Tourism Government Departments Closing in 25 days TDR #58070974

Tender For Package-I1.A. Recovery And Reconstruction Of Road From Sindebong Fatak To Harilal Jhora, Kalimpong G.T.A (Length 2.0Km) Under National Disaster Response Fund (Ndrf) And State Disaster Response Fund (Sdrf).1.B. Recovery And Reconstruction O

Issued by Government Departments · Kalimpong, West Bengal
Tender Value
3.10 Crore
Estimated cost
Bid Submission
13 Nov 2026
25 days left
EMD
6.21 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kalimpong → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Package-I1.A. Recovery And Reconstruction Of Road From Sindebong Fatak To Harilal Jhora, Kalimpong G.T.A (Length 2.0Km) Under National Disaster Response Fund (Ndrf) And State Disaster Response Fund (Sdrf).1.B. Recovery And Reconstruction Of Road Panchayat Office To Sungdung Zero, Kalimpong G.T.A (Length 1.00Km) Under State Disaster Response Fund (Sdrf). 1.C. Recovery And Reconstruction Of Khimdong Road , Kalimpong G.T.A (Length 1.00Km) Under State Disaster Response Fund (Sdrf).1.D. Recovery And Reconstruction Of Road From Seed Farm To Ubkv Office , Kalimpong G.T.A (Length 0.50Km) Under State Disaster Response Fund (Sdrf)1.E. Recovery And Reconstruction Of Road From Sbi Atm To Kanpur House (Length 0.4) Under National Disaster Response Fund (Ndrf) And State Disaster Response Fund (Sdrf) ,Kalimpong,1.F. Recovery And Reconstruction Of Culvert Along The Road From Sindebong Fatak To Harilal Jhora Under State Disaster Response Fund (Sdrf).

BOQ

Name of Work:- Package-I1.A. Recovery and Reconstruction of Road from Sindebong Fatak to Harilal Jhora, Kalimpong G.T.A (Length 2.0Km) under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF).1.B. Recovery and Reconstruction of Road Panchayat Office to Sungdung Zero, Kalimpong G.T.A (Length 1.00Km) under State Disaster Response Fund (SDRF). 1.C. Recovery and Reconstruction of Khimdong Road , Kalimpong G.T.A (Length 1.00Km) under State Disaster Response Fund (SDRF).1.D. Recovery and Reconstruction of Road from Seed Farm to UBKV Office , Kalimpong G.T.A (Length 0.50Km) under State Disaster Response Fund (SDRF)1.E. Recovery and Reconstruction of Road from SBI ATM to Kanpur House (Length 0.4) under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF) ,Kalimpong,1.F. Recovery and Reconstruction of Culvert along the road from Sindebong Fatak to Harilal Jhora under State Disaster Response Fund (SDRF).
Sl. No. Item Description
11a) Recovery and Reconstruction of Road from Sindebong Fatak to Harilal Jhora, Kalimpong G.T.A (Length 2.0Km) under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF).Land Slide Clearance in SoilClearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side.
2Excavation for Structures Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth(iv) Without pumping out water and shoring
3Hand Packed rough dressed stone walls by masons with hard stones from approved quarries including all carriage of materials to site
4Rubble masonry workRubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site(a) In Road and Jhora Work
5Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge.[Rate provided is exclusive of the cost of stoneboulders and sausage crate]
6Hire and labour charges for ShutteringHire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.b) For portion of Ht above 1m and upto 3m
7Plum concrete work Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
8Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
9Weep HoleProviding weep hole (150 X 75mm) in walls including packing brick bats or boulder of approved quality and size at the backsides of walls etc all complete.
10Providing and laying of Filter media with granular materials/stone crushed aggregates/brick aggregates/river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to at hickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment,wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
11Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
12Plaster with sand and cement mortar including rounding off corners or chamfering corners as directed and including raking out joints or roughening of concrete surface, curing with cost and carriage of all materials.
13Neat cement punning on cement plaster surface.
14B. By Mix in Place Method :Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
15Labour for Spreading and consolidating stone metals of specific sizes in hard crust to requisite thickness (measured after compaction) in layers including creening of bats/ metals etc. as necessary, spreading manually or with the help of motor grader, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, spreading and sweeping requisite type and quantity of screening materials to fill up the interstices of coarse aggregates, applying binding materials as directed,including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and as per specification and direction of Engineer-in-charge but excluding cost of stone material.
16Providing and laying bituminous Primer Coat for priming of Base coarse with Bituminous Emulsion of approved grade and requisite quantity including preparation of the surface to be primed ………..i/c cost and carriage of bitumen emulsion and other incidental cost all complete
17Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
18Providing, laying and rolling of Open - graded premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone aggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by any suitable arrangements, laying the mixture uniformly over the surface, including line, grade and level to serve as wearing course on a previously prepared base, including mixing in Mobile Hot Mix Plant (Light Duty) and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating the aggregates to required temperature and including the hire charges of Mobile Hot Mix Plant (Light Duty) and other machinery, pay of operators, cost of fuel and lubricants etc. complete to be followed by seal coat of either Type A or Type B as per Technical Specification Clause 508 for Rural Roads of MORD.
19Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder andaggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
20Spreading of sand over the bituminous surface @ 0.003 m3 per m2 of surface from the road side stacks and carriage of the same up to a distance of 150 m from stack complete including cost of sand.
211.b)Recovery and Reconstruction of Road Panchayat Office to Sungdung Zero, Kalimpong G.T.A (Length 1.00Km) under State Disaster Response Fund (SDRF). Land Slide Clearance in SoilClearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side.
22Excavation for Structures Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.a) upto 3 m depth(iv) Without pumping out water and shoring
23Hand Packed rough dressed stone walls by masons with hard stones from approved quarries including all carriage of materials to site
24Rubble masonry workRubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site(a) In Road and Jhora Work
25Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge.[Rate provided is exclusive of the cost of stoneboulders and sausage crate]
26Hire and labour charges for ShutteringHire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.b) For portion of Ht above 1m and upto 3m
27Plum concrete work Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
28Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
29Weep HoleProviding weep hole (150 X 75mm) in walls including packing brick bats or boulder of approved quality and size at the backsides of walls etc all complete.
30Providing and laying of Filter media with granular materials/stone crushed aggregates/brick aggregates/river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to at hickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment,wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
31Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by theEngineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
32Plaster with sand and cement mortar including rounding off corners or chamfering corners as directed and including raking out joints or roughening of concrete surface, curing with cost and carriage of all materials.
33Neat cement punning on cement plaster surface.
34B. By Mix in Place Method :Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
35Labour for Spreading and consolidating stone metals of specific sizes in hard crust to requisite thickness (measured after compaction) in layers including creening of bats/ metals etc. as necessary, spreading manually or with the help of motor grader, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, spreading and sweeping requisite type and quantity of screening materials to fill up the interstices of coarse aggregates, applying binding materials as directed,including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and as per specification and direction of Engineer-in-charge but excluding cost of stone material.
36Providing and laying bituminous Primer Coat for priming of Base coarse with Bituminous Emulsion of approved grade and requisite quantity including preparation of the surface to be primed ………..i/c cost and carriage of bitumen emulsion and other incidental cost all complete
37Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
38Providing, laying and rolling of Open - graded premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone aggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by any suitable arrangements, laying the mixture uniformly over the surface, including line, grade and level to serve as wearing course on a previously prepared base, including mixing in Mobile Hot Mix Plant (Light Duty) and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating the aggregates to required temperature and including the hire charges of Mobile Hot Mix Plant (Light Duty) and other machinery, pay of operators, cost of fuel and lubricants etc. complete to be followed by seal coat of either Type A or Type B as per Technical Specification Clause 508 for Rural Roads of MORD.
39Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
40Spreading of sand over the bituminous surface @ 0.003 m3 per m2 of surface from the road side stacks and carriage of the same up to a distance of 150 m from stack complete including cost of sand.
41(1.c) Recovery and Reconstruction of Khimdong Road , Kalimpong G.T.A (Length 1.00Km) under State Disaster Response Fund (SDRF)..Clearance of land slides in soil and ordinary rock by abull-dozer D 80 A-12, 180 HP and disposal of the sameon the valley side. .
42Excavation for Structures Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.a) upto 3 m depth(iv) Without pumping out water and shoring
43Hand Packed rough dressed stone walls by masons with hard stones from approved quarries including all carriage of materials to site
44Rubble masonry workRubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site(a) In Road and Jhora Work
45Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge.[Rate provided is exclusive of the cost of stoneboulders and sausage crate]
46Hire and labour charges for ShutteringHire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.b) For portion of Ht above 1m and upto 3m
47Plum concrete work Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
48Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
49Weep HoleProviding weep hole (150 X 75mm) in walls including packing brick bats or boulder of approved quality and size at the backsides of walls etc all complete.
50Providing and laying of Filter media with granular materials/stone crushed aggregates/brick aggregates/river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to at hickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment,wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
51Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by theEngineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
52Plaster with sand and cement mortar including rounding off corners or chamfering corners as directed and including raking out joints or roughening of concrete surface, curing with cost and carriage of all materials.
53Neat cement punning on cement plaster surface.
54B. By Mix in Place Method :Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
55Labour for Spreading and consolidating stone metals of specific sizes in hard crust to requisite thickness (measured after compaction) in layers including creening of bats/ metals etc. as necessary, spreading manually or with the help of motor grader, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, spreading and sweeping requisite type and quantity of screening materials to fill up the interstices of coarse aggregates, applying binding materials as directed,including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and as per specification and direction of Engineer-in-charge but excluding cost of stone material.
56Providing and laying bituminous Primer Coat for priming of Base coarse with Bituminous Emulsion of approved grade and requisite quantity including preparation of the surface to be primed ………..i/c cost and carriage of bitumen emulsion and other incidental cost all complete
57Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
58Providing, laying and rolling of Open - graded premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone aggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by any suitable arrangements, laying the mixture uniformly over the surface, including line, grade and level to serve as wearing course on a previously prepared base, including mixing in Mobile Hot Mix Plant (Light Duty) and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating the aggregates to required temperature and including the hire charges of Mobile Hot Mix Plant (Light Duty) and other machinery, pay of operators, cost of fuel and lubricants etc. complete to be followed by seal coat of either Type A or Type B as per Technical Specification Clause 508 for Rural Roads of MORD.
59Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder andaggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
60Spreading of sand over the bituminous surface @ 0.003 m3 per m2 of surface from the road side stacks and carriage of the same up to a distance of 150 m from stack complete including cost of sand.
61(1.d) Recovery and Reconstruction of Road from Seed Farm to UBKV Office , Kalimpong G.T.A (Length 0.50Km) under State Disaster Response Fund (SDRF).Clearance of land slides in soil and ordinary rock by abull-dozer D 80 A-12, 180 HP and disposal of the sameon the valley side. .
62Excavation for Structures Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.a) upto 3 m depth(iv) Without pumping out water and shoring
63Hand Packed rough dressed stone walls by masons with hard stones from approved quarries including all carriage of materials to site
64Rubble masonry workRubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site(a) In Road and Jhora Work
65Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge.[Rate provided is exclusive of the cost of stoneboulders and sausage crate]
66Hire and labour charges for ShutteringHire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.b) For portion of Ht above 1m and upto 3m
67Plum concrete work Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
68Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
69Weep HoleProviding weep hole (150 X 75mm) in walls including packing brick bats or boulder of approved quality and size at the backsides of walls etc all complete.
70Providing and laying of Filter media with granular materials/stone crushed aggregates/brick aggregates/river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to at hickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment,wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
71Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by theEngineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
72Plaster with sand and cement mortar including rounding off corners or chamfering corners as directed and including raking out joints or roughening of concrete surface, curing with cost and carriage of all materials.
73Neat cement punning on cement plaster surface.
74B. By Mix in Place Method :Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
75Labour for Spreading and consolidating stone metals of specific sizes in hard crust to requisite thickness (measured after compaction) in layers including creening of bats/ metals etc. as necessary, spreading manually or with the help of motor grader, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, spreading and sweeping requisite type and quantity of screening materials to fill up the interstices of coarse aggregates, applying binding materials as directed,including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and as per specification and direction of Engineer-in-charge but excluding cost of stone material.
76Providing and laying bituminous Primer Coat for priming of Base coarse with Bituminous Emulsion of approved grade and requisite quantity including preparation of the surface to be primed ………..i/c cost and carriage of bitumen emulsion and other incidental cost all complete
77Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
78Providing, laying and rolling of Open - graded premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone aggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by any suitable arrangements, laying the mixture uniformly over the surface, including line, grade and level to serve as wearing course on a previously prepared base, including mixing in Mobile Hot Mix Plant (Light Duty) and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating the aggregates to required temperature and including the hire charges of Mobile Hot Mix Plant (Light Duty) and other machinery, pay of operators, cost of fuel and lubricants etc. complete to be followed by seal coat of either Type A or Type B as per Technical Specification Clause 508 for Rural Roads of MORD.
79Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder andaggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
80Spreading of sand over the bituminous surface @ 0.003 m3 per m2 of surface from the road side stacks and carriage of the same up to a distance of 150 m from stack complete including cost of sand.
81(1.e) Recovery and Reconstruction of Road from SBI ATM to Kanpur House (Length 0.4) under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF) ,KalimpongClearance of land slides in soil and ordinary rock by abull-dozer D 80 A-12, 180 HP and disposal of the sameon the valley side. .
82Earth work in excavation of foundation of structuresas per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge.(iii) Without pumping out water but includingshoring as required
83Hand Packed rough dressed stone walls by masons with hard stones from approved quarries including all carriage of materials to site
84Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site
85Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge.[Rate provided is exclusive of the cost of stoneboulders and sausage crate]
86Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
87Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
88Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
89Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.
90Providing and laying of Filter media with granular materials/stone crushed aggregates/brick aggregates/river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to at hickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment,wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
91Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.(a) M-15 Grade
92Plaster with sand and cement mortar including rounding off corners or chamfering corners as directed and including raking out joints or roughening of concrete surface, curing with cost and carriage of all materials.
93Neat cement punning on cement plaster surface.
94B. By Mix in Place Method :Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
95Labour for Spreading and consolidating stone metals of specific sizes in hard crust to requisite thickness (measured after compaction) in layers including creening of bats/ metals etc. as necessary, spreading manually or with the help of motor grader, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, spreading and sweeping requisite type and quantity of screening materials to fill up the interstices of coarse aggregates, applying binding materials as directed,including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and as per specification and direction of Engineer-in-charge but excluding cost of stone material.
96Providing and laying bituminous Primer Coat for priming of Base coarse with Bituminous Emulsion of approved grade and requisite quantity including preparation of the surface to be primed i/c cost and carriage of bitumen emulsion and other incidental cost all completei) For WBM / WMM Surface:(with primer @ 0.70-1.0 kg/sqm)
97Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
98Providing, laying and rolling of Open - graded premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone aggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by any suitable arrangements, laying the mixture uniformly over the surface, including line, grade and level to serve as wearing course on a previously prepared base, including mixing in Mobile Hot Mix Plant (Light Duty) and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating the aggregates to required temperature and including the hire charges of Mobile Hot Mix Plant (Light Duty) and other machinery, pay of operators, cost of fuel and lubricants etc. complete to be followed by seal coat of either Type A or Type B as per Technical Specification Clause 508 for Rural Roads of MORD.
99Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder andaggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(ii) With Cationic Bitumen Emulsion (@ 10.50 kg / 10 sqm.)
100Spreading of sand over the bituminous surface @ 0.003 m3 per m2 of surface from the road side stacks and carriage of the same up to a distance of 150 m from stack complete including cost of sand.
101(1.f) Recovery and Reconstruction of Culvert along the road from Sindebong Fatak to Harilal Jhora under State Disaster Response Fund (SDRF).Earthwork in excavation for foundation of structures as per technical specification including setting out removing spreading or stacking spoils with in a lead of 150 m as directed and including trimming the sides of trenches ..all complete as per direction of E-I-C.
102Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
103Providing formwork and staging including Hire & Labour charges for the same as required for foundation concrete works of. For walls, parapets etc
104Plum concrete work Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
105Providing and laying Design Mix concrete for reinforced work in any part of bridge…..all complete.M-25 Design Mix
106Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.
107Sausage filling works: Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge.[Rate provided is exclusive of the cost of stone boulders and sausage crate]
108Plaster with sand and cement mortar including rounding off corners or chamfering corners as directed and including raking out joints or roughening of concrete surface, curing with cost and carriage of all materials.
109Stone filling on the backside of the walls,abutments, wingwalls etc. including hand packing and carriage and cost of stone.
110Providing weep hole (150 X 75mm) in walls including packing brick bats or boulder of approved quality and sizeat the backsides
111ADD 18% GST
112ADD 1% CESS Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58070974
AUTHORITY Government Departments
TENDER VALUE 3.10 Crore
LAST DATE 13-11-2026
Authority
Authority Name Gorkhaland Territorial Administration
Work Description Tender for Package-I1.A. Recovery And Reconstruction Of Road From Sindebong Fatak To Harilal Jhora, Kalimpong G.T.A (Length 2.0Km) Under National Disaster Response Fund (Ndrf) And State Disaster Response Fund (Sdrf).1.B. Recovery And Reconstruction Of Road Panchayat Office To Sungdung Zero, Kalimpong G.T.A (Length 1.00Km) Under State Disaster Response Fund (Sdrf). 1.C. Recovery And Reconstruction Of Khimdong Road , Kalimpong G.T.A (Length 1.00Km) Under State Disaster Response Fund (Sdrf).1.D. Recovery And Reconstruction Of Road From Seed Farm To Ubkv Office , Kalimpong G.T.A (Length 0.50Km) Under State Disaster Response Fund (Sdrf)1.E. Recovery And Reconstruction Of Road From Sbi Atm To Kanpur House (Length 0.4) Under National Disaster Response Fund (Ndrf) And State Disaster Response Fund (Sdrf) ,Kalimpong,1.F. Recovery And Reconstruction Of Culvert Along The Road From Sindebong Fatak To Harilal Jhora Under State Disaster Response Fund (Sdrf).
Basic Detail
Tender No NIeT_07(1st Call) /SDRF/SE/KC/GTA/2026-2027 (Sl. No. 1 to 9)
Bidding Type Tender
Location
City Kalimpong
State West Bengal
Key Dates
Publish Date 16 Oct 2026
Submission Date 13 Nov 2026
Open Date 16 Nov 2026
Finance
Tender Value 3.10 Crore
Tender Fee Ref. Documents
EMD 6.21 Lakhs
Exemption Not Available
Document List
b4324eda-1c9f-4dee-8571-f3eff21b5bdd.html
BOQ_5189050.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 16, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 13, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 25 days
Nov 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 28 days

Tender Documents

Download All (ZIP) ↓
html

b4324eda-1c9f-4dee-8571-f3eff21b5bdd.html

xls

BOQ_5189050.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender