Bids Are invited for Custom Bid For Services - Loading And Transportation Of 150 Meter Belt Conveyor 1X90kw 1000 Mm Belt Derive Head Completed Set From Surface And Unloading Transportation Installation And Commissioning Of Same At Panel M3 Bottom Sec
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Loading And Transportation Of 150 Meter Belt Conveyor 1X90kw 1000 Mm Belt Derive Head Completed Set From Surface And Unloading Transportation Installation And Commissioning Of Same At Panel M3 Bottom Section At Ballarpur Col.. - Loading Of 1 X 90 Kw, 1000 Mm Belt Drive Head Completed Set With Look Take Up And Snub Drum/Fixed Drum With All Accessories Like As Drums Gear Box ,Motor, Frame, Starter, Tail End Drum, Girders, Chute & Side Plates And Etc As Per Direction Of Engg In Charge Upto Initial Lead Of 50 Mtr , Unloading And Transportation Of 1 X 90 Kw, 1000 Mm Belt Drive Head Completed Set With Look Take Up And Snub Drum/Fixed Drum With All Accessories Like As Drums Gear Box ,Motor, Frame, Starter, Tail End Drum, Girders, Chute & Side Plates And Etc As Per Direction Of Engg In Charge Upto Initial Lead Of 50 Mtr , Transportation Of 1 X 90 Kw, 1000 Mm Belt Drive Head Completed Set With Look Take Up And Snub Drum/Fixed Drum With All Accessories Like As Drums Gear Box ,Motor, Frame, Starter, Tail End Drum, Girders, Chute & Side Plates And Etc As Per Direction Of Engg In Charge For Extra Lead Of 50 Mtr (3 Lead Extra=25301.76X3=75905.28) , Installation Of 1 X 90 Kw, 1000 Mm Belt Drive Head Completed Set With Look Take Up And Snub Drum/Fixed Drum With All Accessories Like As Drums Gear Box ,Motor, Frame, Starter, Tail End Drum, Girders, Chute & Side Plates And Etc As Per Direction Of Engg In Charge , Loading Of 1000Mm Belt Structure With All Accessories For 150 Meter Length I.E 300 Meter Pvc Belting, Top Rollers, Bottom Rollers, Stools, Brackets, Runner, Tail End Guard, Side Plates/Loading Bracket(Chute),Decking Plates, Belt Scrappers, Pull Cord Switches, Etc (Surface) As Per Direction Of Engg In Charge , Unloading Of 1000Mm Belt Structure With All Accessories For 150 Meter Length I.E 300 Meter Pvc Belting, Top Rollers, Bottom Rollers, Stools, Brackets, Runner, Tail End Guard, Side Plates/Loading Bracket(Chute),Decking Plates, Belt Scrappers, Pull Cord Switches, Etc As Per Direction Of Engg In Charge , Transportation Of 1000Mm Belt Structure With All Accessories For 150 Meter Length I.E 300 Meter Pvc Belting, Top Rollers, Bottom Rollers, Stools, Brackets, Runner, Tail End Guard, Side Plates/Loading Bracket(Chute),Decking Plates, Belt Scrappers, Pull Cord Switches, Etc As Per Direction Of Engg In Charge , Transportation Up To The Extra Lead Of 50 Meter ( Extra 1 Lead) , Installation Of 1000Mm Belt Structure With All Accessories For 150 Meter Length I.E 300 Meter Pvc Belting, Top Rollers, Bottom Rollers, Stools, Brackets, Runner, Tail End Guard, Side Plates/Loading Bracket(Chute),Decking Plates, Belt Scrappers, Pull Cord Switches, Etc As Per Direction Of Engg In Charge For Initial Lead Of 50 Meter
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Loading of 1 x 90 Kw, 1000 mm belt Drive head completed set with look take up and Snub Drum/fixed drum with all accessories like as drums gear box ,Motor, frame, Starter, Tail end drum, girders, chute & side plates and etc as per direction of Engg In Charge upto initial lead of 50 mtr | Loading of 1 x 90 Kw, 1000 mm belt Drive head completed set with look take up and Snub Drum/fixed drum with all accessories like as drums gear box ,Motor, frame, Starter, Tail end drum, girders, chute & side plates and etc as per direction of Engg In Charge upto initial lead of 50 mtr |
| 2 | Unloading and transportation of 1 x 90 Kw, 1000 mm belt Drive head completed set with look take up and Snub Drum/fixed drum with all accessories like as drums gear box ,Motor, frame, Starter, Tail end drum, girders, chute & side plates and etc as per direction of Engg In Charge upto initial lead of 50 mtr | Unloading and transportation of 1 x 90 Kw, 1000 mm belt Drive head completed set with look take up and Snub Drum/fixed drum with all accessories like as drums gear box ,Motor, frame, Starter, Tail end drum, girders, chute & side plates and etc as per direction of Engg In Charge upto initial lead of 50 mtr |
| 3 | Transportation of 1 x 90 Kw, 1000 mm belt Drive head completed set with look take up and Snub Drum/fixed drum with all accessories like as drums gear box ,Motor, frame, Starter, Tail end drum, girders, chute & side plates and etc as per direction of Engg In Charge for extra lead of 50 mtr (3 Lead Extra=25301.76x3=75905.28) | Transportation of 1 x 90 Kw, 1000 mm belt Drive head completed set with look take up and Snub Drum/fixed drum with all accessories like as drums gear box ,Motor, frame, Starter, Tail end drum, girders, chute & side plates and etc as per direction of Engg In Charge for extra lead of 50 mtr (3 Lead Extra=25301.76x3=75905.28) |
| 4 | Installation of 1 x 90 Kw, 1000 mm belt Drive head completed set with look take up and Snub Drum/fixed drum with all accessories like as drums gear box ,Motor, frame, Starter, Tail end drum, girders, chute & side plates and etc as per direction of Engg In Charge | Installation of 1 x 90 Kw, 1000 mm belt Drive head completed set with look take up and Snub Drum/fixed drum with all accessories like as drums gear box ,Motor, frame, Starter, Tail end drum, girders, chute & side plates and etc as per direction of Engg In Charge |
| 5 | Loading of 1000mm belt structure with all accessories for 150 meter length i.e 300 meter PVC belting, top rollers, Bottom rollers, Stools, Brackets, Runner, tail end guard, side plates/loading bracket(chute),decking plates, Belt Scrappers, Pull Cord Switches, etc (surface) as per Direction of Engg In Charge | Loading of 1000mm belt structure with all accessories for 150 meter length i.e 300 meter PVC belting, top rollers, Bottom rollers, Stools, Brackets, Runner, tail end guard, side plates/loading bracket(chute),decking plates, Belt Scrappers, Pull Cord Switches, etc (surface) as per Direction of Engg In Charge |
| 6 | Unloading of 1000mm belt structure with all accessories for 150 meter length i.e 300 meter PVC belting, top rollers, Bottom rollers, Stools, Brackets, Runner, tail end guard, side plates/loading bracket(chute),decking plates, Belt Scrappers, Pull Cord Switches, etc as per Direction of Engg In Charge | Unloading of 1000mm belt structure with all accessories for 150 meter length i.e 300 meter PVC belting, top rollers, Bottom rollers, Stools, Brackets, Runner, tail end guard, side plates/loading bracket(chute),decking plates, Belt Scrappers, Pull Cord Switches, etc as per Direction of Engg In Charge |
| 7 | Transportation of 1000mm belt structure with all accessories for 150 meter length i.e 300 meter PVC belting, top rollers, Bottom rollers, Stools, Brackets, Runner, tail end guard, side plates/loading bracket(chute),decking plates, Belt Scrappers, Pull Cord Switches, etc as per Direction of Engg In Charge | Transportation of 1000mm belt structure with all accessories for 150 meter length i.e 300 meter PVC belting, top rollers, Bottom rollers, Stools, Brackets, Runner, tail end guard, side plates/loading bracket(chute),decking plates, Belt Scrappers, Pull Cord Switches, etc as per Direction of Engg In Charge |
| 8 | Transportation up to the extra lead of 50 meter ( Extra 1 lead) | Transportation up to the extra lead of 50 meter ( Extra 1 lead) |
| 9 | Installation of 1000mm belt structure with all accessories for 150 meter length i.e 300 meter PVC belting, top rollers, Bottom rollers, Stools, Brackets, Runner, tail end guard, side plates/loading bracket(chute),decking plates, Belt Scrappers, Pull Cord Switches, etc as per Direction of Engg In Charge for initial lead of 50 meter | Installation of 1000mm belt structure with all accessories for 150 meter length i.e 300 meter PVC belting, top rollers, Bottom rollers, Stools, Brackets, Runner, tail end guard, side plates/loading bracket(chute),decking plates, Belt Scrappers, Pull Cord Switches, etc as per Direction of Engg In Charge for initial lead of 50 meter |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender