Tender For Supply Erection & Commissioning Of Online Stack Monitoring System Spm Analyzer For Boiler Stack And Ptz Camera With Telemetry System Npl Original Certification In All Respect As Per Guide Lines Of Cpcb/Hspcb From The Manufacturer/Authorize
Tender Overview
Project Description
Tender for Supply Erection & Commissioning Of Online Stack Monitoring System Spm Analyzer For Boiler Stack And Ptz Camera With Telemetry System Npl Original Certification In All Respect As Per Guide Lines Of Cpcb/Hspcb From The Manufacturer/Authorized Dealer/ Distributer.
BOQ
| Sl. No. | Item Description |
| 1 | Supply, installation and commissioning of SPM Analyzer (NPL Approved) with PTZ Camera with telemetry system along with data transmission to CPCB/HSPCB Cloud Server for one year complete in all respect as per norms of CPCB/HSPCB.Sensor for Continuous Stack Emission Monitoring System (OCEMS) with PTZ CameraModel – System DUSTHUNTER SB30/SP30, Measuring Parameter – SPM, Measured Principle – Forward Light Scattering, Measuring Range – (0 7.5/15/45/75/150/225/375/1,000/3,000 mg/m3), Unit – mg/m3, mg/Nm3, Process Temp. – Up to 200°C, Ambient Temp. Range – 0°C … +60°C, Temp. – Up to 200°C, Temp. Measurement – Required for Normalization (mg/nm3), Pressure Measurement – Required for Normalization, Process Gas Humidity – Non-Condensing/Condensing as Per Site, Degree of Protection – Min Requirement IP66, Approval – NPL with Verification Certificate & Long-Life Validity, International Certification – TUV Germany, DIN EN 15267-1 (2009), DIN-EN 15267-2 (2009), DIN EN 15859 (2010), DIN EN 14181 (2014), Product Safety – CE, Accurate Dust Measurement – Yes, DO (RS 485 MODBUS) – Yes, AO (4-20 mA) – Yes, Auto Zero Facility – Yes, Auto Span Facility – Yes, Data Connectivity to CPCB – Yes, Data Connectivity to HSPCB – Yes, Weatherproof Panel – Yes, Display Unit – Yes, Touch Screen Make- Endress Hauser/ SintrolNote: We required this NPL Certified Sensor for Continuous Stack Emission Monitoring System with installation of PTZ Camera also as per CPCB Guidelines. Rate Should be inclusive of Installation/Erection and Commissioning.Bidder also responsible for transfer stack data on CPCB/HSPCB server. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender