Environment and Forests Government Departments Closing in 8 days TDR #58057313

Bids Are invited for Facility Management Services - Lumpsum Based - Procurement And Execution Of Specialized Work For Development And Functionalization; Of The Existing Pond As A Wildlife-Theme Waterfall With Snow Leopard Sculpture, 2 Hp Submersible

Issued by Government Departments · Kangra, Himachal Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
26 Oct 2026
8 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kangra → Himachal Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Facility Management Services - Lumpsum Based - Procurement And Execution Of Specialized Work For Development And Functionalization; Of The Existing Pond As A Wildlife-Theme Waterfall With Snow Leopard Sculpture, 2 Hp Submersible Pump, Plumbing, Elect.. - Providing, Designing, Fabricating And Installing Life-Size Artistic Snow Leopard Sculpture In Frp/Resin Composite Suitable For Permanent Outdoor Installation, Approximately 1.50 M Long × 0.80 M High, Including Internal Reinforcement/Frame Wherever Required, Sculpting, Moulding, Surface Detailing, Realistic Weather-Resistant Painting, Uv Protective Clear Coating, Base Fixing Arrangement, Anchoring On Existing/New Rock Pedestal And All Labour/Material Complete As Approved By Engineer-In-Charge. , Providing And Constructing Decorative Natural/Artificial Rockwork For Formation Of Waterfall Cascade Over/Around The Existing Stone Backdrop, Including Selected Natural Boulders/Stone, Cement Mortar/Rcc Backing And/Or Frp/Grc Artificial Rock Where Required, Shaping Of Minimum Two Cascade Levels, Concealed Service Passages, Anchoring, Painting, Texture Finishing And Integration With Existing Stonework Complete. , Providing, Fabricating And Fixing Waterfall Spillway/Channel Approximately 1.50 M Effective Width In Ss 304 / Heavy-Duty Pvc/Frp Channel, Including Supports, Levelling, Edge Finishing And Arrangement For Uniform Sheet/Cascade Flow Complete. , Providing And Installing 2 Hp Heavy-Duty Submersible Water Pump Suitable For Continuous Recirculating Waterfall Duty, Complete With Strainer/Intake Protection, Non-Return Valve, Lifting Chain/Rope, Base/Support And All Necessary Accessories, Testing And Commissioning Complete. , Providing And Fixing Heavy-Duty Hdpe/Pvc Pressure Return Pipeline Of Approximately 63 Mm Nominal Diameter From Pump Chamber/Intake To Waterfall Head, Including Bends, Tees, Unions, Reducers, Solvent/Fusion Joints, Cl S, Supports, Excavation/Chasing Through Rockwork Where Required And Concealed Installation Complete. , Providing And Fixing Pump Control And Electrical Protection System Comprising Weatherproof Control Panel With Mcb/Mpcb, Rccb/Elcb, Contactor, Overload Protection, Starter, Isolator, Timer/Auto-Control Provision, Indicator L S And Suitable Enclosure, Complete With Wiring And Testing. , Providing And Laying Suitable Size Copper Submersible/Electrical Cable From Control Point To Pump, Including Heavy-Duty Protective Conduit, Glands, Terminations And Connections Complete. , Providing And Fixing Waterproof Led Underwater/Rock Lights Of Suitable Ip68/Ip65 Rating Around Waterfall And Pond Edge, Including Drivers/Transformer Where Required, Cable, Conduit, Junction Boxes, Mounting And Testing Complete. , Waterproofing, Sealing And Rectification Of Waterfall Bed, Cascade Channels, Joints And Local Leakage-Prone Portions Adjoining The Existing Pond/Stone Structure Using Approved Polymer-Modified Waterproofing Compound, Sealant And Protective Mortar Treatment Complete. , Providing And Constructing/Altering Complete Pump Chamber Or Concealed Enclosure Approximately 1.00 M × 1.00 M × 1.00 M Near Existing Pond, Including Masonry/Rcc/Stone Finish As Suitable, Removable Access Cover, Drainage Provision And Concealment Within Landscape/Rockwork Complete. , Providing And Fixing Suction/Intake Safety Screen, Foot/Strainer Arrangement, Isolation Valve, Non-Return Valve, Unions And Miscellaneous Plumbing Fittings Required For Safe Operation And Maintenance Of The Recirculating Waterfall System Complete. , Providing Ornamental Plantation And Soft Landscaping In Pockets Around Newly Executed Waterfall Rockwork Using Suitable Ferns/Shrubs/Ground Cover, Including Soil/Media, Manure And Initial Watering, Without Disturbing Existing Pond And Railing. , Transportation, Loading, Unloading, Shifting Of Sculpture, Pump, Rockwork Materials, Plumbing/Electrical Materials And Tools To Site Including Handling Within Site And All Incidental Charges Complete. , Testing, Balancing And Commissioning Of Complete Recirculating Waterfall System Including Adjustment Of Discharge For Uniform Cascade, Pump Trial Run, Leak Testing, Electrical Safety Checks, Final Cleaning, Touch-Up And Handing Over In Fully Functional Condition. , Providing Miscellaneous Specialized Fabrication, Concealed Supports, Anchor Fasteners, Flexible Connectors, Cl S, Minor Civil Making-Good, Protective Works And Incidental Items Not Individually Measured But Essentially Required For Completing The Snow Leopard Waterfall Installation In All Respects As Per Site Conditions And Direction Of Engineer-In-Charge.

BOQ

Sl. No. Item TitleItem Description
1Providing, designing, fabricating and installing life-size artistic Snow Leopard sculpture in FRP/resin composite suitable for permanent outdoor installation, approximately 1.50 m long × 0.80 m high, including internal reinforcement/frame wherever required, sculpting, moulding, surface detailing, realistic weather-resistant painting, UV protective clear coating, base fixing arrangement, anchoring on existing/new rock pedestal and all labour/material complete as approved by Engineer-in-Charge.Providing, designing, fabricating and installing life-size artistic Snow Leopard sculpture in FRP/resin composite suitable for permanent outdoor installation, approximately 1.50 m long × 0.80 m high, including internal reinforcement/frame wherever required, sculpting, moulding, surface detailing, realistic weather-resistant painting, UV protective clear coating, base fixing arrangement, anchoring on existing/new rock pedestal and all labour/material complete as approved by Engineer-in-Charge.
2Providing and constructing decorative natural/artificial rockwork for formation of waterfall cascade over/around the existing stone backdrop, including selected natural boulders/stone, cement mortar/RCC backing and/or FRP/GRC artificial rock where required, shaping of minimum two cascade levels, concealed service passages, anchoring, painting, texture finishing and integration with existing stonework complete.Providing and constructing decorative natural/artificial rockwork for formation of waterfall cascade over/around the existing stone backdrop, including selected natural boulders/stone, cement mortar/RCC backing and/or FRP/GRC artificial rock where required, shaping of minimum two cascade levels, concealed service passages, anchoring, painting, texture finishing and integration with existing stonework complete.
3Providing, fabricating and fixing waterfall spillway/channel approximately 1.50 m effective width in SS 304 / heavy-duty PVC/FRP channel, including supports, levelling, edge finishing and arrangement for uniform sheet/cascade flow complete.Providing, fabricating and fixing waterfall spillway/channel approximately 1.50 m effective width in SS 304 / heavy-duty PVC/FRP channel, including supports, levelling, edge finishing and arrangement for uniform sheet/cascade flow complete.
4Providing and installing 2 HP heavy-duty submersible water pump suitable for continuous recirculating waterfall duty, complete with strainer/intake protection, non-return valve, lifting chain/rope, base/support and all necessary accessories, testing and commissioning complete.Providing and installing 2 HP heavy-duty submersible water pump suitable for continuous recirculating waterfall duty, complete with strainer/intake protection, non-return valve, lifting chain/rope, base/support and all necessary accessories, testing and commissioning complete.
5Providing and fixing heavy-duty HDPE/PVC pressure return pipeline of approximately 63 mm nominal diameter from pump chamber/intake to waterfall head, including bends, tees, unions, reducers, solvent/fusion joints, clamps, supports, excavation/chasing through rockwork where required and concealed installation complete.Providing and fixing heavy-duty HDPE/PVC pressure return pipeline of approximately 63 mm nominal diameter from pump chamber/intake to waterfall head, including bends, tees, unions, reducers, solvent/fusion joints, clamps, supports, excavation/chasing through rockwork where required and concealed installation complete.
6Providing and fixing pump control and electrical protection system comprising weatherproof control panel with MCB/MPCB, RCCB/ELCB, contactor, overload protection, starter, isolator, timer/auto-control provision, indicator lamps and suitable enclosure, complete with wiring and testing.Providing and fixing pump control and electrical protection system comprising weatherproof control panel with MCB/MPCB, RCCB/ELCB, contactor, overload protection, starter, isolator, timer/auto-control provision, indicator lamps and suitable enclosure, complete with wiring and testing.
7Providing and laying suitable size copper submersible/electrical cable from control point to pump, including heavy-duty protective conduit, glands, terminations and connections complete.Providing and laying suitable size copper submersible/electrical cable from control point to pump, including heavy-duty protective conduit, glands, terminations and connections complete.
8Providing and fixing waterproof LED underwater/rock lights of suitable IP68/IP65 rating around waterfall and pond edge, including drivers/transformer where required, cable, conduit, junction boxes, mounting and testing complete.Providing and fixing waterproof LED underwater/rock lights of suitable IP68/IP65 rating around waterfall and pond edge, including drivers/transformer where required, cable, conduit, junction boxes, mounting and testing complete.
9Waterproofing, sealing and rectification of waterfall bed, cascade channels, joints and local leakage-prone portions adjoining the existing pond/stone structure using approved polymer-modified waterproofing compound, sealant and protective mortar treatment complete.Waterproofing, sealing and rectification of waterfall bed, cascade channels, joints and local leakage-prone portions adjoining the existing pond/stone structure using approved polymer-modified waterproofing compound, sealant and protective mortar treatment complete.
10Providing and constructing/altering complete pump chamber or concealed enclosure approximately 1.00 m × 1.00 m × 1.00 m near existing pond, including masonry/RCC/stone finish as suitable, removable access cover, drainage provision and concealment within landscape/rockwork complete.Providing and constructing/altering complete pump chamber or concealed enclosure approximately 1.00 m × 1.00 m × 1.00 m near existing pond, including masonry/RCC/stone finish as suitable, removable access cover, drainage provision and concealment within landscape/rockwork complete.
11Providing and fixing suction/intake safety screen, foot/strainer arrangement, isolation valve, non-return valve, unions and miscellaneous plumbing fittings required for safe operation and maintenance of the recirculating waterfall system complete.Providing and fixing suction/intake safety screen, foot/strainer arrangement, isolation valve, non-return valve, unions and miscellaneous plumbing fittings required for safe operation and maintenance of the recirculating waterfall system complete.
12Providing ornamental plantation and soft landscaping in pockets around newly executed waterfall rockwork using suitable ferns/shrubs/ground cover, including soil/media, manure and initial watering, without disturbing existing pond and railing.Providing ornamental plantation and soft landscaping in pockets around newly executed waterfall rockwork using suitable ferns/shrubs/ground cover, including soil/media, manure and initial watering, without disturbing existing pond and railing.
13Transportation, loading, unloading, shifting of sculpture, pump, rockwork materials, plumbing/electrical materials and tools to site including handling within site and all incidental charges complete.Transportation, loading, unloading, shifting of sculpture, pump, rockwork materials, plumbing/electrical materials and tools to site including handling within site and all incidental charges complete.
14Testing, balancing and commissioning of complete recirculating waterfall system including adjustment of discharge for uniform cascade, pump trial run, leak testing, electrical safety checks, final cleaning, touch-up and handing over in fully functional condition.Testing, balancing and commissioning of complete recirculating waterfall system including adjustment of discharge for uniform cascade, pump trial run, leak testing, electrical safety checks, final cleaning, touch-up and handing over in fully functional condition.
15Providing miscellaneous specialized fabrication, concealed supports, anchor fasteners, flexible connectors, clamps, minor civil making-good, protective works and incidental items not individually measured but essentially required for completing the Snow Leopard waterfall installation in all respects as per site conditions and direction of Engineer-in-Charge.Providing miscellaneous specialized fabrication, concealed supports, anchor fasteners, flexible connectors, clamps, minor civil making-good, protective works and incidental items not individually measured but essentially required for completing the Snow Leopard waterfall installation in all respects as per site conditions and direction of Engineer-in-Charge.

AI Tender Summary

OUR REF NO 58057313
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 26-10-2026
Authority
Authority Name Forest Department
Work Description Bids Are invited for Facility Management Services - Lumpsum Based - Procurement And Execution Of Specialized Work For Development And Functionalization; Of The Existing Pond As A Wildlife-Theme Waterfall With Snow Leopard Sculpture, 2 Hp Submersible Pump, Plumbing, Elect.. - Providing, Designing, Fabricating And Installing Life-Size Artistic Snow Leopard Sculpture In Frp/Resin Composite Suitable For Permanent Outdoor Installation, Approximately 1.50 M Long × 0.80 M High, Including Internal Reinforcement/Frame Wherever Required, Sculpting, Moulding, Surface Detailing, Realistic Weather-Resistant Painting, Uv Protective Clear Coating, Base Fixing Arrangement, Anchoring On Existing/New Rock Pedestal And All Labour/Material Complete As Approved By Engineer-In-Charge. , Providing And Constructing Decorative Natural/Artificial Rockwork For Formation Of Waterfall Cascade Over/Around The Existing Stone Backdrop, Including Selected Natural Boulders/Stone, Cement Mortar/Rcc Backing And/Or Frp/Grc Artificial Rock Where Required, Shaping Of Minimum Two Cascade Levels, Concealed Service Passages, Anchoring, Painting, Texture Finishing And Integration With Existing Stonework Complete. , Providing, Fabricating And Fixing Waterfall Spillway/Channel Approximately 1.50 M Effective Width In Ss 304 / Heavy-Duty Pvc/Frp Channel, Including Supports, Levelling, Edge Finishing And Arrangement For Uniform Sheet/Cascade Flow Complete. , Providing And Installing 2 Hp Heavy-Duty Submersible Water Pump Suitable For Continuous Recirculating Waterfall Duty, Complete With Strainer/Intake Protection, Non-Return Valve, Lifting Chain/Rope, Base/Support And All Necessary Accessories, Testing And Commissioning Complete. , Providing And Fixing Heavy-Duty Hdpe/Pvc Pressure Return Pipeline Of Approximately 63 Mm Nominal Diameter From Pump Chamber/Intake To Waterfall Head, Including Bends, Tees, Unions, Reducers, Solvent/Fusion Joints, Cl S, Supports, Excavation/Chasing Through Rockwork Where Required And Concealed Installation Complete. , Providing And Fixing Pump Control And Electrical Protection System Comprising Weatherproof Control Panel With Mcb/Mpcb, Rccb/Elcb, Contactor, Overload Protection, Starter, Isolator, Timer/Auto-Control Provision, Indicator L S And Suitable Enclosure, Complete With Wiring And Testing. , Providing And Laying Suitable Size Copper Submersible/Electrical Cable From Control Point To Pump, Including Heavy-Duty Protective Conduit, Glands, Terminations And Connections Complete. , Providing And Fixing Waterproof Led Underwater/Rock Lights Of Suitable Ip68/Ip65 Rating Around Waterfall And Pond Edge, Including Drivers/Transformer Where Required, Cable, Conduit, Junction Boxes, Mounting And Testing Complete. , Waterproofing, Sealing And Rectification Of Waterfall Bed, Cascade Channels, Joints And Local Leakage-Prone Portions Adjoining The Existing Pond/Stone Structure Using Approved Polymer-Modified Waterproofing Compound, Sealant And Protective Mortar Treatment Complete. , Providing And Constructing/Altering Complete Pump Chamber Or Concealed Enclosure Approximately 1.00 M × 1.00 M × 1.00 M Near Existing Pond, Including Masonry/Rcc/Stone Finish As Suitable, Removable Access Cover, Drainage Provision And Concealment Within Landscape/Rockwork Complete. , Providing And Fixing Suction/Intake Safety Screen, Foot/Strainer Arrangement, Isolation Valve, Non-Return Valve, Unions And Miscellaneous Plumbing Fittings Required For Safe Operation And Maintenance Of The Recirculating Waterfall System Complete. , Providing Ornamental Plantation And Soft Landscaping In Pockets Around Newly Executed Waterfall Rockwork Using Suitable Ferns/Shrubs/Ground Cover, Including Soil/Media, Manure And Initial Watering, Without Disturbing Existing Pond And Railing. , Transportation, Loading, Unloading, Shifting Of Sculpture, Pump, Rockwork Materials, Plumbing/Electrical Materials And Tools To Site Including Handling Within Site And All Incidental Charges Complete. , Testing, Balancing And Commissioning Of Complete Recirculating Waterfall System Including Adjustment Of Discharge For Uniform Cascade, Pump Trial Run, Leak Testing, Electrical Safety Checks, Final Cleaning, Touch-Up And Handing Over In Fully Functional Condition. , Providing Miscellaneous Specialized Fabrication, Concealed Supports, Anchor Fasteners, Flexible Connectors, Cl S, Minor Civil Making-Good, Protective Works And Incidental Items Not Individually Measured But Essentially Required For Completing The Snow Leopard Waterfall Installation In All Respects As Per Site Conditions And Direction Of Engineer-In-Charge.
Basic Detail
Tender No GEM/2026/B/8162868
Bidding Type Tender
Location
City Kangra
State Himachal Pradesh
Key Dates
Publish Date 15 Oct 2026
Submission Date 26 Oct 2026
Open Date 27 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
37405927-d93d-4038-97eb-d81310ea5fa3.pdf
1791987113.xlsx
1791987119.pdf
1791987122.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 15, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 26, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Oct 27, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
pdf

37405927-d93d-4038-97eb-d81310ea5fa3.pdf

xlsx

1791987113.xlsx

pdf

1791987119.pdf

pdf

1791987122.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender