Health and Family Welfare Government Departments Closing in 18 days TDR #58021840

Tender For One Year Rate Contract For The Supply Of Samsung 32 Inch Smart Led Tv

Issued by Government Departments · Salem, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
03 Nov 2026
18 days left
EMD
10000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Salem → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for One Year Rate Contract For The Supply Of Samsung 32 Inch Smart Led Tv , Laying And Jointing Pvc Pipe. Heading , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete

BOQ

Name of Work:-
Sl. No. Item Description
1Laying and Jointing PVC Pipe. Heading
2Brick work in C.M 1:5 mix including all labour charges etc complete
3Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete
4Brick work in C.M 1:5 mix including all labour charges etc complete
5Brick work in C.M 1:5 mix including all labour charges etc complete
6Brick work in C.M 1:5 mix including all labour charges etc complete
7Brick work in C.M 1:5 mix including all labour charges etc complete
8Brick work in C.M 1:5 mix including all labour charges etc complete
9Brick work in C.M 1:5 mix including all labour charges etc complete
10Brick work in C.M 1:5 mix including all labour charges etc complete
11Brick work in C.M 1:5 mix including all labour charges etc complete
12Brick work in C.M 1:5 mix including all labour charges etc complete
13Brick work in C.M 1:5 mix including all labour charges etc complete
14Brick work in C.M 1:5 mix including all labour charges etc complete
15Brick work in C.M 1:5 mix including all labour charges etc complete
16Brick work in C.M 1:5 mix including all labour charges etc complete
17Brick work in C.M 1:5 mix including all labour charges etc complete
18Brick work in C.M 1:5 mix including all labour charges etc complete
19Brick work in C.M 1:5 mix including all labour charges etc complete
20Brick work in C.M 1:5 mix including all labour charges etc complete
21Brick work in C.M 1:5 mix including all labour charges etc complete
22Brick work in C.M 1:5 mix including all labour charges etc complete
23Brick work in C.M 1:5 mix including all labour charges etc complete
24Brick work in C.M 1:5 mix including all labour charges etc complete
25Brick work in C.M 1:5 mix including all labour charges etc complete
26Brick work in C.M 1:5 mix including all labour charges etc complete
27Brick work in C.M 1:5 mix including all labour charges etc complete
28Brick work in C.M 1:5 mix including all labour charges etc complete
29Brick work in C.M 1:5 mix including all labour charges etc complete
30Brick work in C.M 1:5 mix including all labour charges etc complete
31Brick work in C.M 1:5 mix including all labour charges etc complete
32Brick work in C.M 1:5 mix including all labour charges etc complete
33Brick work in C.M 1:5 mix including all labour charges etc complete
34Brick work in C.M 1:5 mix including all labour charges etc complete
35Brick work in C.M 1:5 mix including all labour charges etc complete
36Brick work in C.M 1:5 mix including all labour charges etc complete
37Brick work in C.M 1:5 mix including all labour charges etc complete
38Brick work in C.M 1:5 mix including all labour charges etc complete
39Brick work in C.M 1:5 mix including all labour charges etc complete
40Brick work in C.M 1:5 mix including all labour charges etc complete
41Brick work in C.M 1:5 mix including all labour charges etc complete
42Brick work in C.M 1:5 mix including all labour charges etc complete
43Brick work in C.M 1:5 mix including all labour charges etc complete
44Brick work in C.M 1:5 mix including all labour charges etc complete
45Brick work in C.M 1:5 mix including all labour charges etc complete
46Brick work in C.M 1:5 mix including all labour charges etc complete
47Brick work in C.M 1:5 mix including all labour charges etc complete
48Brick work in C.M 1:5 mix including all labour charges etc complete
49Brick work in C.M 1:5 mix including all labour charges etc complete
50Brick work in C.M 1:5 mix including all labour charges etc complete
51Brick work in C.M 1:5 mix including all labour charges etc complete
52Brick work in C.M 1:5 mix including all labour charges etc complete
53Brick work in C.M 1:5 mix including all labour charges etc complete
54Brick work in C.M 1:5 mix including all labour charges etc complete
55Brick work in C.M 1:5 mix including all labour charges etc complete
56Brick work in C.M 1:5 mix including all labour charges etc complete
57Brick work in C.M 1:5 mix including all labour charges etc complete
58Brick work in C.M 1:5 mix including all labour charges etc complete
59Brick work in C.M 1:5 mix including all labour charges etc complete
60Brick work in C.M 1:5 mix including all labour charges etc complete
61Brick work in C.M 1:5 mix including all labour charges etc complete
62Brick work in C.M 1:5 mix including all labour charges etc complete
63Brick work in C.M 1:5 mix including all labour charges etc complete
64Brick work in C.M 1:5 mix including all labour charges etc complete
65Brick work in C.M 1:5 mix including all labour charges etc complete
66Brick work in C.M 1:5 mix including all labour charges etc complete
67Brick work in C.M 1:5 mix including all labour charges etc complete
68Brick work in C.M 1:5 mix including all labour charges etc complete
69Brick work in C.M 1:5 mix including all labour charges etc complete
70Brick work in C.M 1:5 mix including all labour charges etc complete
71Brick work in C.M 1:5 mix including all labour charges etc complete
72Brick work in C.M 1:5 mix including all labour charges etc complete
73Brick work in C.M 1:5 mix including all labour charges etc complete
74Brick work in C.M 1:5 mix including all labour charges etc complete
75Brick work in C.M 1:5 mix including all labour charges etc complete
76Brick work in C.M 1:5 mix including all labour charges etc complete
77Brick work in C.M 1:5 mix including all labour charges etc complete
78Brick work in C.M 1:5 mix including all labour charges etc complete
79Brick work in C.M 1:5 mix including all labour charges etc complete
80Brick work in C.M 1:5 mix including all labour charges etc complete
81Brick work in C.M 1:5 mix including all labour charges etc complete
82Brick work in C.M 1:5 mix including all labour charges etc complete
83Brick work in C.M 1:5 mix including all labour charges etc complete
84Brick work in C.M 1:5 mix including all labour charges etc complete
85Brick work in C.M 1:5 mix including all labour charges etc complete
86Brick work in C.M 1:5 mix including all labour charges etc complete
87Brick work in C.M 1:5 mix including all labour charges etc complete
88Brick work in C.M 1:5 mix including all labour charges etc complete
89Brick work in C.M 1:5 mix including all labour charges etc complete
90Brick work in C.M 1:5 mix including all labour charges etc complete
91Brick work in C.M 1:5 mix including all labour charges etc complete
92Brick work in C.M 1:5 mix including all labour charges etc complete
93Brick work in C.M 1:5 mix including all labour charges etc complete
94Brick work in C.M 1:5 mix including all labour charges etc complete
95Brick work in C.M 1:5 mix including all labour charges etc complete
96Brick work in C.M 1:5 mix including all labour charges etc complete
97Brick work in C.M 1:5 mix including all labour charges etc complete
98Brick work in C.M 1:5 mix including all labour charges etc complete
99Brick work in C.M 1:5 mix including all labour charges etc complete
100Brick work in C.M 1:5 mix including all labour charges etc complete
101Brick work in C.M 1:5 mix including all labour charges etc complete
102Brick work in C.M 1:5 mix including all labour charges etc complete
103Brick work in C.M 1:5 mix including all labour charges etc complete
104Brick work in C.M 1:5 mix including all labour charges etc complete
105Brick work in C.M 1:5 mix including all labour charges etc complete
106Brick work in C.M 1:5 mix including all labour charges etc complete
107Brick work in C.M 1:5 mix including all labour charges etc complete
108Brick work in C.M 1:5 mix including all labour charges etc complete
109Brick work in C.M 1:5 mix including all labour charges etc complete
110Brick work in C.M 1:5 mix including all labour charges etc complete Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58021840
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 03-11-2026
Authority
Authority Name Directorate Of Medical Education
Work Description Tender for One Year Rate Contract For The Supply Of Samsung 32 Inch Smart Led Tv , Laying And Jointing Pvc Pipe. Heading , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete
Basic Detail
Tender No 14023/S11/GMKMCH/SLM/2026
Bidding Type Tender
Location
City Salem
State Tamil Nadu
Key Dates
Publish Date 14 Oct 2026
Submission Date 03 Nov 2026
Open Date 03 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 10000
Exemption Available
Document List
BOQ_857612.xls
c9fb000e-ded3-4ba0-b498-37e1048e7845.html
LEDSmarttv.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 14, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 03, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Nov 03, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 18 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_857612.xls

html

c9fb000e-ded3-4ba0-b498-37e1048e7845.html

pdf

LEDSmarttv.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender