Drinking Water Supply and Sanitation Government Departments Closing in 5 days TDR #58050591

Tender For E-Quotation For Rajmahal Mega Rural Water Supply Scheme.

Issued by Government Departments · Dumka, Jharkhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
23 Oct 2026
5 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Dumka → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for E-Quotation For Rajmahal Mega Rural Water Supply Scheme. , Intake Floating Jetty At Ganga River (Rajmahal) , Supplying, Installation, Testing And Commissioning Of Electrically Driven Horizontal Split Casing Centrifugal Pump Set Make (Kirloskar/Wpil/Mather & Platt /Jyoti) Having Discharge Capacity Of Clear Water 270M3/H Against Total Head Of 35.44 Meter Coupled With Tefc Sq. Cage Induction Motor Make (Kirloskar/ Crompton/Jyoti) Operated On 415 + 10% Volts, 50Hz, 1400-1500 Rpm Mounted On Common M.S. Fabricated Base Plate With Cidf Sluice Valve-1 No, Cidf Nr Valve-1 No, Pressure Gauge-1 No, Tire Coupling-1 No, Etc. And Doing Fabrication Work For Connecting The Exiting Common Header Delivery Line. All Complete. , Cost Towards Opening, Dismantling, Cleaning And Repairing And Overhauling Of 60 Hp Hsc C/F Pump Set Having 1475 Rpm Head 35.44 Mtrs. Discharge 270 M3 /Hr Make- Wpil With Following Works:- ( I) Complete Dismantling Of Pump Set From Base Plate And Opening & Cleaning Of Pump With All Labour, Tools And Tackles . (Ii) Repairing Re-Metalling Of Stainless Steel Pump Shaft, Turning & Finishing As Per Sample At Lathe And Fitting -01 No. (Iii) S.S. Shaft Sleeves Both Sides- 02 Nos. As Per Sample. (Iv) Making Neck-Ring As Per Sample- 02 Nos. (V) Cheek Nut- 01 No. (Vi) Supply/Fixing Coupling Rubber -01 No. (Vii) Making Of Gland Titener As Per Sample.-02 Nos. (Viii) Repairing Of Bearing Housing -02 Nos. (Ix) Double Ball Bearing -01 No. (X) Ball Bearing -02 No. (Xi) Paper Packing, Nut-Bolts As Required. (Xii) Repairing Of Damaged Ci Impeller Of Pump -01 No With Ci Welding, Turning & Finishing As Per Sample-01 No. Complete Re-Assembling And Overhauling Of Pump, Installing At Site With All Labour, Tools & Tackles And Testing On Full Load With Transportation Charge Up & Down Etc. Including The Deduction Of Scrap Materials All Complete. , Cost Towards Supplying All Labour Tools And Tackles For Complete Opening, Dismantling, Of 60 Hp, 415±10 Volt, 50C/S, Star Delta 3 Phase Induction Motor (Make- Marathon Motors Ltd.) By Supplying Supper Enameled Copper Wire And Then Tapping, Varnishing, Heating & Testing On Full Load And Repairing Of Stator And Rotor With Including The Deduction Of Cost Of Burnt Copper Wires Etc. All Complete .Weight Of Copper Wire Approx. 30 Kg. With Changing Of Following Bearing:- De/Nde-6313/6313 As Per Sample- 2 Nos And Transportation Charges Of Above Pump Motor Set And Other Fittings Materials From P/Plant To Workshop And Vice Versa Etc At Raw Water P/Plant. , Cost Towards Supplying, Installation, Testing & Commissioning Of Free Standing Type Floor Mounted Cubical Lt Motor Control Panel Fabricated With Ms Sheet Of Suitable Gauge And Size Duly Painted With Two Coats Of Red Oxide Primer Comprising Of 400 Amp, 440V Copper Bus Bar Arrangement 4 Pole Consisting Of Following Accessories: (I) 400 annual periodical maintenance Mccb - 1 No. (Incoming Feeder) (Ii) 250 annual periodical maintenance Mccb - 03Nos (Outgoing Feeder). (Iii) 250Amp Mccb - 01No. (As Spare) (Iv) 63 annual periodical maintenance Mcb -1 No. For Lighting Load And Other Utility Load. (V) Fully Automatic Star Delta (Fasd) Starter (L&K/HavellS/SiemenS/Schneider/Bch Make) Suitable For Above Pump Set Or More Etc.- 3Nos. (Vi) 3-Phase Digital Display Voltmeter & annual periodical maintenance Meter -3 Sets, Phase Indicating Light R-Y-B -3 Nos. (Vii) Copper Bus Bar- 04 Pole 400 Amp, 415V Copper Strip Bus Bar Enclosed In Ms Sheet Along With Overload Relay, Motor Protection Device (Mpd), Proper Power & Control Wiring Inside By Suitable Size Of Copper Conductor And Wires Etc. All Complete Set Including Transportation And Fitting & Mounting Charges At P/Plant. , Cost Towards Special Repairing,Changing & Servicing Of Motor Control Panel With Fasd Starter And 400 annual periodical maintenance Incoming Mccb ,250 annual periodical maintenance Outgoing Mccb., Copper Bus Bar With Supply/Fixing Of Following Works- I. Changing Of Star Contactor Mnx-80-02 Nos. & Delta Contactor Mnx-95-02 Nos. & Main Contactor Mnx-95 -02 Nos (L&K/C&S/SiemenS/Schneider Make). Ii. Incoming Mccb 400 annual periodical maintenance - 01 No. , Outgoing Mccb 250 annual periodical maintenance - 02 Nos. (L&K/C&S/SiemenS/Schneider Make). Iii. Timer (3-30 Sec)-02 Nos. (L&T Make). Iv. On-Off Push Buttons-04 Nos. V. 3 Phase Led Voltmeter Ci 0.5-01 Nos. Vi. 3 Phase Led Ampere Meter Ci 0.5 -02 Nos. Vii. Single Phasing, Reverse Current, Under Voltage, Over Voltage Protection Relay-01 Set Each For Both Motor. Viii. Led Phase Indicating Bulb-06 Nos. Ix. Auto/Manual Selector Switch-02 Nos. X. Thermal Overload Relay (45-75A) -01 No. Xi. 4 Sq. Mm Single Core Copper Cable-20 Mtrs. For Control Wiring And 16 Sq. Mm Single Core Copper Cable- 10 Mtrs With Copper Lugs, Tape Etc. With All Fittings & Electrician Charges At Raw Water P/Plant. , Light Wiring Inside And Outside Of Pump House With Led Street Light-02 Nos. (40 Watt), Led Tube Set- 2 Nos. (20 Watt). , Cost Towards Denting And Painting Of Electro-Mechanical Components As Motor Pump, Panel Board, Sluice Valve, Nr Valves, Suction Pipe Line, Common Header Pipe Line Inside Pump Chamber With Primer And Two Coat Of Metal Oil Paint As Required At Floating Jetty. , Cost Towards Supplying, Installation And Commissioning Of 200Kva Servo Controlled (Oil Cooled) Automatic Voltage Stabilizer Suitable For Output Voltage Of 415 Volt ± 1% 3 Phase 50 Hz With Copper Wound Transformer As Mentioned Below. The Stabilizer Shall Function Satisfactorily Even If Incoming Supply Is Unbalanced Between Phases Within Range Of 10%. The Stabilizer Should Be Constructed In Cubical Box, With Bidirectional Wheels For Easy Handling Necessary Monitors And UserS Controls On Front Panel Such As Indication Alarm, Voltmeter And Selector Switch For Measuring Input And Output Voltage Auto Manual Selector Switch. Raise Low Push Buttons Etc. Suitable Capacity Termination Strips And Bus Bars For Incoming And Outgoing Cable Should Be Provided. All Three Phases Shall Be Independently Monitored And Corrected. Following Protections And Indication Shall Be Incorporated. Over Voltage/Under Voltage Single Phasing Cut Off Contactor With Electronic Output Sensing Unit Suitable Change Over Switch And Earthing 200Kva Oil Cooled Servo Controlled Automatic Voltage Stabilizer (Output 415 Unit ±1%) Input 220 To 480 Volt. , Supplying And Filling Of T-Oil. , Cost Towards Complete Servicing And Repairing Of Stabilizer With All Labour, Tools And Tackles And Electrician Charges Etc. All Complete Job And Testing On Full Load Of 200 Kva Oil Cooled Servo Voltage Stabilizer Working On Three Phase Input Voltage-220 To 480 V And Output- 415±1%V. Make- Servokon System Limited With Following Works- I.Cost Towards Disconnection And Cleaning Of Stabilizer With All Labour Tools And Tackles Ii.Cost Towards Supply/Fixing Of Servo Motor As Per Sample - 3 Nos. Iii.Cost Towards Supply/Fixing Of Panel Sensing/Control Pcb Card As Per Sample - 2 Nos. Iv.R.C Kit - 2 Unit V.Control Transformer. - 2 Nos. Vi.3 Phase Digital Voltmeter (Input/Output) As Per Sample - 01 No. Vii. Armored And Shaft , Supplying And Filling Of T-Oil. , Wtp At Rajmahal , Supplying, Installation, Testing And Commissioning Of Electrically Driven Horizontal Split Casing Centrifugal Pump Set Make (Kirloskar/Wpil/Mather & Platt /Jyoti) Having Discharge Capacity Of Clear Water 270M3/H Against Total Head Of 125 Meter Coupled With Tefc Sq. Cage Induction Motor Make (Kirloskar/ Crompton/Jyoti) Operated On 415 + 10% Volts, 50Hz, 1400-1500 Rpm Mounted On Common M.S. Fabricated Base Plate With Cidf Sluice Valve-1 No, Foot Valve-1 No., Cidf Nr Valve-1 No, Pressure Gauge-1 No, Tire Coupling-1 No, Etc. And Doing Fabrication Work For Connecting The Exiting Common Header Delivery Line. All Complete. , Cost Towards Opening, Dismantling, Cleaning And Repairing And Overhauling Of 240 Hp Hsc C/F Pump Set Having 1475 Rpm Head 125 Mtrs. Discharge 270 M3 /Hr Make- Wpil With Following Works:- ( I) Complete Dismantling Of Pump Set From Base Plate And Opening & Cleaning Of Pump With All Labour, Tools And Tackles . (Ii) Repairing Re-Metalling Of Stainless Steel Pump Shaft, Turning & Finishing As Per Sample At Lathe And Fitting -01 No. (Iii) S.S. Shaft Sleeves Both Sides- 02 Nos. As Per Sample. (Iv) Making Neck-Ring As Per Sample- 02 Nos. (V) Cheek Nut- 01 No. (Vi) Supply/Fixing Coupling Rubber -01 No. (Vii) Making Of Gland Titener As Per Sample.-02 Nos. (Viii) Repairing Of Bearing Housing -02 Nos. (Ix) Double Ball Bearing -01 No. (X) Ball Bearing -02 No. (Xi) Paper Packing, Nut-Bolts As Required. (Xii) Repairing Of Damaged Ci Impeller Of Pump -01 No With Ci Welding, Turning & Finishing As Per Sample-01 No. Complete Re-Assembling And Overhauling Of Pump, Installing At Site With All Labour, Tools & Tackles And Testing On Full Load With Transportation Charge Up & Down Etc. Including The Deduction Of Scrap Materials All Complete. , Cost Towards Supplying All Labour Tools And Tackles For Complete Opening, Dismantling, Of 240 Hp, 415±10 Volt, 50C/S, Star Delta, 3 Phase Induction Motor(Make-Marathon Motors Ltd. ) By Supplying Supper Enameled Copper Wire And Then Tapping, Varnishing, Heating & Testing On Full Load And Repairing Of Stator And Rotor With Including The Deduction Of Cost Of Burnt Copper Wires Etc. All Complete .Weight Of Copper Wire Approx. 95 Kg. With Changing Of Following Bearing:- De/Nde 6319 /6319 As Per Sample- 2 Nos And Transportation Charges Of Above Pump Motor Set And Other Fittings Materials From P/Plant To Workshop And Vice Versa Etc At Clear Water P/Plant. , Cost Towards Supplying, Installation, Testing & Commissioning Of Free Standing Type Floor Mounted Cubical Lt Motor Control Panel Fabricated With Ms Sheet Of Suitable Gauge And Size Duly Painted With Two Coats Of Red Oxide Primer Comprising Of 1250Amp, 440V Copper Bus Bar Arrangement 4 Pole Consisting Of Following Accessories: (I) 1250Amp Mccb - 1 No. (Incoming Feeder) (L&K/C&S/SiemenS/Schneider Make) (Ii) 400Amp Mccb - 02Nos (Outgoing Feeder). (L&K/C&S/SiemenS/Schneider Make) (Iii) 400Amp Mccb - 01No. (As Spare) (L&K/C&S/SiemenS/Schneider Make) (Iv) 63 annual periodical maintenance Mcb -1 No. For Lighting Load And Other Utility Load. (L&K/C&S/SiemenS/Schneider Make) (V) Fully Automatic Star Delta (Fasd) Starter (L&K/HavellS/SiemenS/Schneider/Bch Make) Suitable For Above Pump Set Or More Etc.- 3 Nos. (Vi) 3-Phase Digital Display Voltmeter & annual periodical maintenance Meter -3 Sets, Phase Indicating Light R-Y-B -3 Nos. (Vii) Copper Bus Bar- 04 Pole 1250Amp, 415V Copper Strip Bus Bar Enclosed In Ms Sheet Along With Overload Relay, Motor Protection Device (Mpd), Proper Power & Control Wiring Inside By Suitable Size Of Copper Conductor And Wires Etc. All Complete Set Including Transportation And Fitting & Mounting Charges At P/Plant. , Cost Towards Special Repairing ,Changing & Servicing Of Motor Control Panel With Fasd Starter And 1250 annual periodical maintenance Incoming Mccb , 400 annual periodical maintenance Outgoing Mccb , Copper Bus Bar With Supply/Fixing Of Following Works- I. Changing Of Star Contactor Mnx-400 -01 No. & Delta Contactor Mnx-550 -02 Nos. & Main Contactor Mnx-550 -02 Nos. (L&K/C&S/SiemenS/Schneider Make) Ii. Incoming Mccb 1250 annual periodical maintenance - 01 No. , Outgoing Mccb 400 annual periodical maintenance - 02 Nos. (L&K/C&S/SiemenS/Schneider Make). Iii. Timer (3-30 Sec)-02 Nos. (L&T Make). Iv. On-Off Push Buttons-04 Nos. V. 3 Phase Led Voltmeter Ci 0.5-02 Nos. Vi. 3 Phase Led Ampere Meter Ci 0.5 -02 Nos. Vii. Single Phasing, Reverse Current, Under Voltage, Over Voltage Protection Relay-01 Set Each For Both Motor. Viii. Led Phase Indicating Bulb-06 Nos. Ix. Auto/Manual Selector Switch-02 Nos. X. Thermal Overload Relay (135-225A)- 01 No. Xi. 4 Sq. Mm Single Core Copper Cable-20 Mtrs. For Control Wiring And 16 Sq. Mm Single Core Copper Cable- 10 Mtrs With Copper Lugs, Tape Etc. With All Fittings & Electrician Charges At Raw Water P/Plant. , Cost Towards Denting And Painting Of Electro-Mechanical Components As Motor Pump, Panel Board, Sluice Valve, Nr Valves, Suction Pipe Line, Common Header Pipe Line Inside Pump Chamber With Primer And Two Coat Of Metal Oil Paint As Required At Wtp P/Plant. , Cost Towards Supplying, Installation And Commissioning Of 800Kva Servo Controlled (Oil Cooled) Automatic Voltage Stabilizer Suitable For Output Voltage Of 415 Volt ± 1% 3 Phase 50 Hz With Copper Wound Transformer As Mentioned Below. The Stabilizer Shall Function Satisfactorily Even If Incoming Supply Is Unbalanced Between Phases Within Range Of 10%. The Stabilizer Should Be Constructed In Cubical Box, With Bidirectional Wheels For Easy Handling Necessary Monitors And UserS Controls On Front Panel Such As Indication Alarm, Voltmeter And Selector Switch For Measuring Input And Output Voltage Auto Manual Selector Switch. Raise Low Push Buttons Etc. Suitable Capacity Termination Strips And Bus Bars For Incoming And Outgoing Cable Should Be Provided. All Three Phases Shall Be Independently Monitored And Corrected. Following Protections And Indication Shall Be Incorporated. Over Voltage/Under Voltage Single Phasing Cut Off Contactor With Electronic Output Sensing Unit Suitable Change Over Switch And Earthing (2 Nos.) 800Kva Oil Cooled Servo Controlled Automatic Voltage Stabilizer (Output 415 Unit ±1%) Input 220 To 480 Volt. , Supplying And Filling Of T-Oil. , Cost Towards Complete Servicing And Repairing Of Stabilizer With All Labour, Tools And Tackles And Electrician Charges Etc. All Complete Job And Testing On Full Load Of 800 Kva Oil Cooled Servo Voltage Stabilizer Working On Three Phase Input Voltage-220 To 480 V And Output- 415±1%V. Make- Servokon System Limited With Following Works- I.Cost Towards Disconnection And Cleaning Of Stabilizer With All Labour Tools And Tackles Ii.Cost Towards Supply/Fixing Of Servo Motor As Per Sample - 3 Nos. Iii.Cost Towards Supply/Fixing Of Panel Sensing/Control Pcb Card As Per Sample - 2 Nos. Iv.R.C Kit - 2 Unit V.Control Transformer. - 2 Nos. Vi.3 Phase Digital Voltmeter (Input/Output) As Per Sample - 01 No. Vii. Armored And Shaft , Supplying And Filling Of T-Oil. , Cost Towards Breaking Old Plain Cement Concrete Foundation And Making New Plain Cement Concrete Foundation Suitable For Supplied C/F Pump Set At Wtp.

BOQ

Name of Work:- E-Quotation for Rajmahal Mega rural water supply scheme.
Sl. No. Item Description
1Intake floating jetty at Ganga river (Rajmahal)
2Supplying, Installation, testing and commissioning of electrically driven Horizontal split casing Centrifugal pump set make (Kirloskar/WPIL/Mather & Platt /Jyoti) having discharge capacity of clear water 270m3/h against total head of 35.44 meter coupled with TEFC sq. cage induction motor make (Kirloskar/ Crompton/Jyoti) operated on 415 + 10% volts, 50HZ, 1400-1500 RPM mounted on common M.S. fabricated base plate with CIDF sluice valve-1 no, CIDF NR valve-1 no, pressure gauge-1 no, tire coupling-1 no, etc. and doing fabrication work for connecting the exiting common header delivery line. all complete.
3Cost towards opening, dismantling, cleaning and repairing and overhauling of 60 HP HSC C/F pump set having 1475 rpm head 35.44 mtrs. discharge 270 m3 /hr make- WPIL with following works:- ( i) Complete dismantling of Pump set from base plate and opening & cleaning of Pump with all labour, tools and tackles .(ii) Repairing Re-metalling of stainless steel pump shaft, turning & finishing as per sample at lathe and fitting -01 No. (iii) S.S. Shaft sleeves both sides- 02 Nos. as per sample.(iv) Making neck-ring as per sample- 02 Nos.(v) Cheek Nut- 01 No.(vi) S/F coupling rubber -01 No.(vii) Making of gland titener as per sample.-02 Nos.(viii) Repairing of bearing housing -02 Nos.(ix) Double Ball bearing -01 No.(x) Ball bearing -02 No. (xi) Paper Packing, Nut-bolts as required. (xii) Repairing of damaged CI impeller of pump -01 No with CI welding, turning & finishing as per sample-01 No. Complete re-assembling and overhauling of Pump, installing at site with all labour, tools & tackles and Testing on full load with transportation charge up & down etc. including the deduction of scrap materials all complete.
4Cost towards supplying all labour tools and tackles for complete opening, dismantling, of 60 HP, 415±10 Volt, 50c/s, star delta 3 phase induction motor (make- Marathon Motors Ltd.) by supplying supper enameled copper wire and then tapping, varnishing, heating & testing on full load and repairing of stator and rotor with including the deduction of cost of burnt copper wires etc. all complete .Weight of copper wire approx. 30 kg.With changing of following bearing:- DE/NDE-6313/6313 as per sample- 2 Nos and transportation charges of above pump motor set and other fittings materials from p/plant to workshop and vice versa etc at raw water p/plant.
5Cost towards supplying, Installation, testing & commissioning of free standing type floor mounted cubical LT motor control panel fabricated with MS sheet of suitable gauge and size duly painted with two coats of red oxide primer comprising of 400 Amp, 440V copper bus bar arrangement 4 pole consisting of following accessories:(i) 400 Amp MCCB – 1 No. (Incoming feeder)(ii) 250 Amp MCCB – 03Nos (outgoing feeder).(iii) 250Amp MCCB – 01No. (As spare)(iv) 63 Amp MCB -1 No. for lighting load and other utility load.(v) Fully Automatic Star Delta (FASD) Starter (L&K/Havell’s/Siemen’s/Schneider/BCH make) suitable for Above pump set or more etc.- 3Nos.(vi) 3-phase Digital display Voltmeter & Amp Meter -3 Sets, Phase indicating light R-Y-B -3 Nos.(vii) Copper Bus Bar- 04 Pole 400 Amp, 415V Copper strip bus bar enclosed in MS sheet along with overload relay, Motor protection device (MPD), Proper power & control wiring inside by suitable size of copper conductor and wires etc. all complete set including transportation and fitting & mounting charges at P/Plant.
6Cost towards special repairing,changing & servicing of motor control panel with FASD starter and 400 Amp Incoming MCCB ,250 Amp outgoing MCCB., Copper Bus bar with S/F of following works-i. Changing of Star contactor MNX-80-02 Nos. & Delta contactor MNX-95-02 nos. & Main Contactor MNX-95 -02 Nos (L&K/C&S/Siemen’s/Schneider make).ii. Incoming MCCB 400 Amp – 01 No. , Outgoing MCCB 250 Amp – 02 Nos. (L&K/C&S/Siemen’s/Schneider make).iii. Timer (3-30 sec)-02 Nos. (L&T Make).iv. ON-OFF push buttons-04 Nos.v. 3 Phase LED Voltmeter CI 0.5-01 Nos.vi. 3 Phase LED Ampere meter CI 0.5 -02 Nos.vii. Single phasing, reverse current, under voltage, over voltage protection relay-01 set each for both motor. viii. LED Phase indicating bulb-06 Nos.ix. Auto/Manual Selector switch-02 Nos.x. Thermal overload Relay (45-75A) -01 No.xi. 4 sq. mm Single core copper cable-20 mtrs. for control wiring and 16 sq. mm single core copper cable- 10 mtrs with copper lugs, tape etc. with all fittings & electrician charges at Raw Water P/Plant.
7Light wiring inside and outside of pump house with LED street light-02 Nos. (40 Watt), LED tube set- 2 Nos.(20 Watt).
8Cost towards denting and painting of Electro-mechanical components as Motor Pump, Panel board, Sluice valve, NR Valves, Suction pipe line, common header pipe line inside Pump Chamber with primer and two coat of Metal Oil paint as required at Floating Jetty.
9Cost towards supplying, Installation and commissioning of 200KVA Servo controlled (Oil cooled) automatic voltage stabilizer suitable for output voltage of 415 volt ± 1% 3 phase 50 Hz with copper wound transformer as mentioned below. The stabilizer shall function satisfactorily even if incoming supply is unbalanced between phases within range of 10%. The stabilizer should be constructed in cubical box, with bidirectional wheels for easy handling necessary monitors and user’s controls on front panel such as indication alarm, voltmeter and selector switch for measuring input and output voltage auto manual selector switch. Raise low push buttons etc. Suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. All three phases shall be independently monitored and corrected. Following protections and indication shall be incorporated.Over Voltage/Under Voltage Single PhasingCut off contactor with electronic output sensing unit Suitable change over switch and Earthing200KVA Oil cooled Servo controlled automatic voltage stabilizer (Output 415 unit ±1%) Input 220 to 480 Volt.
10Supplying and filling of T-oil.
11Cost towards complete servicing and repairing of stabilizer with all labour, tools and tackles and electrician charges etc. all complete job and testing on full load of 200 KVA Oil cooled Servo Voltage Stabilizer working on three phase input Voltage-220 to 480 V and Output- 415±1%V. Make- Servokon System Limited with following works-i.Cost towards disconnection and cleaning of stabilizer with all labour tools and tacklesii.Cost towards S/F of servo motor as per sample – 3 Nos.iii.Cost towards S/f of Panel Sensing/control PCB Card as per sample – 2 Nos.iv.R.C kit – 2 Unitv.Control transformer. – 2 Nos.vi.3 phase Digital Voltmeter (Input/Output) As Per sample – 01 No.vii. Armored and shaft
12Supplying and filling of T-oil.
13WTP at RAJMAHAL
14Supplying, Installation, testing and commissioning of electrically driven Horizontal split casing Centrifugal pump set make (Kirloskar/WPIL/Mather & Platt /Jyoti) having discharge capacity of clear water 270m3/h against total head of 125 meter coupled with TEFC sq. cage induction motor make (Kirloskar/ Crompton/Jyoti) operated on 415 + 10% volts, 50HZ, 1400-1500 RPM mounted on common M.S. fabricated base plate with CIDF sluice valve-1 no, Foot valve-1 no., CIDF NR valve-1 no, pressure gauge-1 no, tire coupling-1 no, etc. and doing fabrication work for connecting the exiting common header delivery line. all complete.
15Cost towards opening, dismantling, cleaning and repairing and overhauling of 240 HP HSC C/F pump set having 1475 rpm head 125 mtrs. discharge 270 m3 /hr make- WPIL with following works:- ( i) Complete dismantling of Pump set from base plate and opening & cleaning of Pump with all labour, tools and tackles .(ii) Repairing Re-metalling of stainless steel pump shaft, turning & finishing as per sample at lathe and fitting -01 No. (iii) S.S. Shaft sleeves both sides- 02 Nos. as per sample.(iv) Making neck-ring as per sample- 02 Nos.(v) Cheek Nut- 01 No.(vi) S/F coupling rubber -01 No.(vii) Making of gland titener as per sample.-02 Nos.(viii) Repairing of bearing housing -02 Nos.(ix) Double Ball bearing -01 No.(x) Ball bearing -02 No. (xi) Paper Packing, Nut-bolts as required. (xii) Repairing of damaged CI impeller of pump -01 No with CI welding, turning & finishing as per sample-01 No. Complete re-assembling and overhauling of Pump, installing at site with all labour, tools & tackles and Testing on full load with transportation charge up & down etc. including the deduction of scrap materials all complete.
16Cost towards supplying all labour tools and tackles for complete opening, dismantling, of 240 HP, 415±10 Volt, 50c/s, star delta, 3 phase induction motor(Make-Marathon Motors Ltd. ) by supplying supper enameled copper wire and then tapping, varnishing, heating & testing on full load and repairing of stator and rotor with including the deduction of cost of burnt copper wires etc. all complete .Weight of copper wire approx. 95 kg.With changing of following bearing:- DE/NDE 6319 /6319 as per sample- 2 Nos and transportation charges of above pump motor set and other fittings materials from p/plant to workshop and vice versa etc at clear water p/plant.
17Cost towards supplying, Installation, testing & commissioning of free standing type floor mounted cubical LT motor control panel fabricated with MS sheet of suitable gauge and size duly painted with two coats of red oxide primer comprising of 1250Amp, 440V copper bus bar arrangement 4 pole consisting of following accessories:(i) 1250Amp MCCB – 1 No. (Incoming feeder) (L&K/C&S/Siemen’s/Schneider make)(ii) 400Amp MCCB – 02Nos (outgoing feeder). (L&K/C&S/Siemen’s/Schneider make)(iii) 400Amp MCCB – 01No. (As spare) (L&K/C&S/Siemen’s/Schneider make)(iv) 63 Amp MCB -1 No. for lighting load and other utility load. (L&K/C&S/Siemen’s/Schneider make)(v) Fully Automatic Star Delta (FASD) Starter (L&K/Havell’s/Siemen’s/Schneider/BCH make) suitable for Above pump set or more etc.- 3 Nos.(vi) 3-phase Digital display Voltmeter & Amp Meter -3 Sets, Phase indicating light R-Y-B -3 Nos.(vii) Copper Bus Bar- 04 Pole 1250Amp, 415V Copper strip bus bar enclosed in MS sheet along with overload relay, Motor protection device (MPD), Proper power & control wiring inside by suitable size of copper conductor and wires etc. all complete set including transportation and fitting & mounting charges at P/Plant.
18Cost towards special repairing ,changing & servicing of motor control panel with FASD starter and 1250 Amp Incoming MCCB , 400 Amp outgoing MCCB , Copper Bus bar with S/F of following works-i. Changing of Star contactor MNX-400 -01 No. & Delta contactor MNX-550 -02 Nos. & Main Contactor MNX-550 -02 Nos. (L&K/C&S/Siemen’s/Schneider make)ii. Incoming MCCB 1250 Amp – 01 No. , Outgoing MCCB 400 Amp – 02 Nos. (L&K/C&S/Siemen’s/Schneider make).iii. Timer (3-30 sec)-02 Nos. (L&T Make).iv. ON-OFF push buttons-04 Nos.v. 3 Phase LED Voltmeter CI 0.5-02 Nos.vi. 3 Phase LED Ampere meter CI 0.5 -02 Nos.vii. Single phasing, reverse current, under voltage, over voltage protection relay-01 set each for both motor. viii. LED Phase indicating bulb-06 Nos.ix. Auto/Manual Selector switch-02 Nos.x. Thermal overload Relay (135-225A)- 01 No.xi. 4 sq. mm Single core copper cable-20 mtrs. for control wiring and 16 sq. mm single core copper cable- 10 mtrs with copper lugs, tape etc. with all fittings & electrician charges at Raw Water P/Plant.
19Cost towards denting and painting of Electro-mechanical components as Motor Pump, Panel board, Sluice valve, NR Valves, Suction pipe line, common header pipe line inside Pump Chamber with primer and two coat of Metal Oil paint as required at WTP p/plant.
20Cost towards supplying, Installation and commissioning of 800KVA Servo controlled (Oil cooled) automatic voltage stabilizer suitable for output voltage of 415 volt ± 1% 3 phase 50 Hz with copper wound transformer as mentioned below. The stabilizer shall function satisfactorily even if incoming supply is unbalanced between phases within range of 10%. The stabilizer should be constructed in cubical box, with bidirectional wheels for easy handling necessary monitors and user’s controls on front panel such as indication alarm, voltmeter and selector switch for measuring input and output voltage auto manual selector switch. Raise low push buttons etc. Suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. All three phases shall be independently monitored and corrected. Following protections and indication shall be incorporated.Over Voltage/Under Voltage Single PhasingCut off contactor with electronic output sensing unit Suitable change over switch and Earthing (2 Nos.)800KVA Oil cooled Servo controlled automatic voltage stabilizer (Output 415 unit ±1%) Input 220 to 480Volt.
21Supplying and filling of T-oil.
22Cost towards complete servicing and repairing of stabilizer with all labour, tools and tackles and electrician charges etc. all complete job and testing on full load of 800 KVA Oil cooled Servo Voltage Stabilizer working on three phase input Voltage-220 to 480 V and Output- 415±1%V. Make- Servokon System Limited with following works-i.Cost towards disconnection and cleaning of stabilizer with all labour tools and tacklesii.Cost towards S/F of servo motor as per sample – 3 Nos.iii.Cost towards S/f of Panel Sensing/control PCB Card as per sample – 2 Nos.iv.R.C kit – 2 Unitv.Control transformer. – 2 Nos.vi.3 phase Digital Voltmeter (Input/Output) As Per sample – 01 No.vii. Armored and shaft
23Supplying and filling of T-oil.
24Cost towards breaking old PCC foundation and making new PCC foundation suitable for supplied C/F pump set at WTP. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58050591
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 23-10-2026
Authority
Authority Name Drinking Water And Sanitation Department
Work Description Tender for E-Quotation For Rajmahal Mega Rural Water Supply Scheme. , Intake Floating Jetty At Ganga River (Rajmahal) , Supplying, Installation, Testing And Commissioning Of Electrically Driven Horizontal Split Casing Centrifugal Pump Set Make (Kirloskar/Wpil/Mather & Platt /Jyoti) Having Discharge Capacity Of Clear Water 270M3/H Against Total Head Of 35.44 Meter Coupled With Tefc Sq. Cage Induction Motor Make (Kirloskar/ Crompton/Jyoti) Operated On 415 + 10% Volts, 50Hz, 1400-1500 Rpm Mounted On Common M.S. Fabricated Base Plate With Cidf Sluice Valve-1 No, Cidf Nr Valve-1 No, Pressure Gauge-1 No, Tire Coupling-1 No, Etc. And Doing Fabrication Work For Connecting The Exiting Common Header Delivery Line. All Complete. , Cost Towards Opening, Dismantling, Cleaning And Repairing And Overhauling Of 60 Hp Hsc C/F Pump Set Having 1475 Rpm Head 35.44 Mtrs. Discharge 270 M3 /Hr Make- Wpil With Following Works:- ( I) Complete Dismantling Of Pump Set From Base Plate And Opening & Cleaning Of Pump With All Labour, Tools And Tackles . (Ii) Repairing Re-Metalling Of Stainless Steel Pump Shaft, Turning & Finishing As Per Sample At Lathe And Fitting -01 No. (Iii) S.S. Shaft Sleeves Both Sides- 02 Nos. As Per Sample. (Iv) Making Neck-Ring As Per Sample- 02 Nos. (V) Cheek Nut- 01 No. (Vi) Supply/Fixing Coupling Rubber -01 No. (Vii) Making Of Gland Titener As Per Sample.-02 Nos. (Viii) Repairing Of Bearing Housing -02 Nos. (Ix) Double Ball Bearing -01 No. (X) Ball Bearing -02 No. (Xi) Paper Packing, Nut-Bolts As Required. (Xii) Repairing Of Damaged Ci Impeller Of Pump -01 No With Ci Welding, Turning & Finishing As Per Sample-01 No. Complete Re-Assembling And Overhauling Of Pump, Installing At Site With All Labour, Tools & Tackles And Testing On Full Load With Transportation Charge Up & Down Etc. Including The Deduction Of Scrap Materials All Complete. , Cost Towards Supplying All Labour Tools And Tackles For Complete Opening, Dismantling, Of 60 Hp, 415±10 Volt, 50C/S, Star Delta 3 Phase Induction Motor (Make- Marathon Motors Ltd.) By Supplying Supper Enameled Copper Wire And Then Tapping, Varnishing, Heating & Testing On Full Load And Repairing Of Stator And Rotor With Including The Deduction Of Cost Of Burnt Copper Wires Etc. All Complete .Weight Of Copper Wire Approx. 30 Kg. With Changing Of Following Bearing:- De/Nde-6313/6313 As Per Sample- 2 Nos And Transportation Charges Of Above Pump Motor Set And Other Fittings Materials From P/Plant To Workshop And Vice Versa Etc At Raw Water P/Plant. , Cost Towards Supplying, Installation, Testing & Commissioning Of Free Standing Type Floor Mounted Cubical Lt Motor Control Panel Fabricated With Ms Sheet Of Suitable Gauge And Size Duly Painted With Two Coats Of Red Oxide Primer Comprising Of 400 Amp, 440V Copper Bus Bar Arrangement 4 Pole Consisting Of Following Accessories: (I) 400 annual periodical maintenance Mccb - 1 No. (Incoming Feeder) (Ii) 250 annual periodical maintenance Mccb - 03Nos (Outgoing Feeder). (Iii) 250Amp Mccb - 01No. (As Spare) (Iv) 63 annual periodical maintenance Mcb -1 No. For Lighting Load And Other Utility Load. (V) Fully Automatic Star Delta (Fasd) Starter (L&K/HavellS/SiemenS/Schneider/Bch Make) Suitable For Above Pump Set Or More Etc.- 3Nos. (Vi) 3-Phase Digital Display Voltmeter & annual periodical maintenance Meter -3 Sets, Phase Indicating Light R-Y-B -3 Nos. (Vii) Copper Bus Bar- 04 Pole 400 Amp, 415V Copper Strip Bus Bar Enclosed In Ms Sheet Along With Overload Relay, Motor Protection Device (Mpd), Proper Power & Control Wiring Inside By Suitable Size Of Copper Conductor And Wires Etc. All Complete Set Including Transportation And Fitting & Mounting Charges At P/Plant. , Cost Towards Special Repairing,Changing & Servicing Of Motor Control Panel With Fasd Starter And 400 annual periodical maintenance Incoming Mccb ,250 annual periodical maintenance Outgoing Mccb., Copper Bus Bar With Supply/Fixing Of Following Works- I. Changing Of Star Contactor Mnx-80-02 Nos. & Delta Contactor Mnx-95-02 Nos. & Main Contactor Mnx-95 -02 Nos (L&K/C&S/SiemenS/Schneider Make). Ii. Incoming Mccb 400 annual periodical maintenance - 01 No. , Outgoing Mccb 250 annual periodical maintenance - 02 Nos. (L&K/C&S/SiemenS/Schneider Make). Iii. Timer (3-30 Sec)-02 Nos. (L&T Make). Iv. On-Off Push Buttons-04 Nos. V. 3 Phase Led Voltmeter Ci 0.5-01 Nos. Vi. 3 Phase Led Ampere Meter Ci 0.5 -02 Nos. Vii. Single Phasing, Reverse Current, Under Voltage, Over Voltage Protection Relay-01 Set Each For Both Motor. Viii. Led Phase Indicating Bulb-06 Nos. Ix. Auto/Manual Selector Switch-02 Nos. X. Thermal Overload Relay (45-75A) -01 No. Xi. 4 Sq. Mm Single Core Copper Cable-20 Mtrs. For Control Wiring And 16 Sq. Mm Single Core Copper Cable- 10 Mtrs With Copper Lugs, Tape Etc. With All Fittings & Electrician Charges At Raw Water P/Plant. , Light Wiring Inside And Outside Of Pump House With Led Street Light-02 Nos. (40 Watt), Led Tube Set- 2 Nos. (20 Watt). , Cost Towards Denting And Painting Of Electro-Mechanical Components As Motor Pump, Panel Board, Sluice Valve, Nr Valves, Suction Pipe Line, Common Header Pipe Line Inside Pump Chamber With Primer And Two Coat Of Metal Oil Paint As Required At Floating Jetty. , Cost Towards Supplying, Installation And Commissioning Of 200Kva Servo Controlled (Oil Cooled) Automatic Voltage Stabilizer Suitable For Output Voltage Of 415 Volt ± 1% 3 Phase 50 Hz With Copper Wound Transformer As Mentioned Below. The Stabilizer Shall Function Satisfactorily Even If Incoming Supply Is Unbalanced Between Phases Within Range Of 10%. The Stabilizer Should Be Constructed In Cubical Box, With Bidirectional Wheels For Easy Handling Necessary Monitors And UserS Controls On Front Panel Such As Indication Alarm, Voltmeter And Selector Switch For Measuring Input And Output Voltage Auto Manual Selector Switch. Raise Low Push Buttons Etc. Suitable Capacity Termination Strips And Bus Bars For Incoming And Outgoing Cable Should Be Provided. All Three Phases Shall Be Independently Monitored And Corrected. Following Protections And Indication Shall Be Incorporated. Over Voltage/Under Voltage Single Phasing Cut Off Contactor With Electronic Output Sensing Unit Suitable Change Over Switch And Earthing 200Kva Oil Cooled Servo Controlled Automatic Voltage Stabilizer (Output 415 Unit ±1%) Input 220 To 480 Volt. , Supplying And Filling Of T-Oil. , Cost Towards Complete Servicing And Repairing Of Stabilizer With All Labour, Tools And Tackles And Electrician Charges Etc. All Complete Job And Testing On Full Load Of 200 Kva Oil Cooled Servo Voltage Stabilizer Working On Three Phase Input Voltage-220 To 480 V And Output- 415±1%V. Make- Servokon System Limited With Following Works- I.Cost Towards Disconnection And Cleaning Of Stabilizer With All Labour Tools And Tackles Ii.Cost Towards Supply/Fixing Of Servo Motor As Per Sample - 3 Nos. Iii.Cost Towards Supply/Fixing Of Panel Sensing/Control Pcb Card As Per Sample - 2 Nos. Iv.R.C Kit - 2 Unit V.Control Transformer. - 2 Nos. Vi.3 Phase Digital Voltmeter (Input/Output) As Per Sample - 01 No. Vii. Armored And Shaft , Supplying And Filling Of T-Oil. , Wtp At Rajmahal , Supplying, Installation, Testing And Commissioning Of Electrically Driven Horizontal Split Casing Centrifugal Pump Set Make (Kirloskar/Wpil/Mather & Platt /Jyoti) Having Discharge Capacity Of Clear Water 270M3/H Against Total Head Of 125 Meter Coupled With Tefc Sq. Cage Induction Motor Make (Kirloskar/ Crompton/Jyoti) Operated On 415 + 10% Volts, 50Hz, 1400-1500 Rpm Mounted On Common M.S. Fabricated Base Plate With Cidf Sluice Valve-1 No, Foot Valve-1 No., Cidf Nr Valve-1 No, Pressure Gauge-1 No, Tire Coupling-1 No, Etc. And Doing Fabrication Work For Connecting The Exiting Common Header Delivery Line. All Complete. , Cost Towards Opening, Dismantling, Cleaning And Repairing And Overhauling Of 240 Hp Hsc C/F Pump Set Having 1475 Rpm Head 125 Mtrs. Discharge 270 M3 /Hr Make- Wpil With Following Works:- ( I) Complete Dismantling Of Pump Set From Base Plate And Opening & Cleaning Of Pump With All Labour, Tools And Tackles . (Ii) Repairing Re-Metalling Of Stainless Steel Pump Shaft, Turning & Finishing As Per Sample At Lathe And Fitting -01 No. (Iii) S.S. Shaft Sleeves Both Sides- 02 Nos. As Per Sample. (Iv) Making Neck-Ring As Per Sample- 02 Nos. (V) Cheek Nut- 01 No. (Vi) Supply/Fixing Coupling Rubber -01 No. (Vii) Making Of Gland Titener As Per Sample.-02 Nos. (Viii) Repairing Of Bearing Housing -02 Nos. (Ix) Double Ball Bearing -01 No. (X) Ball Bearing -02 No. (Xi) Paper Packing, Nut-Bolts As Required. (Xii) Repairing Of Damaged Ci Impeller Of Pump -01 No With Ci Welding, Turning & Finishing As Per Sample-01 No. Complete Re-Assembling And Overhauling Of Pump, Installing At Site With All Labour, Tools & Tackles And Testing On Full Load With Transportation Charge Up & Down Etc. Including The Deduction Of Scrap Materials All Complete. , Cost Towards Supplying All Labour Tools And Tackles For Complete Opening, Dismantling, Of 240 Hp, 415±10 Volt, 50C/S, Star Delta, 3 Phase Induction Motor(Make-Marathon Motors Ltd. ) By Supplying Supper Enameled Copper Wire And Then Tapping, Varnishing, Heating & Testing On Full Load And Repairing Of Stator And Rotor With Including The Deduction Of Cost Of Burnt Copper Wires Etc. All Complete .Weight Of Copper Wire Approx. 95 Kg. With Changing Of Following Bearing:- De/Nde 6319 /6319 As Per Sample- 2 Nos And Transportation Charges Of Above Pump Motor Set And Other Fittings Materials From P/Plant To Workshop And Vice Versa Etc At Clear Water P/Plant. , Cost Towards Supplying, Installation, Testing & Commissioning Of Free Standing Type Floor Mounted Cubical Lt Motor Control Panel Fabricated With Ms Sheet Of Suitable Gauge And Size Duly Painted With Two Coats Of Red Oxide Primer Comprising Of 1250Amp, 440V Copper Bus Bar Arrangement 4 Pole Consisting Of Following Accessories: (I) 1250Amp Mccb - 1 No. (Incoming Feeder) (L&K/C&S/SiemenS/Schneider Make) (Ii) 400Amp Mccb - 02Nos (Outgoing Feeder). (L&K/C&S/SiemenS/Schneider Make) (Iii) 400Amp Mccb - 01No. (As Spare) (L&K/C&S/SiemenS/Schneider Make) (Iv) 63 annual periodical maintenance Mcb -1 No. For Lighting Load And Other Utility Load. (L&K/C&S/SiemenS/Schneider Make) (V) Fully Automatic Star Delta (Fasd) Starter (L&K/HavellS/SiemenS/Schneider/Bch Make) Suitable For Above Pump Set Or More Etc.- 3 Nos. (Vi) 3-Phase Digital Display Voltmeter & annual periodical maintenance Meter -3 Sets, Phase Indicating Light R-Y-B -3 Nos. (Vii) Copper Bus Bar- 04 Pole 1250Amp, 415V Copper Strip Bus Bar Enclosed In Ms Sheet Along With Overload Relay, Motor Protection Device (Mpd), Proper Power & Control Wiring Inside By Suitable Size Of Copper Conductor And Wires Etc. All Complete Set Including Transportation And Fitting & Mounting Charges At P/Plant. , Cost Towards Special Repairing ,Changing & Servicing Of Motor Control Panel With Fasd Starter And 1250 annual periodical maintenance Incoming Mccb , 400 annual periodical maintenance Outgoing Mccb , Copper Bus Bar With Supply/Fixing Of Following Works- I. Changing Of Star Contactor Mnx-400 -01 No. & Delta Contactor Mnx-550 -02 Nos. & Main Contactor Mnx-550 -02 Nos. (L&K/C&S/SiemenS/Schneider Make) Ii. Incoming Mccb 1250 annual periodical maintenance - 01 No. , Outgoing Mccb 400 annual periodical maintenance - 02 Nos. (L&K/C&S/SiemenS/Schneider Make). Iii. Timer (3-30 Sec)-02 Nos. (L&T Make). Iv. On-Off Push Buttons-04 Nos. V. 3 Phase Led Voltmeter Ci 0.5-02 Nos. Vi. 3 Phase Led Ampere Meter Ci 0.5 -02 Nos. Vii. Single Phasing, Reverse Current, Under Voltage, Over Voltage Protection Relay-01 Set Each For Both Motor. Viii. Led Phase Indicating Bulb-06 Nos. Ix. Auto/Manual Selector Switch-02 Nos. X. Thermal Overload Relay (135-225A)- 01 No. Xi. 4 Sq. Mm Single Core Copper Cable-20 Mtrs. For Control Wiring And 16 Sq. Mm Single Core Copper Cable- 10 Mtrs With Copper Lugs, Tape Etc. With All Fittings & Electrician Charges At Raw Water P/Plant. , Cost Towards Denting And Painting Of Electro-Mechanical Components As Motor Pump, Panel Board, Sluice Valve, Nr Valves, Suction Pipe Line, Common Header Pipe Line Inside Pump Chamber With Primer And Two Coat Of Metal Oil Paint As Required At Wtp P/Plant. , Cost Towards Supplying, Installation And Commissioning Of 800Kva Servo Controlled (Oil Cooled) Automatic Voltage Stabilizer Suitable For Output Voltage Of 415 Volt ± 1% 3 Phase 50 Hz With Copper Wound Transformer As Mentioned Below. The Stabilizer Shall Function Satisfactorily Even If Incoming Supply Is Unbalanced Between Phases Within Range Of 10%. The Stabilizer Should Be Constructed In Cubical Box, With Bidirectional Wheels For Easy Handling Necessary Monitors And UserS Controls On Front Panel Such As Indication Alarm, Voltmeter And Selector Switch For Measuring Input And Output Voltage Auto Manual Selector Switch. Raise Low Push Buttons Etc. Suitable Capacity Termination Strips And Bus Bars For Incoming And Outgoing Cable Should Be Provided. All Three Phases Shall Be Independently Monitored And Corrected. Following Protections And Indication Shall Be Incorporated. Over Voltage/Under Voltage Single Phasing Cut Off Contactor With Electronic Output Sensing Unit Suitable Change Over Switch And Earthing (2 Nos.) 800Kva Oil Cooled Servo Controlled Automatic Voltage Stabilizer (Output 415 Unit ±1%) Input 220 To 480 Volt. , Supplying And Filling Of T-Oil. , Cost Towards Complete Servicing And Repairing Of Stabilizer With All Labour, Tools And Tackles And Electrician Charges Etc. All Complete Job And Testing On Full Load Of 800 Kva Oil Cooled Servo Voltage Stabilizer Working On Three Phase Input Voltage-220 To 480 V And Output- 415±1%V. Make- Servokon System Limited With Following Works- I.Cost Towards Disconnection And Cleaning Of Stabilizer With All Labour Tools And Tackles Ii.Cost Towards Supply/Fixing Of Servo Motor As Per Sample - 3 Nos. Iii.Cost Towards Supply/Fixing Of Panel Sensing/Control Pcb Card As Per Sample - 2 Nos. Iv.R.C Kit - 2 Unit V.Control Transformer. - 2 Nos. Vi.3 Phase Digital Voltmeter (Input/Output) As Per Sample - 01 No. Vii. Armored And Shaft , Supplying And Filling Of T-Oil. , Cost Towards Breaking Old Plain Cement Concrete Foundation And Making New Plain Cement Concrete Foundation Suitable For Supplied C/F Pump Set At Wtp.
Basic Detail
Tender No E-quotation No. 04 2026-27
Bidding Type Tender
Location
City Dumka
State Jharkhand
Key Dates
Publish Date 15 Oct 2026
Submission Date 23 Oct 2026
Open Date 24 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
0a08e0e5-20e0-492d-b93c-d5be11ae2ff6.html
BOQ_162133.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 15, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 23, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days
Oct 24, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
html

0a08e0e5-20e0-492d-b93c-d5be11ae2ff6.html

xls

BOQ_162133.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender