Tender For Annual Plan-2025-26-Mullurkkara Gp-236/26-Rennovation Of Well And Grill Work In Class Room At Attoor Govt Up School-General Civil Work
Tender Value
84636
Estimated cost
Bid Submission
23 Oct 2026
6 days left
EMD
2116
Bank guarantee accepted
Document Fee
555
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Thrissur → Kerala
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Annual Plan-2025-26-Mullurkkara Gp-236/26-Rennovation Of Well And Grill Work In Class Room At Attoor Govt Up School-General Civil Work
BOQ
| Sl. No. | Item Description |
| 1 | WELL MAINTENANCE |
| 2 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar |
| 3 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 4 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 5 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil |
| 6 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide |
| 7 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 8 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 9 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete |
| 10 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 11 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 12 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 13 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 14 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work |
| 15 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 16 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 17 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 18 | OD488677/2025-2026:Blacksmith 1st class Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 15, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 23, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysOct 26, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender