Tender For Restoration Of Jogni Dy From Km 0.000 To 3.100 And Demarcation Of Canal Land.
Tender Value
2.40 Crore
Estimated cost
Bid Submission
30 Oct 2026
7 days left
EMD
4.80 Lakhs
Bank guarantee accepted
Document Fee
2354
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Prayagraj → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Restoration Of Jogni Dy From Km 0.000 To 3.100 And Demarcation Of Canal Land.
BOQ
| Sl. No. | Item Description |
| 1 | Restoration & strengthening of bank and daowla in all type of soil mixed with chharry, karail, black cotton soil including all lead & lift with manual compaction dressing and T&P etc. required for proper completion of the work. |
| 2 | Dismantling of old brick work ,stone work in lime or concrete mortar including stacking of materials as per direction of Enginner -in- charge |
| 3 | Cost of dismantling R.c.c slab or othr rich Concrete including proper disposal as per direction of engg -in- charge |
| 4 | Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M |
| 5 | Preparation of Sub-grade for Lining excluding cost of earth work. |
| 6 | Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc. |
| 7 | C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. |
| 8 | Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work. |
| 9 | 1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. |
| 10 | Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work. |
| 11 | Providing and fixing of 150 mm dia HDPE 6 kg/m² pressure Pipe Avg. = (12.00+8.00)/2= 10.00 |
| 12 | Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 13 | Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 14 | Cement concrete M-15 1:2:4 in foundation including cost of all material and labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 15 | Providing and laying C.C.(1:1.5:3)with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc. |
| 16 | Laying R.C.C 1:1:2 (M-25 ) with cement , C. sand of F.M. more than 2.0 and crushed hard stone grit i/c cost of all material ,labour ,T&P etc. required for proper completion of work but excluding cost reinforcement . |
| 17 | Colour washing of two coat of parapet including cost of all materials,labour and T&P etc. |
| 18 | Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc. |
| 19 | E/W in embankment for restoration of canal section on VRB Nearby in all type of soil mixed including all lead ,lift dressing , etc. |
| 20 | Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 21 | Painting of RCC Precast boundry piller size 250x250x900 (mm) including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge. |
| 22 | P/F G.P. sheet seal of 22 SWG 300 mm wide i/c cost of all material ,labour ,T&P etc. required for proper completion of work. |
| 23 | Laying and fixing joint board 18 mm thick as per drawing & direction of Engineer -in- charge I /c cost of all materials ,labour ,T & P etc. required for proper completion of work |
| 24 | Supply and laying local sand around the barrel and in filter below C.C. block i/c cost of all material , labour ,T&P etc. Required for proper completion of work. |
| 25 | Supply and laying graded crushed hard stone grit 4.75 mm to 20 mm size in filter below C.c. block and wing wall behind weep hole i/c cost of all material , labour ,T&p etc. required for proper completion of work . |
| 26 | Supply and laying graded crushed hard stone grit 20 mm to 40 mm size in filter below C.c. block and and wing wall behind weep hole i/c cost of all material , labour ,T&p etc. required for proper completion of work . |
| 27 | Carriage and laying stone (weight 25 kg to 60 kg ) pitching in launching appron i/c cost of all materials ,labour ,T&P etc. required for proper completion of work . |
| 28 | Providing and fixing PVC pipe 100 mm dia i/c cost of all material , labour ,T &P etc. required for proper completion of work . |
| 29 | Dewatering of foundation hiring diesel pump 5 HP including operator & P.O.L. cost of dewatering equipment and and its accessorise , labour , etc. |
| 30 | Hume pipe in making diversion including , labour ,T&P and taxes required for proper completion of work . |
| 31 | E/W in back filling including labour , T&P and taxes required for proper completion of work . |
| 32 | E/W in Dismatling approach / diversion including lead lift labour T&P etc . As per direction of Engineer -in -charge . |
| 33 | Laying and fixing copper seal 22 SWG size as direction of Engineer -in -charge i/c cost of all materials ,labour ,T&P etc. required for proper completion of work |
| 34 | Laying and fixing PVC water stop seal size as direction of Engineer- in -charge i/c cost of all materials ,labour ,T&P etc. required for proper completion of work . |
| 35 | Uprooting of behaya / sarpat / gondi / elephant grass and other weeds and its disposal including all cost of material, labour and T&P etc. required for proper completion of the work. |
| 36 | Earth work for preparing Sub-base and Road embankment and patari including all cost of material, labour and T&P etc. required for proper completion of the work. |
| 37 | Dry brick on edge soling , including all cost of material, labour and T&P etc. required for proper completion of the work. |
| 38 | laying sealing compound in construction joint of C.R. stone Masonsry lining including cost of all materiaal, labour, T&P etc. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 16, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 30, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysOct 30, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender