690 LHS
226MANDIR at Ch 61+660 RHS
227Welcome Gate at 63+140 LHS
228MANDIR at 63+270 LHS
229MANDIR at 63+360 RHS
230MANDIR at CH 64+280 LHS
231MANDIR at CH 64+710 LHS
232MANDIR [Group of 4nos. temple] at 65+330 LHS
233B/Wall Primary School at CH 66+460 LHS
234B/Wall Primary School at CH 67+260 RHS
235MANDIR at Ch 68+360 RHS
236B/Wall Primary School at Ch 68+380 RHS Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58074928
AUTHORITY Government Departments
TENDER VALUE 236.94 Crore
LAST DATE 30-11-2026
Authority
Authority Name Ministry Of Road Transport And Highways
Work Description Tender for Rfp For The Balance Work For Widening To Four Lane Of Bhadohi To Varanasi Section Of Nh 731B From Design Km 49.200 To Km 89.285 On Percentage Rate Basis In The State Of Uttar Pradesh.
Basic Detail
Tender No CE-RO/LKO/NH(D)/04/NH 731B/Balance work/2026-27 dated 16.10.2026
Bidding Type Tender
Location
City Bhadohi
State Uttar Pradesh
Key Dates
Publish Date 16 Oct 2026
Submission Date 30 Nov 2026
Open Date 01 Dec 2026
Finance
Tender Value 236.94 Crore
Tender Fee 30000
EMD 2.37 Crore
Exemption Not Available
Document List
8fef529b-e343-4f11-9cd2-8ab489e357a1.html
BOQ_977972.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 16, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 30, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 13 days
Dec 01, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 14 days

Tender Documents

Download All (ZIP) ↓
html

8fef529b-e343-4f11-9cd2-8ab489e357a1.html

xls

BOQ_977972.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender