Bids Are invited for Facility Management Services - Lumpsum Based - Industrial; O M Of Mechanical Work, Amc For Piping And Structural Welding Works; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Transportation Cleaning
Tender Overview
Project Description
Bids Are invited for Facility Management Services - Lumpsum Based - Industrial; O M Of Mechanical Work, Amc For Piping And Structural Welding Works; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Transportation Cleaning And Erection Of Pipe Cs /Chro-Moly Alloy Steel Pipes And Fittings . , Transportation Passivation And Erection Of Ss Pipes And Fittings. , Installation Of Anchor Fasteners Upto Size 5/8 Dia , Edge Preparation Fit Up& Welding Cs /Chro-Moly Alloy Steel Pipe Joint (A) S.W Gtaw , Edge Preparation Fit Up& Welding Cs /Chro-Moly Alloy Steel Pipe Joint (B) S.W Smaw , Edge Preparation Fit Up& Welding Cs /Chro-Moly Alloy Steel Pipe Joint (D) B.W Smaw , Edge Preparation Fit Up& Welding Ss Pipe Joint(A) S.W Gtaw , Edge Preparation Fit Up& Welding Ss Pipe Joint(B)S.W. Smaw , Edge Preparation Fit Up& Welding Ss Pipe Joint(C)B.W Gtaw/Gtaw+Smaw , Ms Sheet Upto 3Mm Thick :Edge Preparation Fit Up Welding Of Long Seam, Circular Joint Bw/Nw/ Fillet. , Edge Preparation Fit Up& Welding Cs /Chro-Moly Alloy Steel Pipe Joint(C) B.W Gtaw/Gtaw+Smaw , Edge Preparation Fit Up& Welding Ss Pipe Joint(D)B.W Smaw , Ss Sheet Upto 3Mm Thick :Edge Preparation Fit Up Welding Of Long Seam, Circular Joint Bw/Nw/ Fillet. , Dpt Root & Final Pass , Fabrication And Erection Piping Supports/Structural , Transportation And Erection Of Valve/Equipment/ Duct , Removal Of Existing Pipes /Structural , And Depositing At Solid Wastestorage Area At Site , Gas Cutting Of Ms Plate , Scaffolding Installation And Removal. , Transportation Cleaning And Erection Of Pipe Cs /Chro-Moly Alloy Steel Pipes And Fittings . , Transportation Passivation And Erection Of Ss Pipes And Fittings. , Installation Of Anchor Fasteners Upto Size 5/8 Dia , Edge Preparation Fit Up& Welding Cs /Chro-Moly Alloy Steel Pipe Joint (A) S.W Gtaw , Edge Preparation Fit Up& Welding Cs /Chro-Moly Alloy Steel Pipe Joint (B) S.W Smaw , Edge Preparation Fit Up& Welding Cs /Chro-Moly Alloy Steel Pipe Joint (C) B.W Gtaw/Gtaw+Smaw , Edge Preparation Fit Up& Welding Cs /Chro-Moly Alloy Steel Pipe Joint (D) B.W Smaw , Edge Preparation Fit Up& Welding Ss Pipe Joint(A) S.W Gtaw , Ms Plate & Plate Rolled Large Dia Pipe: Long Seam/ Circular Joint Edge Preparation And Welding (Above 3Mmto 12Mm Thick) (B) Fillet , Edge Preparation Fit Up& Welding Ss Pipe Joint(B)S.W. Smaw , Edge Preparation Fit Up& Welding Ss Pipe Joint(C)B.W Gtaw/Gtaw+Smaw , Edge Preparation Fit Up& Welding Ss Pipe Joint(D)B.W Smaw , Ms Plate & Plate Rolled Large Dia Pipe: Long Seam/ Circular Joint Edge Preparation And Welding (Above 3Mmto 12Mm Thick) (A) B.W , Dpt Root & Final Pass , Transportation And Erection Of Valve/Equipment/ Duct , Removal Of Existing Pipes /Structural , And Depositing At Solid Waste Storage Area At Site , Ms Sheet Upto 3Mm Thick :Edge Preparation Fit Up Welding Of Long Seam, Circular Joint Bw/Nw/ Fillet. , Ss Sheet Upto 3Mm Thick :Edge Preparation Fit Up Welding Of Long Seam,Circular Joint Bw/Nw/ Fillet. , Gas Cutting Of Ms Plate , Surface Preparation And Painting For The Fabricated Structure , Installation Of Anchor Fasteners Upto Size 5/8 Dia , Bending And Dpt Of Pipes , Fabrication And Erection Piping Supports/Structural Single Job , Transportation,Fabrication Of Structurals(Without Erection ) , Transportation,Handling And Rolling Of Plate (Up To 12Mm Thick) , Scaffolding Installation And Removal. , Supply Of Structural Steels (Channel,Angel,Flat,Rod) , Supply Of Ss 304L Pipes As Per Specifications Size Up To-2 Inch , Supply Of Gi Pipes As Per Specifications Size Up To 2 Inch , Supply Of Cs Pipe As Per Specifications
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Transportation cleaning and erection of pipe CS /chro-moly alloy steel pipes and fittings . | Transportation cleaning and erection of pipe CS /chro-moly alloy steel pipes and fittings . |
| 2 | Transportation passivation and erection of SS pipes and fittings. | Transportation passivation and erection of SS pipes and fittings. |
| 3 | Installation of Anchor Fasteners upto size 5/8'' dia | Installation of Anchor Fasteners upto size 5/8'' dia |
| 4 | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (a) S.W GTAW | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (a) S.W GTAW |
| 5 | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (b) S.W SMAW | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (b) S.W SMAW |
| 6 | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (d) B.W SMAW | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (d) B.W SMAW |
| 7 | Edge preparation fit up& welding SS pipe joint(a) S.W GTAW | Edge preparation fit up& welding SS pipe joint(a) S.W GTAW |
| 8 | Edge preparation fit up& welding SS pipe joint(b)S.W. SMAW | Edge preparation fit up& welding SS pipe joint(b)S.W. SMAW |
| 9 | Edge preparation fit up& welding SS pipe joint(c)B.W GTAW/GTAW+SMAW | Edge preparation fit up& welding SS pipe joint(c)B.W GTAW/GTAW+SMAW |
| 10 | MS sheet upto 3mm thick :Edge preparation fit up welding of long seam, circular joint BW/NW/ Fillet. | MS sheet upto 3mm thick :Edge preparation fit up welding of long seam, circular joint BW/NW/ Fillet. |
| 11 | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint(c) B.W GTAW/GTAW+SMAW | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint(c) B.W GTAW/GTAW+SMAW |
| 12 | Edge preparation fit up& welding SS pipe joint(d)B.W SMAW | Edge preparation fit up& welding SS pipe joint(d)B.W SMAW |
| 13 | SS sheet upto 3mm thick :Edge preparation fit up welding of long seam, circular joint BW/NW/ Fillet. | SS sheet upto 3mm thick :Edge preparation fit up welding of long seam, circular joint BW/NW/ Fillet. |
| 14 | DPT Root & Final pass | DPT Root & Final pass |
| 15 | Fabrication and erection Piping supports/structural | Fabrication and erection Piping supports/structural |
| 16 | Transportation and erection of valve/Equipment/ duct | Transportation and erection of valve/Equipment/ duct |
| 17 | Removal of existing pipes /structural , and depositing at solid wastestorage area at site | Removal of existing pipes /structural , and depositing at solid wastestorage area at site |
| 18 | Gas cutting of MS plate | Gas cutting of MS plate |
| 19 | Scaffolding installation and removal. | Scaffolding installation and removal. |
| 20 | Transportation cleaning and erection of pipe CS /chro-moly alloy steel pipes and fittings . | Transportation cleaning and erection of pipe CS /chro-moly alloy steel pipes and fittings . |
| 21 | Transportation passivation and erection of SS pipes and fittings. | Transportation passivation and erection of SS pipes and fittings. |
| 22 | Installation of Anchor Fasteners upto size 5/8'' dia | Installation of Anchor Fasteners upto size 5/8'' dia |
| 23 | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (a) S.W GTAW | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (a) S.W GTAW |
| 24 | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (b) S.W SMAW | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (b) S.W SMAW |
| 25 | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (c) B.W GTAW/GTAW+SMAW | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (c) B.W GTAW/GTAW+SMAW |
| 26 | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (d) B.W SMAW | Edge preparation fit up& welding CS /chro-moly alloy steel pipe joint (d) B.W SMAW |
| 27 | Edge preparation fit up& welding SS pipe joint(a) S.W GTAW | Edge preparation fit up& welding SS pipe joint(a) S.W GTAW |
| 28 | MS plate & plate rolled large dia pipe: long seam/ circular joint edge preparation and welding (above 3mmto 12mm thick) (b) Fillet | MS plate & plate rolled large dia pipe: long seam/ circular joint edge preparation and welding (above 3mmto 12mm thick) (b) Fillet |
| 29 | Edge preparation fit up& welding SS pipe joint(b)S.W. SMAW | Edge preparation fit up& welding SS pipe joint(b)S.W. SMAW |
| 30 | Edge preparation fit up& welding SS pipe joint(c)B.W GTAW/GTAW+SMAW | Edge preparation fit up& welding SS pipe joint(c)B.W GTAW/GTAW+SMAW |
| 31 | Edge preparation fit up& welding SS pipe joint(d)B.W SMAW | Edge preparation fit up& welding SS pipe joint(d)B.W SMAW |
| 32 | MS plate & plate rolled large dia pipe: long seam/ circular joint edge preparation and welding (above 3mmto 12mm thick) (a) B.W | MS plate & plate rolled large dia pipe: long seam/ circular joint edge preparation and welding (above 3mmto 12mm thick) (a) B.W |
| 33 | DPT Root & Final pass | DPT Root & Final pass |
| 34 | Transportation and erection of valve/Equipment/ duct | Transportation and erection of valve/Equipment/ duct |
| 35 | Removal of existing pipes /structural , and depositing at solid waste storage area at site | Removal of existing pipes /structural , and depositing at solid waste storage area at site |
| 36 | MS sheet upto 3mm thick :Edge preparation fit up welding of long seam, circular joint BW/NW/ Fillet. | MS sheet upto 3mm thick :Edge preparation fit up welding of long seam, circular joint BW/NW/ Fillet. |
| 37 | SS sheet upto 3mm thick :Edge preparation fit up welding of long seam,circular joint BW/NW/ Fillet. | SS sheet upto 3mm thick :Edge preparation fit up welding of long seam,circular joint BW/NW/ Fillet. |
| 38 | Gas cutting of MS plate | Gas cutting of MS plate |
| 39 | Surface preparation and painting for the fabricated structure | Surface preparation and painting for the fabricated structure |
| 40 | Installation of Anchor Fasteners upto size 5/8'' dia | Installation of Anchor Fasteners upto size 5/8'' dia |
| 41 | Bending and DPT of pipes | Bending and DPT of pipes |
| 42 | Fabrication and erection Piping supports/structural single job | Fabrication and erection Piping supports/structural single job |
| 43 | Transportation,fabrication of structurals(Without erection ) | Transportation,fabrication of structurals(Without erection ) |
| 44 | Transportation,handling and rolling of plate (up to 12mm thick) | Transportation,handling and rolling of plate (up to 12mm thick) |
| 45 | Scaffolding installation and removal. | Scaffolding installation and removal. |
| 46 | Supply of structural steels (channel,angel,flat,rod) | Supply of structural steels (channel,angel,flat,rod) |
| 47 | Supply of SS 304L pipes as per specifications Size up to-2 Inch | Supply of SS 304L pipes as per specifications Size up to-2 Inch |
| 48 | Supply of GI pipes as per specifications Size up to 2 Inch | Supply of GI pipes as per specifications Size up to 2 Inch |
| 49 | Supply of CS Pipe as per specifications | Supply of CS Pipe as per specifications |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 17 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender