Supply, Installation And Configuration Of (I) Six (6) HPE Make Servers, Each With 512GB RAM, For Upgrading The Processor And Memory Capacity Of The Existing Three (3) Servers With 2 TB Storage Capacity To Cater To The Storage Requirements Of Data Bei
Tender Overview
Project Description
Supply, Installation And Configuration Of (I) Six (6) HPE Make Servers, Each With 512GB RAM, For Upgrading The Processor And Memory Capacity Of The Existing Three (3) Servers With 2 TB Storage Capacity To Cater To The Storage Requirements Of Data Being Pushed To The Head-End System (HES) And Meter Data Management System (MDMS) From Solar Smart Meters Installed At RTS Plants Under CAPEX And ULA Components Of PM Surya Ghar Yojana (PMSGY), Including Upcoming Projects. (Ii) Eighteen (18) Nos. 15.36 TB Nvme SSD Disks For The Existing HPE Alletra 9000 Storage System, Along With The Necessary Upgrades To Utilize 200 TB Of Storage Capacity, And Procurement Of Virtualization Licenses For The Already Installed RDSS Servers, On An Emergency Basis At The Data Centre, Tirupati
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender