Tender For maintenance of Completed Scheme Under N/A-Ii Horticulture Zonesub-Head : Urgent Repair Of Boundary Walls, Barbed Wire Fencing And Fixing Wicket Gates In Various Parks Of Sd-Iii/Hcd-5
Tender Overview
Project Description
Tender for maintenance of Completed Scheme Under N/A-Ii Horticulture Zonesub-Head : Urgent Repair Of Boundary Walls, Barbed Wire Fencing And Fixing Wicket Gates In Various Parks Of Sd-Iii/Hcd-5
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-Oct-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 26-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Brick work with Fly Ash clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: (a) Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 2 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand). |
| 3 | Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand) : Raised and cut pointing |
| 4 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand) |
| 5 | 15 mm cement plaster on rough side of single or half brick wall of mix : 1:6 (1 cement: 6 coarse sand) |
| 6 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm). |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(a) 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 8 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 9 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed withing a lead of 50 m and lift upto 1.5m.All kinds of soil. |
| 10 | Supplying at site : R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately). |
| 11 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire |
| 12 | Random rubble masonry with hard stone in superstructure above plinth level and upto floor Two level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at window sills, ceiling level and the like. Cement mortar 1:6 (1 cement : 6 coarse sand). |
| 13 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 14 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :(a) Two or more coats on new work |
| 15 | TOTAL (A) = 14,28,202.00 |
| 16 | Multiply GST factor (@0.973 on A) (Say B) = 13,89,641.00 |
| 17 | Add cost index @ 3% on B (Say C) = |
| 18 | TOTAL (B+C) = 14,31,330.00 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender