Power Government Departments Closing in 5 days TDR #58016969

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; As Per Boq - Carriage Of Following Material From Esc Store/Site To Site Of Work Through The Kacha And

Issued by Government Departments · Mainpuri, Uttar Pradesh
Tender Value
10 Lakhs
Estimated cost
Bid Submission
28 Oct 2026
5 days left
EMD
10000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mainpuri → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; As Per Boq - Carriage Of Following Material From Esc Store/Site To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends In The Area Of Concern Division, Mainpuri Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-50 Kms.) , 8.5 Mtr Pcc Poles Or 11 Mtr. Long Stp Poles , 11 Kv X-Arms, Pin Insulators, Cl S Conductor And 11 Kv & 33Kv Jointing Kits, Terminating Kits Other Required Line Material, If Any. , Replacement Of Damaged 8.5 Mtr Pcc Poles Or 11 Mtr. Long Stp Poles By Digging Of Pit And Dismantling Of All Accessories From The Existing / Damaged Pole And Erection Of Single New Pole Including Fitting All Accessories Including The Cost Of Labourer, T&P Etc. Required For Proper Completion Of Work. , Replacement Of Damaged Double Pole Of 8.5 Mtr Pcc Poles Or 11 Mtr. Long Stp Poles (First Opening Of All Accessories & Then Removing Damaged Poles), Re - Erecting D/P Including Fixing Of Disc Insulators With Fitting And Other 11 Kv Accessories As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc, Required For Proper Completion Of Work. The Double Pole Shall Be Grouted In Ratio 1:4:8 (Cement, Sand, Brick Ballast/ Stone Pad As Per Actual Requirement At Site. , Straightening Of Tilted Following Poles In The Existing Lines As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work With Respective Material. , 8.5 Mtr. Long Pcc Poles , 9/11 Mtr St Poles , Replacement Of Following Damaged Accessories In 11 Kv/ Lt Line , 11 Kv X Arm With Cl , 11 Kv Pin Insulators With Pin , 11 Kv Disc Insulator With Cl Nuts And Bolts , Stay Cl With Nut And Bolt , Lt Pin Cl , Rebinding & Tightining Of Loose Stay Set At Defferent Places Of Defferent Feeders As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc, Required For Proper Completion Of Work. , Reconnecting Of Earthing Rod As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc, Required For Proper Completion Of Work. , Re-Sagging And Stringing Of Existing Following Conductor In 11 Ht/Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work , Acsr Weasel Conductor , Acsr Dog Conductor , Ab Conductor , Re-Sagging And Stringing Of Existing Following Conductor In 33 Kv Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work , Acsr Dog Conductor , Guarding Of 11 Kv Line By Laying, Stringing Sagging And Binding Of 02 Nos. Parallel Gi Wire 6 Swg After Providing, Fabrication And Fixing Of Guarding Angle And Fabrication And Fixing Of X-Guards (Tiles) Of Gl Wire At Distance Of 3 Mtr. Including The Cost Of Arrangement Of Labour, T&P Etc. Required For Proper Completion Of Work. (Appx. 40 Span) , Re- Sagging Of Guarding Of 11 Kv Line As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc, Required For Proper Completion Of Work. (Appx. 40 Span) , Choping Of Tree Branches At Defferent Places Of Defferent Feeders As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc, Required For Proper Completion Of Work. , Digging & Laying Of 33 Kv And 11 Kv Xlpe Cables And Installation Of 33 Kv & 11 Kv Terminating Kits, Jointing Kits

BOQ

Sl. No. Item TitleItem Description
1Carriage of following material from ESC Store/Site to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends in the area of Concern Division, MAINPURI including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.)Carriage of following material from ESC Store/Site to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends in the area of Concern Division, MAINPURI including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.)
28.5 mtr PCC Poles Or 11 mtr. Long STP Poles8.5 mtr PCC Poles Or 11 mtr. Long STP Poles
311 KV X-arms, Pin Insulators, clamps Conductor and 11 KV & 33KV Jointing Kits, terminating Kits other required line material, if any.11 KV X-arms, Pin Insulators, clamps Conductor and 11 KV & 33KV Jointing Kits, terminating Kits other required line material, if any.
4Replacement of damaged 8.5 mtr PCC Poles Or 11 mtr. Long STP Poles by digging of pit and dismantling of all accessories from the existing / damaged pole and erection of single new pole including fitting all accessories including the cost of labourer, T&P etc. required for proper completion of work.Replacement of damaged 8.5 mtr PCC Poles Or 11 mtr. Long STP Poles by digging of pit and dismantling of all accessories from the existing / damaged pole and erection of single new pole including fitting all accessories including the cost of labourer, T&P etc. required for proper completion of work.
5Replacement of damaged Double pole of 8.5 mtr PCC Poles Or 11 mtr. Long STP Poles (first opening of all accessories & then removing damaged poles), re - erecting D/P including fixing of Disc Insulators with fitting and other 11 KV accessories as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work. The double pole shall be grouted in ratio 1:4:8 (Cement, sand, brick ballast/ stone pad as per actual requirement at site.Replacement of damaged Double pole of 8.5 mtr PCC Poles Or 11 mtr. Long STP Poles (first opening of all accessories & then removing damaged poles), re - erecting D/P including fixing of Disc Insulators with fitting and other 11 KV accessories as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work. The double pole shall be grouted in ratio 1:4:8 (Cement, sand, brick ballast/ stone pad as per actual requirement at site.
6Straightening of tilted following poles in the existing lines as per direction of supervising engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work with respective material.Straightening of tilted following poles in the existing lines as per direction of supervising engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work with respective material.
78.5 mtr. Long PCC Poles8.5 mtr. Long PCC Poles
89/11 mtr ST Poles9/11 mtr ST Poles
9Replacement of following damaged accessories in 11 KV/ LT lineReplacement of following damaged accessories in 11 KV/ LT line
1011 KV X arm with clamp11 KV X arm with clamp
1111 KV Pin Insulators with pin11 KV Pin Insulators with pin
1211 KV Disc Insulator with Clamp nuts and bolts11 KV Disc Insulator with Clamp nuts and bolts
13Stay Clamp with nut and boltStay Clamp with nut and bolt
14LT Pin clampLT Pin clamp
15Rebinding & Tightining of loose stay set at defferent places of defferent feeders as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.Rebinding & Tightining of loose stay set at defferent places of defferent feeders as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.
16Reconnecting of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.Reconnecting of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.
17RE-sagging and stringing of existing following conductor in 11 HT/LT line as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of workRE-sagging and stringing of existing following conductor in 11 HT/LT line as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
18ACSR Weasel conductorACSR Weasel conductor
19ACSR Dog conductorACSR Dog conductor
20AB conductorAB conductor
21RE-sagging and stringing of existing following conductor in 33 KV line as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of workRE-sagging and stringing of existing following conductor in 33 KV line as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
22ACSR Dog conductorACSR Dog conductor
23Guarding of 11 KV line by laying, stringing sagging and binding of 02 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tiles) of Gl wire at distance of 3 mtr. Including the cost of arrangement of labour, T&P etc. required for proper completion of work. (Appx. 40 Span)Guarding of 11 KV line by laying, stringing sagging and binding of 02 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tiles) of Gl wire at distance of 3 mtr. Including the cost of arrangement of labour, T&P etc. required for proper completion of work. (Appx. 40 Span)
24Re- sagging of Guarding of 11 KV line as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work. (Appx. 40 Span)Re- sagging of Guarding of 11 KV line as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work. (Appx. 40 Span)
25choping of tree branches at defferent places of defferent feeders as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.choping of tree branches at defferent places of defferent feeders as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc, required for proper completion of work.
26Digging & Laying of 33 KV and 11 KV XLPE Cables and Installation of 33 KV & 11 KV terminating Kits, Jointing KitsDigging & Laying of 33 KV and 11 KV XLPE Cables and Installation of 33 KV & 11 KV terminating Kits, Jointing Kits

AI Tender Summary

OUR REF NO 58016969
AUTHORITY Government Departments
TENDER VALUE 10 Lakhs
LAST DATE 28-10-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; As Per Boq - Carriage Of Following Material From Esc Store/Site To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends In The Area Of Concern Division, Mainpuri Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-50 Kms.) , 8.5 Mtr Pcc Poles Or 11 Mtr. Long Stp Poles , 11 Kv X-Arms, Pin Insulators, Cl S Conductor And 11 Kv & 33Kv Jointing Kits, Terminating Kits Other Required Line Material, If Any. , Replacement Of Damaged 8.5 Mtr Pcc Poles Or 11 Mtr. Long Stp Poles By Digging Of Pit And Dismantling Of All Accessories From The Existing / Damaged Pole And Erection Of Single New Pole Including Fitting All Accessories Including The Cost Of Labourer, T&P Etc. Required For Proper Completion Of Work. , Replacement Of Damaged Double Pole Of 8.5 Mtr Pcc Poles Or 11 Mtr. Long Stp Poles (First Opening Of All Accessories & Then Removing Damaged Poles), Re - Erecting D/P Including Fixing Of Disc Insulators With Fitting And Other 11 Kv Accessories As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc, Required For Proper Completion Of Work. The Double Pole Shall Be Grouted In Ratio 1:4:8 (Cement, Sand, Brick Ballast/ Stone Pad As Per Actual Requirement At Site. , Straightening Of Tilted Following Poles In The Existing Lines As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work With Respective Material. , 8.5 Mtr. Long Pcc Poles , 9/11 Mtr St Poles , Replacement Of Following Damaged Accessories In 11 Kv/ Lt Line , 11 Kv X Arm With Cl , 11 Kv Pin Insulators With Pin , 11 Kv Disc Insulator With Cl Nuts And Bolts , Stay Cl With Nut And Bolt , Lt Pin Cl , Rebinding & Tightining Of Loose Stay Set At Defferent Places Of Defferent Feeders As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc, Required For Proper Completion Of Work. , Reconnecting Of Earthing Rod As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc, Required For Proper Completion Of Work. , Re-Sagging And Stringing Of Existing Following Conductor In 11 Ht/Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work , Acsr Weasel Conductor , Acsr Dog Conductor , Ab Conductor , Re-Sagging And Stringing Of Existing Following Conductor In 33 Kv Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work , Acsr Dog Conductor , Guarding Of 11 Kv Line By Laying, Stringing Sagging And Binding Of 02 Nos. Parallel Gi Wire 6 Swg After Providing, Fabrication And Fixing Of Guarding Angle And Fabrication And Fixing Of X-Guards (Tiles) Of Gl Wire At Distance Of 3 Mtr. Including The Cost Of Arrangement Of Labour, T&P Etc. Required For Proper Completion Of Work. (Appx. 40 Span) , Re- Sagging Of Guarding Of 11 Kv Line As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc, Required For Proper Completion Of Work. (Appx. 40 Span) , Choping Of Tree Branches At Defferent Places Of Defferent Feeders As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc, Required For Proper Completion Of Work. , Digging & Laying Of 33 Kv And 11 Kv Xlpe Cables And Installation Of 33 Kv & 11 Kv Terminating Kits, Jointing Kits
Basic Detail
Tender No GEM/2026/B/8155186
Bidding Type Tender
Location
City Mainpuri
State Uttar Pradesh
Key Dates
Publish Date 13 Oct 2026
Submission Date 28 Oct 2026
Open Date 29 Oct 2026
Finance
Tender Value 10 Lakhs
Tender Fee Ref. Documents
EMD 10000
Exemption Not Available
Document List
97d4f73c-67e2-45f7-9ad4-654282ec7374.pdf
1791886817.xlsx
1791886829.pdf
1791886833.pdf
1791886838.pdf
1791886842.pdf
ATCKARHAL_275fc162-95b6-4f1a-b0141791886946285_EDCMAINPURIBUYCON.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 13, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days
Oct 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
pdf

97d4f73c-67e2-45f7-9ad4-654282ec7374.pdf

xlsx

1791886817.xlsx

pdf

1791886829.pdf

pdf

1791886833.pdf

pdf

1791886838.pdf

pdf

1791886842.pdf

pdf

ATCKARHAL_275fc162-95b6-4f1a-b0141791886946285_EDCMAINPURIBUYCON.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender