Bids Are invited for Facility Management Services - Lumpsum Based - Maintenance Of A Type, B Type Quarters And Jot/Sot Hostels; O M Of Electrical Work; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Casing Caping Wiring
Tender Overview
Project Description
Bids Are invited for Facility Management Services - Lumpsum Based - Maintenance Of A Type, B Type Quarters And Jot/Sot Hostels; O M Of Electrical Work; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Casing Caping Wiring Of Copper Wire Upto 4 Mm.Sq Size Along With Supply Of All Materials And With All Requisite Civil Related Jobs. 1.5 /2.5/4 Sq. Mm Copper Wires Shall Be Supplied As Fim , Installation Pvc Board Of Any Size On Wall Including Supply Of All Materials For Fixing & Fixing Of Switches/Sockets Etc. And Make Necessary Connections. , Supply & Installation Of 5A Switch , Supply & Installation Of 5A Socket. , Supply & Installation Of 15A Switch , Supply & Installation Of 15A Socket , Installation Of Fan With Regulator (Without Supply). , Installation Of Tube Light/Bulk Head Fixture. , Installation Of Holder With Bulb. Holder To Be Supplied By Vendor. , Supply & Installation Of Buzzer And Bell Push. , Installation Of Main Db With Mccb And Rcb. Mdb Shall Be Supplied As Fim. , Installation Of Earth Pit Including Earth Excavation With Supply Of All Materials (Excluding 1.8M Long And 40Mm Dia. Perforated Gi Pipe) Like Coke, Salt, Gi Nut Bolts Etc. And Making Of Rcc Chamber With Precast Rcc Covers With Supply Of Brick, Cement, Sand, Chips Etc. As Per Direction Of Engineer-In-Charge , Connection Of The Earth Pit To The Mdb With Gi Flat. , Cleaning And Painting Of Mdb, Pole Db, Etc. Along With Supply Of All Necessary Materials. , Letter Writing On The Panels (Letter Upto 3 Size) With Supply Of All Necessary Materials , Erection, Testing & Commissioning Of Feeder Pillar Upto 400 Including Necessary Connection Of Wires/ Cable, Shifting Of Panel From Main Store/Substore. All Hardwares As May Be Required To Be Supplied By The Contractor. Feeder Pillar Shall Be Provided As Fim. , Erection, Testing And Commissioning Of Lt Panels Above 400 Upto 1000 With Supply Of All Hard Wares And Foundation Materials. Shifting Of Panel From Main Store/Substore. All Hardwares As May Be Required To Be Supplied By The Contractor. Feeder Pillar Shall Be Provided As Fim , End Termination Of Lt Power Cable Of Size Above 185 Sq.Mm To Upto 300 Sq. Mm With Supply Of Glands And Sockets. , Supply Of Skilled Worker. , Supply Of Un-Skilled Worker
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Casing caping wiring of copper wire upto 4 mm.sq size along with supply of all materials and with all requisite civil related jobs. 1.5 /2.5/4 sq. mm Copper wires shall be supplied as FIM | Casing caping wiring of copper wire upto 4 mm.sq size along with supply of all materials and with all requisite civil related jobs. 1.5 /2.5/4 sq. mm Copper wires shall be supplied as FIM |
| 2 | Installation PVC board of any size on wall including supply of all materials for fixing & fixing of switches/Sockets etc. and make necessary connections. | Installation PVC board of any size on wall including supply of all materials for fixing & fixing of switches/Sockets etc. and make necessary connections. |
| 3 | Supply & Installation of 5A Switch | Supply & Installation of 5A Switch |
| 4 | Supply & Installation of 5A Socket. | Supply & Installation of 5A Socket. |
| 5 | Supply & Installation of 15A Switch | Supply & Installation of 15A Switch |
| 6 | Supply & Installation of 15A Socket | Supply & Installation of 15A Socket |
| 7 | Installation of Fan with Regulator (without supply). | Installation of Fan with Regulator (without supply). |
| 8 | Installation of tube light/bulk head fixture. | Installation of tube light/bulk head fixture. |
| 9 | Installation of Holder with bulb. Holder to be supplied by vendor. | Installation of Holder with bulb. Holder to be supplied by vendor. |
| 10 | Supply & Installation of Buzzer and Bell Push. | Supply & Installation of Buzzer and Bell Push. |
| 11 | Installation of Main DB with MCCB and RCB. MDB shall be supplied as FIM. | Installation of Main DB with MCCB and RCB. MDB shall be supplied as FIM. |
| 12 | Installation of earth pit including earth excavation with supply of all materials (excluding 1.8M long and 40mm dia. perforated GI pipe) like coke, salt, GI nut bolts etc. and making of RCC chamber with precast RCC covers with supply of brick, cement, sand, chips etc. as per direction of Engineer-in-charge | Installation of earth pit including earth excavation with supply of all materials (excluding 1.8M long and 40mm dia. perforated GI pipe) like coke, salt, GI nut bolts etc. and making of RCC chamber with precast RCC covers with supply of brick, cement, sand, chips etc. as per direction of Engineer-in-charge |
| 13 | Connection of the earth pit to the MDB with GI Flat. | Connection of the earth pit to the MDB with GI Flat. |
| 14 | Cleaning and Painting of MDB, Pole DB, etc. along with supply of all necessary materials. | Cleaning and Painting of MDB, Pole DB, etc. along with supply of all necessary materials. |
| 15 | Letter Writing on the panels (letter upto 3\\" size) with supply of all necessary materials | Letter Writing on the panels (letter upto 3\\" size) with supply of all necessary materials |
| 16 | Erection, testing & commissioning of feeder pillar upto 400 Amp including necessary connection of wires/ cable, Shifting of Panel from Main store/Substore. All hardwares as may be required to be supplied by the contractor. Feeder Pillar shall be provided as FIM. | Erection, testing & commissioning of feeder pillar upto 400 Amp including necessary connection of wires/ cable, Shifting of Panel from Main store/Substore. All hardwares as may be required to be supplied by the contractor. Feeder Pillar shall be provided as FIM. |
| 17 | Erection, Testing and Commissioning of LT Panels above 400 Amp upto 1000 Amp with supply of all hard wares and foundation materials. Shifting of Panel from Main store/Substore. All hardwares as may be required to be supplied by the contractor. Feeder Pillar shall be provided as FIM | Erection, Testing and Commissioning of LT Panels above 400 Amp upto 1000 Amp with supply of all hard wares and foundation materials. Shifting of Panel from Main store/Substore. All hardwares as may be required to be supplied by the contractor. Feeder Pillar shall be provided as FIM |
| 18 | End termination of LT Power cable of size above 185 sq.mm to upto 300 sq. mm with supply of glands and sockets. | End termination of LT Power cable of size above 185 sq.mm to upto 300 sq. mm with supply of glands and sockets. |
| 19 | Supply of Skilled Worker. | Supply of Skilled Worker. |
| 20 | Supply of Un-Skilled Worker | Supply of Un-Skilled Worker |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender