Supply Of Tower wagon items.
Tender Overview
Project Description
Supply Of tower wagon items. , tachometer part no. 2879766 make-cummins, normal operating voltage 10 to 33 v, low idle rpm: 600-650. [ warranty period: 30 months after the date of delivery ] ] , control governor model lcc107-b-1, 24 v dc to cummins part no: 3167063 for diesel electri c tower wagon(detc). [ warranty period: 30 months after the date of delivery ] ] , spin-on/canister type assembly with replaceable element, filter medium: high-efficiency cell ulose/synthetic media filter, fuel cummins part no.-4084700. [ warranty period: 30 months after the date of delivery ] ] , pickup magnetic, volts: 20 to 30 v , size: 5/8 - 18 unf-2a, dual connector pigtail for diesel electric tower wagon (detc) to cummins part no. 4396219. [ warranty period: 30 months after the dat e of delivery ] ] , engine-driven gear-type positive displacement pump fuel cummins part no.4399117 for 8 w heeler diesel electric tower wagon (detc). [ warranty period: 30 months after the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | TACHOMETER PART NO. 2879766 MAKE-Cummins, Normal operating voltage 10 to 33 V, Low idle RPM: 600-650. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 2 | Control Governor Model LCC107-B-1, 24 V DC to Cummins Part No: 3167063 for Diesel Electri c Tower Wagon(DETC). [ Warranty Period: 30 Months after the date of delivery ] ] |
| 3 | Spin-on/Canister type assembly with replaceable element, Filter medium: High-efficiency cell ulose/synthetic media FILTER, FUEL CUMMINS PART NO.-4084700. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 4 | PICKUP MAGNETIC, Volts: 20 to 30 V , size: 5/8 - 18 UNF-2a, dual connector pigtail for Diesel Electric Tower wagon (DETC) to CUMMINS PART NO. 4396219. [ Warranty Period: 30 Months after the dat e of delivery ] ] |
| 5 | Engine-driven gear-type positive displacement Pump Fuel Cummins Part No.4399117 for 8 W heeler Diesel Electric Tower Wagon (DETC). [ Warranty Period: 30 Months after the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 23 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender