Housing Urban and Rular Development Government Departments Closing in 3 days TDR #57999440

Tender For Upgradation Of Dehwatoo Shalberan Road Advt.Cost=₹94.14 Lacs, Amount Without Gst= ₹79.78 Lacs, Gst Amount= ₹14.36 Lacs

Issued by Government Departments · Anantnag, Jammu and Kashmir
Tender Value
94.14 Lakhs
Estimated cost
Bid Submission
23 Oct 2026
3 days left
EMD
1.88 Lakhs
Bank guarantee accepted
Document Fee
1600
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Anantnag → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Upgradation Of Dehwatoo Shalberan Road Advt.Cost=₹94.14 Lacs, Amount Without Gst= ₹79.78 Lacs, Gst Amount= ₹14.36 Lacs

BOQ

Name of Work:- Upgradation of Dehwatoo Shalberan Road Advt.Cost=₹94.14 lacs, Amount without GST= ₹79.78 lacs, GST amount= ₹14.36 lacs
Sl. No. Item Description
1A) Eangement of JCB/RBM/WBM: Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth
2Engagement of JCB for removal of Boulders from sides of road & Site clearance, removal of debris & Surface Dressing.
3Supply and filling of RBM Filling at site incldd sorting spreeding watering laying & Consld with PRR of 08-10 tonne capicety compactor complete all cariage.
4Supplying , stacking , Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density . :63 mm to 45 mm size stone aggregate with type-B screenings complete job
5B) Construction of R/Wall: Earth work in excavation by mechanical means in trenches for foundations drains , pipes , cables etc. ( exceeding 1.5 m in width ) and for shafts , wells , cesspits and the like not exceeding 10 sqm on plan depth up to 1.5 m incld. disposal of excavated earth up to 1 m from cutting edge disposal earth is to be leveled and neatly dressed( in all kinds of soil)
6Providing and laying of hand Packed stone soling complete job
7Providing and laying in position cement concrete 1:4:8 grade (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) (under Footings) of specified grade excluding the cost of centring and shuttering All work upto plinth level
8Providing and laying in position cement concrete 1:2:4 grade (1 cement : 2 coarse sand : 4 graded stone aggregate 40mm nominal size) (under Footings) of specified grade excluding the cost of centring and shuttering All work upto plinth level Avg lead 30km
9Centering shuttering incl. starightening and removal of form work Foundation upto plinth level;
10Supply and filling of RBM /Stone soling of specified size including spreading complete job i/c carriage Complete Job
11Carriage of material by mechnical transport for an average lead of 40 kms: sand /Bajri
12C) Construction of PCC Drain: Earth work in excavation by mechanical means in trenches for foundations drains , pipes , cables etc. ( exceeding 1.5 m in width ) and for shafts , wells , cesspits and the like not exceeding 10 sqm on plan depth up to 1.5 m incld. disposal of excavated earth up to 1 m from cutting edge disposal earth is to be leveled and neatly dressed( in all kinds of soil)
13Providing and laying of hand Packed stone soling complete job
14Providing and laying in position cement concrete 1:4:8 grade (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) (under Footings) of specified grade excluding the cost of centring and shuttering All work upto plinth level
15Providing and laying in position cement concrete 1:2:4 grade (1 cement : 2 coarse sand : 4 graded stone aggregate 40mm nominal size) (under Footings) of specified grade excluding the cost of centring and shuttering All work upto plinth level Avg lead 30km
16Centering shuttering incl. starightening and removal of form work Foundation upto plinth level
17Carriage of material by mechnical transport for an average lead of 40 kms: sand /Bajri
18D) RCC Pipes At Spots: Providing and Laying of RCC pipes at spots including cost of pipes , E/w in Excavation and providing proper granular cushion(minimum 300mm compacted thickness) with RBM filling incl. all carriages complete job. 600 mm Dia
19450 mm DIA
20E) Construcrtion of 02 M Span RCC Culvert (2 No): Earth work in excavation by mechanical means in trenches for foundations drains , pipes , cables etc. ( exceeding 1.5 m in width ) and for shafts , wells , cesspits and the like not exceeding 10 sqm on plan depth up to 1.5 m incld. disposal of excavated earth up to 1 m from cutting edge disposal earth is to be leveled and neatly dressed( in all kinds of soil)
21Providing and laying of hand Packed stone soling complete job
22Providing and laying in position cement concrete 1:4:8 grade (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) (under Footings) of specified grade excluding the cost of centring and shuttering All work upto plinth level
23Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).
24Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).
25Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
26Centering shuttering incl. starightening and removal of form work Foundation upto plinth level
27Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
28Suspended floors, roofs, landings, balconies and access platforms.
29Providing weepholes in abutments, R/walls, B/Walls etc with 75mm dia PVC pipe cut to length and profile as required to be installed in concrete and other incidentals.
30Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete with Thermo-Mechanically Treated bars of grade Fe-500D or more.
31Carriage of material by mechnical transport for an average lead of 40 kms: sand /Bajri
32E) Pavements: : Providinglaying, spreading and compacting graded stone aggregate range 0.075 mm wet mix macadam specification Including premixing the material with water OMC mechanical plant transporting the material by mechanical transport from plant upto site of work laying the mixed material in uniform layers mechanical paver finisher well prepared surface and compacting the same with vibratory roller . capacity the desired density compaction as per specifications and directions Engineer Incharge Including all complete
33Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface and cleaning with mechanical broom. On W.B.M. /W.M.M. @ 0.4 Kg/sqm.
34Providing and laying of 50mm premix Bituminous Macadam base course with stone aggregates of quality size and grading as specified in CPWD specifications and straight run bitumen of grade 80/100 3.5% by weight of total mix including hot mixing of stone aggregates and bitumen in hot mix plant transporting mixed material and laying with paver finisher to the required level and grade rolling with road roller of 8 to 10 tonne capacity to achieve the required compaction and density50 to 100 mm average compacted thickness with bitumen of grade VG-10 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. incl all Carriages etc complete job.
35Providing and laying of 25mm thick Semi Dense asphaltic base course using mineral aggregate satisfying the gradation set out in specifications with 5% binder content by weight of totall mix with the aid of hot mix plant and paver finisher including rolling wit road roller of 8 to 10 tonne capacity to achieve the required compaction and density 25 mm compacted thickness with bitumen of grade VG- 10 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH Capacity
36Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57999440
AUTHORITY Government Departments
TENDER VALUE 94.14 Lakhs
LAST DATE 23-10-2026
Authority
Authority Name Public Works Department
Work Description Tender for Upgradation Of Dehwatoo Shalberan Road Advt.Cost=₹94.14 Lacs, Amount Without Gst= ₹79.78 Lacs, Gst Amount= ₹14.36 Lacs
Basic Detail
Tender No ENIT NO 91 OF 2026-27
Bidding Type Tender
Location
City Anantnag
State Jammu and Kashmir
Key Dates
Publish Date 13 Oct 2026
Submission Date 23 Oct 2026
Open Date 24 Oct 2026
Finance
Tender Value 94.14 Lakhs
Tender Fee 1600
EMD 1.88 Lakhs
Exemption Not Available
Document List
3c4ddd8c-abe3-4210-9577-0020e1ff6bd8.html
BOQ_1109967.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 13, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 23, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Oct 24, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 4 days

Tender Documents

Download All (ZIP) ↓
html

3c4ddd8c-abe3-4210-9577-0020e1ff6bd8.html

xls

BOQ_1109967.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender