Tender For Design, Manufacture, Supply, Testing, Commissioning Of 102 Nos. Standard Gauge Cars For Corridor 1 & 2 Of Patna Metro Along With Associated Training, Spares And Dlp Etc.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
05 Jan 2027
63 days left
EMD
1 Crore
Bank guarantee accepted
Document Fee
23600
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Patna → Bihar
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Design, Manufacture, Supply, Testing, Commissioning Of 102 Nos. Standard Gauge Cars For Corridor 1 & 2 Of Patna Metro Along With Associated Training, Spares And Dlp Etc.
BOQ
| Sl. No. | Item Description |
| 1 | Item Wise BoQ BoQ_Ver3.0 Item Wise Normal INR and Other Currency INR,USD,JPY,EUR Select, Excess (+), Less (-) Tender Inviting Authority: Executive Director/Rolling Stock/Project (ED/RS/P) Name of Work: DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING OF 102 Nos. STANDARD GAUGE CARS FOR CORRIDOR 1 & 2 OF PATNA METRO ALONG WITH ASSOCIATED TRAINING, SPARES AND DLP etc. Contract No: PRS1 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. COST CENTRE DESCRIPTION Item Code / Make Quantity Cost Centre Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Total Apportioned/Actual Amounts of Cost Centre Items Excise Duty inRs. P GST inRs. P Freight Charges ( Unloading & Stacking) inRs. P Any Other Taxes/Duties/Levies inRs. P Other Taxes 2 inRs. P IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax inRs. P Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category inRs. P TOTAL AMOUNT, It will be converted based on coloumn L value TOTAL TAXES It will be converted only If you choose Full Conversion, Until than it is treated as INR inRs. P TOTAL AMOUNT In Words |
| 2 | PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK (INR) |
| 3 | PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK (USD) |
| 4 | PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK (JPY) |
| 5 | PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK (EUR) |
| 6 | OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT (INR) |
| 7 | OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT (USD) |
| 8 | OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT (JPY) |
| 9 | OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT (EUR) |
| 10 | INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT (INR) |
| 11 | INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT (USD) |
| 12 | INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT (JPY) |
| 13 | INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT (EUR) |
| 14 | TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS (INR) |
| 15 | TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS (USD) |
| 16 | TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS (JPY) |
| 17 | TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS (EUR) |
| 18 | DELETED |
| 19 | DELETED |
| 20 | DELETED |
| 21 | DELETED |
| 22 | UNIT EXCHANGE SPARES, MANDATORY SPARES, CONSUMABLE SPARES, INTERMEDIATE OVERHAULING SPARES, SPECIAL TOOLS, JIGS, FIXTURES, GAUGES, TESTING AND DIAGNOSTIC EQUIPMENT (INR) |
| 23 | UNIT EXCHANGE SPARES, MANDATORY SPARES, CONSUMABLE SPARES, INTERMEDIATE OVERHAULING SPARES, SPECIAL TOOLS, JIGS, FIXTURES, GAUGES, TESTING AND DIAGNOSTIC EQUIPMENT (USD) |
| 24 | UNIT EXCHANGE SPARES, MANDATORY SPARES, CONSUMABLE SPARES, INTERMEDIATE OVERHAULING SPARES, SPECIAL TOOLS, JIGS, FIXTURES, GAUGES, TESTING AND DIAGNOSTIC EQUIPMENT (JPY) |
| 25 | UNIT EXCHANGE SPARES, MANDATORY SPARES, CONSUMABLE SPARES, INTERMEDIATE OVERHAULING SPARES, SPECIAL TOOLS, JIGS, FIXTURES, GAUGES, TESTING AND DIAGNOSTIC EQUIPMENT (EUR) |
| 26 | TRAINING AND MANUALS (INR) |
| 27 | TRAINING AND MANUALS (USD) |
| 28 | TRAINING AND MANUALS (JPY) |
| 29 | TRAINING AND MANUALS (EUR) Total in Figures 0.0 0.0 Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select % 0.0 0.0 Zero Only Quoted Rate in Words DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING OF 102 Nos. STANDARD GAUGE CARS FOR CORRIDOR 1 & 2 OF PATNA METRO ALONG WITH ASSOCIATED TRAINING, SPARES AND DLP etc. SECTION IV Annexure PD-I PRICING DOCUMENT TENDER TOTAL LUMP SUM PRICE To be Completed and Submitted as part of Form FB-2 to the Forms of Bid (THIS DOCUMENT IS TO BE PREPARED AND COMPLETED BY THE TENDERER) I.The 'Tender Total Lump Sum Price' of this Contract (20 nos. trainsets of '3' car and 07 nos. trainset of '6' cars i.e. 102 cars) is INDIAN CURRENCY (IN WORDS) INR Foreign currency (I) IN WORDS USD Foreign currency (II) IN WORDS JPY Foreign currency (III) IN WORDS EUR II. Apportionment of Tender Total Lump Sum Price among Cost Centres Cost Centre COST CENTRE DESCRIPTION Total Apportioned/Actual Amounts of Cost Centre Items Foreign currency (I) Foreign currency (II) Foreign currency (III) Indian Rupees USD JPY EUR INR A. PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK 0.0 0.0 0.0 0.0 B. OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT 0.0 0.0 0.0 0.0 C. INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT 0.0 0.0 0.0 0.0 D. TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS 0.0 0.0 0.0 0.0 E. DELETED 0.0 0.0 0.0 0.0 F. DELETED 0.0 0.0 0.0 0.0 G. UNIT EXCHANGE SPARES, MANDATORY SPARES, CONSUMABLE SPARES, INTERMEDIATE OVERHAULING SPARES, SPECIAL TOOLS, JIGS, FIXTURES, GAUGES, TESTING AND DIAGNOSTIC EQUIPMENT 0.0 0.0 0.0 0.0 H. TRAINING AND MANUALS 0.0 0.0 0.0 0.0 TENDER TOTAL LUMP SUM PRICE 0.0 0.0 0.0 0.0 Note: 1. We offer unconditional discount of ______% (in figure) _______________________percent (in words) on the total quoted Lumpsum price which shall be applicable to all the Milestones in respective currencies on pro rata basis. 2. The revised Lumpsum price after unconditional discount is as follows:The 'Tender Total Lump Sum Price' of this Contract (20 nos. trainsets of 3-cars and 07 nos. trainsets of 6-cars i.e. 102 cars) is INDIAN CURRENCY (IN WORDS) INR Foreign currency (I) IN WORDS USD Foreign currency (II) IN WORDS JPY Foreign currency (III) IN WORDS EUR 3. The above mentioned unconditional discounts shall be /shall not be (Strike off what is not applicable) applicable on the price of withdrawl of the deviations noted with Annexure PD-3. 4. It is certified that 'Pricing Document' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Pricing Document' in the Price Bid. DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING OF 102 Nos. STANDARD GAUGE CARS FOR CORRIDOR 1 & 2 OF PATNA METRO ALONG WITH ASSOCIATED TRAINING, SPARES AND DLP etc. (To be Submitted as part of Appendix FB-2 to the Form of Bid) Annexure PD-1 INDEX OF COST CENTRES COST CENTRE DESCRIPTION A PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK B OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT C INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT D TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS E DELETED F DELETED G UNIT EXCHANGE SPARES, MANDATORY SPARES, CONSUMABLE SPARES, INTERMEDIATE OVERHAULING SPARES, SPECIAL TOOLS, JIGS, FIXTURES, GAUGES, TESTING AND DIAGNOSTIC EQUIPMENT H TRAINING AND MANUALS SECTION IV PRICING DOCUMENT Annexure PD-1 SCHEDULE OF AMOUNTS APPORTIONED TO COST CENTRES COST CENTRE DESCRIPTIONS (To be Completed and Submitted as part of Form FB-2 to the Forms of Bid) COST CENTRE No. A - Preliminaries & General Requirements and Design of Rolling Stock. This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to: · Submission of Project Management Plan; · Submission of Interface Management Plan and Detailed Interface Documents; · Submission of Works Programme; · Submission of Design Submission Programme; · Submission of Quality Assurance Plan; · Submission of Safety Assurance Plan and Site Safety Plan; · Submission of Environmental Plan; · Submission of Software Quality Assurance Plan; · Submission of Inspection, Testing & Commissioning (including Integrated Testing & Commissioning) Plan; · Liaison with other Designated Contractors during the design process; · Submission of the Preliminary Design, the pre-Final Design, the Final Design; · Submission of the Final Design Document; · Submission of “As-Built drawings”; · Any other item considered necessary to comply with the Scope of Work. Note: 1. The maximum amount that can be apportioned in this Cost Centre shall not exceed 10% of the total amount apportioned in Cost Centres A, B, C and D.2. It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid. COST CENTRE No. A - PRELIMINARIES & GENERAL REQUIREMENTS AND DESIGN OF ROLLING STOCK MILESTONE NUMBER WORK DESCRIPTION APPORTIONED AMOUNT MILESTONE COMPLETION DATE( IN WEEKS FROM COMMENCMENT DATE) Foreign currency (I) Foreign currency (II) Foreign currency (III) INDIAN RUPEES USD JPY EUR INR MILESTONE ACTIVITY COLUMN A COLUMN B COLUMN C COLUMN D Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ---“ from the Project Manager for: A1 Project Management Plan. 41153.0 41213.0 41183.0 A2 Interface Management Plan and Detailed Interface Documents. 41153.0 41213.0 41183.0 A3 Works Programme. 41153.0 41213.0 41183.0 A4 Design Submission Programme. 62.0 61.0 A5 Quality Assurance Plan. 41153.0 41213.0 41183.0 A6 System Safety Assurance Plan and Site Safety Plan. 41153.0 41213.0 41183.0 A7 Environmental Plan. 41153.0 41213.0 41183.0 A8 Software Quality Assurance Plan. 41153.0 41213.0 41183.0 A9 Testing and Commissioning in the Depot, Integrated Testing and Commissioning on the Section, Service Trials and final commissioning of trains Plan. 41153.0 41213.0 41183.0 A10 Preliminary Design Completion 41153.0 41213.0 41183.0 A11 Pre-Final Design Completion 41153.0 41213.0 41183.0 A12 Final Design Completion 41153.0 41213.0 41183.0 A13 Final Design Document Delivery. 41153.0 41213.0 41183.0 A14 “As-Built Drawings” delivery. 41153.0 41213.0 41183.0 A15 Any other item considered necessary by the contractor to comply with the Scope of Work. COST CENTRE TOTAL 0.0 0.0 0.0 0.0 Note: 1. The maximum amount that can be apportioned in this Cost Centre shall not exceed 10% of the total amount apportioned in Cost Centres A, B, C and D. Apportionment of amount of foreign currency shall be in consonance with the actual import.2. It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid.3. Bidders shall fill the 'Milestone Completion Date' (wherever not specified) against each Milestone Activity above, such that it falls within the relevant Key Dates (refer Form FB-1 to Forms of Bid) and within the submission schedule (refer Table 2-A: Submission of Plans under ERGS clause 2.1.3). In case of non compliance to this condition, the Employer shall consider the relevant activity under the non-compliant 'Milestone Completion Date' to be completed on the respective Key Date/submission schedule as mentioned in the tender conditions for all purposes including tender evaluation. COST CENTRE No. 'B' - OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TANSPORTATION IN INDIA, DELIVERY & RECEIPT OF CARS IN DEPOT This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This includes but is not limited to: . selection of suppliers for major system and sub-systems for trains; . completion of all routine and type testing of equipment; . completion of Main Tooling for manufacture; . completion of all Factory Acceptance Tests; . completion of test running in factory; . completion of manufacture, testing and inspection, dispatch from offshore factory and shipping port of first prototype train; . provision of Marine and Transit Insurance from off-shore Factory to Depot Site in Patna . completion of manufacture, testing and inspection, dispatch from offshore factory and shipping port of balance cars; . completion of shipping to port in India, Inland transportation in India, delivery and receipt of cars in designated depots in good condition; . transportation costs off-shore manufactured trains from the offshore port to port in India, port in India to Depot in Patna; . all handling costs and incidental charges at port in India, Depot and any intermediate location in India; . all costs associated with special traffic arrangements necessary for transportation; . any other item considered necessary to comply with the scope of work. COST CENTRE No. B – OFFSHORE MANUFACTURE, DISPATCH, COMPLETION OF SHIPPING TO PORT IN INDIA, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT MILESTONE NUMBER WORK DESCRIPTION APPORTIONED AMOUNT WEEKS FOR COMPLETION OF MILESTONE FROM COMMENCEMENT DATE FOREIGN CURRENCY(I) FOREIGN CURRENCY(II) FOREIGN CURRENCY(III) INDIAN RUPEES USD JPY EUR INR MILESTONE ACTIVITY COLUMN A COLUMN B COLUMN C COLUMN D Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ---“ from the Project Manager after:• Issue of Inspection Certificate on satisfactory completion of all Factory Tests;• Marine Insurance;• Documents for shipment to Indian Port;• Dispatch of cars from offshore factory and shipping port;• Transit insurance from Port in India to Depot Site in Patna and• Completion of shipping to port in India, Inlandtransportation in India,Delivery and Receipt of trains in the Depot in Patna in good condition; For: B1 Obtain as above for First Prototype Offshore Manufatured 3-cars train B2 Obtain as above for First Prototype Offshore Manufatured 6-cars train B3 Obtain as above for second Offshore Manufatured 3-cars train B4 Obtain as above for third Offshore Manufatured 3-cars train B5 Obtain as above for fourth Offshore Manufatured 3-cars train B6 Obtain as above for Fifth Offshore Manufatured 3-cars train B7 Obtain as above for Sixth Offshore Manufatured 3-cars train COST CENTRE TOTAL 0.0 0.0 0.0 0.0 NOTES: 1. The maximum number of trainsets that can be manufactured offshore are '06' trainsets of 3 cars and '01' trainset of 6 cars each. Contractor at his option may reduce the number of trains manufactured off-shore. 2. The apportioned amount ( both foreign and local currency) shall be same for each milestone for similar type of train configuration.3. It is certified that 'Annexure PD-1’ annexed in Technical Bid is a “TRUE COPY”(with prices blanked off) of the said ‘Annexure PD-1’ in the Price Bid.4. Bidders shall fill the 'Milestone Completion Date' (wherever not specified) against each Milestone Activity above, such that it falls within the relevant Key Dates (refer Form FB-1 to Forms of Bid). In case of non compliance to this condition, the Employer shall consider the relevant activity under the non-compliant 'Milestone Completion Date' to be completed on the respective Key Date as mentioned in the tender conditions for all purposes including tender evaluation. COST CENTRE No. 'C' – INDIGENOUS MANUFACTURE, DISPATCH, INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to: · selection of suppliers for major system and sub-systems for trains; · completion of all routine and type testing of components and equipment; · completion of Main Tooling for manufacture; · completion of all factory acceptance tests; · completion of test running in factory; · completion of manufacture, testing and inspection, dispatch, transit insurance ex. Factory to Depot site in Patna; · Inland transportation in India, delivery and receipt of cars in Depot in good condition; · transportation costs of indigenously manufactured trains from Factory in India to Depot Site in Patna · all handling costs and incidental charges at factory in India, Depot and any intermediate location in India; · all costs associated with special traffic arrangements necessary for transportation; · any other item considered necessary to comply with the scope of work. COST CENTRE No. C – INDIGENOUS MANUFACTURE, DISPATCH INLAND TRANSPORTATION IN INDIA, DELIVERY AND RECEIPT OF CARS IN DEPOT MILESTONE NUMBER WORK DESCRIPTION APPORTIONED AMOUNT WEEKS FOR COMPLETION OF MILESTONE FROM COMMENCEMENT DATE FOREIGN CURRENCY (I) FOREIGN CURRENCY (II) FOREIGN CURRENCY (III) INDIAN RUPEES USD JPY EUR INR MILESTONE ACTIVITY COLUMN A COLUMN B COLUMN C COLUMN D Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ---“ from the Project Manager after:• Issue of Inspection Certificate on satisfactory completion of all Factory Tests;• Transit Insurance;• Dispatch Documents;• Dispatch of cars from onshore factory;• Inland transportation in India, delivery and receipt of cars in the Depot in Patna in good condition; For: C1 Obtain as above for First Indigenously Manufactured Prototype 3-cars Train. C2 .Obtain as above for First Indigenously Manufactured Prototype 6-cars Train. C3 Obtain as above for Second Indigenously Manufactured 3-cars Train. C4 Obtain as above for Third Indigenously Manufactured 3-cars Train. C5 Obtain as above for Fourth Indigenously Manufactured 3-cars Train. C6 Obtain as above for Fifth Indigenously Manufactured 3-cars Train. C7 Obtain as above for Sixth Indigenously Manufactured 3-cars Train. C8 .Obtain as above for Seventh Indigenously Manufactured 3-cars Train. C9 Obtain as above for Eighth Indigenously Manufactured 3-cars Train. C10 .Obtain as above for Ninth Indigenously Manufactured 3-cars Train. C11 Obtain as above for Tenth Indigenously Manufactured 3-cars Train. C12 Obtain as above for Eleventh Indigenously Manufactured 3-cars Train. C13 Obtain as above for Twelfth Indigenously Manufactured 3-cars Train. C14 Obtain as above for thirteenth Indigenously Manufactured 3-cars Train. C15 Obtain as above for fourteenth Indigenously Manufactured 3-cars Train. C16 Obtain as above for fifteenth Indigenously Manufactured 3-cars Train. C17 Obtain as above for sixteenth Indigenously Manufactured 3-cars Train. C18 Obtain as above for seventeenth Indigenously Manufactured 3-cars Train. C19 Obtain as above for eighteenth Indigenously Manufactured 3-carsTrain. C20 Obtain as above for ninteenth Indigenously Manufactured 3-cars Train. C21 Obtain as above for twentieth Indigenously Manufactured 3-cars Train. C22 Obtain as above for second Indigenously Manufactured 6-cars Train. C23 Obtain as above for third Indigenously Manufactured 6-cars Train. C24 Obtain as above for fourth Indigenously Manufactured 6-cars Train. C25 Obtain as above for fifth Indigenously Manufactured 6-cars Train. C26 Obtain as above for sixth Indigenously Manufactured 6-cars Train. C27 Obtain as above for seventh Indigenously Manufactured 6-cars Train. COST CENTRE TOTAL 0.0 0.0 0.0 0.0 NOTES: 1. Contractor at his option may increase the number of trains manufactured indigenously. However, the number of trains manufactured indigenously shall not be less than Fourteen '3 Car' trains and Six '06' car train.2. The apportioned amount ( both foreign and local currency) shall be same for each milestone for similar type of train configuration.3. It is certified that 'Annexure PD-1’ annexed in Technical Bid is a “TRUE COPY”(with prices blanked off) of the said ‘Annexure PD-1’ in the Price Bid.4. Bidders shall fill the 'Milestone Completion Date' (wherever not specified) against each Milestone Activity above, such that it falls within the relevant Key Dates (refer Form FB-1 to Forms of Bid). In case of non compliance to this condition, the Employer shall consider the relevant activity under the non-compliant 'Milestone Completion Date' to be completed on the respective Key Date as mentioned in the tender conditions for all purposes including tender evaluation. COST CENTRE D - TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING AND COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to: . Formation of trains, completion of functional tests and running of trains in the Depot. . Integrated testing and commissioning of trains in the nominated Depot and on the sections in conjunction with other Designated Contractors. . Instrumentation Tests and Oscillation trials on prototype trains only as necessary for obtaining sanction of statutory authorities. . Service trial and Final commissioning of trains. . All instrumentation, computers, and any other item including supervisory and operating staff essential for testing, commissioning and service trials of trains etc. will be provided by the Contractor. . Any other item considered necessary to comply with the scope of Works. Note: 1. The Minimum amount that shall be apportioned in the cost centres 'D' shall not be less than 10% of the amount apportioned in Cost Centres ‘A’, ‘B', ‘C’ and 'D’. 2. Deleted COST CENTRE 'D' - TESTING AND COMMISSIONING IN THE DEPOT, INTEGRATED TESTING & COMMISSIONING ON THE SECTION, SERVICE TRIALS AND FINAL COMMISSIONING OF TRAINS MILESTONE NUMBER WORK DESCRIPTION APPORTIONED AMOUNT WEEKS FOR COMPLETION OF MILESTONE IN WEEKS FROM COMMENCEMENT DATE FOREIGN CURRENCY(I) FOREIGN CURRENCY(II) FOREIGN CURRENCY(III) INDIAN RUPEES USD JPY EUR INR MILESTONE ACTIVITY COLUMN A COLUMN B COLUMN C COLUMN D Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ---“ from the Project Manager after:• Formation of train, obtaining certificate of satisfactory completion of functional tests and running of train in the Depot.• Completion of Integrated Testing and Commissioning in the Depot;• Completion of integrated testing and commissioning on the section in conjunction with Designated contractors;• ** Instrumentation Tests, Oscillation trials;• Service Trials and Final Commissioning;• ** Sanction of Statutory Authorities of Test results.For: D1 .Obtain as above for First Prototype 3-cars Train. D2 Obtain as above for First Prototype 6-cars Train. D3 .Obtain as above for second 3-cars Train. D4 Obtain as above for Third 3-cars Train. D5 Obtain as above for Fourth 3-cars Train. D6 Obtain as above for Fifth 3-cars Train. D7 Obtain as above for Sixth 3-cars Train. D8 Obtain as above for seventh 3-cars Train. D9 Obtain as above for Eighth 3-cars Train. D10 Obtain as above for Nineth 3-cars Train. D11 Obtain as above for Tenth 3-cars Train. D12 Obtain as above for Eleventh 3-cars Train. D13 Obtain as above for Twelfth 3-cars Train. D14 Obtain as above for Thirteenth 3-cars Train. D15 Obtain as above for Fourteenth 3-cars Train. D16 Obtain as above for Fifteenth 3-cars Train. D17 Obtain as above for Sixteenth 3-cars Train. D18 Obtain as above for Seventeenth 3-cars Train D19 Obtain as above for Eighteenth 3-cars Train. D20 Obtain as above for Nineteenth 3-cars Train. D21 Obtain as above for twentieth 3-cars Train D22 Obtain as above for Second 6-cars Train D23 Obtain as above for Third 6-cars Train D24 Obtain as above for Fourth 6-cars Train D25 Obtain as above for Fifth 6-cars Train D26 Obtain as above for Sixth 6-cars Train D27 Obtain as above for Seventh 6-cars Train COST CENTRE TOTAL 0.0 0.0 0.0 0.0 NOTES: 1. The apportioned amounts (both foreign currency and local currency) shall be same for each Milestone (D1 to D27) for similar type of train configuration.2. The minimum amount that shall be apportioned in the cost centres 'D' shall not be less than 10% of the amount apportioned in Cost Centres 'A', 'B', 'C' and 'D'.3. It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid.4. Bidders shall fill the 'Milestone Completion Date' (wherever not specified) against each Milestone Activity above, such that it falls within the relevant Key Dates (refer Form FB-1 to Forms of Bid). In case of non compliance to this condition, the Employer shall consider the relevant activity under the non-compliant 'Milestone Completion Date' to be completed on the respective Key Date as mentioned in the tender conditions for all purposes including tender evaluation.5. Deleted. COST CENTRE NO. E DELETED COST CENTRE NO. F DELETED COST CENTRE No. G– UNIT EXCHANGE SPARES, MANDATORY SPARES, CONSUMABLE SPARES FOR PERIOD UP TO EXPIRY OF DLP, INTERMEDIATE OVERHAULING SPARES, SPECIAL TOOLS, TESTING AND DIAGNOSTIC EQUIPMENT. This Cost Centre comprises all those obligations and activities throughout the contract connected with the provision and supply of spares, special tools, testing and diagnostic equipment. This includes but is not limited to: · Supply of Unit exchange spares, Mandatory Spares. · Supply of consumable spares up to expiry of DLP Period. · Supply of Special tools, jigs, fixtures, gauges, testing and diagnostic equipment. · Supply of Intermediate Overhauling Spares · Any other item considered necessary by the Contractor to comply with the Scope of Works. NOTES: 1. The costs indicated in this Cost Centre for all the Milestones 'G1', 'G2', 'G4', 'G5' and 'G6' shall be the ACTUAL COSTS and not the apportioned cost. Apportionment of amount of foreign currency shall be in consonance with the actual import.2. It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid. SIGNATURE OF BIDDER COST CENTRE 'G' : UNIT EXCHANGE SPARES, MANDATORY SPARES, CONSUMABLE SPARES FOR PERIOD UP TO EXPIRY OF DLP, INTERMEDIATE OVERHAULING SPARES, SPECIAL TOOLS, TESTING AND DIAGNOSTIC EQUIPMENT Milestone Number WORK DESCRIPTION Foreign Currency(I) Foreign Currency(II) Foreign Currency(III) Indian Rupees Weeks from Commencement Date USD JPY EUR INR MILESTONE ACTIVITY (Column 'A') (Column 'B') (Column 'C') (Column 'D') Obtain the “Notice of No Objection” or “Notice of No Objection Subject to------“from the Project Manager for the delivery of the following: G1 Unit Exchange Spares - 0.0 0.0 0.0 0.0 (Details to be given as per Annexure GA 1) G2 Mandatory Spares - 0.0 0.0 0.0 0.0 (Details to be given as per Annexure GA 2) G4 Consumable Spares for tendered quantity for period up to expiry of DLP:- 0.0 0.0 0.0 0.0 (As per Chapter 8 of the Employer’s Requirement – General Specifications.) (Details to be given as per Annexure GA 4) G5 Special Tools, Jigs, Fixtures, Gauges, Testing 0.0 0.0 0.0 0.0 and Diagnostic Equipment:- (As per Chapter 8 of the Employer’s Requirement – General Specifications.) (Details to be given as per Annexure GA 5) G6 Intermediate Overhauling Spares for 3 Nos. '3' car Train and 02 no. '6'car train. 0.0 0.0 0.0 0.0 (As per Chapter 8 of the Employer’s Requirement – General Specifications.) (Details to be given as per Annexure GA 6) G7 Simulator (As per Appendix-9 of the Employer’s Requirement – General Specifications.)(Details to be filled here) Cost Centre TOTAL 0.0 0.0 0.0 0.0 Notes : |
| 30 | The costs indicated in this Cost Centre for all the Milestones G1, G2, G4, G5 and G6 shall be the actual costs and not the apportioned costs. Amount of foreign currency shall be in consonance with the actual import. |
| 31 | For Milestone G1,G2 and G5 Bidder must furnish unit price for each item under these Milestones and shall not alter the quantities indicated under these Milestones for each item. |
| 32 | For Milestones G4 & G6:- Bidder shall furnish the quantity and unit price for each item (Refer Chapter 8 of Employer’s Requirements-General Specification). |
| 33 | Deleted |
| 34 | For Milestone G4:- In case of increase/decrease of quantities of ordered train sets on account of exercising of option by the Employer, the declared quantity by the Bidder of consumables required under this Milestone will be increased/decreased on pro-rata basis. There shall be no change in the unit cost of consumables quoted by the Bidder. |
| 35 | Employer at his sole discretion may exercise the option to increase/decrease the quantities (to any extent) of spares indicated under milestones G1, G2, G4, G5 and G6. However, the value for the option to increase/decrease the quanitities shall be within the ±15% of the Contract Price.For increased quantities, payment to the contractor shall be on the basis of actual supplies made and quoted unit rates and no escalation or any other additional sums shall be payable. Any increase/decrase in quantities may be intimated at any time during till completion of 5 years after taking over of the last trainset by Employer. The delivery schedule for the enhanced quantities shall be mutually agreed. |
| 36 | Accomplishment of Milestone 'G6' will be a pre-requisite for issue of the Performance Certificate. |
| 37 | Contractor shall indicate the annual percentage escalation/deflation that will be applicable for increase or decrease of the unit cost of each item/spare listed in Annexures GA1, GA2, GA4, GA5 and GA6 for procurement by Employer for a period of upto five years after completion of five years from the date of taking over of last trainset.For avoidance of doubt, following example is provided:Say, the date of taking over of last trainset is 07-Nov-2024, then the price quoted for each item/spare listed in Annexures GA1, GA2, GA4, GA5 and GA6 shall be applicable till 06-Nov-2029 and the annual percentage escalation/deflation on the price quoted for each item/spare listed in Annexures GA1, GA2, GA4, GA5 and GA6 shall be applicable for the period from 07-Nov-2029 to 05-Nov-2034. |
| 38 | Employer may exercise the option to procure individual Spares listed in Annexures GA1, GA2, GA4, GA5 and GA6 by the Bidder at any time within five years after completion of five years from the date of taking over of last trainset by PMRCL. Procurement Price in such case shall be calculated by considering the percentage of increase/decrease per annum (with minimum duration as one month) as quoted by the Contractor in Annexures GA1, GA2, GA4, GA5 and GA6.For avoidance of doubt, following example is provided:Say, the date of taking over of last trainset is 07-Nov-2024, then the price quoted for each item/spare listed in Annexures GA1, GA2, GA4, GA5 and GA6 shall remain same for the supplies instructed/ordered by PMRCL till 06-Nov-2029. The annual percentage escalation/deflation on the price quoted for each item/spare listed in Annexures GA1, GA2, GA4, GA5 and GA6 shall be applicable on the supplies instructed/ordered by PMRCL during the period from 07-Nov-2029 to 05-Nov-2034. |
| 39 | Deleted |
| 40 | IMPORTANT NOTE REGARDING EVALUATION OF COST QUOTED UNDER THIS COST CENTRE Wherever Bidders do not quote for spares against milestones ‘G1’, 'G2' and ‘G5' exactly as per specified list of spares in the Bid, following methodology for loading of prices for milestones ‘G1’, 'G2' and ‘G5’ will be considered: |
| 41 | Cases where the Bidder has quoted unit rates but the quoted quantity do not match with the specified quantity in the Bid – Unit price quoted will be considered for calculating the procurement price of the quantities specified in the Bid and this calculated price will be considered for evaluation. |
| 42 | Cases where Bidder has mentioned unit rates as 'ZERO' or '0' or '-' or 'NIL':– For all such items the prices shall be considered as '0 (Zero)' for evaluation.– Also, during actual contract execution, such items, if any, will be considered as to be supplied free of cost to the Employer. |
| 43 | Cases where Bidder has either left unit rates blank or some items have been excluded from the specified list – For all such items, the average of prices quoted by any of the other responsive Bidder for such item will be considered and added to the respective Milestone price quoted by the Bidder. This calculated price will be considered for evaluation.– However, during actual contract execution, such items, if any, will be considered as to be supplied free of cost to the Employer. |
| 44 | Cases where the Bidder has quoted for additional items (over and above the items specified in the Bid):- Price of additional items quoted by the Bidder will not be considered for evaluation and such items will not form part of the contract. |
| 45 | Deleted |
| 46 | It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid. |
| 47 | The list of spares (minimum) that are required to be stocked by the Contractor during DLP for Commissioning and DLP obligations is attached as 'Annexure GDLP'. |
| 48 | Bidders shall fill the 'Milestone Completion Date' (wherever not specified) against each Milestone Activity above, such that it falls within the relevant Key Dates (refer Form FB-1 to Forms of Bid). In case of non compliance to this condition, the Employer shall consider the relevant activity under the non-compliant 'Milestone Completion Date' to be completed on the respective Key Date as mentioned in the tender conditions for all purposes including tender evaluation. SIGNATURE OF BIDDER Unit Exchange Spares for 20 trainset of '3 car' and 07 trainset of '6 car' Unit Exchange Spares: Annexure - GA1 (* 'set' means as used in ' 3-car trainset'** 'BogieSet' means as used in '1 bogie' ) S No. Description Unit * Qty Unit Cost Total Cost Escalation p.a (%) REMARKS F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C USD JPY EUR (INR) USD JPY EUR (INR) USD JPY EUR (INR) |
| 49 | Transformer |
| 50 | Traction Motor with Half Coupling, Power Cables & Connectors |
| 51 | Power Converter and Inverter |
| 52 | Auxiliary Converter (without battery charger) |
| 53 | On-board Battery charger |
| 54 | Vacuum Circuit Breaker |
| 55 | Complete Motor Bogie equipped with Traction Motors, Wheel Sets and brake units etc. |
| 56 | All types of Complete Trailer Bogie equipped with Wheel Sets and brake units etc. |
| 57 | Motor car wheel sets complete with drive mechanism, TBU's, axle box and bearings etc. |
| 58 | Trailer car wheel set complete with TBU's, axle box, bearing etc. |
| 59 | 25 kV cable with HV bushing and connecter. |
| 60 | Battery set with inter connectors |
| 61 | Pantograph with base insulators and its control panel |
| 62 | All Electrical monitoring, control and protection panels/cubicles comprising of relays, MCBs, switches, displays, pneumatic gauges, sensors duly wired used therein as applicable. (list to be furnished by the Bidder) |
| 63 | Coupler: Auto ( without electrical head); |
| 64 | Coupler: Semi-permanent(with muff coupling) |
| 65 | Intermediate automatic coupler(with electrical head) |
| 66 | Gangways comprising of two-halves |
| 67 | Master controller & Mode selector |
| 68 | PWM Generator with interface panel |
| 69 | Main Motor Compressor Set for pneumatic system |
| 70 | Auxiliary motor compressor set |
| 71 | Air dryer |
| 72 | Secondary suspension complete set |
| 73 | Primary suspension |
| 74 | Complete Brake Control Unit(Pneumatic) |
| 75 | Electronic Brake control unit |
| 76 | Complete PA/ PIS and CCTV set including connectors but excluding interconnecting cable. |
| 77 | Complete saloon door operating mechanism |
| 78 | Saloon Air-conditioning Unit |
| 79 | TCMS Equipment set |
| 80 | WFL (complete with fasteners including holder) |
| 81 | Surge Arrester |
| 82 | Fire detection Unit |
| 83 | Current Transformer |
| 84 | Potential Transformer |
| 85 | Stainles Steel Passenger Seat |
| 86 | Traction Motor |
| 87 | Interconnecting 25kV cable between pantographs with connector assembly |
| 88 | Complete Cab Door with Operating & Locking mechanism TOTAL(GA1) 0.0 0.0 0.0 0.0 Mandatory Spares for 20 trainset of '3 car' and 07 trainset of '6 car' Annexure - GA2 Mandatory Spares: (* 'Set' means as used in ' 3-car trainset' ) S No. Description Part No. Unit* Qty Unit Cost Total Cost Escalation p.a (%) REMARKS F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C USD JPY EUR (INR) USD JPY EUR (INR) USD JPY EUR (INR) HVAC Unit |
| 89 | Microprocessor based control unit |
| 90 | Set of all types of Temperature sensors |
| 91 | Humidity sensor |
| 92 | Smoke sensor |
| 93 | Fresh & Return air Damper motors |
| 94 | Compressor |
| 95 | Condenser & Evaporator fans with motor |
| 96 | Emergency Inverter with control unit Brake & Pneumatics |
| 97 | Set of all types of PCB Cards as used in Brake Electronic Control Unit of each DM, T & DM car |
| 98 | Set of all types of Power Module cards |
| 99 | Set of all types of Input Output Cards |
| 100 | Speed Sensor |
| 101 | Tread Brake Unit |
| 102 | Set of all types of Valves as used in Pneumatic Circuit |
| 103 | Set of all types of Magnet Valves |
| 104 | Set of all types Safety Valves |
| 105 | Set of all type of Gauges |
| 106 | Set of all type of Sensors |
| 107 | Set of all type of Pressure Switches |
| 108 | Set of all types of Pressure Governors |
| 109 | Set of all types of isolating cocks |
| 110 | Set of all types of Drain Cocks |
| 111 | All components as used in Pneumatic BCU |
| 112 | Set of all types of flexible Pneumatic Hose with end fittings PA/PIS & CCTV |
| 113 | Set of all types of PCB cards as used in PA/PIS & CCTV system |
| 114 | Set of all types of Power Module Cards |
| 115 | Set of all types of Input Output Cards |
| 116 | Train Number Indicator |
| 117 | Destination Indicator Front |
| 118 | External side display board |
| 119 | Set of MOPs,AOPs,Power Amplifiers,Speakers(Saloon internal/external) as used in PA/PIS & CCTV system |
| 120 | Passenger emergency activation device |
| 121 | Set of PSSS modules |
| 122 | Set of all types of LCD Route Maps & displays |
| 123 | Saloon Camera |
| 124 | Outside rear view camera |
| 125 | Detrainment Camera DOOR SYSTEM |
| 126 | Door control unit |
| 127 | Saloon Door Leaf (pair) |
| 128 | Door Motor including gear mechanism if any |
| 129 | Set of rollers |
| 130 | Set of all types of sensors/switches as used in saloon door |
| 131 | Cab-Saloon Partition door panels with operating & locking mechanism |
| 132 | Complete Emergency Door |
| 133 | All types of mechanical components and panels as used in one Emergency door |
| 134 | Set of all types of sensors,Relays, Contactors,Limit Switches etc. as used in one Emergency door |
| 135 | Set of all types of sensors, Relays, Contactors,Limit Switches etc. in Cab door |
| 136 | Set of all types of saloon Door Gaskets and Rubber items |
| 137 | Door Hanging device Mandatory Spares: (* 'Set' means as used in ' 3-car Trainset' ) S No. Description Part No. Unit* Qty Unit Cost Total Cost Escalation p.a (%) REMARKS F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C USD JPY EUR (INR) USD JPY EUR (INR) USD JPY EUR (INR) Converter/Inverter |
| 138 | Set of all types of PCB cards as used in Converter/Inverter |
| 139 | Set of all types of Power module card incl. IGBTs as used in Converter/Inverter |
| 140 | Set of all types of Input Output Cards as used in converter/Inverter |
| 141 | Set of all types of Contactors as used in converter/inverter |
| 142 | Charging contactor |
| 143 | Main contactor |
| 144 | Current Transformer |
| 145 | Potential Transformer |
| 146 | Power Unit |
| 147 | Gate Control Unit complete with back panel |
| 148 | Set of all types of components used in DC link circuit module including DC link capacitors |
| 149 | Earthing protection circuit module Auxiliary Converter-Inverter |
| 150 | Set of all types of PCB cards as used in Aux. Converter |
| 151 | Set of all types of Power module card incl. IGBTs as used in Aux. converter |
| 152 | Set of all types of input Output Cards as used in Aux. converter |
| 153 | Set of all types of Contactors as used in Aux. converter |
| 154 | Charging contactor |
| 155 | Main contactor |
| 156 | Current Transformer |
| 157 | Potential Transformer |
| 158 | Power Unit |
| 159 | Gate Control Unit complete with back panel |
| 160 | Set of all types of components used in DC link circuit module including DC link capacitors |
| 161 | Earthing protection circuit module Transformer |
| 162 | Oil pump |
| 163 | Radiator blower including fan(if required) |
| 164 | Set of all types of Valves & Relays as used in Transformer |
| 165 | Set of all types of Sensors/Gauges as used in Transformer TCMS |
| 166 | Set of all types of PCB cards including Back Panels as used in TCMS |
| 167 | Display Unit Master Controller |
| 168 | Set of all types of Switches and contactors as used in Master Controller |
| 169 | Potentiometer Pantograph |
| 170 | Control panel and control Box including all types of valves,Switches,Regulators, Filters etc. |
| 171 | Valves used for Maximum Extension Device & Auto-Dropping Device |
| 172 | Pantograph Pan assembly |
| 173 | Pantograph Raising Cylinder |
| 174 | Air Feed Insulator |
| 175 | Pantograph foot insulator Vaccum Circuit Breaker |
| 176 | Control box including all types of valves,relays, auxiliary contact, pressure regulator,Pressure switch,sensors,gauges etc. Coupler |
| 177 | Proximity sensor |
| 178 | Set of all types of Pneumatic hoses as used in coupler |
| 179 | Set of all types of electrical jumpers with connectors including cab to cab jumpers Bogie |
| 180 | Set of all types of Dampers for one bogie |
| 181 | Traction Link Device(Monolink/Z-link) |
| 182 | Axle boxes including bearing |
| 183 | Leveling Valves |
| 184 | Spacers for Air Suspension |
| 185 | All types of lateral & longitudinal buffers as used in one Bogie Mandatory Spares: (* 'Set' means as used in ' 3-car trainset' ) S No. Description Part No. Unit* Qty Unit Cost Total Cost Escalation p.a (%) REMARKS F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C USD JPY EUR (INR) USD JPY EUR (INR) USD JPY EUR (INR) Electrical items |
| 186 | Complete lights- Head light, Tail light/Marker Light, Flasher light, Console light, Gangway light, saloon light,Door Indication Light(interior/exterior),cubicle light,Passenger Alarm light,cab main light complete with sensors, controllers and fittings, housing,casing,covers etc. |
| 187 | Set of all types of DC-DC converters |
| 188 | Earthing Ground Switch |
| 189 | Lightening Arrestor Wiper |
| 190 | Set of Wiper Pump,Wiper Tank,Nozzle Miscellaneous items |
| 191 | Set of all types of hardwares - mounting, bolts, washers etc. for Converter/inverter |
| 192 | Set of all types of hardwares - mounting, bolts, washers etc. for Auxiliary converter including battery charger |
| 193 | Set of all types of hardwares - mounting, bolts, washers etc. for pneumatic Compressors |
| 194 | Set of all types of hardwares - mounting, bolts, washers etc. for Transformer |
| 195 | Set of all types of hardwares - mounting, bolts, washers etc. for all types of Air reservoirs |
| 196 | Set of all types of hardwares - mounting, bolts, washers etc. for all types of Valve boxes |
| 197 | Set of all tyes of hardwares - mounting, bolts, washers etc. for all types of Doors |
| 198 | Set of all types of hardwares - mounting, bolts, washers etc. for Air conditioning unit |
| 199 | Set of all types of hardwares - mounting, bolts, washers etc. for Traction Motor |
| 200 | Set of all types of hardwares - mounting, bolts, washers etc. for Surge Arrestor |
| 201 | Set of all types of hardwares - mounting, bolts, washers etc. for Current Transformer |
| 202 | Set of all types of hardwares - mounting, bolts, washers etc. for Potential Transformer |
| 203 | Set of all types of hardwares-mounting,bolts,washers etc. for Pantograph |
| 204 | Set of all types of hardwares-mounting,bolts,washers etc. for VCB |
| 205 | Set of all types of hardwares-mounting,bolts,washers etc. for EGS |
| 206 | Set of all types of connectors with pins of MAKE A, B….. (Tenderer to specify) |
| 207 | Set of all types of relays of MAKE A, B….. (Tenderer to specify) |
| 208 | Set of all type of pushbuttons of MAKE A, B….. (Tenderer to specify) |
| 209 | Set of all types of contactors of MAKE A, B….. (Tenderer to specify) |
| 210 | Set of all types of MCBs of MAKE A, B….. (Tenderer to specify) |
| 211 | Set of all types of indicators of MAKE A, B….. (Tenderer to specify) |
| 212 | Set of all types of fuses of MAKE A, B….. (Tenderer to specify) |
| 213 | Set of all types of air filters for pneumatic circuits |
| 214 | Set of all types of Air Filters for HVAC |
| 215 | Set of Seats in Cab |
| 216 | Set of Glasses of all types of Doors & Windows. |
| 217 | Windsheild glass |
| 218 | Draught Screen |
| 219 | Set of all types of PCBs as used in FDU |
| 220 | Driver Desk Panel (FRP) |
| 221 | FRP Panels |
| 222 | Air Duct |
| 223 | Cab Mask |
| 224 | Insulation like glass wool etc. |
| 225 | Maskon key (5 nos. per trainset) |
| 226 | Lock for Maskon Key |
| 227 | Fume Extractor for battery box |
| 228 | Mating connector for shore supply as per ERTS 9.2.10 |
| 229 | Set of cable completed with connectors at both end as per ERTS 9.2.10 TOTAL(GA2) 0.0 0.0 0.0 0.0 Annexure - GA4 Consumable Spares for 102 cars ( 20 trainsets of 3 -car and 07 trainsets of 6-car) for period up to expiry of DLP:- MANDATORY CONSUMABLE SPARES FOR 102 CARS (20 TRAINSETS OF 3 -CAR AND 07 TRAINSETS OF 6-CAR) S No. Description Part No. Unit Qty Unit Cost Total Cost Escalation p.a (%) F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C USD JPY EUR (INR) USD JPY EUR (INR) USD JPY EUR (INR) |
| 230 | Lubricants |
| 231 | All types of Lubricants required for wheel set Bearing Mountings |
| 232 | Anti friction coating spray VCB |
| 233 | Lubricant for Pantograph |
| 234 | Lubricant for Battery(Neutral Petroleum Jelly) |
| 235 | Lubricant for HVAC |
| 236 | Anti Corrision coating for coupler |
| 237 | Any other item whose declared life is less than one year |
| 238 | Main transformer Oil |
| 239 | Aux. compressor Oil |
| 240 | WFL Oil |
| 241 | Oil for driving Gear |
| 242 | Any other item whose declared life is less than one year |
| 243 | Greases |
| 244 | Grease for coupler |
| 245 | All types of grease for Saloon door |
| 246 | Grease for HVAC |
| 247 | Grease for Traction Motor |
| 248 | Grease for VCB |
| 249 | Grease for EGS |
| 250 | Grease for Pantograph |
| 251 | Grease for Gear Box coupling |
| 252 | Grease for Pneumatic Valve |
| 253 | Roof Insulators of Pantograph,VCB etc. |
| 254 | Master Controller |
| 255 | Any other item whose declared life is less than one year |
| 256 | Sealants |
| 257 | Sealant for Saloon door |
| 258 | Sealant for Gangway Assembly |
| 259 | Sealant for Coupler |
| 260 | Sealant for VCB |
| 261 | Drive Gear Coupling |
| 262 | Sealant for Door Glass seal bonding |
| 263 | Adhesive Door Window seal bonding |
| 264 | Masking for Door window Glass sealant |
| 265 | Sealant for car body fittings |
| 266 | Adhesive for Air suspension(during height adjustment) |
| 267 | Adhesive for mounting screw of VCB |
| 268 | Pantograph mounting screw thread locker |
| 269 | Rubber bonded metal components of Bogie |
| 270 | Any other item whose declared life is less than one year |
| 271 | Brake Pads |
| 272 | Brake Block |
| 273 | Split Pin for Brake Block |
| 274 | Filters |
| 275 | Set of Main air compressor Filter |
| 276 | Set of Auxiliary Compressor Filter |
| 277 | Set of Micromesh Oil Filter |
| 278 | Set of Line Filter(Pneumatic Pipe Line) |
| 279 | VCB Air Filter |
| 280 | HVAC Mixed air Filter |
| 281 | HVAC Fresh air Filter |
| 282 | HVAC Return air Filter |
| 283 | HVAC Booster Fan Filter |
| 284 | HVAC Smoke Sensor Filter |
| 285 | Any other item whose declared life is less than one year |
| 286 | Gaskets |
| 287 | Set of Gasket for Main Transformer |
| 288 | Gasket for interior items(like Passenger seat,Draught screen,window Glass etc) |
| 289 | Sealing Ring for Main compressor,Driving Gear etc. |
| 290 | Gaskets for Converter/Inverter Box |
| 291 | Gaskets for SIV/BCG Box |
| 292 | Gaskets for ACCB Box |
| 293 | Gaskets for Coupler |
| 294 | Pantograph carbon strips |
| 295 | Other wearable parts |
| 296 | Wiper Blade |
| 297 | Battery |
| 298 | Distilled Water |
| 299 | Other item |
| 300 | All type of cleaning agent like Isopropyle Alchohol,Spirit etc |
| 301 | Degreasing Agent like WD40 etc. |
| 302 | Oil seperator Brake System |
| 303 | Grab Handle,Rope,Spring |
| 304 | Smoke detector tester(Spray type) |
| 305 | Dustoff for cleaning TCMS PCB cards |
| 306 | Liner for Air suspension( during height adjustment) |
| 307 | Rubber care product(French Chalk Powder |
| 308 | PTFE tape for Pneumatic joints VCB |
| 309 | Raychem/HVBT-4-A Insulation Tape for Bus Bar connection on roof |
| 310 | Silicone Gel for Main Transformer Breather |
| 311 | Air Dryer Desiccant TOTAL - GA4 0.0 0.0 0.0 0.0 w Note:(I) Bidder should furnish detailed list of items proposed as consumables (II) Any other items which are not included in the list, but is required during the course of the DLP will be deemed to be included in the above list (iii) Irrespective of the unit and quantity of items indicated in the price bid, the contractor shall supply any of the above items and its quantity required up to the expiry of DLP period.However, amount payable to the contracator shall be limited to the amount quoted in Bid. Annexure - GA 5 Special Tools, Jigs, Fixtures, Gauges, Testing and Diagnostic Equipment for 20 trainset of '3 car' and 07 trainset of '6 car' ` MANDATORY SPECIAL TOOLS , JIGS ,FIXTURES, GAUGES, TESTING AND DIAGNOSTIC EQUIPMENT ('Set' means numbers of complete special Tools/Jigs/Fixtures/Gauges/Testing & Diagnostic Equipment) etc. S No. Sub No. SYSTEM EQUIPMENT Part No. Unit Qty Unit Cost Total Cost Escalation p.a (%) REMARKS F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C USD JPY EUR (INR) USD JPY EUR (INR) USD JPY EUR (INR) |
| 312 | 1.1 1.2 Assembly, Dis-assembly, Alignment, Testing &Repair jigs and fixtures, Tools required for Overhauling etc. Set 1.0 |
| 313 | 2.1 2.2 Assembly, Dis-assembly, Testing & repair jigsand Fixtures, Tools required for Overhauling , Working stand etc. Set 1.0 |
| 314 | 3.1 3.2 BDV tester for Transfromer oil Set 1.0 3.3 Suitable oil filling equipment, complete with oil filteration,centrifuging, oil testing and other accessories for main transformer as per ERTS 8.7.15. Set 1.0 |
| 315 | 4.1 4.2 In house preventive and breakdown maintenance equipment (tools, jigs/fixtures/hardware& software/test bench etc) of CI as per 8.9.16 Set 1.0 4.3 Test equipment as per clause 8.9.12(i). Set 1.0 4.4 Facility to monitor the events of propulsion system on-line on a maintenance terminal as per ERTS 8.9.14 Set 1.0 |
| 316 | 5.1 5.2 In-situ and disassembled traction motor cleaning arrangement/fixture to suck the dust from the rotor and stator including filter through an external industrial blower/vacuum cleaner(To be supplied by the Employer)in accordance with ERTS clause 8.10.13,8.10.14 and 8.10.16) Set 2.0 |
| 317 | 7.1 7.2 Maintenance Terminal to monitor and record the events online as per ERTS 9.2.8(x) Set 2.0 7.3 In house Preventive and Breakdown maintenance equipment (tools, jigs/fixtures/hardware & software/testbench etc.) of Auxiliary Inverter . Set 1.0 |
| 318 | 8.1 8.2 Universal Test bench(UTB) with computer, Printer, Software,UPS and all other accessories. Set 1.0 8.3 Tread Brake Unit test bench & repair tools. Set 1.0 8.4 Supply of any special tools complete with requisite Hardware/Software as per ERTS clause 6.17.6, 6.17.7 Set 1.0 8.5 Special Tool for accessing manual parking brake release arrangement at platform level (2 sets/Train ) as per ERTS clause 6.15.4 Nos 54.0 |
| 319 | 9.1 9.2 Assembly and Disassembly tools as recommended by OEM Set 1.0 9.3 Go gauge/No go gauge for end screw as recommended by OEM Set 1.0 |
| 320 | 10.1 10.2 Equipment and means for downloading of visual images recorded in non-volatile SSD memory of CCTV alongwith all connecting cables as per ERTS 13.9.11. Set 2.0 0.0 10.3 Card Extender for all types of electronics cards Set 1.0 0.0 |
| 321 | 12.1 12.2 Lifting jig including any mechanical handling equipment as per ERTS 11.4.3 Set 2.0 0.0 12.3 Oilless refrigerant charging /reclaiming unit including vacuum pump, suction equipment, leakage detector etc. Set 1.0 0.0 12.4 Complete Set of Automatic Filter Cleaning Machine as per ERTS Set 1.0 0.0 12.5 HVAC duct cleaning tool as per ERTS 11.5.3 Set 1.0 0.0 |
| 322 | 13.1 13.2 Force detection gauge,suction tool as recommended by OEM Set 4.0 0.0 13.3 Door handling unit,Door control box for local operations,alignment tools as recommended by OEM Set 1.0 0.0 13.4 Complete set of maintenance and diagnostic tools including software and hardware as per ERTS 7.2.7 Set 2.0 0.0 13.5 Complete set of Special tools for cleaning of the door guides as per ERTS 7.2.1 (xii) as recommended by OEM Set 4.0 0.0 13.6 Backlash Gauge for spindle as recommended by OEM Set 1.0 0.0 |
| 323 | 14.1 14.2 Mounting/dismounting tools/jig as recommended by OEM Set 1.0 0.0 0.0 14.3 Coupler Proximity sensor functionality & gap measuring tools as recommended by OEM Set 1.0 0.0 0.0 |
| 324 | 15.1 15.2 WFL System Programming tool for spray cycle of WFL System as per ERTS 5.14.2 Set 2.0 0.0 0.0 0.0 0.0 15.3 WFL nozzle alignment tool as per ERTS 5.14.2 Set 2.0 0.0 0.0 0.0 0.0 Special Tools, Jigs, Fixtures, Gauges, Testing and Diagnostic Equipment for 20 trainset of '3 car' and 07 trainset of '6 car' ` MANDATORY SPECIAL TOOLS , JIGS ,FIXTURES, GAUGES, TESTING AND DIAGNOSTIC EQUIPMENT S No. Sub No. SYSTEM EQUIPMENT Part No. Unit Qty Unit Cost Total Cost Escalation p.a (%) REMARKS F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C USD JPY EUR (INR) USD JPY EUR (INR) USD JPY EUR (INR) |
| 325 | 16.1 16.2 Wheel Profile gauge as per ERTS 5.11.5(Mechanical as well as laser based) including wheels back to back measurement within axle (Mechanical type) Set 1.0 |
| 326 | 17.1 17.2 Dampers Damper Testing machine as recommended by OEM Set 1.0 |
| 327 | 19.1 19.2 Gangway handling trolley Set 1.0 19.3 Gangway covers to protect interior of uncoupled train as per ERTS 4.15.1(vii) Set 6.0 19.4 Gangway work Table Set 1.0 |
| 328 | 20.1 20.2 Signal list modification tool as per ERTS 10.3.4 Set 1.0 20.3 Notebook Computers as approved by the Project Manager, together with all associated accessories and pre-installed software as per ERTS clause 10.9.11)Notebook computers together with all associated accessories and pre-installed software necessary for all diagnostic and configuration editing functions for all train-borne equipment2) copies of all the software uploaded in the notebook computers shall also be provided separately in approved non-volatile memory. Set 10.0 20.4 Remote data downloading server including backup (Hardware &software, On board Equipment) as per ERTS 10.11.2(i) &(ii) Set 1.0 20.5 Tools required for reading and processing of recorded data log files as per clause 10.10.7 Set 1.0 20.6 Complete Depot Management Tool as per appendix TK ERTS 10.11.1(iii) Set 1.0 20.7 Card Extender for all types of electronics cards Set 1.0 |
| 329 | 22.1 22.2 One complete set of software(s) package and associated hardware as per Clause 3.22.9 Set 1.0 |
| 330 | 23.1 23.2 Facility for replacement of power LED clusters used as head and tail lights as per ERTS 12.8.2 (i) Set 2.0 23.3 Special tool for replacement of defective LEDs/ block of LEDs as per ERTS 12.9.1 (x) Set 2.0 |
| 331 | 24.1 TOTAL GA5 0.0 0.0 0.0 0.0 NOTE:1. Delivery of the items listed in Annexure'GA5' is a prerequisite for accomplishment of the KD 6.1.However, exemption for Key Date delivery of certain items may be granted to the Contractor subjected to approval of the Project Manager.2. Above requirement of special tools, Jigs, Fixtures system wise is only indicative.However, at the time of design finalization or maintenance manual finalization, if respective OEM recommends any other special tools,jigs,fixtures the price of the same shall be deemed to be included in this list. Annexure - GA6 Intermediate Overhauling Spares for 3 train Sets of 3-car: MANDATORY INTERMEDIATE OVERHAULING SPARES FOR 03 TRAINSETS OF 3 - CAR CONFIGURATION: S No. SYSTEM EQUIPMENT Part No. Unit Qty Unit Cost Total Cost Escalation p.a (%) REMARKS F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C USD JPY EUR (INR) USD JPY EUR (INR) USD JPY EUR (INR) |
| 332 | Pantograph |
| 333 | Main Transformer |
| 334 | Converter / Inverter |
| 335 | Auxiliary Inverter |
| 336 | Compressor |
| 337 | Pneumatics |
| 338 | Axle Boxes |
| 339 | Drive Gear |
| 340 | Air Condition (Cab & Saloon ) |
| 341 | Bogie |
| 342 | Brake |
| 343 | Master Controller |
| 344 | Coupler TOTAL GA6 (3 car train) 0.0 0.0 0.0 0.0 Intermediate Overhauling Spares for 02 train Sets of 6-car: (A) MANDATORY INTERMEDIATE OVERHAULING SPARES FOR 02 TRAINSETS OF 6- CAR CONFIGURATION: S No. SYSTEM EQUIPMENT Part No. Unit Qty Unit Cost Total Cost Escalation p.a (%) REMARKS F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C USD JPY EUR (INR) USD JPY EUR (INR) USD JPY EUR (INR) |
| 345 | Pantograph |
| 346 | Main Transformer |
| 347 | Converter / Inverter |
| 348 | Auxiliary Inverter |
| 349 | Compressor |
| 350 | Pneumatics |
| 351 | Axle Boxes |
| 352 | Drive Gear |
| 353 | Air Condition (Cab & Saloon ) |
| 354 | Bogie |
| 355 | Brake |
| 356 | Master Controller |
| 357 | Coupler TOTAL GA6 (6 car train) 0.0 0.0 0.0 0.0 Total GA6 for 3 car & 6 car trains 0.0 0.0 0.0 0.0 Note:- (i) Irrespective of the unit and quantity of items indicated in the price bid, the contractor shall supply any of the above items and its quantity required for intermediate overhauling of above specified number of trainsets.However, amount payable to the contracator shall be limited to the amount quoted in Bid. Annexure - GDLP List of Spares (minimum) that will be stocked by the Contractor during DLP for commissioning and DLP obligations (not a part of Cost Centre 'G'): S No. SYSTEM EQUIPMENT Part No. Unit Qty Unit Cost Total Cost Escalation p.a (%) REMARKS F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C F. C(I) F. C(II) F. C(III) L. C USD JPY EUR (INR) USD JPY EUR (INR) USD JPY EUR (INR) A Main Transformer Nos. 1.0 0.0 0.0 0.0 0.0 B HVAC system Nos. 2.0 0.0 0.0 0.0 0.0 C Main air compressor Nos. 2.0 0.0 0.0 0.0 0.0 D Aux. compressor Nos. 2.0 0.0 0.0 0.0 0.0 E 25KV HV bushing Nos. 1.0 0.0 0.0 0.0 0.0 F Gangway(within unit) Halves 2.0 0.0 0.0 0.0 0.0 G Front auto coupler(without Elect.Head) Nos. 2.0 0.0 0.0 0.0 0.0 H Semi permanent couplers with collapsable tubes Nos. 1.0 I Pantograph Nos. 2.0 0.0 0.0 0.0 0.0 J Surge Arrestor Nos. 2.0 0.0 0.0 0.0 0.0 K Lightning Arrestor Nos. 2.0 0.0 0.0 0.0 0.0 L Traction Motor(with half coupling,Power cables & connectors) Nos. 2.0 0.0 0.0 0.0 0.0 M VCB Nos. 2.0 0.0 0.0 0.0 0.0 N EGS Nos. 1.0 0.0 0.0 0.0 0.0 O ACCT Nos. 2.0 0.0 0.0 0.0 0.0 P ACPT Nos. 2.0 0.0 0.0 0.0 0.0 Q Master Controller Nos. 2.0 0.0 0.0 0.0 0.0 R Driver Seat Nos. 1.0 0.0 0.0 0.0 0.0 S Assistance Driver Seat Nos. 1.0 0.0 0.0 0.0 0.0 |
| 358 | Traction Converter Inverter Power unit Nos. 2.0 0.0 0.0 0.0 0.0 Gate control unit(control logic unit) Nos. 2.0 0.0 0.0 0.0 0.0 All types of contactor unit of CI Nos. of each type 2.0 0.0 0.0 0.0 0.0 DC link unit(including OVT) Nos. 2.0 0.0 0.0 0.0 0.0 Filter capacitor(for converter & inverter) Nos. 2.0 0.0 0.0 0.0 0.0 Charging resistor unit Nos. 2.0 0.0 0.0 0.0 0.0 Discharging resistor unit Nos. 2.0 0.0 0.0 0.0 0.0 All types of colling fans as required for converter &inverter Nos. of each type 2.0 0.0 0.0 0.0 0.0 Gate power supply unit Nos. 2.0 0.0 0.0 0.0 0.0 Gate Interface Card Nos. 2.0 0.0 0.0 0.0 0.0 |
| 359 | APS including BCG GCU for SIV(Control logic Unit) Nos. 2.0 0.0 0.0 0.0 0.0 All types of contactors unit Nos. of each type 2.0 0.0 0.0 0.0 0.0 ACC unit Nos. 2.0 0.0 0.0 0.0 0.0 Circuit breaker(APS)/No Fuse Breaker(NFB) Nos. 2.0 0.0 0.0 0.0 0.0 All types of Cooling fans as required for APS Nos. of each type 2.0 0.0 0.0 0.0 0.0 DC link unit Nos. 2.0 0.0 0.0 0.0 0.0 Filter capacitor unit Nos. 2.0 0.0 0.0 0.0 0.0 Gate power supply unit Nos. 2.0 0.0 0.0 0.0 0.0 Power unit for BCG Nos. 2.0 0.0 0.0 0.0 0.0 Control unit for BCG Nos. 2.0 0.0 0.0 0.0 0.0 Contactor unit of BCG Nos. 2.0 0.0 0.0 0.0 0.0 Circuit breaker(BCG) Nos. 2.0 0.0 0.0 0.0 0.0 All types of cooling fans as required for BCG Nos. of each type 2.0 0.0 0.0 0.0 0.0 Gate power supply unit of BCG Nos. 2.0 0.0 0.0 0.0 0.0 |
| 360 | Shore Supply Unit |
| 361 | ACCB All types of CT,AVR etc Nos. of each type 2.0 0.0 0.0 0.0 0.0 |
| 362 | Traction Motor Half couplings Nos. 4.0 0.0 0.0 0.0 0.0 |
| 363 | Main Transformer Oil Pump Nos. 2.0 0.0 0.0 0.0 0.0 All types of valves Nos. of each type 2.0 0.0 0.0 0.0 0.0 Oil flow detector Nos. 1.0 0.0 0.0 0.0 0.0 PT100 sensor Nos. 2.0 0.0 0.0 0.0 0.0 Oil level indicator Nos. 2.0 0.0 0.0 0.0 0.0 Oil level detector Nos. 2.0 0.0 0.0 0.0 0.0 Air dryer(Filter breather)with Silica Gel Nos. 1.0 0.0 0.0 0.0 0.0 |
| 364 | VCB VCB Pressure regulator Nos. 2.0 0.0 0.0 0.0 0.0 VCB pressure switches Nos. 2.0 0.0 0.0 0.0 0.0 All typesof magnetic valves Nos. of each type 2.0 0.0 0.0 0.0 0.0 |
| 365 | TCMS All types of PCBs(including backpaanels),connectors etc Nos. of each type 1.0 0.0 0.0 0.0 0.0 All types of connectors(including hoods,receptables,plugs,terminal/pins etc) Nos. of each type 2.0 0.0 0.0 0.0 0.0 Event recorder Nos. 1.0 0.0 0.0 0.0 0.0 Video display unit Nos. 4.0 0.0 0.0 0.0 0.0 |
| 366 | Battery items Temperature Probe-PT 100 Nos. 4.0 0.0 0.0 0.0 0.0 Spare cells Nos. 40.0 0.0 0.0 0.0 0.0 |
| 367 | Electrical panels(Relays panels,ECM panel etc), junction box(HTB,LTJB,SSJB,HTEB,LTEB etc.) All types of contactors,relays,MCBs,diode blocks,Push Button,Switches etc Nos. of each type 10.0 0.0 0.0 0.0 0.0 All types TBs,Mounting boards(for contactors,relays,CBs etc),sockets etc Nos. of each type 2.0 0.0 0.0 0.0 0.0 All types Auxiliary switches,Auxiliary contact blocks,Switching Elements,IP Ports,LEDs,Limit switches etc(as applicable) Nos. of each type 2.0 0.0 0.0 0.0 0.0 Cooling Fan Unit Nos. 2.0 0.0 0.0 0.0 0.0 |
| 368 | Battery control box Battery Fuse Nos. 2.0 0.0 0.0 0.0 0.0 All types of contactors,relays,CBs Nos. of each type 2.0 0.0 0.0 0.0 0.0 |
| 369 | Fire detection System Smoke & Heat detector Nos. of each type 10.0 0.0 0.0 0.0 0.0 |
| 370 | lighting system All type of sensors & Dimmer Nos. of each type 2.0 0.0 0.0 0.0 0.0 DC-DC converter Nos. of each type 4.0 0.0 0.0 0.0 0.0 |
| 371 | PA/PIS & CCTV Main operating panel(MOP) Nos. 2.0 0.0 0.0 0.0 0.0 Cab loud speaker(CLSP) Nos. 2.0 0.0 0.0 0.0 0.0 Passenger Emergency Control Unit(PECU) Nos. 10.0 0.0 0.0 0.0 0.0 Saloon loud speaker(SLSP) Nos. 10.0 0.0 0.0 0.0 0.0 Dynamic route Map Nos. 10.0 0.0 0.0 0.0 0.0 Passenger Information Display(PID) Nos. 10.0 0.0 0.0 0.0 0.0 All types of network switches used for PA/PIS &CCTV Nos. of each type 3.0 0.0 0.0 0.0 0.0 Front display unit(FDU) Nos. 3.0 0.0 0.0 0.0 0.0 Train Number Indicator(TNI) Nos. 3.0 0.0 0.0 0.0 0.0 Side Display Unit(SDU) Nos. 10.0 0.0 0.0 0.0 0.0 Saloon camera(SCAM) Nos. 10.0 0.0 0.0 0.0 0.0 Exterior camera(ECAM) Nos. 3.0 0.0 0.0 0.0 0.0 Network video recorder(NVR) Nos. 4.0 0.0 0.0 0.0 0.0 SD card Nos. 4.0 0.0 0.0 0.0 0.0 External loudspeakers(ELSP) Nos. 10.0 0.0 0.0 0.0 0.0 Amplifier Nos. 2.0 0.0 0.0 0.0 0.0 Aux. operating panel(AOP) Nos. 2.0 0.0 0.0 0.0 0.0 |
| 372 | Jumpers |
| 373 | Pantograph Air bellow Assembly Nos. 2.0 0.0 0.0 0.0 0.0 Carbon strips Nos. 20.0 0.0 0.0 0.0 0.0 All types of air pressure hose Mtr. 10.0 0.0 0.0 0.0 0.0 All types of valves Nos. 4.0 0.0 0.0 0.0 0.0 Pan Head Nos. 4.0 0.0 0.0 0.0 0.0 Foot Insulator Nos. 3.0 0.0 0.0 0.0 0.0 |
| 374 | Earth Brush |
| 375 | Brakes All types of ballcocks(isolation/drain cocks etc) Nos. of each type 2.0 0.0 0.0 0.0 0.0 All types of PCBs Nos. of each type 2.0 0.0 0.0 0.0 0.0 All types of Pressure governers/switches,speed sensors Nos. of each type 2.0 0.0 0.0 0.0 0.0 All types of Hose pipes,gauges, test fitting,connectors etc. Nos. of each type 2.0 0.0 0.0 0.0 0.0 All type of under gear hoses Nos. of each type 10.0 0.0 0.0 0.0 0.0 Brake control unit(Pneumatic) Nos. of each type 2.0 0.0 0.0 0.0 0.0 TBU Nos. of each type 2.0 0.0 0.0 0.0 0.0 TBU spring Nos. 24.0 0.0 0.0 0.0 0.0 |
| 376 | HVAC Emergency Inverter including transformer,DC-DC converter Nos. of each type 2.0 0.0 0.0 0.0 0.0 Heating elements including its fuse and OHP Nos. 4.0 0.0 0.0 0.0 0.0 All types of relays Nos. of each type 1.0 0.0 0.0 0.0 0.0 Compressor Nos. 2.0 0.0 0.0 0.0 0.0 Condensor fan assembly complete Nos. 1.0 0.0 0.0 0.0 0.0 Supply fan deck complete Nos. 1.0 0.0 0.0 0.0 0.0 Solenoid valve,complete Nos. 1.0 0.0 0.0 0.0 0.0 HP switch Nos. 2.0 0.0 0.0 0.0 0.0 LP switch Nos. 2.0 0.0 0.0 0.0 0.0 Pressure transducer,discharge pressure Nos. 1.0 0.0 0.0 0.0 0.0 Pressure transducer,suction pressure Nos. 1.0 0.0 0.0 0.0 0.0 TX valve Nos. 5.0 0.0 0.0 0.0 0.0 All types of CBs with Auxiliary contacts Nos. of each type 2.0 0.0 0.0 0.0 0.0 All types of Temperature probe(return air,supply air,fresh air) Nos. of each type 4.0 0.0 0.0 0.0 0.0 PLC,complete Nos. 4.0 0.0 0.0 0.0 0.0 Referigerant filter drier Nos. 4.0 0.0 0.0 0.0 0.0 Hygrostat Nos. 2.0 0.0 0.0 0.0 0.0 Cab booster fan Nos. 2.0 0.0 0.0 0.0 0.0 All types of connectors(including hoods,receptables,plugs,terminal/pins etc) Nos. of each type 3.0 0.0 0.0 0.0 0.0 |
| 377 | Door All types if switches(except lockout switch) Nos. of each type 8.0 0.0 0.0 0.0 0.0 Lockout switch Nos. 2.0 0.0 0.0 0.0 0.0 Roller Nos. 4.0 0.0 0.0 0.0 0.0 Motor assembly Nos. 4.0 0.0 0.0 0.0 0.0 Coupling Nos. 4.0 0.0 0.0 0.0 0.0 Bearing bracket Nos. 4.0 0.0 0.0 0.0 0.0 Driving arm assembly(left & right) Nos. of each type 2.0 0.0 0.0 0.0 0.0 Hanging device Nos. 2.0 0.0 0.0 0.0 0.0 Door leaf assembly (left & right) Nos. of each type 4.0 0.0 0.0 0.0 0.0 Front seal(left & right) Nos. 4.0 0.0 0.0 0.0 0.0 Rear sealing rubber(left & right) Nos. 4.0 0.0 0.0 0.0 0.0 Lower acoustic seal(left &right) Nos. 4.0 0.0 0.0 0.0 0.0 Top acoustic seal assembly Nos. 4.0 0.0 0.0 0.0 0.0 Emergency access device Nos. 2.0 0.0 0.0 0.0 0.0 EAD bowden cable Nos. 4.0 0.0 0.0 0.0 0.0 Emergency egress device Nos. 2.0 0.0 0.0 0.0 0.0 EED bowden cable Nos. 4.0 0.0 0.0 0.0 0.0 |
| 378 | Coupler Mouth piece for MR Nos. 4.0 0.0 0.0 0.0 0.0 Set of all types of pneumatic hoses Nos. of each type 2.0 0.0 0.0 0.0 0.0 Proximity sensors Nos. 4.0 0.0 0.0 0.0 0.0 Uncouple cylinder Nos. 2.0 0.0 0.0 0.0 0.0 Coupling/Uncoupling valves(5/2 magnetic valve) Nos. 4.0 0.0 0.0 0.0 0.0 |
| 379 | Partition Door Air grill Nos. 2.0 0.0 0.0 0.0 0.0 Door Handles Nos. 4.0 0.0 0.0 0.0 0.0 Limit switch Nos. 4.0 0.0 0.0 0.0 0.0 Partition door glass & Door catcher Nos. of each type 20.0 0.0 0.0 0.0 0.0 |
| 380 | Wiper Wiper Motor Nos. 1.0 0.0 0.0 0.0 0.0 Wiper tankincluding all connectors for wiper outlet Nos. 2.0 0.0 0.0 0.0 0.0 Pump assembly Nos. 2.0 0.0 0.0 0.0 0.0 |
| 381 | Front End Emergency Door All types of Gas spring Nos. of each type 4.0 0.0 0.0 0.0 0.0 All types of Limit switch Nos. of each type 2.0 0.0 0.0 0.0 0.0 Guide rope Mtr 20.0 0.0 0.0 0.0 0.0 |
| 382 | Driver Seat Slider lock lever Nos. 2.0 0.0 0.0 0.0 0.0 Gas spring lever assembly Nos. 2.0 0.0 0.0 0.0 0.0 Foot rest Nos. 1.0 0.0 0.0 0.0 0.0 |
| 383 | Bogie Set of primary Spring(Spring coil outer & inner) Nos. 2.0 0.0 0.0 0.0 0.0 Vertical damper Nos. 2.0 0.0 0.0 0.0 0.0 Lateral damper Nos. 2.0 0.0 0.0 0.0 0.0 Lateral Buffer Nos. 2.0 0.0 0.0 0.0 0.0 Levelling Rod Assembly Nos. 2.0 0.0 0.0 0.0 0.0 Anti roll bar assembly Nos. 2.0 0.0 0.0 0.0 0.0 |
| 384 | Wheel Flange Lubricator Oil tank Nos. 1.0 0.0 0.0 0.0 0.0 Nozzle Nos. 4.0 0.0 0.0 0.0 0.0 Pump assembly Nos. 4.0 0.0 0.0 0.0 0.0 Solenoid valve Nos. 3.0 0.0 0.0 0.0 0.0 Float switch Nos. 3.0 0.0 0.0 0.0 0.0 Flow divider Nos. 3.0 0.0 0.0 0.0 0.0 |
| 385 | Motor Car Wheel Set |
| 386 | Journal bearings |
| 387 | All types of Axle box cover alongwith associated assembly |
| 388 | Roof bus bar(complete T car set) with connecting cables |
| 389 | Strap hangers complete |
| 390 | Glasses Saloon door glasses Nos. 4.0 0.0 0.0 0.0 0.0 wind screen glasses(complete set) Nos. 10.0 0.0 0.0 0.0 0.0 Emergency Door glass Nos. 5.0 0.0 0.0 0.0 0.0 Draught screen glass Nos. 5.0 0.0 0.0 0.0 0.0 Cab door glass Nos. 4.0 0.0 0.0 0.0 0.0 Note:- 1.Above list of items required to be maintained during DLP is dynamic & not exhaustive. Same list of items and quantity are subject to be reviewed every 03 months based on the failure rate of the items/sub-assemblies.2. The price of GDLP spares will not be a part of Financial Evaluation. COST CENTRE No. H – TRAINING AND MANUALS This Cost Centre comprises: 1. All those obligations and activities throughout the Contract associated with training of Employer's operating and maintenance personnel. This includes but is not limited to: ♦ Deputation of Instructors by the Contractors for training of the deputed operating and maintenance personnel of the Employer in India. ♦ Training of operating and maintenance personnel of the Employer at the Contractor’s facilities. ♦ Furnishing of Training Manual and connected Materials. ♦ Any other item considered necessary by the Contractor to comply with the Scope of Works. Notes: 1.0 The Bidder shall not complete the column “Weeks for completion of Milestone from commencement date” for the Milestone Activities 'H1' to 'H5'.The dates of operation of these Milestone Activities will be at the discretion of the Employer. 2.0 Deleted 3.0 The travel, boarding and lodging expenses for the Employer's trainees sent overseas will be borne by the Employer. 2. All those obligations and activities throughout the Contract associated with the provision of Manuals. This includes but is not limited to: ♦ Provision of Operating Manuals (Hard copies and in Electronic format). ♦ Provision of Maintenance Manuals (Hard copies and in Electronic format). ♦ Provision of Spare parts Catalogue (Hard copies and in Electronic format). ♦ Any other item considered necessary by the Contractor to comply with the Scope of Works. Note: 1. Amount quoted in this Cost Centre shall be the actual cost and not the apportioned cost.2. It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"True Copy\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid. SIGNATURE OF BIDDER COST CENTRE No. H – TRAINING AND MANUALS MILESTONE NUMBER WORK DESCRIPTION ACTUAL AMOUNT MILESTONE COMPLETION DATE ( IN WEEKS FROM COMMENCMENT DATE) FOREIGN CURRENCY(I) FOREIGN CURRENCY(II) FOREIGN CURRENCY(III) INDIAN RUPEES USD JPY EUR INR MILESTONE ACTIVITY COLUMN A COLUMN B COLUMN C COLUMN D Obtain the “Notice of No Objection” or “Notice of No Objection Subject to------“from the Project Manager for the completion of all training including delivery of final training manuals for the following: H1 Training of Project Owner's/Employer's Driving Instructors and Drivers (2 man month) in operation of MRTS off-shore. 128.0 H2 Training of Project Owner's/Employer's maintenance personnel (10 man months) in Contractor’s / Sub Contractor's Works and MRTS Offshore. H3 Provision of Contractor’s Driving Instructors and Drivers (2 man months) for Training of Employer's/Project owner's operating personnel in India. H4 Provision of Contractor’s Instructors or OEM's Experts (12 man month) for Training of Employer's/Project Owner's maintenance personnel in India. H5 Submission of Training Manuals (Original plus five hard Copies) and in Electronic format. Obtain the “Notice of No Objection” or “Notice of No Objection Subject to---“ from the Project Manager on delivery of the following final Manuals: H6 Operating Manual (Original plus 3 Hard copies). 130.0 H7 Operating Manual in Electronic format. 130.0 H8 Maintenance Manual (Original plus 3 Hard copies). 130.0 H9 Maintenance Manual in Electronic format. 130.0 H10 Spare parts Catalogue (Original plus 3 Hard copies). H11 Spare parts Catalogue in Electronic format. Obtain the “Notice of No Objection” or “Notice of No Objection Subject to---“ from the Project Manager for completion of the following: H12 Any other item considered necessary by the Contractor to comply with the scope of works COST CENTRE TOTAL 0.0 0.0 0.0 0.0 Notes: |
| 391 | The Tenderer shall not complete the column “Weeks for completion of Milestone from commencement date” for Milestones H1 to H5 and H12. |
| 392 | The dates of operation of the Milestone Activities for Milestones H1 to H5 and H10 to H12 will be at the discretion of the Employer. |
| 393 | The completion of Milestone 'H6' to 'H9' shall be considered as a pre-requisite for accomplishment of Key Date '6.1' |
| 394 | Deleted |
| 395 | The travel, boarding and lodging expenses for the employer’s trainees sent overseas will be borne by the Employer. |
| 396 | Amount quoted in this Cost Centre shall be ACTUAL COST and not apportioned cost. |
| 397 | It is certified that 'Annexure PD-1' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-1' in the Price Bid. |
| 398 | Bidders shall fill the 'Milestone Completion Date' (wherever not specified) against each Milestone Activity above, such that it falls within the relevant Key Dates (refer Form FB-1 to Forms of Bid). In case of non compliance to this condition, the Employer shall consider the relevant activity under the non-compliant 'Milestone Completion Date' to be completed on the respective Key Date as mentioned in the tender conditions for all purposes including tender evaluation. SIGNATURE OF BIDDER Annexure PD-2 MILESTONE PAYMENT SCHEDULE SHOWING CASHFLOWS FOR THE CONTRACT This document to be prepared and completed as required by the Tenderer and submitted as part of Form FB-2 to the Forms of Bid |
| 399 | It is certified that 'Annexure PD-2' annexed in Technical Bid is a \\"TRUE COPY\\" (with prices blanked off) of said 'Annexure PD-2' in the Price Bid. Annexure PD-3 PRICING OF UNQUALIFIED WITHDRAWAL OF CONDITIONS, QUALIFICATIONS, DEVIATIONS ETC. SUBMITTED IN FORM FB-10 ('A', 'B' and 'C')TO FORMS OF BID Item Condition, Qualification, Deviation etc. Key date affected by each condition, qualification, deviation etc. Increase or Decrease for unqualified withdrawal of each conditions, qualification, deviation etc. (excluding 'Taxes & Duties' ) Cost Centre Milestone No. F.C. (I) F.C. (II) F.C. (III) L.C. USD JPY EUR (INR) A B C D E F G H I TOTAL 0.0 0.0 0.0 0.0 Notes: |
| 400 | In this Annexure, the Tenderer shall indicate every key date that will be affected by each remark, comment, condition, qualifications or deviation, etc. that has been specified in Form FB-10 to Forms of Bid ('A', 'B' and 'C'). |
| 401 | Prices for unqualified withdrawal of each remark, comment, condition, qualifications or deviation, etc. that has been specified in Form FB-10 ('A', 'B' and 'C') shall be quoted in this Annexure PD-3 , clearly indicating the Cost Centre and Milestone No. to which it will be allocated. In case the tenderer does not indicate the Cost Centre and Milestone No., PMRCL will allocate the quoted price for withdrawal to the last Milestone under Cost Centre 'D'. The 'Tender Total Lump Sum Price' quoted by the Tenderer in 'TENDER TOTAL LUMP SUM PRICE' Page shall not include the Price for withdrawal of remark, comment, condition, qualifications or deviation etc quoted in this 'Annexure PD-3' |
| 402 | In case price for unqualified withdrawal of any remark, comment, condition, qualification or deviation etc. indicated in Appendix FB-10 ('A', 'B' and 'C') is not quoted in Annexure PD-3, it shall be considered that the remark, comment, condition, qualification or deviation is unconditionally withdrawn without any financial implication. |
| 403 | It is certified that 'Annexure PD-3' annexed in Technical Bid as a \\"TRUE COPY\\" (with prices blanked off) of the said 'Annexure PD-3' in the Price Bid. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 15, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJan 05, 2027
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 63 daysJan 06, 2027
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 64 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender