Tender For Dynamic Multi Star Field Simulator (Dmss)
Tender Overview
Project Description
Tender For Dynamic Multi Star Field Simulator (Dmss) Test System For Star Trackers Simulating The Real Sky Scenery Consisting Of Electro Optical Simulator And Control Computer. - 2 Multi Head Open Loop, Closed Loop Mounted To Star Tracker Using Equivalent Mechanical Interface. Simulate Scenes With Angular Rate Variable From 0 Deg/Sec Upto 10 Deg/Sec Or Better - 3 Test Simulator Type Test System For Star Trackers Simulating The Real Sky Scenery Consisting Of Electro Optical Simulator And Control Computer. Yes / No / Explain 4 Usage Methods Single Head, Multi Head Yes / No / Explain 5 Operating Modes Open Loop, Closed Loop Yes / No / Explain 6 Simulator Mounting Mounted To Star Tracker Using Equivalent Mechanical Interface Provided By Customer. Yes / No / Explain 7 Dynamic Specifications Simulate Scenes With Angular Rate Variable From 0°/S Upto 10°/S Or Better, No Constraints On Acceleration. Yes / No / Explain Tender No : Ursc/Ce/Is202600110201 Page 42 Of 62 8 Field Of View ≥ 25°, Circular Yes / No / Explain 9 Number Of Stars In Fov (A) If Total Number Of Stars In Fov In Any Specified Direction/Orientation Is < 128, Then All The Stars In The Fov Shall Be Displayed On Simulator’S Display. (B) If Total Number Of Stars In Fov In Any Specified Direction/Orientation Is ≥ 128, Then Brightest 128 Stars In The Fov Shall Be Displayed On Simulator’S Display. Yes / No / Explain 10 Star Diameter ≤ 0.02° (At 90%) Within Fov For Faintest Star Mi>5.6 Yes / No / Explain 11 Star Position Accuracy ≤ 0.01° Yes / No / Explain 12 Angular Resolution ≤ 0.012° @90% In 25° Fov Yes / No / Explain 13 Beam Diameter Beam Diameter Of Simulator To Be Compatible To The Star Tracker Of Aperture 50Mm. Yes / No / Explain 14 Update /Refresh Rate Of Stars Minimum 100Hz Yes / No / Explain 15 Distance From Star Tracker Optics 10-40Mm From Star Tracker Optics. Yes / No / Explain 16 Weight Preferably Less Than 2Kg. Yes / No / Explain 17 Simulated Objects Stars From Star Catalogue In Range 1.5Mi … 6Mi ± 0.2Mi, Star Dynamic Magnitude Range Of Atleast 4.5, Solar System Objects (Moon, Earth, Sun, Planets…), Protons, Extended Objects(Via Data Input Or File) Yes / No / Explain 18 Star Catalogue Built In Star Catalogue, Provision To Load Customized Star Catalogues According To Simple File Format Yes / No / Explain Tender No : Ursc/Ce/Is202600110201 Page 43 Of 62 19 Background Dynamical Stray Light (Via Image Files Or Simulated By Model), Extended Objects (To Mask Part Of The Fov) Yes / No / Explain 20 Dynamic Simulation Operation Mode File Or Data Input Provision For Customized Attitude Profiles At Maximum 128Hz Update Rate. Yes / No / Explain 21 Data Logging For Analysis Logging Of Time Tagged Simulated Attitude, Logging Of Time Tagged Simulated Star Image Location With Magnitude, Pixel Location, No. Of Stars, Catalog Number, Etc.\ Yes / No / Explain 22 Server Type Pc In 19-Inch Rack Mount Chassis /Standard Pc With Compatible Software. Yes / No / Explain 23 Server Features Provide Scene Simulation For Single Head Or Multiple Heads With Synchronization, Use Star Tracker Current Attitude To Generate Input Scenes Including Planets, Sun, Moon, Earth Etc. At Various Rates And Accelerations, Cater To Drive Each Simulator Independently For Any Attitude. Yes / No / Explain 24 Server Interface Facility To Control The Scene Control Computer(Server) Remotely Through Another Pc. Usb Or Lan Facilities To Be Available. Yes / No / Explain 25 Demonstration By Vendor All The Technical Specifications From Si No 3 To Sl. No 24 Shall Be Demonstrated By Vendor. Yes / No / Explain Tender No : Ursc/Ce/Is202600110201 Page 44 Of 62 26 Environment Conditions Provide Scene Simulation For Single Head Or Multiple Heads With Synchronization, Use Star Tracker Current Attitude To Generate Input Scenes Including Planets, Sun, Moon, Earth Etc. At Various Rates And Accelerations, Cater To Drive Each Simulator Independently For Any Attitude. Yes / No / Explain 27 Continuous Operation Minimum 24 Hours Continuous Operation Yes / No / Explain 28 Simulator Life Duration Minimum 5 Years Yes / No / Explain 29 Isolation Electrical And Thermal Isolation From Star Tracker To Be Provided Yes / No / Explain 30 Harness Minimum 10M Length Cables To Be Provided Between Server And Optical Simulator. Yes / No / Explain 31 Software Necessary Software To Control The Position And Magnitude Of A Star In X-Y Coordinate Within The Field Of View Shall Be Provided. The Distortion Model For Simulator If Any Shall Be Bundled With The Same. Yes / No / Explain Tender No : Ursc/Ce/Is202600110201 Page 45 Of 62 32 Test Procedures Acceptance Test (Meeting At Supplier Premises) Shall Be Performed Prior To Shipment And Shall Be Repeated After The Installation At Isroursc To Establish Satisfactory Performance Of The Simulator. The Isroursc Representative Shall Participate In The Acceptance Tests And Upon Successful Completion Of Them The Equipment Shall Be Shipped. The Supplier Representative Shall Install And Commission The Equipment At Isroursc Premises And Provide Necessary Training For Its Usage. The Test Plan And Methods To Demonstrate The Specification Compliance For Above Specifications Si No 3 To Sl No 24 Are To Be Provided. Yes / No / Explain Tender No : Ursc/Ce/Is202600110201 Page 46 Of 62 33 Acceptance, Installation And Training The Supplier Shall Give Intimation At Least One Month In Advance, Prior To Conducting The Acceptance Test. The Supplier Shall Demonstrate The Capabilities Of The System For Test And Evaluation Prior To Shipment And After The Installation At Isro-Ursc. The Supplier Shall Bring Additional Test Equipment Needed For Conducting Test And Evaluation During The Time Of Installations On Returnable Basis. The Procedures Shall Also Include The Tests For Optical Spare Parts, If Applicable. Isro-Ursc Personnel May Participate At SupplierS Premises At The Time Of Test And Performance Evaluation. The Purchaser Has The Option To Waive The Acceptance Tests Participation And Provide Clearance To Ship By Mail. However, Installation And Demonstration Of The Performance Of The System At PurchaserS Premises Is A Must And It Should Be Carried Out With Isro Star Tracker. The Customer Will Provide The Test Plan, Procedures And Send To The Supplier At Least One Month Before The Customer Acceptance Test (Cat) Tests Commencement In Isro Premises. Cat Will Be Carried Out Using Isro Star Tracker. Yes / No / Explain Tender No : Ursc/Ce/Is202600110201 Page 47 Of 62 The Contractor Shall Demonstrate The Capabilities Of The System For Test And Evaluation Prior To Shipment And After The Installation At Purchaser’S Premises. The Contractor Shall Inform At The Time Of Order Acceptance, The Additional Test Equipment Needed For Conducting Test And Evaluation At PurchaserS Premises. Also, Supplier Shall Bring Any Specialized Equipment Required For Testing And Installation In India On Returnable Basis. 34 Warranty Minimum Twentyfour Months Warranty Should Be Provided For The Full System And Their Accessories Including Software From The Date Of Installation, Supported By Performance Warranty. Yes / No / Explain 35 Delivery Schedule All Items Shall Be Supplied Within T0+12 Months For (T0=From The Date Of Receipt Of Po). The Details Of Various Components Of The System Like Simulator Optics & Controller, Server Display, Network Interface And Test Procedures Shall Be Supplied Well In Advance. Installation And Training Shall Be Done Within 30 Days Of Communication From Isro-Ursc After Receipt Of Items. Yes / No / Explain Tender No : Ursc/Ce/Is202600110201 Page 48 Of 62 Document : Technical Specification Supporting Documents Required From Vendor 1. Compliance Matrix 5 Additional Documents Can Be Uploaded By The Vendor 36 Deliverables 1.Simulator 6 Nos With All Required Accessories (Simulator Optics Mechanical Mounts, Control Computer With Driver Card And Necessary Software, Cables, Power Adapters). 2.Rack For Holding The Server In The Requested Configuration. 3.Opto-Mechanical Devices For Calibration Of Simulator If Any. 4.All Necessary Manuals Containing A Complete Description Of The Functioning Of The Item, Instructions Necessary For Operation And Maintenance Of The System And Interface Definitions. 5.Test Reports For Tests Performed In Accordance With Accepted Test Plans. 6.Operational Manual 7.Service Manual
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Offline submission at the designated office.
Upcoming · 23 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 23 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender