Power Boards / Undertakings / PSU Closing in 1 days TDR #58046494

Tender For Civil Works Related To Construction Of 01 No 33 Kv Pahadpur Bay At 132 Kv S/S Lalganj, Pratapgarh

Issued by Boards / Undertakings / PSU · Prayagraj, Uttar Pradesh
Tender Value
3.07 Lakhs
Estimated cost
Bid Submission
28 Oct 2026
1 days left
EMD
7500
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Prayagraj → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Civil Works Related To Construction Of 01 No 33 Kv Pahadpur Bay At 132 Kv S/S Lalganj, Pratapgarh

BOQ

Name of Work:- Civil Works Related to Construction of 01 No 33 KV Pahadpur Bay at 132 KV S/S Lalganj, Pratapgarh
Sl. No. Item Description
1Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.(Code no-2.6.1)
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (Code No 2.8.1)
3Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (Code no 2.27)
4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 Cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (Code No- 4.1.2)
5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (Code No- 4.1.8)
6Centering & shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns (Code no 4.3.1)
7Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (Code no 5.1.2)
8Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete (Code no 5.9.1)
9Centering and shuttering including strutting, propping etc. and removal of form forWalls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.(Code no 5.9.2)
10Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts(Code no 5.9.6)
11Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.(Code no-5.22.6)
12Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) (Code No- 6.1.1)
13Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.( Code No-10.2)
1412 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) (Code No- 13.4.1)
156 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand) (Code No-13.16.1)
16Neat Cement punning. (Code No-13.18)
17Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture( Code no13.48.3)
18Supply of 28 mm. dia M.S. Anchor bolts (conforming to IS 266) 900 mm. long with base plate (75x75x6mm) welded with anchor bolts including its threading upto a length of 10cm. and also supply of a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work(CSI No. 9.12)
19Fixing and grouting 28 mm and above dia bolts in proper alignment level and setout with help of a template complete including supply of all labour & T&P etc. required for proper completion of the work.(labour rates only) . (CSI No. 9.13)
20Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (CSI No. 9.14)
21Fixing and grouting 25 mm and below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (CSI No. 9.15)
22Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) . (CSI No. 9.30)
23Fixing of template in position level and alignment for grouting of Anchor bolt in main gantry (labour rate only). (CSI No. 9.31)
24Same in item 23 CSI No.9.31 above but for auxiliary structure. (labour rate only). (CSI No. 9.32)
25Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). (CSI No. 9.33)
26Champhering the edge of concrete in auxiliary/ main structure of size 25mm wide in triangular section including supply of all materials, labour and T&P etc required for proper completion of the works.(CSI No. 11.18)
272.5 cm thick 1:1.5:3 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC (CSI No. 12.26)
28Painting letters & number over cable trench cover or other places with the help of stencils including painting of base of 150 mm. dia of one coat of primer and two coats of superior quality synthetic enamel paint size of letter to be 60 mm. x 10 mm. including cost of all materials labour and T&P etc. required for proper completion of the work including placing of Trench covers in required position (CSI.13.28)
29Placing of trench cover of all size in proper position including transportation from different places within the S/S area including all labour, T&P etc. required for proper completion of the work as per direction of Engineer - in - charge. (CSI No. 20.11) Please Enable Macros to View BoQ information Special Condition :-
30Tenderer are required to quote their offer as above / at par / below in estimated cost.
31The rates are to be filled up in figures and words both.
32The offer rates shall remain firm (not variable) for entire execution period.
33Departmental rates are exclusive of GST. Rates quoted by firm shall exclude GST which will be borne by department as per applicable rules.
34In case of any discrepancy between the language of the items of bill of quantity and that of PWD the later shall prevail.
35Tenders are advised to visit the site of work and make themselves acquainted with the site conditions. No claim whatsoever shall be entertained after submission of tender.
36After awarding / allotting the tender to L-1 by Committee the Contractor have to deposit the performance guarantee security amount for doing agreement.
37All above works shall be executed as per U.P.P.W.D/ U.P.P.T.C.L. specification or as directed by Engineer-In-charge.
38The work may be carried in energized s/s area having high voltage installations contractor must employee trained Supervisor & Labour to work in such electrical hazardous area. All risk to men & materials shall be contractor’s responsibility.
39All materials shall be arranged by the contractor’s at his own cost.
40No handling charges of T&P and labour will be paid for extended period of contract, if any.
41Rates quoted by Tenderer will remain firm till completion of scope of work of contract.
42Contractor shall register his labour engaged in construction work in the office of Dy. Labour Commissioner ¼Hkou ,oa vU; lfUuekZ.k deZdkj ¼fu;kstu rFkk lsok ‘krZ fofu;eu½ vf/kfu;e 1996.
43MS Scrap received against dismantled RCC/RB work will be issued to the contractor as per current departmental approved rate.
44Brick bats recovered against dismantled brick work will be issued to the contractor @ Rs. 1103.00/Cum.
45Testing of material if any, required expenditure shall be borne by the contractor. Nothing shall be paid extra by the department.
46Contractor has to made available 12 No cube at site and will frequently fill the cube at site. Accordingly cube test report will be submitted by contractor at his own cost. Final bill of work will be paid to contractor only after he will submit all satisfactory test result from authorized lab.
47The contractor should have all related T&P like as concrete mixture, Needle & Surface vibratory, Slump test equipment & survey equipment etc.
48Contractor has to put up all relevant drawing to SE (Civil) Prayagraj for approval at his own cost; nothing shall be paid extra for it.
49As per G.O No. 622/23-12-2012-2. Audit/08 TC dt. 08 June 2012, Contractor has to deposit extra Security/ Performance guarantee, if the tendered rates are found below to the department rates.
50As per section 171 of CGST Act, 2017 Any reduction in rate of tax on any supply of goods or service or the benefit of input tax credit shall be passed on the recipient by way of commensurate reduction in prices. Hence supplier/manufacturer to ensure to pass the benefit of reduced prices to UPPTCL, Further price quoted by supplier/Manufacturer is subject to scrutiny under above section”
51Security of work will be released after six month from the date of completion of the work if no defect has been found after six month.
52Only in case of non availabulity of departmental water supply, the contractor will make own arrangements, However, in case of departmental water supply 1.5% deduction will be made from contractor’s bill for water charges for the item which involve water consumption.
53The bill Processing / Payment will be done according to existing ERP System. The contractor should registered his firm on ERP System for Vender Id at his own Cost.
54If Tender has been cancelled after inviting due to any reason between tender call to final process, the tender cost will not refund to contractor, only EMD Will be refunded to Firm. Name ……………………………..………..... Full Postal Address:………………………. ………………………………………………….. Phone No……………….. Mob. No…………

AI Tender Summary

OUR REF NO 58046494
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 3.07 Lakhs
LAST DATE 28-10-2026
Authority
Authority Name Uttar Pradesh Power Transmission Corporation Limited
Work Description Tender for Civil Works Related To Construction Of 01 No 33 Kv Pahadpur Bay At 132 Kv S/S Lalganj, Pratapgarh
Basic Detail
Tender No 40/ECTC,PRG/2026-27
Bidding Type Tender
Location
City Prayagraj
State Uttar Pradesh
Key Dates
Publish Date 15 Oct 2026
Submission Date 28 Oct 2026
Open Date 29 Oct 2026
Finance
Tender Value 3.07 Lakhs
Tender Fee 1180
EMD 7500
Exemption Not Available
Document List
40DocsforPahadpurBayLalag_1.pdf
982e12c9-28f5-4907-a420-01984cbda99b.html
BOQ_2260664.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 15, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 1 day
Oct 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
pdf

40DocsforPahadpurBayLalag_1.pdf

html

982e12c9-28f5-4907-a420-01984cbda99b.html

xls

BOQ_2260664.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender