Coal and Mines Boards / Undertakings / PSU Closing in 4 days TDR #58002153

Tender For Drivage Of 1 No. Underground Vertical Air Shaft From Seam-Iii To Seam-I To Establish Return Airway System For Vijay West Ug Mine At Rani Atari Sub Area. Nit No. Secl/Chrm/ Dy.Gmc/26-27/E-Tender/41 Dt. 12.10.2026

Issued by Boards / Undertakings / PSU · Korea, Chhattisgarh
Tender Value
2.21 Crore
Estimated cost
Bid Submission
02 Nov 2026
4 days left
EMD
2.77 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Korea → Chhattisgarh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Drivage Of 1 No. Underground Vertical Air Shaft From Seam-Iii To Seam-I To Establish Return Airway System For Vijay West Ug Mine At Rani Atari Sub Area. Nit No. Secl/Chrm/ Dy.Gmc/26-27/E-Tender/41 Dt. 12.10.2026

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 28-Oct-2026 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 02-Nov-2026

BOQ

Name of Work:- Drivage of 1 No. Underground Vertical Air Shaft from Seam-III to Seam-I to establish return airway system for Vijay West UG Mine at Rani Atari Sub Area. NIT NO. SECL/CHRM/ Dy.GMC/26-27/e-Tender/41 Dt. 12.10.2026
Sl. No. Item Description
1Item Description
2Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Hard rock (requiring blasting)
3Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 38.3m to 39m
4Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 39m to 40.5m
5Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 40.5m to 42m
6Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 42m to 43.5m
7Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 43.5m to 45m
8Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 45m to 46.5m
9Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 46.5m to 48m
10Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 48m to 49.5m
11Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 49.5m to 51m
12Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 51m to 52.5m
13Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 52.5m to 54m
14Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 54m to 55.5m
15Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 55.5m to 57m
16Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 57m to 58.5m
17Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 58.5m to 60m
18Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 60m to 61.5m
19Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 61.5m to 63m
20Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 63m to 64.5m
21Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 64.5m to 66m
22Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 66m to 67.5m
23Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 67.5m to 69m
24Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 69m to 70.5m
25Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 70.5m to 72m
26Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 72m to 73.5m
27Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 73.5m to 75m
28Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 75m to 76.5m
29Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 76.5m to 77.7m
30Extra rates for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as required
31Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. All works upto plinth level
32Extra for laying concrete in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete.
33Centering and shuttering including strutting, propping etc. and removal of form for : Chimneys and shafts
34Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 rived from natural sources) graded stone aggregate 20 mm nominal size derived from natural sources)
35Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor,etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:1½:3 (1cement : 1½coarse sand : 3graded stone aggregate 20 mm nominal size)
36Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars
37Extra for laying reinforced cement concrete in or under water and/ or liquid mud, including cost of pumping or bailing out water and removing slush etc., complete.
38Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 110 mm diameter
39Total Impact of GST for the Purpose of CTC Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58002153
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 2.21 Crore
LAST DATE 02-11-2026
Authority
Authority Name South Eastern Coalfields Limited
Work Description Tender for Drivage Of 1 No. Underground Vertical Air Shaft From Seam-Iii To Seam-I To Establish Return Airway System For Vijay West Ug Mine At Rani Atari Sub Area. Nit No. Secl/Chrm/ Dy.Gmc/26-27/E-Tender/41 Dt. 12.10.2026
Basic Detail
Tender No SECL/CHRM/ Dy. GMC/26-27/e-Tender/41 dt. 12.10.2026
Bidding Type Tender
Location
City Korea
State Chhattisgarh
Key Dates
Publish Date 28 Oct 2026
Submission Date 02 Nov 2026
Open Date 03 Nov 2026
Finance
Tender Value 2.21 Crore
Tender Fee Ref. Documents
EMD 2.77 Lakhs
Exemption Not Available
Document List
797c8e9d-f685-4241-9c46-876289d7579c.html
BOQ_379927.xls
Tendernotice_1.pdf
Tendernotice_2.pdf
Tendernotice_3.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 28, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 02, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 4 days
Nov 02, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 4 days
Nov 03, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
html

797c8e9d-f685-4241-9c46-876289d7579c.html

xls

BOQ_379927.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

pdf

Tendernotice_3.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender