Tender For E-Quotation For Barhait Mega Rural Water Supply Scheme.
Tender Overview
Project Description
Tender for E-Quotation For Barhait Mega Rural Water Supply Scheme. , Intake Well At (Gumani River) , Supplying, Installation, Testing And Commissioning Of Water Lubricated Single Or Multistage, Radial/Mixed Flow Vertical Turbine Pump(Make-Kirloskar /Jyoti/Wpil / Wilo Mather & Platt) Having Discharge Of 117 M³/Hr Against A Total Head Of 30 Meters Consisting Of Pump Bowl Assemblies With Dynamically Balanced Bronze Impeller , Stainless Steel Pump Shaft , S.S. Line Shaft 1.5 Mtr Length Each , 30 Feet Ms Fabricated Flanged Type Column Assembly , Strainer, Non- Reverse Rachet Coupling And Discharge Head Etc. Coupled With Suitable Vertical Hollow Shaft -Ie3 Energy Efficient Spdp Squirrel Cage Induction Motor (Kirloskar/ Jyoti/ Cgl Make) Confirming To Is 12615:2011 With Latest Amendments Having 10% More Bhp Than That Of Pump Operating On 3-Ph, 50Hz, 415 ± 10%, 1450-1500 Rpm With Required Size Of Isi Marked Heavy Duty Cidf Sluice Valve & Cidf Nr Valve , Pressure Gauge, Ms Clamp Including Cost Of Construction Of New Foundation With Suitable Size Of Nut ,Bolts And Packings And Doing Fabrication Work For Connecting The Exiting Common Header Delivery Line Etc. All Complete Or As Per Site Requirement Or Direction Of E/I. , Cost Towards Supplying, Installation, Testing & Commissioning Of Free Standing Type Floor Mounted Cubical Lt Motor Control Panel Fabricated With Ms Sheet Of Suitable Gauge And Size Duly Painted With Two Coats Of Red Oxide Primer Comprising Of 200 Amp, 440V Copper Bus Bar Arrangement 4 Pole Consisting Of Following Accessories: (I) 200Amp Mccb - 1 No. (Incoming Feeder) (Ii) 100 annual periodical maintenance Mccb - 03Nos (Outgoing Feeder). (Iii) 100 annual periodical maintenance Mccb - 01No. (As Spare) (Iv) 32 annual periodical maintenance Mcb -1 No. For Lighting Load And Other Utility Load. (V) Fully Automatic Star Delta (Fasd) Starter (L&K/HavellS/SiemenS/Schneider/Bch Make) Suitable For Above Pump Set Or More Etc.- 3 Nos. (Vi) 3-Phase Digital Display Voltmeter & annual periodical maintenance Meter -3Sets, Phase Indicating Light R-Y-B -3 Nos. (Vii) Copper Bus Bar- 04 Pole 200 Amp, 415V Copper Strip Bus Bar Enclosed In Ms Sheet Along With Overload Relay, Motor Protection Device (Mpd), Proper Power & Control Wiring Inside By Suitable Size Of Copper Conductor And Wires Etc. All Complete Set Including Transportation And Fitting & Mounting Charges At P/Plant. , Cost Towards Special Repairing,Changing & Servicing Of Motor Control Panel With Fasd Starter And 200 annual periodical maintenance Incoming Mccb , 100 annual periodical maintenance Outgoing Mccb, Copper Bus Bar With Supply/Fixing Of Following Works- I. Changing Of Star Contactor Mnx-70-01 Nos. & Delta Contactor Mnx-80-02 Nos. & Main Contactor Mnx-80 - 02 Nos. (L&K/HavellS/SiemenS/Schneider/Bch Make) Ii. Incoming Mccb 200 Amp-01 No. , Outgoing Mccb 100 annual periodical maintenance -01 No. (L&K/HavellS/SiemenS/Schneider/Bch Make) Iii. Timer (3-30 Sec)-02 Nos. (L&T Make). Iv. On-Off Push Buttons-04 Nos. V. 3 Phase Led Voltmeter Ci 0.5-01 Nos. Vi. 3 Phase Led Ampere Meter Ci 0.5 -02 Nos. Vii. Single Phasing, Reverse Current, Under Voltage, Over Voltage Protection Relay-01 Set Each For Both Motor. Viii. Led Phase Indicating Bulb-06 Nos. Ix. Auto/Manual Selector Switch-02 Nos. X. Thermal Overload Relay -80 A Max.-01 No. Xi. 4 Sq. Mm Single Core Copper Cable-20 Mtrs. For Control Wiring And 16 Sq. Mm Single Core Copper Cable- 10 Mtrs With Copper Lugs, Tape Etc. With All Fittings & Electrician Charges At Raw Water P/Plant. , Light Wiring Inside And Outside Of Pump House With Led Street Light-02 Nos. (40 Watt), Led Tube Set- 2 Nos. (20 Watt). , Cost Towards Supplying, Installation And Commissioning Of 100 Kva Servo Controlled (Oil Cooled) Automatic Voltage Stabilizer Suitable For Output Voltage Of 415 Volt ± 1% 3 Phase 50 Hz With Copper Wound Transformer As Mentioned Below. The Stabilizer Shall Function Satisfactorily Even If Incoming Supply Is Unbalanced Between Phases Within Range Of 10%. The Stabilizer Should Be Constructed In Cubical Box, With Bidirectional Wheels For Easy Handling Necessary Monitors And UserS Controls On Front Panel Such As Indication Alarm, Voltmeter And Selector Switch For Measuring Input And Output Voltage Auto Manual Selector Switch. Raise Low Push Buttons Etc. Suitable Capacity Termination Strips And Bus Bars For Incoming And Outgoing Cable Should Be Provided. All Three Phases Shall Be Independently Monitored And Corrected. Following Protections And Indication Shall Be Incorporated. Over Voltage/Under Voltage Single Phasing Cut Off Contactor With Electronic Output Sensing Unit Suitable Change Over Switch And Earthing 100 Kva Oil Cooled Servo Controlled Automatic Voltage Stabilizer (Output 415 Unit ±1%) Input 220 To 480 Volt. , Supplying And Filling Of T-Oil. , Cost Towards Complete Servicing And Repairing Of Stabilizer With All Labour, Tools And Tackles And Electrician Charges Etc. All Complete Job And Testing On Full Load Of 100 Kva Oil Cooled Servo Voltage Stabilizer Working On Three Phase Input Voltage-220 To 480 V And Output- 415±1%V. Make- Servokon System Limited With Following Works- I.Cost Towards Disconnection And Cleaning Of Stabilizer With All Labour Tools And Tackles Ii.Cost Towards Supply/Fixing Of Servo Motor As Per Sample - 3 Nos. Iii.Cost Towards Supply/Fixing Of Panel Sensing/Control Pcb Card As Per Sample - 2 Nos. Iv.R.C Kit - 2 Unit V.Control Transformer. - 2 Nos. Vi.3 Phase Digital Voltmeter (Input/Output) As Per Sample - 01 No. Vii. Armored And Shaft , Supplying And Filling Of T-Oil. , Providing All Labours, Tools, Tackels And Technician For Disconnection And Taking Out 20 Hp Vt P/Set With Column Pipe From Intake Well All Complete Set. , Cost Towards All Labour, Tools, Tackles And Technician For Opening, Dismantling, Repairing And Overhauling Of 20 Hp Multi Stage Vt Pump Having Head 30 Meter, Discharge- 117 M3/Hr. Speed 1460 Rpm. I. With Supply/Fixing Of S.S. Pump Shaft- 01 No. Ii. Top And Bottom Bush- 02 Nos., Iii. Intermediate Bushes -5 Nos. Iv. Spider Cut Less Rubber Bushes- 05 Nos. V. Locks. Vi. Impeller Copper Bush-5 Pcs. Vii. 25 Mm Dia. S.S. Line Shaft- 10 Ft. Each 2 Nos. Viii. 25 Mm Dia. S.S. Head Shaft- 5 Ft. Each 1 No. Ix. S.S. Socket And Bush-05 Nos. Each. X. Ferro Collar Ball Rubber Bush- 5 Pc. Xi. Spider Bearing - 06 Nos. Xi. Ball Sleeve Bush- 05 Nos. Each All Materials As Per Required Reassembling The Same At Workshop And Refitting At Site Etc. All Complete. (Rate After Deducting The Scrap Materials).Make Of Pump - Wilo (Mather & Platt) , Providing All Labours, Tools, Tackels And Technician For Lowering After Repairing Of 20 Hp Vt P/Set With Column Pipe, Line Shaft, Nut Bolts As Per Required Into Intake Well All Complete. , Cost Towards Supplying All Labour Tools And Tackles For Complete Opening, Dismantling, Of 20 Hp, 415±10 Volt, 50C/S, Star Delta, 3 Phase Vt Motor By Supplying Supper Enameled Copper Wire And Then Tapping, Varnishing, Heating & Testing On Full Load And Repairing Of Stator And Rotor With Including The Deduction Of Cost Of Burnt Copper Wires Etc. All Complete .Weight Of Copper Wire Approx. 12 Kg. With Changing Of Following Bearing:- De/Nde 6309-Zz/6309-Zz As Per Sample- 2 Nos And Transportation Charges Of Above Pump Motor Set And Other Fittings Materials From P/Plant To Workshop And Vice Versa Etc At Raw Water P/Plant. , Cost Towards Supplying All Labour Tools And Tackles For Complete Opening, Dismantling, Of 7.5 Hp, 415±10 Volt, 50C/S, Star Delta, 3 Phase Induction Motor By Supplying Supper Enameled Copper Wire And Then Tapping, Varnishing, Heating & Testing On Full Load And Repairing Of Stator And Rotor With Including The Deduction Of Cost Of Burnt Copper Wires Etc. All Complete .Weight Of Copper Wire Approx. 7 Kg. With Changing Of Following Bearing:- De/Nde 6208-2Z/C3 As Per Sample- 2 Nos And Transportation Charges Of Above Pump Motor Set And Other Fittings Materials From P/Plant To Workshop And Vice Versa Etc At Raw Water P/Plant. , Cost Towards Denting And Painting Of Electro-Mechanical Components As Motor Pump, Panel Board, Sluice Valve, Nr Valves, Suction Pipe Line, Common Header Pipe Line Inside Pump Chamber With Primer And Two Coat Of Metal Oil Paint As Required At Intake Well. , Wtp At Barahait , Supplying, Installation, Testing And Commissioning Of Electrically Driven Horizontal Split Casing Centrifugal Pump Set Make (Kirloskar/Wpil/Mather & Platt /Jyoti) Having Discharge Capacity Of Clear Water 117 M3/H Against Total Head Of 105 Meter Coupled With Tefc Sq. Cage Induction Motor Make (Kirloskar/ Crompton/Jyoti) Operated On 415 + 10% Volts, 50Hz, 1450-1500 Rpm Mounted On Common M.S. Fabricated Base Plate With Cidf Sluice Valve-1 No, Cidf Nr Valve-1 No, Pressure Gauge-1 No, Tire Coupling-1 No, Etc. And Doing Fabrication Work For Connecting The Exiting Common Header Delivery Line. All Complete. , Cost Towards Opening, Dismantling, Cleaning And Repairing And Overhauling Of 100 Hp Hsc C/F Pump Set Having 1460 Rpm Head 105 Mtrs. Discharge 117 M3 /Hr Make- Wpil With Following Works:- ( I) Complete Dismantling Of Pump Set From Base Plate And Opening & Cleaning Of Pump With All Labour, Tools And Tackles . (Ii) Repairing Re-Metalling Of Stainless Steel Pump Shaft, Turning & Finishing As Per Sample At Lathe And Fitting -01 No. (Iii) S.S. Shaft Sleeves Both Sides- 02 Nos. As Per Sample. (Iv) Making Neck-Ring As Per Sample- 02 Nos. (V) Cheek Nut- 01 No. (Vi) Supply/Fixing Coupling Rubber -01 No. (Vii) Making Of Gland Titener As Per Sample.-02 Nos. (Viii) Repairing Of Bearing Housing -02 Nos. (Ix) Double Ball Bearing -01 No. (X) Ball Bearing -02 No. (Xi) Paper Packing, Nut-Bolts As Required. (Xii) Repairing Of Damaged Ci Impeller Of Pump -01 No With Ci Welding, Turning & Finishing As Per Sample-01 No. Complete Re-Assembling And Overhauling Of Pump, Installing At Site With All Labour, Tools & Tackles And Testing On Full Load With Transportation Charge Up & Down Etc. Including The Deduction Of Scrap Materials All Complete. , Cost Towards Supplying All Labour Tools And Tackles For Complete Opening, Dismantling, Of 100 Hp, 415±10 Volt, 50C/S, Star Delta, 3 Phase Induction Motor By Supplying Supper Enameled Copper Wire And Then Tapping, Varnishing, Heating & Testing On Full Load And Repairing Of Stator And Rotor With Including The Deduction Of Cost Of Burnt Copper Wires Etc. All Complete .Weight Of Copper Wire Approx. 40 Kg. With Changing Of Following Bearing:- De/Nde 6317 /6317 As Per Sample- 2 Nos And Transportation Charges Of Above Pump Motor Set And Other Fittings Materials From P/Plant To Workshop And Vice Versa Etc At Clear Water P/Plant. , Cost Towards Supplying, Installation, Testing & Commissioning Of Free Standing Type Floor Mounted Cubical Lt Motor Control Panel Fabricated With Ms Sheet Of Suitable Gauge And Size Duly Painted With Two Coats Of Red Oxide Primer Comprising Of 500 Amp, 440V Copper Bus Bar Arrangement 4 Pole Consisting Of Following Accessories: (I) 500 annual periodical maintenance Mccb - 1 No. (Incoming Feeder) (L&K/C&S/SiemenS/Schneider Make) (Ii) 250 annual periodical maintenance Mccb - 03Nos (Outgoing Feeder). (L&K/C&S/SiemenS/Schneider Make) (Iii) 250 annual periodical maintenance Mccb - 01No. (As Spare) (L&K/C&S/SiemenS/Schneider Make) (Iv) 63 annual periodical maintenance Mcb -1 No. For Lighting Load And Other Utility Load. (L&K/C&S/SiemenS/Schneider Make) (V) Fully Automatic Star Delta (Fasd) Starter (L&K/HavellS/SiemenS/Schneider/Bch Make) Suitable For Above Pump Set Or More Etc.- 3 Nos. (Vi) 3-Phase Digital Display Voltmeter & annual periodical maintenance Meter -3Sets, Phase Indicating Light R-Y-B -3 Nos. (Vii) Copper Bus Bar- 04 Pole 500 Amp, 415V Copper Strip Bus Bar Enclosed In Ms Sheet Along With Overload Relay, Motor Protection Device (Mpd), Proper Power & Control Wiring Inside By Suitable Size Of Copper Conductor And Wires Etc. All Complete Set Including Transportation And Fitting & Mounting Charges At P/Plant. , Cost Towards Special Repairing ,Changing & Servicing Of Motor Control Panel With Fasd Starter And 500 annual periodical maintenance Incoming Mccb , 250 annual periodical maintenance Outgoing Mccb , Copper Bus Bar With Supply/Fixing Of Following Works- I. Changing Of Star Contactor Mnx-110-02 Nos. & Delta Contactor Mnx-140-02 Nos. & Main Contactor Mnx-140-02 Nos. . (L&K/HavellS/SiemenS/Schneider/Bch Make) Ii. Incoming Mccb 500 Amp-01 No. , Outgoing Mccb 250 annual periodical maintenance -02 Nos. (L&K/HavellS/SiemenS/Schneider/Bch Make) Iii. Timer (3-30 Sec)-02 Nos. (L&T Make). Iv. On-Off Push Buttons-04 Nos. V. 3 Phase Led Voltmeter Ci 0.5-02 Nos. Vi. 3 Phase Led Ampere Meter Ci 0.5 -02 Nos. Vii. Single Phasing, Reverse Current, Under Voltage, Over Voltage Protection Relay-01 Set Each For Both Motor. Viii. Led Phase Indicating Bulb-06 Nos. Ix. Auto/Manual Selector Switch-02 Nos. X. Thermal Overload Relay (125-160A) .-01 No Xi. 4 Sq. Mm Single Core Copper Cable-20 Mtrs. For Control Wiring And 16 Sq. Mm Single Core Copper Cable- 10 Mtrs With Copper Lugs, Tape Etc. With All Fittings & Electrician Charges At Raw Water P/Plant. , Cost Towards Supplying, Installation And Commissioning Of 315Kva Servo Controlled (Oil Cooled) Automatic Voltage Stabilizer Suitable For Output Voltage Of 415 Volt ± 1% 3 Phase 50 Hz With Copper Wound Transformer As Mentioned Below. The Stabilizer Shall Function Satisfactorily Even If Incoming Supply Is Unbalanced Between Phases Within Range Of 10%. The Stabilizer Should Be Constructed In Cubical Box, With Bidirectional Wheels For Easy Handling Necessary Monitors And UserS Controls On Front Panel Such As Indication Alarm, Voltmeter And Selector Switch For Measuring Input And Output Voltage Auto Manual Selector Switch. Raise Low Push Buttons Etc. Suitable Capacity Termination Strips And Bus Bars For Incoming And Outgoing Cable Should Be Provided. All Three Phases Shall Be Independently Monitored And Corrected. Following Protections And Indication Shall Be Incorporated. Over Voltage/Under Voltage Single Phasing Cut Off Contactor With Electronic Output Sensing Unit Suitable Change Over Switch And Earthing (2 Nos.) 315 Kva Oil Cooled Servo Controlled Automatic Voltage Stabilizer (Output 415 Unit ±1%) Input 220 To 480 Volt. , Supplying And Filling Of T-Oil , Cost Towards Complete Servicing And Repairing Of Stabilizer With All Labour, Tools And Tackles And Electrician Charges Etc. All Complete Job And Testing On Full Load Of 315 Kva Oil Cooled Servo Voltage Stabilizer Working On Three Phase Input Voltage-220 To 480 V And Output- 415±1%V. Make- Servokon System Limited With Following Works- I.Cost Towards Disconnection And Cleaning Of Stabilizer With All Labour Tools And Tackles Ii.Cost Towards Supply/Fixing Of Servo Motor As Per Sample - 3 Nos. Iii.Cost Towards Supply/Fixing Of Panel Sensing/Control Pcb Card As Per Sample - 2 Nos. Iv.R.C Kit - 2 Unit V.Control Transformer. - 2 Nos. Vi.3 Phase Digital Voltmeter (Input/Output) As Per Sample - 01 No. Vii. Armored And Shaft , Supplying And Filling Of T-Oil. , Cost Towards Breaking Old Plain Cement Concrete Foundation And Making New Plain Cement Concrete Foundation Suitable For Supplied C/F Pump Set At Wtp. , Cost Towards Denting And Painting Of Electro-Mechanical Components As Motor Pump, Panel Board, Sluice Valve, Nr Valves, Suction Pipe Line, Common Header Pipe Line Inside Pump Chamber With Primer And Two Coat Of Metal Oil Paint As Required At Wtp P/Plant
BOQ
| Sl. No. | Item Description |
| 1 | Intake well at (gumani river) |
| 2 | Supplying, Installation, testing and commissioning of water lubricated single or multistage, Radial/Mixed flow Vertical turbine pump(make-Kirloskar /Jyoti/WPIL / WILO Mather & platt) having discharge of 117 m³/hr against a total head of 30 meters consisting of pump bowl assemblies with dynamically balanced bronze impeller , stainless steel pump shaft , S.S. line shaft 1.5 mtr length each , 30 feet MS fabricated flanged type column assembly , strainer, non- reverse rachet coupling and discharge head etc. coupled with suitable Vertical hollow shaft -IE3 energy efficient SPDP Squirrel cage induction motor (Kirloskar/ Jyoti/ CGL make) confirming to IS 12615:2011 with latest amendments having 10% more BHP than that of Pump operating on 3-PH, 50Hz, 415 ± 10%, 1450-1500 rpm with required size of ISI marked heavy duty CIDF sluice valve & CIDF NR valve , Pressure gauge, MS clamp including cost of construction of new foundation with suitable size of nut ,bolts and packings and doing fabrication work for connecting the exiting common header delivery line etc. all complete or as per site requirement or direction of E/I. |
| 3 | Cost towards supplying, Installation, testing & commissioning of free standing type floor mounted cubical LT motor control panel fabricated with MS sheet of suitable gauge and size duly painted with two coats of red oxide primer comprising of 200 Amp, 440V copper bus bar arrangement 4 pole consisting of following accessories:(i) 200Amp MCCB – 1 No. (Incoming feeder)(ii) 100 Amp MCCB – 03Nos (outgoing feeder).(iii) 100 Amp MCCB – 01No. (As spare)(iv) 32 Amp MCB -1 No. for lighting load and other utility load.(v) Fully Automatic Star Delta (FASD) Starter (L&K/Havell’s/Siemen’s/Schneider/BCH make) suitable for Above pump set or more etc.- 3 Nos.(vi) 3-phase Digital display Voltmeter & Amp Meter -3Sets, Phase indicating light R-Y-B -3 Nos.(vii) Copper Bus Bar- 04 Pole 200 Amp, 415V Copper strip bus bar enclosed in MS sheet along with overload relay, Motor protection device (MPD), Proper power & control wiring inside by suitable size of copper conductor and wires etc. all complete set including transportation and fitting & mounting charges at P/Plant. |
| 4 | Cost towards special repairing,changing & servicing of motor control panel with FASD starter and 200 Amp Incoming MCCB , 100 Amp outgoing MCCB, Copper Bus bar with S/F of following works-i. Changing of Star contactor MNX-70-01 Nos. & Delta contactor MNX-80-02 nos. & Main contactor MNX-80 – 02 Nos. (L&K/Havell’s/Siemen’s/Schneider/BCH make)ii. Incoming MCCB 200 Amp-01 No. , Outgoing MCCB 100 Amp -01 No. (L&K/Havell’s/Siemen’s/Schneider/BCH make)iii. Timer (3-30 sec)-02 Nos. (L&T Make).iv. ON-OFF push buttons-04 Nos.v. 3 Phase LED Voltmeter CI 0.5-01 Nos.vi. 3 Phase LED Ampere meter CI 0.5 -02 Nos.vii. Single phasing, reverse current, under voltage, over voltage protection relay-01 set each for both motor. viii. LED Phase indicating bulb-06 Nos.ix. Auto/Manual Selector switch-02 Nos.x. Thermal overload Relay -80 A max.-01 No.xi. 4 sq. mm Single core copper cable-20 mtrs. for control wiring and 16 sq. mm single core copper cable- 10 mtrs with copper lugs, tape etc. with all fittings & electrician charges at Raw Water P/Plant. |
| 5 | Light wiring inside and outside of pump house with LED street light-02 Nos. (40 Watt), LED tube set- 2 Nos.(20 Watt). |
| 6 | Cost towards supplying, Installation and commissioning of 100 KVA Servo controlled (Oil cooled) automatic voltage stabilizer suitable for output voltage of 415 volt ± 1% 3 phase 50 Hz with copper wound transformer as mentioned below. The stabilizer shall function satisfactorily even if incoming supply is unbalanced between phases within range of 10%. The stabilizer should be constructed in cubical box, with bidirectional wheels for easy handling necessary monitors and user’s controls on front panel such as indication alarm, voltmeter and selector switch for measuring input and output voltage auto manual selector switch. Raise low push buttons etc. Suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. All three phases shall be independently monitored and corrected. Following protections and indication shall be incorporated.Over Voltage/Under Voltage Single PhasingCut off contactor with electronic output sensing unit Suitable change over switch and Earthing100 KVA Oil cooled Servo controlled automatic voltage stabilizer (Output 415 unit ±1%) Input 220 to 480 Volt. |
| 7 | Supplying and filling of T-oil. |
| 8 | Cost towards complete servicing and repairing of stabilizer with all labour, tools and tackles and electrician charges etc. all complete job and testing on full load of 100 KVA Oil cooled Servo Voltage Stabilizer working on three phase input Voltage-220 to 480 V and Output- 415±1%V. Make- Servokon System Limited with following works-i.Cost towards disconnection and cleaning of stabilizer with all labour tools and tacklesii.Cost towards S/F of servo motor as per sample – 3 Nos.iii.Cost towards S/f of Panel Sensing/control PCB Card as per sample – 2 Nos.iv.R.C kit – 2 Unitv.Control transformer. – 2 Nos.vi.3 phase Digital Voltmeter (Input/Output) As Per sample – 01 No.vii. Armored and shaft |
| 9 | Supplying and filling of T-oil. |
| 10 | Providing all labours, tools, tackels and technician for disconnection and taking out 20 HP VT p/set with column pipe from intake well all complete set. |
| 11 | Cost towards all labour, tools, tackles and technician for opening, dismantling, repairing and overhauling of 20 HP multi stage VT pump having head 30 meter, discharge- 117 m3/hr. speed 1460 rpm.i. With S/F of S.S. pump shaft- 01 No.ii. Top and bottom bush- 02 Nos.,iii. Intermediate bushes -5 Nos.iv. Spider cut less rubber bushes- 05 Nos.v. Locks.vi. Impeller copper bush-5 Pcs.vii. 25 mm dia. S.S. line shaft- 10 ft. each 2 Nos.viii. 25 mm dia. S.S. head shaft- 5 ft. each 1 No.ix. S.S. Socket and bush-05 Nos. each.x. Ferro collar ball rubber bush- 5 Pc.xi. spider bearing – 06 Nos.xi. Ball sleeve bush- 05 Nos. each all materials as per required reassembling the same at workshop and refitting at site etc. all complete. (Rate after deducting the scrap materials).Make of pump – Wilo (Mather & Platt) |
| 12 | Providing all labours, tools, tackels and technician for lowering after repairing of 20 HP VT P/Set with column pipe, line shaft, Nut bolts as per required into intake well all complete. |
| 13 | Cost towards supplying all labour tools and tackles for complete opening, dismantling, of 20 HP, 415±10 Volt, 50c/s, star delta, 3 phase VT motor by supplying supper enameled copper wire and then tapping, varnishing, heating & testing on full load and repairing of stator and rotor with including the deduction of cost of burnt copper wires etc. all complete .Weight of copper wire approx. 12 kg.With changing of following bearing:- DE/NDE 6309-ZZ/6309-ZZ as per sample- 2 Nos and transportation charges of above pump motor set and other fittings materials from p/plant to workshop and vice versa etc at raw water p/plant. |
| 14 | Cost towards supplying all labour tools and tackles for complete opening, dismantling, of 7.5 HP, 415±10 Volt, 50c/s, star delta, 3 phase Induction motor by supplying supper enameled copper wire and then tapping, varnishing, heating & testing on full load and repairing of stator and rotor with including the deduction of cost of burnt copper wires etc. all complete .Weight of copper wire approx. 7 kg.With changing of following bearing:- DE/NDE 6208-2Z/C3 as per sample- 2 Nos and transportation charges of above pump motor set and other fittings materials from p/plant to workshop and vice versa etc at raw water p/plant. |
| 15 | Cost towards denting and painting of Electro-mechanical components as Motor Pump, Panel board, Sluice valve, NR Valves, Suction pipe line, common header pipe line inside Pump Chamber with primer and two coat of Metal Oil paint as required at Intake well. |
| 16 | WTP at barahait |
| 17 | Supplying, Installation, testing and commissioning of electrically driven Horizontal split casing Centrifugal pump set make (Kirloskar/WPIL/Mather & Platt /Jyoti) having discharge capacity of clear water 117 m3/h against total head of 105 meter coupled with TEFC sq. cage induction motor make (Kirloskar/ Crompton/Jyoti) operated on 415 + 10% volts, 50HZ, 1450-1500 RPM mounted on common M.S. fabricated base plate with CIDF sluice valve-1 no, CIDF NR valve-1 no, pressure gauge-1 no, tire coupling-1 no, etc. and doing fabrication work for connecting the exiting common header delivery line. all complete. |
| 18 | Cost towards opening, dismantling, cleaning and repairing and overhauling of 100 HP HSC C/F pump set having 1460 rpm head 105 mtrs. discharge 117 m3 /hr make- WPIL with following works:- ( i) Complete dismantling of Pump set from base plate and opening & cleaning of Pump with all labour, tools and tackles .(ii) Repairing Re-metalling of stainless steel pump shaft, turning & finishing as per sample at lathe and fitting -01 No. (iii) S.S. Shaft sleeves both sides- 02 Nos. as per sample.(iv) Making neck-ring as per sample- 02 Nos.(v) Cheek Nut- 01 No.(vi) S/F coupling rubber -01 No.(vii) Making of gland titener as per sample.-02 Nos.(viii) Repairing of bearing housing -02 Nos.(ix) Double Ball bearing -01 No.(x) Ball bearing -02 No. (xi) Paper Packing, Nut-bolts as required. (xii) Repairing of damaged CI impeller of pump -01 No with CI welding, turning & finishing as per sample-01 No. Complete re-assembling and overhauling of Pump, installing at site with all labour, tools & tackles and Testing on full load with transportation charge up & down etc. including the deduction of scrap materials all complete. |
| 19 | Cost towards supplying all labour tools and tackles for complete opening, dismantling, of 100 HP, 415±10 Volt, 50c/s, star delta, 3 phase induction motor by supplying supper enameled copper wire and then tapping, varnishing, heating & testing on full load and repairing of stator and rotor with including the deduction of cost of burnt copper wires etc. all complete .Weight of copper wire approx. 40 kg.With changing of following bearing:- DE/NDE 6317 /6317 as per sample- 2 Nos and transportation charges of above pump motor set and other fittings materials from p/plant to workshop and vice versa etc at clear water p/plant. |
| 20 | Cost towards supplying, Installation, testing & commissioning of free standing type floor mounted cubical LT motor control panel fabricated with MS sheet of suitable gauge and size duly painted with two coats of red oxide primer comprising of 500 Amp, 440V copper bus bar arrangement 4 pole consisting of following accessories:(i) 500 Amp MCCB – 1 No. (Incoming feeder) (L&K/C&S/Siemen’s/Schneider make)(ii) 250 Amp MCCB – 03Nos (outgoing feeder). (L&K/C&S/Siemen’s/Schneider make)(iii) 250 Amp MCCB – 01No. (As spare) (L&K/C&S/Siemen’s/Schneider make)(iv) 63 Amp MCB -1 No. for lighting load and other utility load. (L&K/C&S/Siemen’s/Schneider make)(v) Fully Automatic Star Delta (FASD) Starter (L&K/Havell’s/Siemen’s/Schneider/BCH make) suitable for Above pump set or more etc.- 3 Nos.(vi) 3-phase Digital display Voltmeter & Amp Meter -3Sets, Phase indicating light R-Y-B -3 Nos.(vii) Copper Bus Bar- 04 Pole 500 Amp, 415V Copper strip bus bar enclosed in MS sheet along with overload relay, Motor protection device (MPD), Proper power & control wiring inside by suitable size of copper conductor and wires etc. all complete set including transportation and fitting & mounting charges at P/Plant. |
| 21 | Cost towards special repairing ,changing & servicing of motor control panel with FASD starter and 500 Amp Incoming MCCB , 250 Amp outgoing MCCB , Copper Bus bar with S/F of following works-i. Changing of Star contactor MNX-110-02 Nos. & Delta contactor MNX-140-02 Nos. & Main Contactor MNX-140-02 Nos. . (L&K/Havell’s/Siemen’s/Schneider/BCH make) ii. Incoming MCCB 500 Amp-01 No. , Outgoing MCCB 250 Amp -02 Nos. (L&K/Havell’s/Siemen’s/Schneider/BCH make)iii. Timer (3-30 sec)-02 Nos. (L&T Make).iv. ON-OFF push buttons-04 Nos.v. 3 Phase LED Voltmeter CI 0.5-02 Nos.vi. 3 Phase LED Ampere meter CI 0.5 -02 Nos.vii. Single phasing, reverse current, under voltage, over voltage protection relay-01 set each for both motor. viii. LED Phase indicating bulb-06 Nos.ix. Auto/Manual Selector switch-02 Nos.x. Thermal overload Relay (125-160A) .-01 Noxi. 4 sq. mm Single core copper cable-20 mtrs. for control wiring and 16 sq. mm single core copper cable- 10 mtrs with copper lugs, tape etc. with all fittings & electrician charges at Raw Water P/Plant. |
| 22 | Cost towards supplying, Installation and commissioning of 315KVA Servo controlled (Oil cooled) automatic voltage stabilizer suitable for output voltage of 415 volt ± 1% 3 phase 50 Hz with copper wound transformer as mentioned below. The stabilizer shall function satisfactorily even if incoming supply is unbalanced between phases within range of 10%. The stabilizer should be constructed in cubical box, with bidirectional wheels for easy handling necessary monitors and user’s controls on front panel such as indication alarm, voltmeter and selector switch for measuring input and output voltage auto manual selector switch. Raise low push buttons etc. Suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. All three phases shall be independently monitored and corrected. Following protections and indication shall be incorporated.Over Voltage/Under Voltage Single PhasingCut off contactor with electronic output sensing unit Suitable change over switch and Earthing (2 Nos.)315 KVA Oil cooled Servo controlled automatic voltage stabilizer (Output 415 unit ±1%) Input 220 to 480Volt. |
| 23 | Supplying and filling of T-oil |
| 24 | Cost towards complete servicing and repairing of stabilizer with all labour, tools and tackles and electrician charges etc. all complete job and testing on full load of 315 KVA Oil cooled Servo Voltage Stabilizer working on three phase input Voltage-220 to 480 V and Output- 415±1%V. Make- Servokon System Limited with following works-i.Cost towards disconnection and cleaning of stabilizer with all labour tools and tacklesii.Cost towards S/F of servo motor as per sample – 3 Nos.iii.Cost towards S/f of Panel Sensing/control PCB Card as per sample – 2 Nos.iv.R.C kit – 2 Unitv.Control transformer. – 2 Nos.vi.3 phase Digital Voltmeter (Input/Output) As Per sample – 01 No.vii. Armored and shaft |
| 25 | Supplying and filling of T-oil. |
| 26 | Cost towards breaking old PCC foundation and making new PCC foundation suitable for supplied C/F pump set at WTP. |
| 27 | Cost towards denting and painting of Electro-mechanical components as Motor Pump, Panel board, Sluice valve, NR Valves, Suction pipe line, common header pipe line inside Pump Chamber with primer and two coat of Metal Oil paint as required at WTP p/plant Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender