Tender For Construction Of Bairkhad Minor From Km 0.000 To Km. 0.250 And Km. 0.300 To Km. 4.000 Including Earth Work And Pucca Work. Lot-1
Tender Value
Ref. Documents
Estimated cost
Bid Submission
21 Oct 2026
5 days left
EMD
67000
Bank guarantee accepted
Document Fee
944
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Sonbhadra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Bairkhad Minor From Km 0.000 To Km. 0.250 And Km. 0.300 To Km. 4.000 Including Earth Work And Pucca Work. Lot-1
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation of canal with manual compaction and dressing below 0.60 cumecs discharge and disposal of surplus earth with manual lead upto 30m including cost of all lifts, material T&P etc required for proper completion of work as per direction of Engineer-in-charge. |
| 2 | Excavating soft rock,disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part thereof upto total lead of 120 m including cost of all lifts, material T&P etc.required for proper completion of work as per direction of Engineer in Charge . |
| 3 | Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 210m including cost of all lifts, mechanical compaction and material labour T&P etc. for proper completion of work as per direction of Engineer-in-charge. |
| 4 | Earthwork in filling in canal embankment with borrow area soil used with total lead upto 1.0 km by truck or tractor trolley including cost of all lifts,borrowing earth from private land/approved borrow area land, mechanical compaction,material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. |
| 5 | Site Clearence /Ordianry jungle clearance for layout and survey work at construction site including all leads and lifts, labour charges,T& P etc. and its disposal required for proper completion of work as per direction of Engineer-in-charge. |
| 6 | Earth work in excavation of foundation in all types of soil including all leads and lifts, labour charges, T& P etc. and its disposal of surplus earth from foundation trenches required for proper completion of work as per direction of Engineer-in-charge. |
| 7 | Supplying and laying of of local sand in back filling i/c cost of all materials labour ,T&P etc. required for proper completetion of work as per direction of Engineer-in-charge. |
| 8 | Supplying and laying of coarse sand in filter including cost of all materials labour ,T&P etc. required for proper completetion of work as per direction of Engineer-in-charge. |
| 9 | Laying C.C. 1:2:4 (M–15) with cement, coarse sand of F.M. not less than 2.00 and hard stone ballast as obtained from the excavation of foundation including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. |
| 10 | Reinforcement including straightening, cutting, bending, binding & placing including cost of binding wire, materials, labours carriage T&P and taxes etc. for proper completion of work as per direction of Engineer-in-charge. |
| 11 | Centering & Shuttering for R.C.C. work in different parts of structure including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. |
| 12 | Centering & Shuttering for C.C. work in different parts of structure including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. |
| 13 | Laying R.C.C. (M–20) with cement, coarse sand of F.M. not less than 2.00 and crushed hard stone grit including cost of all material, labour, T&P etc. required for proper completion of work but excluding cost of reinforcement, centering and shuttering. in construction of different parts of structureas per direction of Engineer-in-charge. |
| 14 | Dewatering by 5 H.P. Diesel pump of foundation including cost of dewatering equipment, and its accessories, required material, labour etc as per direction of engineer in charge. |
| 15 | Random rubble stone masonery in 1:4 cement (OPC 43 grade) and sand mortar including all leads and lift, cost of soil, labour charges, manual compaction and T&P etc. for Proper Completion of work as direction of engineer in charge |
| 16 | Raised pointing work(struck deep) for exposed surface of stone masonry in 1:3 with cement OPC-43 grade, sand mortar including all leads and lift, cost of labour charges, manual compaction and T&P etc. for Proper Completion of work as per direction of Engineer-in-charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 12, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 21, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysOct 21, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender