Housing Urban and Rular Development Government Departments Closing in 12 days TDR #58040511

Tender For Construction Of Cancer Care Centres At North Bengal Medical College & Hospital Under North Bengal Construction Division-Electrical Work--------Sitc Of Ups And Allied Electrical Installation Work.

Issued by Government Departments · Darjeeling, West Bengal
Tender Value
46.85 Lakhs
Estimated cost
Bid Submission
30 Oct 2026
12 days left
EMD
93715
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Darjeeling → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of Cancer Care Centres At North Bengal Medical College & Hospital Under North Bengal Construction Division-Electrical Work--------Sitc Of Ups And Allied Electrical Installation Work.

BOQ

Name of Work:- Construction of Cancer Care Centres at North Bengal Medical College & Hospital Under North Bengal Construction Division-Electrical Work--------SITC of UPS and allied Electrical Installation work.
Sl. No. Item Description
1Online UPS- Input supply: Three Phase, Outputsupply: Three Phase
2Supplying, installation, Testing & Commissioning of following capacity at full load (Unity Power Factor) at operating temperature 0 to 40 0C, Relative humidity 0 to 95%, Online double conversion true sine wave Uninterrupted hot swapable (allow for the replacement or addition of battery modules without shutting down the entire system) modular Power Supply (UPS) system with N+1 modules (N denotes total number of modules required for rated capacity). The UPS shall include a Rectifier, inverter, battery bank suitable for 30 minutes back up (Battery VAH capacity shall not be less than 1600 VAH per KVA of UPS rating per Hour backup time) on full load (Battery shall be VRLA, SMF in ABS Container) and Static Bypass switch along with provision for manual bypass, suitable isolation transformer for additional protection against neutral faults etc. UPS shall have inbuilt phase sequence correction.
3The UPS systems offered are to be of the latest technology with Digital Control Microprocessor based forreliable operation using Insulated Gate Bipolar Transistor (IGBT)'s both for the rectifier & inverter (3 Level) with PWM (Pulse Width Modulation). The quality of design, manufacturing and inspection process should confirm to the relevant Inter-national standards such as IEC/EN/VDE. The operating efficiency of the UPS systems shall be >96% while operating on battery mode and delivering quality power to the 100% non-linear loads. Current total harmonic effect(ITHD) on the input grid shall be < 5% at 50 %load.
4The required LC ( inductor (L) and a capacitor (C)) filters shall be included in UPS cost), extreme power factor kit to be included to limit the input power factor (PF) to 0.99 and output power factor shall be unity (i.e. kw rating of the UPS shall be kva rating x 1 ), however UPS shall be suitable to take load at 0.7 laging to 0.7 leading power factor loads. UPS shall be suitable for incoming supply AC : 3Phase 400V +/-20%, 50 Hz +/-5 Hz, AC Output voltage: 3Phase 415 Volt, 50 Hz +/- 0.2Hz, Overload capacity of 120% for 10 mins, Sine wave output. Non condensing, noise level less than 60db at 1 meter distance, protections: Input Under voltage over voltage, abnormal out voltage, battery overcharging, output over current, short circuit protection, battery deep discharge protection, 10KV surge.
5UPS must comply with low voltage electromagnetic compatibility (EMC) achieved as per EN 6204, EN6204 Part I and Part 2, it shall be a Voltage and Frequency Independent (VFI)-type UPS. . Communication RS232/RS485/SNMP port open protocol for BMS integration, all hardware & software for iOT Communication as per approved by Engineering in charge. Required battery racks and interconnecting copper conductor cables of suitable size and connectors and all required accessories are inclusive of the cost). This system must provide a means for logging and alarming of all monitored points plus email notification. Forced air-cooling with integral inbuilt fans with redundancy (if one fan fail UPS should be able to handle at least 80% of the load, Noise Level 65 DB at 1 meter distance. The system shall be in compliance IEC 62040- 1,2 & 3, IS: 16242 and CPWD Specification. Display Panel(minimum) (In-build 5 inch or more LC Display /LED) to display : a) Input: Voltage, current, Frequency. b) Bypass: Voltage, Frequency. c)Output: Voltage, frequency, Current. d) Battery:Voltage, Capacity. e) Load: KVA, KW, Percentage. f) Temperature: STS, Inverter, PFC. g) Event Logging & Statistical Data (On LCD/LED):
6UPS should capture and display up to 3000 events like: Over temperature / DC Bus Fail / Fan Fail / Fuse Fail / Overload / Short-circuit / Device Fail / Inverter Fail / Rectifier Fail / Bypass Fail, etc. h) Statistical Data: No. of power failures / Transfers to Bypass / Total Running time, etc. i) Mains Mode of Operation /Battery Mode of Operation / Bypass feeding the load / UPS Fault /Battery charging and discharging, overload, battery voltage and battery capacity. j) Audible Alarms : Mains Failure, Battery Low Alarm, UPS Overload, Fault, Shutdown, Input Over, Under Voltage, Output Over, Under Voltage, Battery Over, Under Voltage, Over Load and short circuit, Over Temperature. The UPS should have QR code which should contain drawing, test report OEM manual, Geo- Tag of manufacturing location etc[Make- APC by Schneider Electric/Microtek/Numeric/Luminous/Power One/Switching AVO as approved EIC]
720KVA (Each Power module shall be < 10 KVA)[for (i) Different Labs at 1 St Floor- 3 No.]
830KVA (Each Power module shall be < 10 KVA)[for (i) Bone Marrow Transplant OT & ICU at Third(3rd) Floor -1 No (II) - 6 Nos Major OT-1 No.]
910KVA (Each Power module shall be < 10 KVA)[for (i) HDU- 1 no.]
10Online UPS - Input supply: Single Phase, OutputSupply: Single Phase.
11Supplying, installation, Testing & Commissioning of following capacity at full load (Unity Power Factor) ON LINE Uninterrupted Power Supply (UPS) system suitable for Single Phase input, Single Phase output AC Supply.The UPS shall include a Rectifier, inverter, battery bank suitable for 30 minutes back up (Battery VAH capacity shall not be less than 1600 VAH per KVA of UPS rating per Hour backup time) on full load (Battery shall be VRLA, SMF in ABS Container) and Static Bypass switch along with provision for manual bypass, suitable isolation transformer for additional protection against neutral faults etc.
12The UPS systems shall be Microprocessor based Digital Control, using Insulated Gate Bipolar Transistor (IGBT)'s both for the rectifier & inverter with PWM (Pulse Width Modulation) Technology. The quality of design, manufacturing and inspection process should confirm to the relevant Inter-national standards such as IEC/EN/VDE. The operating efficiency of the UPS systems shall be >95% at 100% non-linear loads. Current total harmonic distortion(ITHD)/ total demand distortion (TDD) on the input grid shall be < 5% at 100 %load. (The required LC filters shall be included in UPS cost), extreme power factor kit to be include to limit the input pf to 0.99 and output power factor shall be unity (i.e. kw rating of the UPS shall be kva rating x 1 ) however UPS shall be suitable to take load at 0.7 laging to 0.7 leading power factorloads.
13UPS shall be suitable for incoming supply AC single phase 160-270V 50 Hz and delivering output AC supply true sine wave single phase 220/230/240 Volt, 50 Hz +/- 0.2Hz, Overload capacity of 120% for 10 mins and 150% for 1 minute. Operating temperature 0 to 40 0C, Relative humidity 0-95% non condensing, noise level less than 60db at 1 meter distance, Protection for Under voltage, over voltage, abnormal output voltage, battery over charging, output over current, short-circuit, battery deep discharge , 10 KV surge. Display for watt/VA,Amp and Voltage power parameters etc.
14UPS shall comply with low voltage electromagnetic compatibility (EMC) achieved as per EN 6204, EN6204 Part I and Part 2, it shall be a Voltage and Frequency Independent (VFI) type UPS (as per standard IEC 62040-1, 2 & 3) . The UPS should be with IGBT Based Inverter Technology, Communication RS232/ RS485/ SNMP port open protocol for BMS integration as per approved by Engineering in charge. Required battery racks, DC breaker of suitable rating and interconnecting copper conductor cable of suitable size and connectors and all required accessories are inclusive in the cost. The UPS should have QR code which should contain drawing, test report OEM manual, Geo- Tag of manufacturing location etc [Make- APC by Schneider Electric/Microtek/Numeric/Luminous/Power One/Switching AVO as approved by EIC]
156KVA[(i) for Staircase Emergency Lighting -03 Nos & (ii)Sub-station Emergency Lighting-01 No]
16Wiring for circuit/ submain wiring along with earth wire with the following sizes of FRLS/HFFR PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit as required. [Make: KEI/ RR Kabel/ Polycab/ Gloster]
172 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire
182 X 6 sq. mm + 1 X 6 sq. mm earth wire
194 X 16 sq. mm + 2 X 6 sq. mm earth wire
20Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar,earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator)
2112 way , Double door
22Supplying and fixing 5 A to 32 A rating, 240/415 V, 10 kA, \\"C\\" curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required - Single pole
23Supplying and fixing following rating, double pole, 240 V, isolator in the existing MCB DB complete with connections, testing and commissioning etc. as required. 40 A
24NON SCHEDULE ITEMS
25Finishing of the PVC insulated wire ends by socketting with pin/ ring type copper sockets and insulated tapes etc., including supplying sockets, tapes.
26i) 2.5 sq mm
27ii) 4.0 sq. mm.
28iii) 6 sq mm
29iv) 10 sq mm
30iv) 16sq mm
31S&F of 440V, 63A, 25 KA breaking capacity MCCB in SS enclosure with IP- 20/30 protection, powder coated provision for housing Four pole (4P) MCCB, concealed in wall after cutting the wall & mending good the damages to original finish / on flat iron frame complete with all accessories incl. necessary connection & earthing attachment painting, connection & provision for earthing attachment. [for 30 KVA 3-ph UPS system incomer & outgoing][Make- Legrand / Siemens/ Schneider/LK as approved by E.I.C]
32S&F of 440V, 32A, 30 KA breaking capacity MCCB in SS enclosure with IP- 20/30 protection, powder coated provision for housing Four pole (4P) MCCB, concealed in wall after cutting the wall & mending good the damages to original finish / on flat iron frame complete with all accessories incl. necessary connection & earthing attachment painting, connection & provision for earthing attachment. [for 20 KVA/ 10 KVA 3-ph UPS system incomer & outgoing [Make- Legrand / Siemens/ Schneider/LK as approved by E.I.C]
33S&F of 440V, 10A, 30 KA breaking capacity MCCB in SS enclosure with IP- 20/30 protection, powder coated provision for housing Four pole (2P) MCCB, concealed in wall after cutting the wall & mending good the damages to original finish / on flat iron frame complete with all accessories incl. necessary connection & earthing attachment painting, connection & provision for earthing attachment. [for 6 KVA 3-ph UPS system incomer & outgoing [Make- Legrand / Siemens/ Schneider]
34Supplying and fixing 415V, TPN on load front operated Changeover switch with Sheet Steel enclosure on angle iron frame on wall with nuts bolts etc(for 30/20/10KVA UPS outgoing)
3563A FP (Make- L&T, Cat No- CO106300S00)
36Supplying and Fixing 32 A Changeover Switch with Sheet Steel enclosure on flat iron frame on wall with nuts bolts etc.
37Supplying & fixing sheet metal (16 SWG) Iron Clad Busbar chambers on angle iron frame on wall, incl.earthing attachment and painting as required
384 Bars 415 V, 100/125 A.Dimension ofCu. bars[85mm long]-4x15x3mm & Dimension of Sheet Metal Box-500x150mm
39Supplying & fixing sheet metal (16 SWG) Iron Clad Busbar chambers on angle iron frame on wall, incl.earthing attachment and painting as required
402 bars 240 V, 63 A.Dimension ofAl. bars[85mm long]-2x20x5mm & Dimension of Sheet Metal Box-300x150mm
41S & Drawing following sizes PVC insulated FRLSH Cu wire (Make: Havells/ Finolex Gold/ Polycab/ RR) in suitable sizes of steel reinforced PVC flexible conduit with both side PVC glands(Make: Precision/ AKG) on wall as follows incl. making connections as per direction of EIC
42i) 4 x 16 & 2 x 10 mm² copper wire. (From 10/20/30 KVA UPS Three Output to FP MCB to C/O Switch and from C/O Switch to Bus-Bar )
43ii) 2 x 6 & 1 x 4 mm² copper wire. (From 6 KVA UPS Single Phase Output to DP MCB to DP C/O Switch and from C/O Switch to Bus-Bar )
44Add GST @18% (Item no 1 to 15.02)
45Add LWC @1% (Item No 1 to 16) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58040511
AUTHORITY Government Departments
TENDER VALUE 46.85 Lakhs
LAST DATE 30-10-2026
Authority
Authority Name Public Works Department
Work Description Tender for Construction Of Cancer Care Centres At North Bengal Medical College & Hospital Under North Bengal Construction Division-Electrical Work--------Sitc Of Ups And Allied Electrical Installation Work.
Basic Detail
Tender No WBPWD/EE/DED/e-NIT-49/2026-27
Bidding Type Tender
Location
City Darjeeling
State West Bengal
Key Dates
Publish Date 14 Oct 2026
Submission Date 30 Oct 2026
Open Date 02 Nov 2026
Finance
Tender Value 46.85 Lakhs
Tender Fee Ref. Documents
EMD 93715
Exemption Not Available
Document List
BOQ_5187421.xls
dca37b63-8506-4cea-9795-d5af789ea6ad.html
Tendernotice_1.pdf
WBF2911.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 14, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 30, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Nov 02, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 15 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_5187421.xls

html

dca37b63-8506-4cea-9795-d5af789ea6ad.html

pdf

Tendernotice_1.pdf

pdf

WBF2911.pdf