Bids Are invited for Facility Management Services - Lumpsum Based - Procurement And Execution Of Specialized Work For Development And Functionalization; Of The Existing Pond As A Wildlife-Theme Waterfall With Snow Leopard Sculpture, 2 Hp Submersible
Tender Overview
Project Description
Bids Are invited for Facility Management Services - Lumpsum Based - Procurement And Execution Of Specialized Work For Development And Functionalization; Of The Existing Pond As A Wildlife-Theme Waterfall With Snow Leopard Sculpture, 2 Hp Submersible Pump, Plumbing, Elect.. - Providing, Designing, Fabricating And Installing Life-Size Artistic Snow Leopard Sculpture In Frp/Resin Composite Suitable For Permanent Outdoor Installation, Approximately 1.50 M Long × 0.80 M High, Including Internal Reinforcement/Frame Wherever Required, Sculpting, Moulding, Surface Detailing, Realistic Weather-Resistant Painting, Uv Protective Clear Coating, Base Fixing Arrangement, Anchoring On Existing/New Rock Pedestal And All Labour/Material Complete As Approved By Engineer-In-Charge. , Providing And Constructing Decorative Natural/Artificial Rockwork For Formation Of Waterfall Cascade Over/Around The Existing Stone Backdrop, Including Selected Natural Boulders/Stone, Cement Mortar/Rcc Backing And/Or Frp/Grc Artificial Rock Where Required, Shaping Of Minimum Two Cascade Levels, Concealed Service Passages, Anchoring, Painting, Texture Finishing And Integration With Existing Stonework Complete. , Providing, Fabricating And Fixing Waterfall Spillway/Channel Approximately 1.50 M Effective Width In Ss 304 / Heavy-Duty Pvc/Frp Channel, Including Supports, Levelling, Edge Finishing And Arrangement For Uniform Sheet/Cascade Flow Complete. , Providing And Installing 2 Hp Heavy-Duty Submersible Water Pump Suitable For Continuous Recirculating Waterfall Duty, Complete With Strainer/Intake Protection, Non-Return Valve, Lifting Chain/Rope, Base/Support And All Necessary Accessories, Testing And Commissioning Complete. , Providing And Fixing Heavy-Duty Hdpe/Pvc Pressure Return Pipeline Of Approximately 63 Mm Nominal Diameter From Pump Chamber/Intake To Waterfall Head, Including Bends, Tees, Unions, Reducers, Solvent/Fusion Joints, Cl S, Supports, Excavation/Chasing Through Rockwork Where Required And Concealed Installation Complete. , Providing And Fixing Pump Control And Electrical Protection System Comprising Weatherproof Control Panel With Mcb/Mpcb, Rccb/Elcb, Contactor, Overload Protection, Starter, Isolator, Timer/Auto-Control Provision, Indicator L S And Suitable Enclosure, Complete With Wiring And Testing. , Providing And Laying Suitable Size Copper Submersible/Electrical Cable From Control Point To Pump, Including Heavy-Duty Protective Conduit, Glands, Terminations And Connections Complete. , Providing And Fixing Waterproof Led Underwater/Rock Lights Of Suitable Ip68/Ip65 Rating Around Waterfall And Pond Edge, Including Drivers/Transformer Where Required, Cable, Conduit, Junction Boxes, Mounting And Testing Complete. , Waterproofing, Sealing And Rectification Of Waterfall Bed, Cascade Channels, Joints And Local Leakage-Prone Portions Adjoining The Existing Pond/Stone Structure Using Approved Polymer-Modified Waterproofing Compound, Sealant And Protective Mortar Treatment Complete. , Providing And Constructing/Altering Complete Pump Chamber Or Concealed Enclosure Approximately 1.00 M × 1.00 M × 1.00 M Near Existing Pond, Including Masonry/Rcc/Stone Finish As Suitable, Removable Access Cover, Drainage Provision And Concealment Within Landscape/Rockwork Complete. , Providing And Fixing Suction/Intake Safety Screen, Foot/Strainer Arrangement, Isolation Valve, Non-Return Valve, Unions And Miscellaneous Plumbing Fittings Required For Safe Operation And Maintenance Of The Recirculating Waterfall System Complete. , Providing Ornamental Plantation And Soft Landscaping In Pockets Around Newly Executed Waterfall Rockwork Using Suitable Ferns/Shrubs/Ground Cover, Including Soil/Media, Manure And Initial Watering, Without Disturbing Existing Pond And Railing. , Transportation, Loading, Unloading, Shifting Of Sculpture, Pump, Rockwork Materials, Plumbing/Electrical Materials And Tools To Site Including Handling Within Site And All Incidental Charges Complete. , Testing, Balancing And Commissioning Of Complete Recirculating Waterfall System Including Adjustment Of Discharge For Uniform Cascade, Pump Trial Run, Leak Testing, Electrical Safety Checks, Final Cleaning, Touch-Up And Handing Over In Fully Functional Condition. , Providing Miscellaneous Specialized Fabrication, Concealed Supports, Anchor Fasteners, Flexible Connectors, Cl S, Minor Civil Making-Good, Protective Works And Incidental Items Not Individually Measured But Essentially Required For Completing The Snow Leopard Waterfall Installation In All Respects As Per Site Conditions And Direction Of Engineer-In-Charge.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Providing, designing, fabricating and installing life-size artistic Snow Leopard sculpture in FRP/resin composite suitable for permanent outdoor installation, approximately 1.50 m long × 0.80 m high, including internal reinforcement/frame wherever required, sculpting, moulding, surface detailing, realistic weather-resistant painting, UV protective clear coating, base fixing arrangement, anchoring on existing/new rock pedestal and all labour/material complete as approved by Engineer-in-Charge. | Providing, designing, fabricating and installing life-size artistic Snow Leopard sculpture in FRP/resin composite suitable for permanent outdoor installation, approximately 1.50 m long × 0.80 m high, including internal reinforcement/frame wherever required, sculpting, moulding, surface detailing, realistic weather-resistant painting, UV protective clear coating, base fixing arrangement, anchoring on existing/new rock pedestal and all labour/material complete as approved by Engineer-in-Charge. |
| 2 | Providing and constructing decorative natural/artificial rockwork for formation of waterfall cascade over/around the existing stone backdrop, including selected natural boulders/stone, cement mortar/RCC backing and/or FRP/GRC artificial rock where required, shaping of minimum two cascade levels, concealed service passages, anchoring, painting, texture finishing and integration with existing stonework complete. | Providing and constructing decorative natural/artificial rockwork for formation of waterfall cascade over/around the existing stone backdrop, including selected natural boulders/stone, cement mortar/RCC backing and/or FRP/GRC artificial rock where required, shaping of minimum two cascade levels, concealed service passages, anchoring, painting, texture finishing and integration with existing stonework complete. |
| 3 | Providing, fabricating and fixing waterfall spillway/channel approximately 1.50 m effective width in SS 304 / heavy-duty PVC/FRP channel, including supports, levelling, edge finishing and arrangement for uniform sheet/cascade flow complete. | Providing, fabricating and fixing waterfall spillway/channel approximately 1.50 m effective width in SS 304 / heavy-duty PVC/FRP channel, including supports, levelling, edge finishing and arrangement for uniform sheet/cascade flow complete. |
| 4 | Providing and installing 2 HP heavy-duty submersible water pump suitable for continuous recirculating waterfall duty, complete with strainer/intake protection, non-return valve, lifting chain/rope, base/support and all necessary accessories, testing and commissioning complete. | Providing and installing 2 HP heavy-duty submersible water pump suitable for continuous recirculating waterfall duty, complete with strainer/intake protection, non-return valve, lifting chain/rope, base/support and all necessary accessories, testing and commissioning complete. |
| 5 | Providing and fixing heavy-duty HDPE/PVC pressure return pipeline of approximately 63 mm nominal diameter from pump chamber/intake to waterfall head, including bends, tees, unions, reducers, solvent/fusion joints, clamps, supports, excavation/chasing through rockwork where required and concealed installation complete. | Providing and fixing heavy-duty HDPE/PVC pressure return pipeline of approximately 63 mm nominal diameter from pump chamber/intake to waterfall head, including bends, tees, unions, reducers, solvent/fusion joints, clamps, supports, excavation/chasing through rockwork where required and concealed installation complete. |
| 6 | Providing and fixing pump control and electrical protection system comprising weatherproof control panel with MCB/MPCB, RCCB/ELCB, contactor, overload protection, starter, isolator, timer/auto-control provision, indicator lamps and suitable enclosure, complete with wiring and testing. | Providing and fixing pump control and electrical protection system comprising weatherproof control panel with MCB/MPCB, RCCB/ELCB, contactor, overload protection, starter, isolator, timer/auto-control provision, indicator lamps and suitable enclosure, complete with wiring and testing. |
| 7 | Providing and laying suitable size copper submersible/electrical cable from control point to pump, including heavy-duty protective conduit, glands, terminations and connections complete. | Providing and laying suitable size copper submersible/electrical cable from control point to pump, including heavy-duty protective conduit, glands, terminations and connections complete. |
| 8 | Providing and fixing waterproof LED underwater/rock lights of suitable IP68/IP65 rating around waterfall and pond edge, including drivers/transformer where required, cable, conduit, junction boxes, mounting and testing complete. | Providing and fixing waterproof LED underwater/rock lights of suitable IP68/IP65 rating around waterfall and pond edge, including drivers/transformer where required, cable, conduit, junction boxes, mounting and testing complete. |
| 9 | Waterproofing, sealing and rectification of waterfall bed, cascade channels, joints and local leakage-prone portions adjoining the existing pond/stone structure using approved polymer-modified waterproofing compound, sealant and protective mortar treatment complete. | Waterproofing, sealing and rectification of waterfall bed, cascade channels, joints and local leakage-prone portions adjoining the existing pond/stone structure using approved polymer-modified waterproofing compound, sealant and protective mortar treatment complete. |
| 10 | Providing and constructing/altering complete pump chamber or concealed enclosure approximately 1.00 m × 1.00 m × 1.00 m near existing pond, including masonry/RCC/stone finish as suitable, removable access cover, drainage provision and concealment within landscape/rockwork complete. | Providing and constructing/altering complete pump chamber or concealed enclosure approximately 1.00 m × 1.00 m × 1.00 m near existing pond, including masonry/RCC/stone finish as suitable, removable access cover, drainage provision and concealment within landscape/rockwork complete. |
| 11 | Providing and fixing suction/intake safety screen, foot/strainer arrangement, isolation valve, non-return valve, unions and miscellaneous plumbing fittings required for safe operation and maintenance of the recirculating waterfall system complete. | Providing and fixing suction/intake safety screen, foot/strainer arrangement, isolation valve, non-return valve, unions and miscellaneous plumbing fittings required for safe operation and maintenance of the recirculating waterfall system complete. |
| 12 | Providing ornamental plantation and soft landscaping in pockets around newly executed waterfall rockwork using suitable ferns/shrubs/ground cover, including soil/media, manure and initial watering, without disturbing existing pond and railing. | Providing ornamental plantation and soft landscaping in pockets around newly executed waterfall rockwork using suitable ferns/shrubs/ground cover, including soil/media, manure and initial watering, without disturbing existing pond and railing. |
| 13 | Transportation, loading, unloading, shifting of sculpture, pump, rockwork materials, plumbing/electrical materials and tools to site including handling within site and all incidental charges complete. | Transportation, loading, unloading, shifting of sculpture, pump, rockwork materials, plumbing/electrical materials and tools to site including handling within site and all incidental charges complete. |
| 14 | Testing, balancing and commissioning of complete recirculating waterfall system including adjustment of discharge for uniform cascade, pump trial run, leak testing, electrical safety checks, final cleaning, touch-up and handing over in fully functional condition. | Testing, balancing and commissioning of complete recirculating waterfall system including adjustment of discharge for uniform cascade, pump trial run, leak testing, electrical safety checks, final cleaning, touch-up and handing over in fully functional condition. |
| 15 | Providing miscellaneous specialized fabrication, concealed supports, anchor fasteners, flexible connectors, clamps, minor civil making-good, protective works and incidental items not individually measured but essentially required for completing the Snow Leopard waterfall installation in all respects as per site conditions and direction of Engineer-in-Charge. | Providing miscellaneous specialized fabrication, concealed supports, anchor fasteners, flexible connectors, clamps, minor civil making-good, protective works and incidental items not individually measured but essentially required for completing the Snow Leopard waterfall installation in all respects as per site conditions and direction of Engineer-in-Charge. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender