Tender For R/Mtc. Of Wtp Under Dws Divn-I, Agartala During The Year 2026-27 / Sh- Construction Of Boundary Wall ( 75.00 Mtr.) In North Side Of Bordowali Oht Complex Under Dws Sub Divn No - Ii, Milansangha.. Job No. Tr 28/Ce/ Tjb/ 2026-27
Tender Overview
Project Description
Tender for R/Mtc. Of Wtp Under Dws Divn-I, Agartala During The Year 2026-27 / Sh- Construction Of Boundary Wall ( 75.00 Mtr.) In North Side Of Bordowali Oht Complex Under Dws Sub Divn No - Ii, Milansangha.. Job No. Tr 28/Ce/ Tjb/ 2026-27
BOQ
| Sl. No. | Item Description |
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.-All kinds of soil |
| 3 | Demolishing brick work including stacking ofserviceable materials and disposal of unserviceable materials with all lifts and upto a lead of 50m etc. complete as per direction of the Engineer- in-charge:-In cement mortar. |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil- |
| 5 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.-All kinds of soil |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: |
| 8 | A) 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size). |
| 9 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level: |
| 10 | 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) |
| 11 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement- |
| 12 | 1:1½:3 ( 1 Cement: 1½: fine sand : 3 graded stone aggregate 20 mm nominal size) |
| 13 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement |
| 14 | 1:1½:3 ( 1 Cement: 1½: fine sand : 3 graded stone aggregate 20 mm nominal size) |
| 15 | Centering shuttering including struttings, propping etc. and removal of form work for: |
| 16 | A)Foundations, footings, bases for columns etc. for mass concrete with timber plank. |
| 17 | B)Columns, Pillars, Piers, Abutments, Posts and Struts with wooden plank . |
| 18 | C ) Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank- |
| 19 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level. |
| 20 | A)Thermo-Mechanically Treated bars/ Cold twisted deformed steel bars. |
| 21 | First class brick work in foundation and plinth including cost of all materials as required complete: |
| 22 | A)In cement mortar 1:4 ( 1 cement : 4 fine sand ) |
| 23 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete. In cement mortar 1:4 ( 1 cement : 4 fine sand ) |
| 24 | 12mm cement plaster of mix |
| 25 | A)In cement mortar 1 : 4 ( 1 cement : 4 fine sand ) |
| 26 | 15 mm cement plaster on the rough side of single or half brick wall of mix. In cement mortar 1:4 ( 1 cement : 4 fine sand |
| 27 | Neat cement punning. |
| 28 | Finishing walls with textured exterior paint of required shade of approved brand and manufacture [Payment shall be made after submission of Test Certificate issued by the Manufacturer] :New work ( two or more coats applied @ 3.28 litre/10 sqm) over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm.. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender