Tender For Providing & Installation Of 90 Kw/120 Hp Centrifugal Pump-Motor Set In Position-02 For Madantore Zone, Repairing And Overhauling Of 315 Kva Transformer, Rectification Of Lt Mcc Panel At Ajoyghat Pumping Station At Churulia Water Supply Sch
Tender Overview
Project Description
Tender for Providing & Installation Of 90 Kw/120 Hp Centrifugal Pump-Motor Set In Position-02 For Madantore Zone, Repairing And Overhauling Of 315 Kva Transformer, Rectification Of Lt Mcc Panel At Ajoyghat Pumping Station At Churulia Water Supply Scheme.
BOQ
| Sl. No. | Item Description |
| 1 | Centrifugal Pump Replacement portion:- |
| 2 | Horizontal Split casing Centrifugal Pumping Machinery with Channel Base Frame, Couplings, Coupling Guards, Companion Flanges, foundation bolt etc. with Horizontal foot Mounted, TEFC, Induction Motor, duty with adequate margin as per direction of EIC.M.O.C. for Pump:-a) Volute Casing-C.I. IS:210 FG:260b) Impeller-BR IS:318 GR-LTB-2c) Shaft - SS ASTM A 276 CL 410, ANLDd) Shaft Sleeves-SS ASTM A 276 CL 410ANLD-250-280 BHNe) Neck ring- LTB5(IS:318, Gr LTB-5)f) Discharge-200 M³/Hour, Head-90 Mtr.(H-Q-P Curve of Pumps has to be submitted during the delivery)(Make:- Kirloskar/Mather & Platt /Other approved make)Specifications for Motor:-a) 90 KW(4 Pole, 3 Phase Induction Motor)b) Rotational Speed-1480 RPMc) Colling Type-TEFCd) Operating Voltage-415 V±10%, Frequency- 50 Hz ± 5%.e) Efficiency Class-IE-4f) Protection Class-IP55(Make:-CG/Marathon/Other approved make) |
| 3 | 200 mm X 125 mm eccentric reducer X 200 mm long, 8 mm thick as per IS:2062. |
| 4 | 100 mm X 200 mm concentric enlarger X 200 mm long, 8 mm thick as per IS:2062. |
| 5 | 200 mm cast iron, P.N.-1.0, double flanged Rising Spindle Sluice Valve generally confirming to IS 14846 having body door /dome/Bonnet and cover of cast Iron Gr FG 260, outside screen rising Spindle of IS 6603 Gr-12 cr-13, spindle nut & seat rings are Gunmetal as per 1S:318 LTB 2. Flanges flat faced and drilled to IS:1538 Part IV & VI, Valves are suitable for maximum working pressure of 10 kg/sqcm (seat test) and body tested to 15 kg/sqcm. All the valves should be tested by closed end method only.(Make:-IVI/Jupiter/Other approved make) |
| 6 | 150 mm dia Glycerine filled Diaphragm Seal type pressure gagues(0-16 kgf/Cm²) with syphon tube and three way cock and as per technical specification as per IS:3624:1987.(Make:-H.Guru/Other approved make) |
| 7 | 150 mm dia Glycerine filled Diaphragm Seal type compound gagues(+1-1 KSCG) with syphon tube and three way cock and as per technical specification as per IS:3624:1987.(Make:-H.Guru/Other approved make) |
| 8 | Installation of above supplied centrifugal Pump-motor set, reducer, enlarger, valves(Item No-1.01, 1.02, 1.03, 1.04, 1.05, 1.06) after withdrawing of existing damaged same from the base, removing the base frame, dismantling of foundations, making new foundation at the same place by using RCC, to avoid any vibrational damaged, inserted suitable sized of eye bolts, including supply of all erection items as required for instalation of pumping machinery, necessary inter-connection of motors with earth bus bar, power cable from LT MCC to motor etc as required for completion of work as per relevant IE Rules and Hydraulic Standards with the entire satisfaction of EIC.including hire charges of welding set, fuel, lubricant etc for completion of work, as per fully satisfaction of EIC. |
| 9 | 315 KVA Transformer repairing and overhauling portion :- |
| 10 | Disconnection of the 315 KVA transformer from H.T. & L.T. side with proper protection by engaging skilled Electrician. |
| 11 | Drain out the old transformer oil from the transfomer up to the bottom level keep the same in an empty drum including supply of empty drum as per direction. |
| 12 | Supply of Transformer oil as per IS:335(1993) specification in a sealed drum.(Make:-Servo/Power oil/Transol/approved make) |
| 13 | Supply of All kinds of gaskets & oil seal supply for HT & LT bushings, top cover, inspection cover, valve etc. of 315 KVA, 11 KV /0.433 KV transformer.(Make:-Reputed) |
| 14 | Atfirst loosening of cover bolts then removing of top cover, inspection cover, H.V. & L.V. bushings, with conservator tank to cleaning the insides like cores, windings etc for 315 KVA transformer as per direction. |
| 15 | Placing the top cover and inspection cover in proper position and tightening of nuts and bolts after cleaning of the surface sludge of core and coil assembly with hot oil through filter machine for 315 KVA transformer as per direction of EIC. |
| 16 | Filling the transformer oil through filter machine by old oil and new supply oil after filtration to the 315 KVA Transformer engaging skilled and unskilled personnel for increasing IR value as per direction including hire charges of oil filter machine and oil testing equipment and 5 KVA DG set and carraige the same from and back as per direction of EIC. |
| 17 | Making necessary connection of Transformer at HT and LT sides after cleaning,washing tightened up the cable end with cable termination Kit and rapping with new adhesive and insulation tapes,including testing and commissioning all complete as per direction of EIC.(Both L.V. & H.V. Sides of 315 KVA Transformer) |
| 18 | LT MCC Starter repairing portion:- |
| 19 | On delay timer, range 0-30 Sec, coil voltage-240 V AC.(Make:-EAPL, Model No-A1D1/Other approved make) |
| 20 | Thermal overload relay, range from 13-19 Amp.(Make:-ABB, Model No-TA25DU 19M/Other approved make) |
| 21 | 8 pin PLA relay, coil voltage-220/240 V AC.(Make:-OMRON/Other approved make) |
| 22 | 26 amp, AC-3 duty, 3 pole power contactor, 415 V AC, coil voltage-230 V AC, with 1 NO auxiliary contact.(Make:-ABB, Type code-26-30-10-80/Other approved make) |
| 23 | 230 V, AC pilot light with integrated LED.(Make:-ABB, Model No-CL2-523G/R/Y/A/Other approved make) |
| 24 | 230 V, AC pilot light with integrated LED.(Make:-ABB, Model No-CL2-523L/Other approved make) |
| 25 | 125 Amp, bolt type cable terminal.(Make:-Reputed) |
| 26 | 1 Core X 95 Sqmm unsheathed FRLSH PVC insulated industrial cables with flexible bright annealed copper conductor for voltage grade up to 1100 volts conforming to IS:694 as amended up to date. (Make:-Gloster/Polycab/Other approved make) |
| 27 | 95 Sqmm Cu ring socket.(Make:-Dowells/Braco/Other approved make) |
| 28 | 1 Core X 10 Sqmm unsheathed FRLSH PVC insulated industrial cables with flexible bright annealed copper conductor for voltage grade up to 1100 volts conforming to IS:694 as amended up to date. (Make:-Gloster/Polycab/Other approved make) |
| 29 | 16 Sqmm Al ring socket.(Make:-Dowells/Braco/Other approved make) |
| 30 | 10 Sqmm Cu ring socket.(Make:-Dowells/Braco/Other approved make) |
| 31 | 10 Sqmm Cu pin socket.(Make:-Dowells/Braco/Other approved make) |
| 32 | 50 mm X 8 mm aluminium busbar.(1.5 Mtr long) |
| 33 | Nuts, bolts and washer. |
| 34 | 63 Amp H.R.C. fuse with base frame.(Make:-L & K/Other approved make) |
| 35 | Digital electronic over current relay without communication current range=0.5A-80A, control voltage=100VAC-220VAC, window hole for entry, without ground fault protection.(Make:-Schneider, Model No-3DM2-WRDUWZ/Other approved make) |
| 36 | On delay timer, range from 3-30 Sec, 240 V AC, 50 Hz.(Make:-L & K, Model No-ST80328OOOO/Other approved make) |
| 37 | Dismantling and replacement of defective/damaged electronic over-current relay, power contactor, indicating lamps, sockets, control wires, ON-delay timer and other necessary accessories with new suitable components for proper functioning of the starter panel. Making necessary power and control circuits as per site requirement and testing the complete system to ensure proper and satisfactory operation. The entire work shall be carried out by skilled electrician/service engineer under the direction of the EIC and to the wholly satisfaction of the Engineer-in-Charge (EIC). |
| 38 | Add GST @ 18% |
| 39 | Add CESS @ 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender