Power Government Departments Closing in 6 days TDR #58042780

Bids Are invited for Custom Bid For Services - Increasing Capacity Of 100 Kva To 250 Kva Distribution Tranformer On Semi Turnkey Basis In Business 2025 26 Under The Area Of Edd Fatehabad Agra - (Part-A) Supply & Erection Providing & Fixing Of Stone P

Issued by Government Departments · Agra, Uttar Pradesh
Tender Value
17.40 Lakhs
Estimated cost
Bid Submission
24 Oct 2026
6 days left
EMD
17400
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Agra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - Increasing Capacity Of 100 Kva To 250 Kva Distribution Tranformer On Semi Turnkey Basis In Business 2025 26 Under The Area Of Edd Fatehabad Agra - (Part-A) Supply & Erection Providing & Fixing Of Stone Pad , Providing & Fixing Of Alluminium Lug 240/400 , Providing & Fixing Of Suspension Cl With I Hook , Providing & Fixing Of Lt Cl , Providing & Fixing Of Dead End Cl , Providing & Fixing Of I Hook , Providing & Fixing Of T-Off Channel With Cl , Providing & Fixing Of Danger Board , Providing & Fixing Of Dp Cl , Cooper L-Piece 50X225x10mm (36 Nos.)/Cooper L- Piece 62X225x12mm (36 Nos.) , Providing & Fixing Of Db Cl , Providing & Fixing Tailless Unit Set And Making Connection As Per Diretion Of Superevising Engineer , (Part-B) Carriage & Erection Carriage Of Pcc Pole 8.5 Mtr. Long. From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of St Pole 11 Mtr. Long. From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) I) Lt Xlpe Cable Al 3.5X70/150/35/240/400 Sqmm ( 618Mtr), Lt Pvc Cable (Mtr), Abc 3X120/95 Sqmm(1610 Mtr) , Carriage Of Following Material From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) J) Line Material Viz. Weasal Conductor , Stay Set Complete(24 Nos), 11 Kv Fuse Set, Cross Arm, Angle, Pin Insulators (Nos), Disk Insulators With Fitting, And Other Line Material, If Required, X Arm V Type ( Nos), Distribution Box (53Nos), G.I Pin 11 Kv With Nut. , Carriage Of 250 Kva T/F From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Construction Of Plinth For 250 Kva Transformer Of Size 5X5x4 Above The Ground Lable And 1 Feet Below The Ground. At The Bottom There Shall Be Cc Pad Of Brick Ballast Of Size 5X5x3 Thick In Ratio 1:3:6 [Cement, Sand And Brick Ballast]. The First Class Brick Wall Work Shall Be 9 Thick In Ratio 1:4 [Cement And Sand]. The Hollow Portion Among The Wall Shall Be Filled Up With The Brick Ballast. On The Top Of The Wall Of Plint There Shall Be Rcc Work In Ratio 1:3:6 [Cement, Sand And Grit Stone] By Using 12 Mm Dai Ms Bar At Distance Of 9. There Shall Be Plastering All Over The Plinth 12 Mm Thick In Ratio 1:4 [Cement And Sand] Above The Ground Level. Proper Watering And Curing Of The Plinth Shall Be Carried Out As Per Direction Of Supervising Engineer. , Fencing Of 250 Kva T/Fs As Per Following Specification -Fabrication Of 50X50x6 Mm Size Ms Angle Frame Of Size 3000X2400mm With 450 Mm Long Angle For Grouting The Frame And Fixing Of 2X1.5, 10 Swg Welded Wire Mesh With Ms Strip Of 24X5mm Size All Round The Frame And Drilling 9 Mm Holes Insides Of Frames At As Distance Of 300Mm For Jointing Of Frame With The Help Of Boslts And Nuts Including Cost Of Material. The Width Of Panal May Vary As Per Site Conditions, Grouting And Fixing Of Angle Iron Frames In Ratio 1:2:4 (Cement, Coarse Sand And Stone Ballast ) In The Pocket Of 150X150x150mm All Round The Plinth And Bolting Of Frames With 25X8 Mm Size Bolts And Nuts, Making Main Gate In Front Of The Plinth Of Size 3000X2400 Mm By Making Two Leaves Of Size 3000X1200mm Size And Grouting The Same In Ratio And Method Mentioned At Item (B) Above Fixing With Hinges With Dandlas For Locking System & Painting Of Entire Wire Mesh Angle Iron Etc. With Bus Green Super Enamelled Pain In Two Coats On The Primer Two Coats Of Red Oxide. , Earthing Of 250 Kva Distribution Transformer By Maintenance Free Earthing Electrods (Chemical) By Digging Pits 6 Dia 3Mtr. Deep Including Inserting Pipe In Pipe Technology Concept Involve Two Mild Steel Pipes One Inserted Inside The Other Of Size ;- 1. Inner Pip Dia Meter 50 Mm. 2. Outer Pipe Dia Meter 100 Mm. Length Of The Both Pipe Shall Be 3000 Mm. The M.S.Pipe Shall Be Isi Mark Of Class B As Per Is 1239. Thickness Of The Pipe Shall Be 12 Swg. The Empty Space In The Pipe Shall Be Filled With The Specially Developed Crystalline Material Conductiv Mixture Such As Copper And Aluminimum Powder.Conductive Carbon And Bonding Material Etc. Mixed In Diffrent Proportions. Conductive Mixture Contents Shall Be 70 % Carbon Powder & 30% Metal Powder Preferably Pure Copper Or Aluminum Material Along With The Required Quantity Of Bonding Materials. Granule Size Of The Carbon & Metal Powder Shall Be 100 Mesh. The Mixture If Forced (Pressurized) Inside The Earth Electrode In Empty Space Of Inner Pipe & In Empty Space Between The Inner & Outer Pipe Of The Earth Electrode, In Paste Form And After Soldification Of The Same The Bottom End Cap As Well As Top End Cap Is Provided. The Mixture Shall Be Pressed By Machine In The Pipe. Precaution Shall Be Taken Has To Have No Air Gap Inside The Pipe While Pressing. The Back Fill Compound (Earth Enhancment Material ) Shall Be Superior Conductive Material That Improves Earthing Effectiveness Especially In Areas Of Poor Conductivity Such As Rocky Ground, Sandy Soil & Areas Of Moisture Varation. It May Contain Conductive Cement (20%) Graphite Carbon Powder(50%), Hydrous Aluminum Siliacate (10%), Sodium Montmorillonite (20%) Etc. It Shall Be Placed Around Earth Electrode In The Earth Pit To Improve The Conductive Of Earth Electrode & Ground Contact Area. Mild Steel Electro Galavanized Flat 50X6 Mm Shall Welded To Earth Electrode Pips & Connected With Trasnformer Neutral And Body As Below With The Hlep Of Steel Nut & Bolt Or Through Welding As Per Requirment Of Site, To Gi Pipe And Filling Of Chemical Mixutre Around The Gi Pipe Upto 3 Mtr. Including Making Of Chamber & Connecting The Top Of The Inserted Pipe With Transformer Body & Neutral Through M.S.Flat 50X6mm With The Help Of Nut & Bolt Or Through Welding And Making A Main Hole Of Size 2×2 And Covering The Same By A Stone Pad For The Purpose Of Poring Water For Moisture. , Construction Of Plinth Of 11 Kv Rmu Of Size 6*6*4 Above Ground Level One Ft Below The Ground Level Of 9 After Exavation Of 4 Earth Brick Ballast Shall Be Provided And Rammering Will Be Done Properly After Ballast Shall Be Provided And Rammering Will Be Done Properly After That A Reataining Wall 9 With By First Class Brick In Ratio1:4 Of Cement & Sand Shall Be Made. The Earth Shall Be Proveded Upto 6 From The Earth Level And Proper Rammering Shall Be Done One No. Jall Of 12 Mm Ms Tar Shall Be Fixed In The Hollow Of Plinth And One Ft. Thick Rcc In Ratio Of Cement Sand & Stone Ballast Shall Be Laid On The Top Of The Plinth. The 12 Mm Thick Plastering Shall Be Done All Round The Plinth In 1:4 Ratio Of Cement And Sand. (All Material Provided By The Contractor At His Own Cost For Proper Completion Of Work.) , Fencing Of 11 Kv Rmu Shall Be 1150*1200 Mm Made Of 35*35 Mm Ms Angle Coveered By Expended Metal 14 Swg Up To Full Height 1200 Mm Duly Steftened By Ms Flat By An 8 Swg Dia Bolt & Nut.(All Material Provided By The Contractor At His Own Cost For Proper Completion Of Work) , Chemical Earthing For 11Kv Rmu (All Material Provided By Contractors) As Per Respo Norms. And Direction By Concern Executive Engineer. , Installation Of 250 Kva T/F At Channel Which Fitted On Plinth In Proper Alignment Direction & Making Ht/Lt Connection All Cost Of Labour And T&P Which Required For Completion Of Work. , Erection And Grouting Of Single Pole 8.5 Mtr. Long Pcc Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Double Pole 8.5 Mtr. Long Pcc Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of St Pole 11 Mtr. Long Single In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Fixing Of Distribution Box With Cl On Errected Pole For Giving Supply To Consumer By Connecting Consumer Cables. , Installation Of Stay Set Complate As Direction By Supervising Engineer. , Laying Of Lt Xlpe Cable Al 3.5X70/150/35/240/400 Sqmm ( 618Mtr), Lt Pvc Cable (Mtr), Abc 3X120/95 Sqmm(1610 Mtr), Overhead With Making Loop As Per Respo Norms And Direction By Superivising Engineer. , Dismentling & Removal Of 100 Kva T/F And Recived Back To Ele. Store Center Taj Agra

BOQ

Sl. No. Item TitleItem Description
1(Part-A) Supply & Erection Providing & Fixing of Stone pad(Part-A) Supply & Erection Providing & Fixing of Stone pad
2Providing & Fixing of Alluminium Lug 240/400Providing & Fixing of Alluminium Lug 240/400
3Providing & Fixing of Suspension Clamp with I HookProviding & Fixing of Suspension Clamp with I Hook
4Providing & Fixing of LT ClampProviding & Fixing of LT Clamp
5Providing & Fixing of Dead End ClampProviding & Fixing of Dead End Clamp
6Providing & Fixing of I HookProviding & Fixing of I Hook
7Providing & Fixing of T-off Channel with clampProviding & Fixing of T-off Channel with clamp
8Providing & Fixing of Danger BoardProviding & Fixing of Danger Board
9Providing & Fixing of DP ClampProviding & Fixing of DP Clamp
10Cooper L-Piece 50x225x10mm (36 Nos.)/Cooper L- Piece 62x225x12mm (36 Nos.)Cooper L-Piece 50x225x10mm (36 Nos.)/Cooper L- Piece 62x225x12mm (36 Nos.)
11Providing & Fixing of DB ClampProviding & Fixing of DB Clamp
12Providing & Fixing Tailless unit set and making connection as per diretion of superevising engineerProviding & Fixing Tailless unit set and making connection as per diretion of superevising engineer
13(Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)(Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
14Carriage of ST Pole 11 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)Carriage of ST Pole 11 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
15Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) I) LT XLPE CABLE AL 3.5X70/150/35/240/400 SQMM ( 618mtr), LT PVC Cable (mtr), ABC 3X120/95 SQMM(1610 mtr)Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) I) LT XLPE CABLE AL 3.5X70/150/35/240/400 SQMM ( 618mtr), LT PVC Cable (mtr), ABC 3X120/95 SQMM(1610 mtr)
16Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) J) Line material viz. Weasal conductor , stay set Complete(24 Nos), 11 kv Fuse set, cross arm, angle, Pin insulators (nos), Disk insulators with fitting, and other line material, if required, x Arm v type ( nos), Distribution Box (53nos), G.I PIN 11 Kv with Nut.Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) J) Line material viz. Weasal conductor , stay set Complete(24 Nos), 11 kv Fuse set, cross arm, angle, Pin insulators (nos), Disk insulators with fitting, and other line material, if required, x Arm v type ( nos), Distribution Box (53nos), G.I PIN 11 Kv with Nut.
17Carriage of 250 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)Carriage of 250 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.)
18Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.
19Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2\\"x1.5\\", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.
20Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6\\" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.
21Construction of plinth of 11 KV RMU of size 6'*6*4' above ground level one ft below the ground level of 9\\" after exavation of 4\\" earth brick ballast shall be provided and rammering will be done properly after ballast shall be provided and rammering will be done properly After that a reataining wall 9\\" with by first class brick in ratio1:4 of cement & sand shall be made. The earth shall be proveded upto 6\\" from the earth level and proper rammering shall be done one No. Jall of 12 mm MS Tar shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. the 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. (All material provided by the contractor at his own cost for proper completion of work.)Construction of plinth of 11 KV RMU of size 6'*6*4' above ground level one ft below the ground level of 9\\" after exavation of 4\\" earth brick ballast shall be provided and rammering will be done properly after ballast shall be provided and rammering will be done properly After that a reataining wall 9\\" with by first class brick in ratio1:4 of cement & sand shall be made. The earth shall be proveded upto 6\\" from the earth level and proper rammering shall be done one No. Jall of 12 mm MS Tar shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. the 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. (All material provided by the contractor at his own cost for proper completion of work.)
22Fencing of 11 Kv RMU shall be 1150*1200 mm made of 35*35 mm MS Angle coveered by expended metal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & Nut.(All Material provided by the contractor at his own cost for proper completion of work)Fencing of 11 Kv RMU shall be 1150*1200 mm made of 35*35 mm MS Angle coveered by expended metal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & Nut.(All Material provided by the contractor at his own cost for proper completion of work)
23Chemical Earthing For 11KV RMU (All material provided by contractors) as per RESPO Norms. And direction by concern Executive Engineer.Chemical Earthing For 11KV RMU (All material provided by contractors) as per RESPO Norms. And direction by concern Executive Engineer.
24Installation of 250 KVA T/F at channel which fitted on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.Installation of 250 KVA T/F at channel which fitted on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work.
25Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
26Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
27Erection and grouting of ST Pole 11 Mtr. long Single in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting of ST Pole 11 Mtr. long Single in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
28Fixing of Distribution Box with Clamp on Errected pole for giving supply to consumer by connecting consumer cables.Fixing of Distribution Box with Clamp on Errected pole for giving supply to consumer by connecting consumer cables.
29Installation of Stay set complate as direction by supervising Engineer.Installation of Stay set complate as direction by supervising Engineer.
30Laying of LT XLPE CABLE AL 3.5X70/150/35/240/400 SQMM ( 618mtr), LT PVC Cable (mtr), ABC 3X120/95 SQMM(1610 mtr), overhead with making loop as per RESPO Norms and direction by superivising Engineer.Laying of LT XLPE CABLE AL 3.5X70/150/35/240/400 SQMM ( 618mtr), LT PVC Cable (mtr), ABC 3X120/95 SQMM(1610 mtr), overhead with making loop as per RESPO Norms and direction by superivising Engineer.
31Dismentling & Removal of 100 KVA T/F and Recived back to ele. Store Center Taj AgraDismentling & Removal of 100 KVA T/F and Recived back to ele. Store Center Taj Agra

AI Tender Summary

OUR REF NO 58042780
AUTHORITY Government Departments
TENDER VALUE 17.40 Lakhs
LAST DATE 24-10-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Custom Bid For Services - Increasing Capacity Of 100 Kva To 250 Kva Distribution Tranformer On Semi Turnkey Basis In Business 2025 26 Under The Area Of Edd Fatehabad Agra - (Part-A) Supply & Erection Providing & Fixing Of Stone Pad , Providing & Fixing Of Alluminium Lug 240/400 , Providing & Fixing Of Suspension Cl With I Hook , Providing & Fixing Of Lt Cl , Providing & Fixing Of Dead End Cl , Providing & Fixing Of I Hook , Providing & Fixing Of T-Off Channel With Cl , Providing & Fixing Of Danger Board , Providing & Fixing Of Dp Cl , Cooper L-Piece 50X225x10mm (36 Nos.)/Cooper L- Piece 62X225x12mm (36 Nos.) , Providing & Fixing Of Db Cl , Providing & Fixing Tailless Unit Set And Making Connection As Per Diretion Of Superevising Engineer , (Part-B) Carriage & Erection Carriage Of Pcc Pole 8.5 Mtr. Long. From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of St Pole 11 Mtr. Long. From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) I) Lt Xlpe Cable Al 3.5X70/150/35/240/400 Sqmm ( 618Mtr), Lt Pvc Cable (Mtr), Abc 3X120/95 Sqmm(1610 Mtr) , Carriage Of Following Material From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) J) Line Material Viz. Weasal Conductor , Stay Set Complete(24 Nos), 11 Kv Fuse Set, Cross Arm, Angle, Pin Insulators (Nos), Disk Insulators With Fitting, And Other Line Material, If Required, X Arm V Type ( Nos), Distribution Box (53Nos), G.I Pin 11 Kv With Nut. , Carriage Of 250 Kva T/F From Electricity Store Centretajganj Agra To Work Of Site Through Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work..(Distance 00-50Kms.) , Construction Of Plinth For 250 Kva Transformer Of Size 5X5x4 Above The Ground Lable And 1 Feet Below The Ground. At The Bottom There Shall Be Cc Pad Of Brick Ballast Of Size 5X5x3 Thick In Ratio 1:3:6 [Cement, Sand And Brick Ballast]. The First Class Brick Wall Work Shall Be 9 Thick In Ratio 1:4 [Cement And Sand]. The Hollow Portion Among The Wall Shall Be Filled Up With The Brick Ballast. On The Top Of The Wall Of Plint There Shall Be Rcc Work In Ratio 1:3:6 [Cement, Sand And Grit Stone] By Using 12 Mm Dai Ms Bar At Distance Of 9. There Shall Be Plastering All Over The Plinth 12 Mm Thick In Ratio 1:4 [Cement And Sand] Above The Ground Level. Proper Watering And Curing Of The Plinth Shall Be Carried Out As Per Direction Of Supervising Engineer. , Fencing Of 250 Kva T/Fs As Per Following Specification -Fabrication Of 50X50x6 Mm Size Ms Angle Frame Of Size 3000X2400mm With 450 Mm Long Angle For Grouting The Frame And Fixing Of 2X1.5, 10 Swg Welded Wire Mesh With Ms Strip Of 24X5mm Size All Round The Frame And Drilling 9 Mm Holes Insides Of Frames At As Distance Of 300Mm For Jointing Of Frame With The Help Of Boslts And Nuts Including Cost Of Material. The Width Of Panal May Vary As Per Site Conditions, Grouting And Fixing Of Angle Iron Frames In Ratio 1:2:4 (Cement, Coarse Sand And Stone Ballast ) In The Pocket Of 150X150x150mm All Round The Plinth And Bolting Of Frames With 25X8 Mm Size Bolts And Nuts, Making Main Gate In Front Of The Plinth Of Size 3000X2400 Mm By Making Two Leaves Of Size 3000X1200mm Size And Grouting The Same In Ratio And Method Mentioned At Item (B) Above Fixing With Hinges With Dandlas For Locking System & Painting Of Entire Wire Mesh Angle Iron Etc. With Bus Green Super Enamelled Pain In Two Coats On The Primer Two Coats Of Red Oxide. , Earthing Of 250 Kva Distribution Transformer By Maintenance Free Earthing Electrods (Chemical) By Digging Pits 6 Dia 3Mtr. Deep Including Inserting Pipe In Pipe Technology Concept Involve Two Mild Steel Pipes One Inserted Inside The Other Of Size ;- 1. Inner Pip Dia Meter 50 Mm. 2. Outer Pipe Dia Meter 100 Mm. Length Of The Both Pipe Shall Be 3000 Mm. The M.S.Pipe Shall Be Isi Mark Of Class B As Per Is 1239. Thickness Of The Pipe Shall Be 12 Swg. The Empty Space In The Pipe Shall Be Filled With The Specially Developed Crystalline Material Conductiv Mixture Such As Copper And Aluminimum Powder.Conductive Carbon And Bonding Material Etc. Mixed In Diffrent Proportions. Conductive Mixture Contents Shall Be 70 % Carbon Powder & 30% Metal Powder Preferably Pure Copper Or Aluminum Material Along With The Required Quantity Of Bonding Materials. Granule Size Of The Carbon & Metal Powder Shall Be 100 Mesh. The Mixture If Forced (Pressurized) Inside The Earth Electrode In Empty Space Of Inner Pipe & In Empty Space Between The Inner & Outer Pipe Of The Earth Electrode, In Paste Form And After Soldification Of The Same The Bottom End Cap As Well As Top End Cap Is Provided. The Mixture Shall Be Pressed By Machine In The Pipe. Precaution Shall Be Taken Has To Have No Air Gap Inside The Pipe While Pressing. The Back Fill Compound (Earth Enhancment Material ) Shall Be Superior Conductive Material That Improves Earthing Effectiveness Especially In Areas Of Poor Conductivity Such As Rocky Ground, Sandy Soil & Areas Of Moisture Varation. It May Contain Conductive Cement (20%) Graphite Carbon Powder(50%), Hydrous Aluminum Siliacate (10%), Sodium Montmorillonite (20%) Etc. It Shall Be Placed Around Earth Electrode In The Earth Pit To Improve The Conductive Of Earth Electrode & Ground Contact Area. Mild Steel Electro Galavanized Flat 50X6 Mm Shall Welded To Earth Electrode Pips & Connected With Trasnformer Neutral And Body As Below With The Hlep Of Steel Nut & Bolt Or Through Welding As Per Requirment Of Site, To Gi Pipe And Filling Of Chemical Mixutre Around The Gi Pipe Upto 3 Mtr. Including Making Of Chamber & Connecting The Top Of The Inserted Pipe With Transformer Body & Neutral Through M.S.Flat 50X6mm With The Help Of Nut & Bolt Or Through Welding And Making A Main Hole Of Size 2×2 And Covering The Same By A Stone Pad For The Purpose Of Poring Water For Moisture. , Construction Of Plinth Of 11 Kv Rmu Of Size 6*6*4 Above Ground Level One Ft Below The Ground Level Of 9 After Exavation Of 4 Earth Brick Ballast Shall Be Provided And Rammering Will Be Done Properly After Ballast Shall Be Provided And Rammering Will Be Done Properly After That A Reataining Wall 9 With By First Class Brick In Ratio1:4 Of Cement & Sand Shall Be Made. The Earth Shall Be Proveded Upto 6 From The Earth Level And Proper Rammering Shall Be Done One No. Jall Of 12 Mm Ms Tar Shall Be Fixed In The Hollow Of Plinth And One Ft. Thick Rcc In Ratio Of Cement Sand & Stone Ballast Shall Be Laid On The Top Of The Plinth. The 12 Mm Thick Plastering Shall Be Done All Round The Plinth In 1:4 Ratio Of Cement And Sand. (All Material Provided By The Contractor At His Own Cost For Proper Completion Of Work.) , Fencing Of 11 Kv Rmu Shall Be 1150*1200 Mm Made Of 35*35 Mm Ms Angle Coveered By Expended Metal 14 Swg Up To Full Height 1200 Mm Duly Steftened By Ms Flat By An 8 Swg Dia Bolt & Nut.(All Material Provided By The Contractor At His Own Cost For Proper Completion Of Work) , Chemical Earthing For 11Kv Rmu (All Material Provided By Contractors) As Per Respo Norms. And Direction By Concern Executive Engineer. , Installation Of 250 Kva T/F At Channel Which Fitted On Plinth In Proper Alignment Direction & Making Ht/Lt Connection All Cost Of Labour And T&P Which Required For Completion Of Work. , Erection And Grouting Of Single Pole 8.5 Mtr. Long Pcc Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of Double Pole 8.5 Mtr. Long Pcc Pole In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Of St Pole 11 Mtr. Long Single In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories Alongwith Stone Pad As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Fixing Of Distribution Box With Cl On Errected Pole For Giving Supply To Consumer By Connecting Consumer Cables. , Installation Of Stay Set Complate As Direction By Supervising Engineer. , Laying Of Lt Xlpe Cable Al 3.5X70/150/35/240/400 Sqmm ( 618Mtr), Lt Pvc Cable (Mtr), Abc 3X120/95 Sqmm(1610 Mtr), Overhead With Making Loop As Per Respo Norms And Direction By Superivising Engineer. , Dismentling & Removal Of 100 Kva T/F And Recived Back To Ele. Store Center Taj Agra
Basic Detail
Tender No GEM/2026/B/8141218
Bidding Type Tender
Location
City Agra
State Uttar Pradesh
Key Dates
Publish Date 14 Oct 2026
Submission Date 24 Oct 2026
Open Date 25 Oct 2026
Finance
Tender Value 17.40 Lakhs
Tender Fee Ref. Documents
EMD 17400
Exemption Not Available
Document List
4e16b8d1-da71-4f81-b003-49e713a7786c.pdf
1791546786.xlsx
1791545747.pdf
1791545755.pdf
1791545760.pdf
1791545765.pdf
1791545770.pdf
1791545774.pdf
1791545783.pdf
1791545793.pdf
1791545831.pdf
1791545847.pdf
1791545863.pdf
ALL_b1839275-065c-4df1-83b51791546885487_EDC2FATEHABADBUYER.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 14, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 6 days
Oct 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
pdf

4e16b8d1-da71-4f81-b003-49e713a7786c.pdf

xlsx

1791546786.xlsx

pdf

1791545747.pdf

pdf

1791545755.pdf

pdf

1791545760.pdf

pdf

1791545765.pdf

pdf

1791545770.pdf

pdf

1791545774.pdf

pdf

1791545783.pdf

pdf

1791545793.pdf

pdf

1791545831.pdf

pdf

1791545847.pdf

pdf

1791545863.pdf

pdf

ALL_b1839275-065c-4df1-83b51791546885487_EDC2FATEHABADBUYER.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender