Tender For Dismantling Of Existing Foundation And Construction Of Two No. 220 Kv Breaker Foundation At 220 Kv Sub Station Mainpuri, Distt- Mainpuri
Tender Value
3.19 Lakhs
Estimated cost
Bid Submission
12 Nov 2026
25 days left
EMD
3200
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Agra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Dismantling Of Existing Foundation And Construction Of Two No. 220 Kv Breaker Foundation At 220 Kv Sub Station Mainpuri, Distt- Mainpuri
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. (SOR No.2.6.1) |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m (SOR No.2.8.1). |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift..(SOR No.2.25 (A)) |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)(SOR No. 4.1.2) |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :Concrete 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) (SOR No. 4.1.10) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (SOR No. 5.1.2) |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete . (CSI No. 5.9.1) |
| 8 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).(SOR No. 5.12) |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.(SOR No 5.22.6) |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:(Cement mortar 1:4 (1 cement : 4 coarse sand)) (SOR No.6.1.1) |
| 11 | Fixing and grouting 25 mm and below dia bolts in proper alignment level and setout with help of a template complete including supply of all labour & T&P etc. required for proper completion of the work.(labour rates only) . (NSI No. 9.15) |
| 12 | Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) . (NSI No.22/CSI 9.30) |
| 13 | Fixing of template in position level and alignment for grouting of Anchor bolt in Auxiliary Structure (labour rate only). (NSI No. 24/ CSI 9.32) |
| 14 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.(SOR 10.25.2) |
| 15 | Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (NSI No. 11.18) |
| 16 | 2.5 cm thick 1:1.5:3 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC (NSI 12.26) |
| 17 | 12 mm cement plaster of mix :1:4 (1 cement: 4 Coarse sand)(SOR No.13.4.1) |
| 18 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture :(SOR No. 13.62.1) |
| 19 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar:(SOR No. 15.7.4) |
| 20 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.(SOR No. 15.3) |
| 21 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved..(SOR No. 15.60) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 14, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 12, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 25 daysNov 13, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 26 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender