Tender For Dismantling Of Ascr Panther Conductor From Dead End Gantry To Tower No. 05 Of Kachhwa-Ii Line, Construction Of 01No. C+0 Type Tower, Erection And Stringing Of Htls Panther Conductor At 220Kv Substation Raja Ka Talab Under Electricity Trans
Tender Overview
Project Description
Tender for Dismantling Of Ascr Panther Conductor From Dead End Gantry To Tower No. 05 Of Kachhwa-Ii Line, Construction Of 01No. C+0 Type Tower, Erection And Stringing Of Htls Panther Conductor At 220Kv Substation Raja Ka Talab Under Electricity Transmission Division-I, Varanasi
BOQ
| Sl. No. | Item Description |
| 1 | Part-(A)-Supply |
| 2 | Pipe type Earthing |
| 3 | SINGLE TENSION FTTG. Suitable for HTLS PANTHER |
| 4 | Vibration dampers suitable for HTLS PANTHER |
| 5 | Part-(B)-Erection Work |
| 6 | Cost of excavation of 132KV C+0 type tower PS foundation pits including all earth work, backfilling leveling etc. |
| 7 | Setting of stubs including all foundation work but excluding the cost of concerting and excavation (Rate per location) for following towers. |
| 8 | Cost of 1:2:4 concreting of all type of tower foundation including cost of cement, dewatering, shoring and shuttering, forming, curring but excluding cost of reinforcement bars. |
| 9 | Erection of 132KV C+0 type tower including all work above ground level excluding hoisting of insulators, hardware & accessories, but including fitting of danger numer, phase plates, bird guard and fixing & punching for 132 KV DC lines |
| 10 | Installation of steel reinforcement bars in RCC foundation including cost of steel reinforcement bars with cutting bending placing dinding etc. |
| 11 | Dismantling of all three phases of the existing ACSR Panther conductor, including all hardware fittings and conductor accessories such as armour rods, vibration dampers, and insulator strings, etc., from the existing line. The dismantled conductor shall be re-rolled onto empty drums for reuse, and all removed materials shall be safely transported to UPPTCL stores. |
| 12 | Laying, stringing, tensioning, clamping, and jointing of all three phases of the HTLS conductor (proposed as a replacement for the Panther conductor), including hoisting of insulators and installation of all required hardware and accessories such as fittings, armour rods, vibration dampers, etc. The scope also includes completion of all associated works up to the re-energisation of the line. |
| 13 | Laying, stringing, tensioning, clamping, jointing including fitting of all necessary Hardware and accessories of 7/3.25 mm GS Earthwire |
| 14 | Grounding work including earthwork etc. for Pipe type grounding including cost of coke & salt Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 17 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender